[go: up one dir, main page]

CN204185942U - A kind of construction steel pipe connecting structure - Google Patents

A kind of construction steel pipe connecting structure Download PDF

Info

Publication number
CN204185942U
CN204185942U CN201420580154.8U CN201420580154U CN204185942U CN 204185942 U CN204185942 U CN 204185942U CN 201420580154 U CN201420580154 U CN 201420580154U CN 204185942 U CN204185942 U CN 204185942U
Authority
CN
China
Prior art keywords
steel pipe
fixing block
pipe fixing
block
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420580154.8U
Other languages
Chinese (zh)
Inventor
丁嘉铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Minzu University
Original Assignee
Northwest Minzu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Minzu University filed Critical Northwest Minzu University
Priority to CN201420580154.8U priority Critical patent/CN204185942U/en
Application granted granted Critical
Publication of CN204185942U publication Critical patent/CN204185942U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Chutes (AREA)

Abstract

本实用新型公开了一种建筑用钢管连接结构,包括连接块,及设置在连接块上的第一钢管固定块,及设置在连接块上的第二钢管固定块,连接块上设有与第一钢管固定块滑动连接的第一滑槽,连接块上设有与第二钢管固定块滑动连接的第二滑槽,连接块上设有第一螺纹通孔,第一螺纹通孔上设有可固定第一钢管固定块和第二钢管固定块的第一紧固螺钉,第一钢管固定块和第二钢管固定块内均设有与钢管相配合的凹槽,第一钢管固定块和第二钢管固定块上均设有第二螺纹通孔,第二螺纹通孔上设有可固定钢管的第二紧固螺钉。其结构简单,使用、安装方便,操作简单,强度高,支撑性能好,成本低,适用范围广,使用寿命长,具有安全可靠的作用。

The utility model discloses a steel pipe connection structure for construction, which comprises a connection block, a first steel pipe fixing block arranged on the connection block, and a second steel pipe fixing block arranged on the connection block. A first chute for sliding connection of a steel pipe fixing block, a second chute for sliding connection with a second steel pipe fixing block is provided on the connecting block, a first threaded through hole is provided on the connecting block, and a first threaded through hole is provided on the first threaded through hole Can fix the first fastening screw of the first steel pipe fixing block and the second steel pipe fixing block, the first steel pipe fixing block and the second steel pipe fixing block are all provided with grooves matching with the steel pipe, the first steel pipe fixing block and the second steel pipe fixing block The two steel pipe fixing blocks are provided with second threaded through holes, and the second threaded through holes are provided with second fastening screws capable of fixing the steel pipes. The utility model has the advantages of simple structure, convenient use and installation, simple operation, high strength, good support performance, low cost, wide application range, long service life, and safe and reliable functions.

Description

一种建筑用钢管连接结构A steel pipe connection structure for construction

技术领域 technical field

本实用新型涉及一种建筑用钢连接结构。 The utility model relates to a steel connecting structure for building.

背景技术 Background technique

现有技术中的钢管结构体,特别是钢管结构的承重梁的固定板连接,是这季节通过螺栓相互固定连接。虽然连接结构简单,但是钢结构体的整体强度低,导致整个钢管结构的支撑度下降,使用寿命低。 The steel pipe structures in the prior art, especially the fixed plate connection of the load-bearing beams of the steel pipe structure, are fixedly connected to each other by bolts in this season. Although the connection structure is simple, the overall strength of the steel structure is low, resulting in a decrease in the support of the entire steel pipe structure and a low service life.

发明内容 Contents of the invention

本实用新型要解决的技术问题是提供一种结构简单,使用、安装方便,操作简单,强度高,支撑性能好,成本低,适用范围广,使用寿命长,具有安全可靠作用的建筑用钢管连接结构。 The technical problem to be solved by the utility model is to provide a steel pipe connection for construction with simple structure, convenient use and installation, simple operation, high strength, good support performance, low cost, wide application range, long service life, and safety and reliability. structure.

为解决上述问题,本实用新型采用如下技术方案: In order to solve the above problems, the utility model adopts the following technical solutions:

一种建筑用钢管连接结构,包括连接块,及设置在连接块上的第一钢管固定块,及设置在连接块上的第二钢管固定块,所述连接块上设有与所述第一钢管固定块滑动连接的第一滑槽,所述连接块上设有与所述第二钢管固定块滑动连接的第二滑槽,所述连接块上设有第一螺纹通孔,所述第一螺纹通孔上设有可固定第一钢管固定块和第二钢管固定块的第一紧固螺钉,所述第一钢管固定块和第二钢管固定块内均设有与钢管相配合的凹槽,所述第一钢管固定块和第二钢管固定块上均设有第二螺纹通孔,所述第二螺纹通孔上设有可固定钢管的第二紧固螺钉。 A steel pipe connection structure for construction, comprising a connection block, a first steel pipe fixing block arranged on the connection block, and a second steel pipe fixing block arranged on the connection block, the connection block is provided with the first The first chute for sliding connection of the steel pipe fixing block, the second chute for sliding connection with the second steel pipe fixing block is provided on the connecting block, the first threaded through hole is provided on the connecting block, and the second A threaded through hole is provided with a first fastening screw that can fix the first steel pipe fixing block and the second steel pipe fixing block, and the first steel pipe fixing block and the second steel pipe fixing block are all provided with concave holes that match the steel pipes. The first steel pipe fixing block and the second steel pipe fixing block are provided with second threaded through holes, and the second threaded through holes are provided with second fastening screws that can fix steel pipes.

作为优选的技术方案,所述第一钢管固定块和第二钢管固定块内底部均设有固定机构,所述固定机构上设有与钢管内圈相配合的固定块。 As a preferred technical solution, both the inner bottoms of the first steel pipe fixing block and the second steel pipe fixing block are provided with a fixing mechanism, and the fixing mechanism is provided with a fixing block matched with the inner ring of the steel pipe.

作为优选的技术方案,所述第一滑槽和第二滑槽内底部均设有耐磨层。 As a preferred technical solution, both the inner bottom of the first chute and the second chute are provided with a wear-resistant layer.

作为优选的技术方案,所述第一螺纹通孔设有四个。 As a preferred technical solution, there are four first threaded through holes.

作为优选的技术方案,所述第二螺纹通孔设有八个。 As a preferred technical solution, there are eight second threaded through holes.

本实用新型一种建筑用钢管连接结构的有益效果是:使用时,通过所设的第一滑槽和第二滑槽,使用者可根据安装位置调整第一钢管固定块和第二钢管固定块的安装位置,通过所设的第一紧固螺钉可固定第一钢管固定块和第二钢管固定块,通过所设的第二紧固螺钉和固定机构相配合使用,使其在固定钢管时能够更加牢靠。其结构简单,使用、安装方便,操作简单,强度高,支撑性能好,成本低,适用范围广,使用寿命长,具有安全可靠的作用。 The utility model has the beneficial effect of a steel pipe connection structure for construction: when in use, the user can adjust the first steel pipe fixing block and the second steel pipe fixing block according to the installation position through the set first chute and the second chute The installation position, the first steel pipe fixing block and the second steel pipe fixing block can be fixed by the first fastening screw, and the second fastening screw and the fixing mechanism can be used together to make it possible to fix the steel pipe. more solid. The utility model has the advantages of simple structure, convenient use and installation, simple operation, high strength, good support performance, low cost, wide application range, long service life, and safe and reliable functions.

附图说明 Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。 In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本实用新型一种建筑用钢管连接结构的结构示意图。 Fig. 1 is a structural schematic diagram of a steel pipe connection structure for construction of the present invention.

图中:1、连接块;2、第一钢管固定块;3、第二钢管固定块;4、第一滑槽;5、第二滑槽;6、第一螺纹通孔;7、第一紧固螺钉;8、凹槽;9、第二螺纹通孔;10、第二紧固螺钉;11、固定机构;12、固定块。 In the figure: 1. Connecting block; 2. The first steel pipe fixing block; 3. The second steel pipe fixing block; 4. The first chute; 5. The second chute; 6. The first threaded through hole; 7. The first Fastening screw; 8, groove; 9, second threaded through hole; 10, second fastening screw; 11, fixing mechanism; 12, fixing block.

具体实施方式 Detailed ways

参阅图1所示的一种建筑用钢管连接结构,包括连接块1,及设置在连接块1上的第一钢管固定块2,及设置在连接块1上的第二钢管固定块3,所述连接块1上设有与所述第一钢管固定块2滑动连接的第一滑槽4,所述连接块1上设有与所述第二钢管固定块3滑动连接的第二滑槽5,所述连接块1上设有第一螺纹通孔6,所述第一螺纹通孔6上设有可固定第一钢管固定块2和第二钢管固定块3的第一紧固螺钉7,所述第一钢管固定块2和第二钢管固定块3内均设有与钢管相配合的凹槽8,所述第一钢管固定块2和第二钢管固定块3上均设有第二螺纹通孔9,所述第二螺纹通孔9上设有可固定钢管的第二紧固螺钉10。 Referring to a steel pipe connection structure for construction shown in Figure 1, it includes a connection block 1, a first steel pipe fixing block 2 arranged on the connection block 1, and a second steel pipe fixing block 3 arranged on the connection block 1, so that The connecting block 1 is provided with a first chute 4 which is slidably connected with the first steel pipe fixing block 2, and the connecting block 1 is provided with a second chute 5 which is slidably connected with the second steel pipe fixing block 3 , the connecting block 1 is provided with a first threaded through hole 6, and the first threaded through hole 6 is provided with a first fastening screw 7 capable of fixing the first steel pipe fixing block 2 and the second steel pipe fixing block 3, Both the first steel pipe fixing block 2 and the second steel pipe fixing block 3 are provided with a groove 8 matching with the steel pipe, and the first steel pipe fixing block 2 and the second steel pipe fixing block 3 are all provided with a second screw thread The through hole 9, the second threaded through hole 9 is provided with a second fastening screw 10 that can fix the steel pipe.

所述第一钢管固定块2和第二钢管固定块3内底部均设有固定机构11,所述固定机构11上设有与钢管内圈相配合的固定块12。 Both the inner bottoms of the first steel pipe fixing block 2 and the second steel pipe fixing block 3 are provided with a fixing mechanism 11, and the fixing mechanism 11 is provided with a fixing block 12 matching with the inner ring of the steel pipe.

所述第一滑槽4和第二滑槽5内底部均设有耐磨层。 Both the inner bottoms of the first chute 4 and the second chute 5 are provided with wear-resistant layers.

所述第一螺纹通孔6设有四个。 There are four first threaded through holes 6 .

所述第二螺纹通孔9设有八个。 There are eight second threaded through holes 9 .

    本实用新型一种建筑用钢管连接结构的有益效果是:使用时,通过所设的第一滑槽和第二滑槽,使用者可根据安装位置调整第一钢管固定块和第二钢管固定块的安装位置,通过所设的第一紧固螺钉可固定第一钢管固定块和第二钢管固定块,通过所设的第二紧固螺钉和固定机构相配合使用,使其在固定钢管时能够更加牢靠。其结构简单,使用、安装方便,操作简单,强度高,支撑性能好,成本低,适用范围广,使用寿命长,具有安全可靠的作用。 The utility model has the beneficial effect of a steel pipe connection structure for construction: when in use, the user can adjust the first steel pipe fixing block and the second steel pipe fixing block according to the installation position through the set first chute and the second chute The installation position, the first steel pipe fixing block and the second steel pipe fixing block can be fixed by the first fastening screw, and the second fastening screw and the fixing mechanism can be used together to make it possible to fix the steel pipe. more solid. The utility model has the advantages of simple structure, convenient use and installation, simple operation, high strength, good support performance, low cost, wide application range, long service life, and safe and reliable functions.

以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何不经过创造性劳动想到的变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应该以权利要求书所限定的保护范围为准。 The above is only a specific embodiment of the utility model, but the scope of protection of the utility model is not limited thereto, and any change or replacement that is not thought of through creative work should be covered within the scope of protection of the utility model . Therefore, the protection scope of the present utility model should be determined by the protection scope defined in the claims.

Claims (5)

1. a construction steel pipe connecting structure, it is characterized in that: comprise contiguous block, and the first steel pipe fixed block be arranged on contiguous block, and the second steel pipe fixed block be arranged on contiguous block, described contiguous block is provided with the first chute be slidably connected with described first steel pipe fixed block, described contiguous block is provided with the second chute be slidably connected with described second steel pipe fixed block, described contiguous block is provided with the first tapped through hole, described first tapped through hole is provided with the first trip bolt can fixing the first steel pipe fixed block and the second steel pipe fixed block, the groove matched with steel pipe is equipped with in described first steel pipe fixed block and the second steel pipe fixed block, described first steel pipe fixed block and the second steel pipe fixed block are equipped with the second tapped through hole, described second tapped through hole is provided with the second trip bolt can fixing steel pipe.
2. construction steel pipe connecting structure according to claim 1, is characterized in that: described first steel pipe fixed block and the second steel pipe fixed block inner bottom part are equipped with fixed mechanism, and described fixed mechanism is provided with the fixed block matched with steel pipe inner ring.
3. construction steel pipe connecting structure according to claim 1, is characterized in that: described first chute and the second chute inner bottom part are equipped with wearing layer.
4. construction steel pipe connecting structure according to claim 1, is characterized in that: described first tapped through hole is provided with four.
5. construction steel pipe connecting structure according to claim 1, is characterized in that: described second tapped through hole is provided with eight.
CN201420580154.8U 2014-10-09 2014-10-09 A kind of construction steel pipe connecting structure Expired - Fee Related CN204185942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420580154.8U CN204185942U (en) 2014-10-09 2014-10-09 A kind of construction steel pipe connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420580154.8U CN204185942U (en) 2014-10-09 2014-10-09 A kind of construction steel pipe connecting structure

Publications (1)

Publication Number Publication Date
CN204185942U true CN204185942U (en) 2015-03-04

Family

ID=52617953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420580154.8U Expired - Fee Related CN204185942U (en) 2014-10-09 2014-10-09 A kind of construction steel pipe connecting structure

Country Status (1)

Country Link
CN (1) CN204185942U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988524A (en) * 2017-04-11 2017-07-28 周庆川 Steel pipe for building is connected device
CN107869192A (en) * 2017-11-17 2018-04-03 重庆大安渝南重型钢结构工程有限公司 A kind of attachment means of board house
CN108343154A (en) * 2018-02-16 2018-07-31 陈良培 A kind of assembling type steel structure building
CN109707044A (en) * 2019-03-02 2019-05-03 浙江万峰装配式房屋工程有限公司 Steel house connection structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988524A (en) * 2017-04-11 2017-07-28 周庆川 Steel pipe for building is connected device
CN106988524B (en) * 2017-04-11 2019-02-22 周庆川 Steel pipe for building is connected and fixed device
CN107869192A (en) * 2017-11-17 2018-04-03 重庆大安渝南重型钢结构工程有限公司 A kind of attachment means of board house
CN108343154A (en) * 2018-02-16 2018-07-31 陈良培 A kind of assembling type steel structure building
CN108343154B (en) * 2018-02-16 2019-12-06 广东精艺建设集团有限公司 Assembled steel construction building
CN109707044A (en) * 2019-03-02 2019-05-03 浙江万峰装配式房屋工程有限公司 Steel house connection structure

Similar Documents

Publication Publication Date Title
CN204185942U (en) A kind of construction steel pipe connecting structure
MY176716A (en) Anti-rotation system for box and pin connection
CL2019000047A1 (en) Corrosion resistant deformable bolt.
BR112013001178A2 (en) improvement of split valves.
BR112016001836A2 (en) THREADED SHAPE, COMPOSITE PIPE AND THREADED COUPLER
CN204418775U (en) A kind of steel tower fixture
ECSP13012849A (en) FIN AND INSTALLATION FOR THE CONVERSION OF HYDRAULIC ENERGY THAT INCLUDES THIS FIN
CN203441916U (en) Direction adjustable oil bolt assembly
EA201492025A1 (en) WEIGHING UNIT
CN201972652U (en) Double-buckle cutting silk
CN205136255U (en) Nonrust steel pipe coupling assembling
CN205894735U (en) Strutting arrangement for civil construction
ES2530367T3 (en) Mounting bracket
CN104153565B (en) Steel pipe connecting device for civil engineering
CN203961267U (en) One is convenient to angular adjustment connecting fastening for steel pipe
CN211010064U (en) Wedge-shaped ball valve convenient to disassemble
CN203336099U (en) Flange high in strength and not prone to deformation
CN104060817B (en) One is convenient to angular adjustment connecting fastening for steel pipe
CN204628166U (en) A kind of support degree of tightness link press span
CN104747548A (en) Fixing ring capable of installing detecting element
CN204386101U (en) The spacing fixed structure of a kind of stone material load-bearing and load-bearing limiting gasket wherein
CN203626632U (en) Nonstandard drill pipe
CN104831917A (en) Plug structure of disk type scaffold
CN205065145U (en) Set up two -sided counterpoint water gauge water knockout drum of external screw thread
CN204717200U (en) A kind of two-sided contraposition Watermeter water knockout drum

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150304

Termination date: 20151009

EXPY Termination of patent right or utility model