CN204198229U - A kind ofly realize joining the lifting beam device hanging segmentation tread flaking - Google Patents
A kind ofly realize joining the lifting beam device hanging segmentation tread flaking Download PDFInfo
- Publication number
- CN204198229U CN204198229U CN201420600396.9U CN201420600396U CN204198229U CN 204198229 U CN204198229 U CN 204198229U CN 201420600396 U CN201420600396 U CN 201420600396U CN 204198229 U CN204198229 U CN 204198229U
- Authority
- CN
- China
- Prior art keywords
- segmentation
- shaped hanging
- tread flaking
- top panel
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses and a kind ofly realize joining the lifting beam device hanging segmentation tread flaking, comprise I-shaped hanging beam, described I-shaped hanging beam comprises top panel and lower faceplate, and the web be vertically welded between top panel and lower faceplate, the top panel of described I-shaped hanging beam be welded with two symmetrical, link up with crane the upper lift ring be connected for installing lifting rope, the lower faceplate of described I-shaped hanging beam be welded with two symmetrical, for installing the lower lift ring of lifting rope and connection segment.Place in operation of the present utility model ensure that segmentation lifts and tread flaking smoothly, ensures segmental hoisting safety, ensures bow anchor system integraty, shortens segmentation integraty and applies for checking and examination.
Description
Technical field
The utility model relates to and a kind ofly realizes joining the lifting beam device hanging segmentation tread flaking.
Background technology
Ship-related products quality and segmentation tread flaking occupy important leading position at shipbuilding process, if guaranteeing to realize segmentation safty hoisting under shipbuilding product design prerequisite, make the quick tread flaking of segmentation, just effectively can shorten the production cycle of segmentation.
The specified lift heavy of crane in Ship-building Company's segmentation workshop is generally 60T/ platform, and the deck panel normal length of boats and ships only has 4500-5000mm, and weight has more than 80T, owing to being subject to the restriction of segmentation workshop crane crane capacity, and for considerations such as, subsection complete to anchor system, anchor chain bulkhead symmetry, therefore need two crane associatings whole segmentation could be sling.But current but not well join the lifting device hung for crane.
Utility model content
For overcoming the deficiencies in the prior art, the purpose of this utility model is that providing a kind of realizes joining the lifting beam device hanging segmentation tread flaking.
The utility model is the technical scheme solving the employing of its technical matters:
A kind ofly realize joining the lifting beam device hanging segmentation tread flaking, comprise I-shaped hanging beam, described I-shaped hanging beam comprises top panel and lower faceplate, and the web be vertically welded between top panel and lower faceplate, the top panel of described I-shaped hanging beam be welded with two symmetrical, link up with crane the upper lift ring be connected for installing lifting rope, the lower faceplate of described I-shaped hanging beam be welded with two symmetrical, for installing the lower lift ring of lifting rope and connection segment.
Further, the web of described I-shaped hanging beam is welded with reinforced rib.
Further, the spacing of two upper lift rings is greater than 7200 millimeters, and the spacing of two lower lift rings is mated with section length.
Further, described upper lift ring all adopts full penetration with I-shaped hanging beam top panel, lower lift ring with the fillet weld of welding of H-girder lower faceplate.
Further, described upper lift ring and lower lift ring include eye plate and bracket, and the two bottom sides of described eye plate, bracket all has groove, and the welding of each groove cornerite.
The beneficial effects of the utility model are: place in operation of the present utility model ensure that segmentation lifts and tread flaking smoothly, ensure segmental hoisting safety, ensure bow anchor system integraty, shorten segmentation integraty and apply for checking and examination.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and example, the utility model is described further.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram at A-A place in Fig. 1;
Fig. 3 is the close-up schematic view at B place in Fig. 2;
Fig. 4 is using state schematic diagram of the present utility model.
Detailed description of the invention
Referring to figs. 1 through Fig. 4, of the present utility modelly a kind ofly realize joining the lifting beam device hanging segmentation tread flaking, comprise I-shaped hanging beam, described I-shaped hanging beam comprises top panel 1 and lower faceplate 2, and the web 3 be vertically welded between top panel 1 and lower faceplate 2, the top panel 1 of described I-shaped hanging beam be welded with two symmetrical, link up with for installing lifting rope and crane the upper lift ring 4 be connected, the lower faceplate of described I-shaped hanging beam be welded with two symmetrical, for installing the lower lift ring 5 of lifting rope and connection segment.
For strengthening the reliability of hanging beam, the web 3 of described I-shaped hanging beam is welded with reinforced rib 6.
For preventing the suspension bridge of two cranes from mutually colliding, the spacing of two upper lift rings 4 is greater than 7200 millimeters, and the spacing of two lower lift rings 5 is mated with section length.
In the present embodiment, described upper lift ring 4 all adopts full penetration with I-shaped hanging beam top panel 1, lower lift ring 5 with the fillet weld of welding of H-girder lower faceplate 2.Further, described upper lift ring 4 and lower lift ring 5 include eye plate and bracket, and the two bottom sides of described eye plate, bracket all has groove 7, and the welding of each groove 7 cornerite.
Using method of the present utility model is: the tread flaking suspension ring quality that preoperation inspection segmentation is installed, in device, whether steel rope and hook be damaged, two upper lift rings 4 are installed steel rope link up with a crane respectively and be connected, two lower lift rings 5 are installed the tread flaking suspension ring of steel rope difference connection segment one end, two cranes start simultaneously, slowly be pulled upwardly with same speed, segmentation connection hangs certain altitude and guarantees that lifting can normally tread flaking after balancing.This product place in operation ensure that segmentation lifts and tread flaking smoothly, ensures segmental hoisting safety, ensures bow anchor system integraty, shortens segmentation integraty and applies for checking and examination.
The above, just preferred embodiment of the present utility model, the utility model is not limited to above-mentioned embodiment, as long as it reaches technique effect of the present utility model with identical means, all should belong to protection domain of the present utility model.
Claims (5)
1. one kind realizes joining the lifting beam device hanging segmentation tread flaking, it is characterized in that: comprise I-shaped hanging beam, described I-shaped hanging beam comprises top panel (1) and lower faceplate (2), and the web (3) be vertically welded between top panel (1) and lower faceplate (2), the top panel (1) of described I-shaped hanging beam be welded with two symmetrical, link up with for installing lifting rope and crane the upper lift ring (4) be connected, the lower faceplate of described I-shaped hanging beam be welded with two symmetrical, for installing the lower lift ring (5) of lifting rope and connection segment.
2. according to claim 1ly a kind ofly realize joining the lifting beam device hanging segmentation tread flaking, it is characterized in that: the web (3) of described I-shaped hanging beam is welded with reinforced rib (6).
3. according to claim 1ly a kind ofly realize joining the lifting beam device hanging segmentation tread flaking, it is characterized in that: the spacing of two upper lift rings (4) is greater than 7200 millimeters, the spacing of two lower lift rings (5) is mated with section length.
4. according to claim 1ly a kind ofly realize joining the lifting beam device hanging segmentation tread flaking, it is characterized in that: described upper lift ring (4) all adopts full penetration with I-shaped hanging beam top panel (1), lower lift ring (5) with the fillet weld of welding of H-girder lower faceplate (2).
5. according to claim 4ly a kind ofly realize joining the lifting beam device hanging segmentation tread flaking, it is characterized in that: described upper lift ring (4) and lower lift ring (5) include eye plate and bracket, the two bottom sides of described eye plate, bracket all has groove (7), and the welding of each groove (7) cornerite.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420600396.9U CN204198229U (en) | 2014-10-16 | 2014-10-16 | A kind ofly realize joining the lifting beam device hanging segmentation tread flaking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420600396.9U CN204198229U (en) | 2014-10-16 | 2014-10-16 | A kind ofly realize joining the lifting beam device hanging segmentation tread flaking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204198229U true CN204198229U (en) | 2015-03-11 |
Family
ID=52656213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420600396.9U Expired - Fee Related CN204198229U (en) | 2014-10-16 | 2014-10-16 | A kind ofly realize joining the lifting beam device hanging segmentation tread flaking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204198229U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590032A (en) * | 2018-06-11 | 2018-09-28 | 天津市建筑设计院 | A kind of steel construction elevator hanging ring girder connection |
CN109353448A (en) * | 2018-10-29 | 2019-02-19 | 上海外高桥造船有限公司 | Boat segmental tread flaking method |
CN111332936A (en) * | 2020-03-31 | 2020-06-26 | 中国五冶集团有限公司 | Manufacturing method of shoulder pole for hoisting simple shaped steel column die |
-
2014
- 2014-10-16 CN CN201420600396.9U patent/CN204198229U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590032A (en) * | 2018-06-11 | 2018-09-28 | 天津市建筑设计院 | A kind of steel construction elevator hanging ring girder connection |
CN109353448A (en) * | 2018-10-29 | 2019-02-19 | 上海外高桥造船有限公司 | Boat segmental tread flaking method |
CN111332936A (en) * | 2020-03-31 | 2020-06-26 | 中国五冶集团有限公司 | Manufacturing method of shoulder pole for hoisting simple shaped steel column die |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108163694A (en) | A kind of body section hanging method with hatch coaming | |
CN204198229U (en) | A kind ofly realize joining the lifting beam device hanging segmentation tread flaking | |
CN108946474A (en) | A kind of turn-over method of two phase stainless steel p-type block | |
CN105799860A (en) | Method for overturning C-shaped block of large-size ship | |
CN106006408A (en) | Integral transport and lift method for large hull stern cabin block | |
JP6098453B2 (en) | Jib hanger | |
CN205045694U (en) | Even deck of boat hoist of atress | |
CN205381364U (en) | Convenient auxiliary fixtures that sets up of outer hanging scaffold of boats and ships topside | |
CN205114861U (en) | Hoist and mount lacing device | |
CN104234636B (en) | Jack-up unit derrick installation method | |
CN203021166U (en) | Steel plate lifting appliance | |
CN102733362B (en) | Hoisting method for super-tonnage tower head platforms of marine wind power installation vessels | |
CN202717497U (en) | Lifting device of prefabricated composite floor slab | |
CN103171976A (en) | Hoisting method for shipyard gantry crane | |
CN102145734B (en) | Method for integrally folding semi-submersible drilling platform | |
CN204251194U (en) | A kind of Novel hanging tool | |
CN113335475A (en) | Deck bottom fixed pulley sliding platform dismantling process | |
CN102050377B (en) | Method for installing combined hoist and oil production platform drilling equipment | |
CN108163142B (en) | Hoisting method of stern springboard | |
CN202558444U (en) | Steel penstock hoisting balance beam device | |
CN206266077U (en) | Sling system | |
CN103640972A (en) | Crane hook fixing device | |
CN115258909A (en) | Horizontal-lifting tail sliding system and method for offshore wind turbine tower | |
CN203095390U (en) | Mounting structure of FPSO (floating production storage and offloading) module lifting eye | |
CN202829351U (en) | Longitudinal hoisting device of full-gyration tug |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20171016 |