CN204152527U - The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression - Google Patents

The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression Download PDF

Info

Publication number
CN204152527U
CN204152527U CN201420590208.9U CN201420590208U CN204152527U CN 204152527 U CN204152527 U CN 204152527U CN 201420590208 U CN201420590208 U CN 201420590208U CN 204152527 U CN204152527 U CN 204152527U
Authority
CN
China
Prior art keywords
preliminary bracing
board
tunnel
arch
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420590208.9U
Other languages
Chinese (zh)
Inventor
张万斌
李海军
刘大刚
曹林卫
付刚
于茂春
朱小兵
李鸿
姜波
胥犇
安柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Chongqing Survey Design and Research Co Ltd
Original Assignee
CREEC Chongqing Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Chongqing Survey Design and Research Co Ltd filed Critical CREEC Chongqing Survey Design and Research Co Ltd
Priority to CN201420590208.9U priority Critical patent/CN204152527U/en
Application granted granted Critical
Publication of CN204152527U publication Critical patent/CN204152527U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the combined type preliminary bracing system of wall multiple-arch tunnel in a kind of implicit expression, preliminary bracing structure (2) and secondary liner structure (3) form double-arch structure, lining cutting steelframe (4) is provided with between double-arch structure, the both sides of this lining cutting steelframe (4) are provided with interim mid-board (7), the lower end of this interim mid-board (7) is connected near lowest part with preliminary bracing structure (2) bottom, and the upper end of interim mid-board (7) is connected near vault place with preliminary bracing structure (2) top; Suspend anchor pole (8) in midair at the row self-advancing type that each side arranges of described interim mid-board (7) top, the bottom of self-advancing type suspention anchor pole (8) and the top of preliminary bracing structure (2) fix.The utility model ensure that the feasibility of wall multiple-arch tunnel scheme in implicit expression, makes it have good working security, waterproofing system integrality, structure durability and long-term safety, has broad application prospects in major long tunnel and city tunnel.

Description

The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression
Technical field
The utility model belongs to technical field of tunnel construction, specifically, and the particularly combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression.
Background technology
The structural shape that multiple-arch tunnel adopts to mainly contain in monolithic wall multiple-arch tunnel in wall multiple-arch tunnel and combined type, also expedites the emergence of a lot of multiple-arch tunnel structural shape improved.But the parametrizations such as the many employings of multiple-arch tunnel preliminary bracing anchor pole both at home and abroad at present, the i.e. isometric design of system anchor bolt, causes this large-span structure of multiple-arch tunnel on the weak side in the folder petrographic province territory supporting of Zhong Qiang top, easily occurs this region surrouding rock deformation, fall block, cave in, and in multiple-arch tunnel employing temporarily during wall, due to large-span structure, Zhong Qiang top pressure from surrounding rock is very large, when wall is removed in interim, often cause excessive pressure from surrounding rock release, also cause preliminary bracing to be subject to the pressure effect of release suddenly.Thus causing preliminary bracing distortion, cracking, middle wall displacement, destruction, secondary lining problems of crack, jeopardizes Multi-arch Tunnel Construction safety and structural safety.
In general multiple-arch tunnel, wall has temporary support, waste of material, and potential safety hazard when temporary support is removed, affect the duration, and secondary liner structure experiences repeatedly the problem of stress state.And the middle wall alienation of wall multiple-arch tunnel, in tunnel, right side, exists the problem of size sudden change in implicit expression at middle wall and Tunnel junction, right side, the stress at this position is easily caused to concentrate.
Utility model content
Technical problem to be solved in the utility model is to provide the combined type preliminary bracing system of wall multiple-arch tunnel in a kind of implicit expression of structural safety when can ensure structural system safety and the dismounting of interim mid-board.
The technical solution of the utility model is as follows: the combined type preliminary bracing system of wall multiple-arch tunnel in a kind of implicit expression, secondary liner structure (3) is positioned at the internal layer of preliminary bracing structure (2), the outer lining cutting of supporting and protection structure (2) and secondary liner structure (3) in the early stage has anchor pole (1), described preliminary bracing structure (2) and secondary liner structure (3) form double-arch structure, lining cutting steelframe (4) is provided with between double-arch structure, wall (5) during this lining cutting steelframe (4) and sprayed mortar are formed, the top that the middle wall of lining cutting steelframe (4) erects support arranges diagonal brace (6), it is characterized in that: in the middle part of two tunnels, be provided with interim mid-board (7), the lower end of this interim mid-board (7) is connected near lowest part with preliminary bracing structure (2) bottom, the upper end of interim mid-board (7) is connected near vault place with preliminary bracing structure (2) top, anchor pole (8) is suspended in midair at the row self-advancing type that each side arranges of described interim mid-board (7) top, often row self-advancing type suspention anchor pole (8) is along the genesis analysis in tunnel, and the bottom of self-advancing type suspention anchor pole (8) and the top of preliminary bracing structure (2) fix.
The utility model folder petrographic province territory in wall multiple-arch tunnel Zhong Qiang top in implicit expression arranges non-grade and participates in fourdrinier wire shape anchor pole, carries out strengthening supporting to folder rock; Self-advancing type suspention anchor pole is adopted in the both sides at interim mid-board top, the stability of structure when ensureing that interim mid-board is removed, slow down preliminary bracing distortion, cracking, middle wall displacement, destruction, the disadvantages such as secondary lining cracking, ensure that Multi-arch Tunnel Construction safety and structural safety.Middle wall adopts double-deck profile steel frame, and adopts shaped steel lateral connection, and middle wall and right side Tunnel gradation zone adopt shaped steel diagonal brace, can avoid this region rigidity dash forward strain and stress concentrate.
In order to simplify structure, facilitate processing and fabricating, and guarantee the stability during preliminary bracing formation enclosed construction and reliability, as preferably, described interim mid-board (7) is arc-shaped steel shelf structure, and the interim mid-board (7) of lining cutting steelframe (4) both sides is parallel or symmetrical.
In order to make connection more firm, and be convenient to quick-detachment, the end of described interim mid-board (7) is removably connected by bolt and preliminary bracing structure (2).
As preferably, the distance often in row between two adjacent self-advancing types suspention anchor pole (8) is equal.
Beneficial effect: the utility model ensure that the feasibility of wall multiple-arch tunnel scheme in implicit expression, make it have good working security, waterproofing system integrality, structure durability and long-term safety, have broad application prospects in major long tunnel and city tunnel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail:
As shown in Figure 1, preliminary bracing structure 2 is made up of left side Tunnel and right side Tunnel, and the inner side of supporting and protection structure 2 arranges secondary liner structure 3 in the early stage, and the outer lining cutting of preliminary bracing structure 2 and secondary liner structure 3 has anchor pole 1.Preliminary bracing structure 2 and secondary liner structure 3 form double-arch structure, are provided with lining cutting steelframe 4 between double-arch structure, wall 5 during this lining cutting steelframe 4 and sprayed mortar are formed, and the top that in lining cutting steelframe 4, wall erects support arranges diagonal brace 6.The set-up mode of above structure is same as the prior art, and therefore not to repeat here.
As shown in Figure 1, interim mid-board 7 is provided with in the middle part of two tunnels, this interim mid-board 7 is arc-shaped steel shelf structure, one of them interim mid-board 7 is positioned at left side Tunnel, another interim mid-board 7 is positioned at right side Tunnel, and the interim mid-board 7 of lining cutting steelframe 4 both sides is parallel or symmetrical.The lower end of interim mid-board 7 is by removably connecting near lowest part bottom bolt and preliminary bracing structure 2, and the upper end of interim mid-board 7 is removably connected near vault place by bolt and preliminary bracing structure 2 top.The row self-advancing type that each side arranges above each interim mid-board 7 suspends anchor pole 8 in midair, and often row self-advancing type suspention anchor pole 8 is along the genesis analysis in tunnel, and the distance often in row between two adjacent self-advancing types suspention anchor poles 8 is equal.The top of each self-advancing type suspention anchor pole 8 is fixed on the rock of tunnel upper, and the self-advancing type suspention bottom of anchor pole 8 and the top of preliminary bracing structure 2 fix.

Claims (3)

1. the combined type preliminary bracing system of wall multiple-arch tunnel in an implicit expression, secondary liner structure (3) is positioned at the internal layer of preliminary bracing structure (2), the outer lining cutting of supporting and protection structure (2) and secondary liner structure (3) in the early stage has anchor pole (1), described preliminary bracing structure (2) and secondary liner structure (3) form double-arch structure, lining cutting steelframe (4) is provided with between double-arch structure, wall (5) during this lining cutting steelframe (4) and sprayed mortar are formed, the top that the middle wall of lining cutting steelframe (4) erects support arranges diagonal brace (6), it is characterized in that: in the middle part of two tunnels, be provided with interim mid-board (7), the lower end of this interim mid-board (7) is connected near lowest part with preliminary bracing structure (2) bottom, the upper end of interim mid-board (7) is connected near vault place with preliminary bracing structure (2) top, anchor pole (8) is suspended in midair at the row self-advancing type that each side arranges of described interim mid-board (7) top, often row self-advancing type suspention anchor pole (8) is along the genesis analysis in tunnel, and the bottom of self-advancing type suspention anchor pole (8) and the top of preliminary bracing structure (2) fix.
2. the combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression according to claim 1, it is characterized in that: described interim mid-board (7) is arc-shaped steel shelf structure, the interim mid-board (7) of lining cutting steelframe (4) both sides is parallel or symmetrical.
3. the combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression according to claim 1 and 2, is characterized in that: the distance often in row between two adjacent self-advancing types suspention anchor pole (8) is equal.
CN201420590208.9U 2014-10-13 2014-10-13 The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression Expired - Fee Related CN204152527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420590208.9U CN204152527U (en) 2014-10-13 2014-10-13 The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420590208.9U CN204152527U (en) 2014-10-13 2014-10-13 The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression

Publications (1)

Publication Number Publication Date
CN204152527U true CN204152527U (en) 2015-02-11

Family

ID=52510652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420590208.9U Expired - Fee Related CN204152527U (en) 2014-10-13 2014-10-13 The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression

Country Status (1)

Country Link
CN (1) CN204152527U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761836A (en) * 2017-01-26 2017-05-31 湖南工程学院 Without wall construction method in middle drift multiple-arch tunnel auxiliary
CN113250705A (en) * 2021-06-28 2021-08-13 重庆工程职业技术学院 Multi-arch tunnel construction method
CN115163086A (en) * 2022-07-27 2022-10-11 中铁隧道勘察设计研究院有限公司 Construction method for converting multi-arch tunnel into large-span tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761836A (en) * 2017-01-26 2017-05-31 湖南工程学院 Without wall construction method in middle drift multiple-arch tunnel auxiliary
CN106761836B (en) * 2017-01-26 2018-08-03 湖南工程学院 Wall construction method in no middle drift multiple-arch tunnel auxiliary
CN113250705A (en) * 2021-06-28 2021-08-13 重庆工程职业技术学院 Multi-arch tunnel construction method
CN113250705B (en) * 2021-06-28 2023-10-20 重庆工程职业技术学院 Multi-arch tunnel construction method
CN115163086A (en) * 2022-07-27 2022-10-11 中铁隧道勘察设计研究院有限公司 Construction method for converting multi-arch tunnel into large-span tunnel
CN115163086B (en) * 2022-07-27 2024-05-28 中铁隧道勘察设计研究院有限公司 Construction method for converting multi-arch tunnel into large-span tunnel

Similar Documents

Publication Publication Date Title
CN203654299U (en) Steel support loose end
CN105133793A (en) Space constraint multi-cavity pipe-in-pipe steel bar concrete huge column and construction method
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN204152527U (en) The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression
CN202219536U (en) Die holder for assembling steel reinforcement cage of prefabricated box girder
CN204959766U (en) Double-portal supporting structure suitable for large-scale excavation foundation pit
CN203821877U (en) Concrete column reinforcement device
CN204826211U (en) Outer wall hanging plate connecting device of precast concrete
CN203977840U (en) A kind of high-altitude long-span strengthening concrete vestibule braced structures
CN203559432U (en) Underground powerhouse vault
CN203411992U (en) Reserved hole template of deep hole in mass concrete
CN105162033A (en) Mechanized self-lifting portal crossing frame
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN104088665A (en) Steel pipe column construction process for underground excavated station
CN205000555U (en) Huge post of multicavity guan zhongguan reinforced concrete of space restraint
CN204738446U (en) Prefabricated restraint concrete shear force wall wallboard
CN204435833U (en) Operation platform wall-attached supporting seat
CN204492851U (en) Metro built by mining method transverse passage-way temporary support component
CN203394544U (en) Large-span mountain tunnel lagging jack with supporting legs
CN204112739U (en) A kind of tower crane high-altitude mounting or dismounting operation caisson type operating platform
CN203783108U (en) Movable lifting bracket for elevator shaft
CN206693491U (en) A kind of hollow heat-insulation building block with reinforcing bar locating framework structure
CN206693037U (en) A kind of plank road supporting structure of minority tourism
CN204676863U (en) elevator shaft operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150211

CF01 Termination of patent right due to non-payment of annual fee