[go: up one dir, main page]

CN204198255U - Eccentric formula tin hook that turns over - Google Patents

Eccentric formula tin hook that turns over Download PDF

Info

Publication number
CN204198255U
CN204198255U CN201420388906.0U CN201420388906U CN204198255U CN 204198255 U CN204198255 U CN 204198255U CN 201420388906 U CN201420388906 U CN 201420388906U CN 204198255 U CN204198255 U CN 204198255U
Authority
CN
China
Prior art keywords
hook
suspension
fork
eccentric
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420388906.0U
Other languages
Chinese (zh)
Inventor
王赓
鲁海涛
周公利
高峰
姜东�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201420388906.0U priority Critical patent/CN204198255U/en
Application granted granted Critical
Publication of CN204198255U publication Critical patent/CN204198255U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型涉及一种偏心式翻罐钩,包括吊钩、吊叉、连接轴、吊钩吊梁,吊钩吊梁的凸台上设有定位孔,吊叉的凸台上设有通孔,吊钩吊梁通过长杆或螺杆与吊叉连接,并通过紧固件固定,吊叉与吊钩通过连接轴连接,所述的吊钩为偏心钩。本实用新型的优点是:实现了吊钩操作一次完成,仅需时间1分钟,平均缩短吊钩时间3分钟,不仅有效地提高了吊车作业率,并且降低了操作工人的劳动强度。由于吊钩采用了偏心设计,吊钩钩嘴在吊钩方向伸一定的长度,因此可准确将耳轴挂好,杜绝了吊钩罩与罐体碰撞而造成吊钩罩发生损坏、变形现象,提高了吊钩组、钢绳的使用寿命。

The utility model relates to an eccentric tank turning hook, which comprises a hook, a hanging fork, a connecting shaft, and a hook hanging beam. The boss of the hook hanging beam is provided with a positioning hole, and the boss of the hanging fork is provided with a through hole. , the hook and the suspension beam are connected to the suspension fork through a long rod or a screw rod, and are fixed by fasteners, the suspension fork and the suspension hook are connected through a connecting shaft, and the suspension hook is an eccentric hook. The utility model has the advantages that: the hook operation is completed once, only takes 1 minute, and the hook time is shortened by 3 minutes on average, which not only effectively improves the operation rate of the crane, but also reduces the labor intensity of the operators. Due to the eccentric design of the hook, the hook mouth of the hook extends a certain length in the direction of the hook, so the trunnion can be hung accurately, and the damage and deformation of the hook cover caused by the collision between the hook cover and the tank body are avoided. The service life of the hook group and the steel rope is improved.

Description

一种偏心式翻罐钩An eccentric can turning hook

技术领域technical field

本实用新型涉及一种偏心式翻罐钩,尤其涉及一种用于冶金铸造起重机副卷的偏心式翻罐钩。The utility model relates to an eccentric can-turning hook, in particular to an eccentric can-turning hook used for the secondary roll of a metallurgical casting crane.

背景技术Background technique

在现代化钢铁冶金企业中,冶金铸造起重机越来越成为制约高产达标的关键设备。冶金铸造起重机利用主卷吊具完成各类铁水罐、钢水罐的吊运,利用副卷吊钩完成兑铁、折铁、倒残钢渣等翻罐作业,例如:鞍钢炼钢总厂大脱硫275T吊车完成由大罐向小罐折铁水;大脱硫140T吊车完成铁水扒渣;混铁炉125T吊车完成向混铁炉兑铁水及折铁水;炉前140T、135T吊车完成向转炉兑铁水及折铁水;连铸300T吊车完成钢水罐倒残钢渣等作业,从而保证连续作业生产流程的顺行。In modern iron and steel metallurgical enterprises, metallurgical casting cranes have increasingly become the key equipment that restricts high production standards. Metallurgical foundry cranes use the main coil hoist to complete the hoisting of various molten iron tanks and steel tanks, and use the auxiliary coil hooks to complete the tank turning operations such as mixing iron, folding iron, and dumping residual steel slag. The crane completes the folding of molten iron from the large tank to the small tank; the large desulfurization 140T crane completes the slag removal of molten iron; the 125T crane of the mixed iron furnace completes the mixing and folding of molten iron to the mixing furnace; the 140T and 135T cranes in front of the furnace complete the mixing and folding of molten iron to the converter ; The continuous casting 300T crane completes operations such as dumping residual steel slag from the molten steel tank, thereby ensuring the smooth flow of the continuous operation production process.

这些翻罐作业的完成均依赖于副卷翻罐钩,原车副卷吊钩均采用标准吊钩(锻造)。吊钩组中滑轮组的直径尺寸大于吊钩钩嘴的同向尺寸,吊车司机在进行翻罐作业时,吊钩滑轮组及吊钩罩子先撞到罐体,导致吊钩钩嘴无法挂到罐底耳轴,从而无法完成挂罐,造成吊钩困难。只能靠地面人员协助完成,通常约需用4-5分钟,造成影响生产时间。同时,由于作业时,吊钩滑轮组撞到罐体,易使吊钩滑轮组外部的吊钩罩子损坏变形,严重时造成钢绳挤断报废,从而发生安全事故。The completion of these can turning operations all depends on the auxiliary coil turning hook, and the original vehicle auxiliary coil hooks all adopt standard hooks (forging). The diameter of the pulley block in the hook block is larger than the same direction of the hook mouth. When the crane driver is turning over the tank, the hook pulley block and the hook cover hit the tank first, causing the hook mouth to fail to hang to the bottom of the tank. The trunnion makes it impossible to finish hanging the tank, making the hook difficult. It can only be completed with the assistance of ground personnel, and usually takes about 4-5 minutes, which affects production time. Simultaneously, because during operation, hook pulley block hits tank body, easily makes the hook cover damage deformation of hook pulley block outside, causes steel rope to be broken and scrapped when serious, thereby safety accident takes place.

发明内容Contents of the invention

为克服现有技术的不足,本实用新型的目的是提供一种偏心式翻罐钩,方便挂罐,缩短挂罐时间,提高吊钩组使用寿命,确保人员安全。In order to overcome the deficiencies of the prior art, the purpose of this utility model is to provide an eccentric tank turning hook, which is convenient for hanging tanks, shortens the time for hanging tanks, improves the service life of the hook group, and ensures the safety of personnel.

为实现上述目的,本实用新型通过以下技术方案实现:In order to achieve the above object, the utility model is realized through the following technical solutions:

一种偏心式翻罐钩,包括吊钩、吊叉、连接轴、吊钩吊梁,吊钩吊梁的凸台上设有定位孔,吊叉的凸台上设有通孔,吊钩吊梁通过长杆或螺杆与吊叉连接,并通过紧固件固定,吊叉与吊钩通过连接轴连接,所述的吊钩为偏心钩。An eccentric tank turning hook, comprising a hook, a hanging fork, a connecting shaft, and a hook hanging beam, a positioning hole is arranged on the boss of the hook hanging beam, a through hole is arranged on the boss of the hanging fork, the hook hangs The beam is connected to the suspension fork through a long rod or a screw rod, and is fixed by a fastener. The suspension fork and the suspension hook are connected through a connecting shaft, and the suspension hook is an eccentric hook.

所述的吊钩在重力作用下自然悬挂时,吊钩的钩嘴伸出距离D=400~800mm。When the hook hangs naturally under the action of gravity, the protruding distance of the mouth of the hook is D=400-800mm.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

实现了吊钩操作一次完成,仅需时间1分钟,平均缩短吊钩时间3分钟,不仅有效地提高了吊车作业率,并且降低了操作工人的劳动强度。由于吊钩采用了偏心设计,吊钩钩嘴在吊钩方向伸一定的长度,因此可准确将耳轴挂好,杜绝了吊钩罩与罐体碰撞而造成吊钩罩发生损坏、变形现象,提高了吊钩组、钢绳的使用寿命。It is realized that the hook operation is completed at one time, only takes 1 minute, and the hook time is shortened by 3 minutes on average, which not only effectively improves the crane operation rate, but also reduces the labor intensity of the operators. Due to the eccentric design of the hook, the hook mouth of the hook extends a certain length in the direction of the hook, so the trunnion can be hung accurately, and the damage and deformation of the hook cover caused by the collision between the hook cover and the tank body are avoided. The service life of the hook group and the steel rope is improved.

附图说明Description of drawings

图1是吊钩结构示意图。Figure 1 is a schematic diagram of the hook structure.

图2是吊叉结构示意图。Figure 2 is a schematic diagram of the suspension fork structure.

图3是本实用新型的主视图。Fig. 3 is the front view of the utility model.

图4是本实用新型的侧视图。Fig. 4 is a side view of the utility model.

图中:1-吊钩  2-吊叉  3-连接轴  4-定位孔  5-吊钩吊梁  6-长杆  7-通孔。In the figure: 1-Hook 2-Fork 3-Connecting shaft 4-Positioning hole 5-Hook beam 6-Long rod 7-Through hole.

具体实施方式Detailed ways

下面结合说明书附图对本实用新型进行详细地描述,但是应该指出本实用新型的实施不限于以下的实施方式。The utility model is described in detail below in conjunction with the accompanying drawings, but it should be pointed out that the implementation of the utility model is not limited to the following embodiments.

见图1-图4,偏心式翻罐钩,包括吊钩1、吊叉2、连接轴3、吊钩吊梁5,吊钩吊梁5的凸台上设有定位孔4,吊叉2的凸台上设有通孔7,吊钩吊梁5通过长杆6或螺杆与吊叉2连接,并通过紧固件固定,吊叉2与吊钩1通过连接轴3连接,吊钩1为偏心钩,吊钩1在重力作用下自然悬挂时,吊钩1的钩嘴伸出距离D=400~800mm,以适应不同型号的吊车。当需要吊其它物件时,可将长杆6或螺杆拆除,保证挂钩1自由旋转。See Figure 1-Figure 4, the eccentric tank turning hook, including hook 1, hanging fork 2, connecting shaft 3, hook hanging beam 5, the boss of hook hanging beam 5 is provided with positioning hole 4, hanging fork 2 There is a through hole 7 on the boss, the hook beam 5 is connected with the suspension fork 2 through the long rod 6 or the screw rod, and fixed by fasteners, the suspension fork 2 is connected with the suspension hook 1 through the connecting shaft 3, and the suspension hook 1 It is an eccentric hook. When the hook 1 hangs naturally under the action of gravity, the mouth of the hook 1 protrudes at a distance D=400-800mm, so as to adapt to different types of cranes. When other objects need to be hung, the long rod 6 or the screw rod can be removed to ensure that the hook 1 can rotate freely.

吊钩1采用16Mn轧制钢板铆焊,进行了强度验算,并通过连接轴3和吊叉2固定。将吊钩1钩嘴延伸到与吊钩1中轴线距离D为400~800mm(可根据现场实际需要量设计选取距离),使钩嘴位置伸出量超出吊钩罩外部一定尺寸,保证吊钩1准确的挂上铁水、钢水罐底的耳轴上,有效避免副卷吊钩滑轮组撞到罐体,整个钩挂过程无需现场人员配合,缩短了生产作业时间,有效地提高了吊车作业率。The hook 1 is riveted and welded with 16Mn rolled steel plate, and the strength has been checked, and it is fixed by the connecting shaft 3 and the fork 2. Extend the mouth of the hook 1 to a distance D of 400-800mm from the central axis of the hook 1 (the distance can be designed and selected according to the actual demand on site), so that the protruding amount of the mouth of the hook exceeds a certain size outside the hook cover to ensure that the hook 1. Accurately hang on the trunnions at the bottom of the molten iron and molten steel tanks, effectively avoiding the secondary roll hook pulley block from hitting the tank body. The entire hooking process does not require the cooperation of on-site personnel, which shortens the production and operation time and effectively improves the crane operation rate.

由于吊钩1根据现场实际需要量设计有前伸量,无论罐耳轴处于何位置,均可轻松挂上耳轴,避免了吊钩罩与罐体撞击及钢丝绳与罐沿的摩擦。当吊钩1挂上罐底耳轴抬钩受力后,由于重心变化,吊钩1钩嘴中心线与滑轮组中心线重合为一条线,此时吊钩垂始终在垂直方向直受力,从而保证吊钩不能脱钩,确保安全作业。Since the hook 1 is designed with a forward extension according to the actual demand on site, no matter where the tank trunnion is, the trunnion can be easily hung, which avoids the collision between the hook cover and the tank body and the friction between the steel wire rope and the tank edge. When the hook 1 is hung on the trunnion of the tank bottom and the force is applied to the lifting hook, due to the change of the center of gravity, the centerline of the mouth of the hook 1 coincides with the centerline of the pulley block to form a line. At this time, the hook is always directly stressed in the vertical direction, thus Ensure that the hook cannot be unhooked to ensure safe operation.

Claims (1)

1.一种偏心式翻罐钩,其特征在于,包括吊钩、吊叉、连接轴、吊钩吊梁,吊钩吊梁的凸台上设有定位孔,吊叉的凸台上设有通孔,吊钩吊梁通过长杆或螺杆与吊叉连接,并通过紧固件固定,吊叉与吊钩通过连接轴连接,所述的吊钩为偏心钩;所述的吊钩在重力作用下自然悬挂时,吊钩的钩嘴伸出距离D=400~800mm。  1. An eccentric tank turning hook is characterized in that it comprises a suspension hook, a suspension fork, a connecting shaft, a suspension hook suspension beam, the boss of the suspension hook suspension beam is provided with a positioning hole, and the projection of the suspension fork is provided with Through holes, the hook and the suspension beam are connected to the suspension fork through a long rod or screw rod, and are fixed by fasteners. The suspension fork and the suspension hook are connected through a connecting shaft. The suspension hook is an eccentric hook; When hanging naturally under the action, the protruding distance of the mouth of the hook is D = 400 ~ 800mm. the
CN201420388906.0U 2014-07-12 2014-07-12 Eccentric formula tin hook that turns over Expired - Fee Related CN204198255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420388906.0U CN204198255U (en) 2014-07-12 2014-07-12 Eccentric formula tin hook that turns over

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420388906.0U CN204198255U (en) 2014-07-12 2014-07-12 Eccentric formula tin hook that turns over

Publications (1)

Publication Number Publication Date
CN204198255U true CN204198255U (en) 2015-03-11

Family

ID=52656239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420388906.0U Expired - Fee Related CN204198255U (en) 2014-07-12 2014-07-12 Eccentric formula tin hook that turns over

Country Status (1)

Country Link
CN (1) CN204198255U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706296A (en) * 2018-05-24 2018-10-26 芜湖贝浩机械科技有限公司 A kind of industrial automation equipment is linked up with pulley
CN108715400A (en) * 2018-06-22 2018-10-30 山东钢铁股份有限公司 Metallurgy, which is hung, to be hung with automatic picking off and hanging hook and metallurgy with hot-metal bottle tipping suspender

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706296A (en) * 2018-05-24 2018-10-26 芜湖贝浩机械科技有限公司 A kind of industrial automation equipment is linked up with pulley
CN108715400A (en) * 2018-06-22 2018-10-30 山东钢铁股份有限公司 Metallurgy, which is hung, to be hung with automatic picking off and hanging hook and metallurgy with hot-metal bottle tipping suspender

Similar Documents

Publication Publication Date Title
CN207170936U (en) A kind of ladling apparatus
CN204198255U (en) Eccentric formula tin hook that turns over
CN203382365U (en) Lifting appliance system for lifting thin, long and thin-wall equipment integrally
CN204209119U (en) Metallurgical ladle adds the device of stuffing sand
CN201300154Y (en) Steel coil head telescope handling device
CN205046825U (en) Pier drum type fender maintenance platform
CN204108309U (en) The cold steel extractor of steel ladle opening improved
CN203269355U (en) A spreader for lifting concrete pipes
CN206927468U (en) A kind of charging device for iron-smelting furnace
CN201942426U (en) C-shaped hanging hook capable of preventing unhooking
CN202379593U (en) Runner hanging structure of large-sized impulse water turbine
CN204657468U (en) A kind of iron and steel bag dry slag hooks bag device
CN209810261U (en) Impact crusher
CN210506398U (en) A turn over jar and strike a jar device for slag ladle
CN208327156U (en) Metallurgy, which is hung, to be hung with automatic picking off and hanging hook and metallurgy with hot-metal bottle tipping suspender
CN202379580U (en) Pipeline horizontal lifting appliance with automatic hook
CN203959660U (en) A kind of suspension hook with anti-drop device
CN217921051U (en) Automatic iron adding ladle turning lifting appliance
CN204251201U (en) Molten steel tank mousing-hook device
CN201660363U (en) Hook flexible connection type crane hanging beam
CN208038480U (en) A kind of trolley for replacing blast furnace front tapping machine rock drill
CN201520777U (en) Special lifting lug for auxiliary hook of converter ladle
CN203237919U (en) Special lifting appliance for high-speed wire guide plate
CN210789216U (en) Hot metal bottle tipping device
CN204778324U (en) Mix indisputable formula torpedo jar and rescue sling utensil of reassuming office

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311

Termination date: 20200712