CN204134937U - A kind of frost and snow cleanout tool of cement pole - Google Patents
A kind of frost and snow cleanout tool of cement pole Download PDFInfo
- Publication number
- CN204134937U CN204134937U CN201420348355.5U CN201420348355U CN204134937U CN 204134937 U CN204134937 U CN 204134937U CN 201420348355 U CN201420348355 U CN 201420348355U CN 204134937 U CN204134937 U CN 204134937U
- Authority
- CN
- China
- Prior art keywords
- snow
- frost
- pole
- cement
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Cleaning In General (AREA)
Abstract
本申请提供了一种水泥线杆的霜雪清除工具,该霜雪清除工具包括擦除部和与该擦除部相连接的握持部。擦除部包括弧形卡口,卡口设置有钢丝刷,钢丝刷用于擦除水泥线杆的霜雪;与擦除部相连接的握持部用于为运维人员提供握持的把手,以控制该擦除部对水泥线杆上的霜雪进行清除。由于水泥线杆上的霜雪能够利用本工具清除干净,也就能够避免运维人员登杆作业时滑落,从而保证运维人员安全地进行登杆作业。
The present application provides a tool for removing frost and snow from a cement pole. The tool for removing frost and snow includes an erasing part and a holding part connected with the erasing part. The erasing part includes a curved bayonet, and the bayonet is equipped with a wire brush, which is used to erase the frost and snow on the cement pole; the grip part connected with the erasing part is used to provide a handle for the operation and maintenance personnel to hold , to control the erasing part to remove the frost and snow on the cement pole. Since the frost and snow on the cement line pole can be cleaned with this tool, it can also prevent the operation and maintenance personnel from slipping when climbing the pole, thereby ensuring that the operation and maintenance personnel can safely carry out the pole climbing operation.
Description
技术领域 technical field
本申请涉及电力技术领域,更具体地说,涉及一种水泥线杆的霜雪清除工具。 The present application relates to the field of electric power technology, and more specifically, relates to a tool for removing frost and snow from cement utility poles. the
背景技术 Background technique
在冬季,北方的水泥线杆一般会覆盖有霜雪,当运维人员需要登杆作业时有可能因为这些霜雪而滑落,从而给运维人员带来危险,为此,亟需一种能够清除水泥线杆上的霜雪的工具,以避免运维人员登杆作业时滑落。 In winter, the cement poles in the north are generally covered with frost and snow. When the operation and maintenance personnel need to climb the poles, they may slip due to the frost and snow, which will bring danger to the operation and maintenance personnel. Therefore, there is an urgent need for a A tool for removing frost and snow on cement poles to prevent operation and maintenance personnel from slipping when climbing on the poles. the
实用新型内容 Utility model content
有鉴于此,本申请提供一种水泥线杆的霜雪清除工具,用于在冬季清除水泥线杆上的霜雪,以避免运维人员登杆作业时滑落。 In view of this, the present application provides a tool for removing frost and snow from cement utility poles, which is used to remove frost and snow from cement utility poles in winter, so as to prevent operation and maintenance personnel from slipping when climbing on the poles. the
为了实现上述目的,现提出的方案如下: In order to achieve the above purpose, the proposed scheme is as follows:
一种水泥线杆的霜雪清除工具,包括擦除部和握持部,其中: A frost and snow removal tool for a cement pole, including an erasing part and a holding part, wherein:
擦除部包括托板,所述托板包括弧形卡口,所述弧形卡口设置有钢丝刷,所述钢丝刷用于擦除水泥线杆上的霜雪; The erasing part includes a supporting plate, and the supporting plate includes an arc-shaped bayonet, and the arc-shaped bayonet is provided with a wire brush, and the wire brush is used to erase the frost and snow on the cement pole;
握持部与所述擦除部相连接,用于操控所述擦除部,并带动所述擦除部以所述钢丝刷擦拭所述霜雪。 The gripping part is connected with the wiping part, and is used for manipulating the wiping part, and drives the wiping part to wipe the frost and snow with the wire brush. the
优选的,所述托板包括第一钢片、第二钢片和第三钢片; Preferably, the pallet includes a first steel sheet, a second steel sheet and a third steel sheet;
所述第一钢片的两端分别与所述第二钢片的一端、所述第三钢片的一端通过螺栓相连接,并在同一水平面形成所述弧形卡口。 Two ends of the first steel sheet are respectively connected with one end of the second steel sheet and one end of the third steel sheet by bolts, and form the arc bayonet on the same horizontal plane. the
优选的,所述钢丝刷包括多个软质钢丝球。 Preferably, the wire brush includes a plurality of soft steel wire balls. the
优选的,所述握持部包括用于操纵电力器件的绝缘杆或可伸缩长杆。 Preferably, the gripping part includes an insulating rod or a telescopic long rod for manipulating the electric device. the
优选的,所述擦除部与所述握持部固定连接或铰接。 Preferably, the erasing part is fixedly connected or hinged to the holding part. the
优选的,所述擦除部与所述握持部通过十字联轴节铰接。 Preferably, the erasing part is hinged to the holding part through an Oldham coupling. the
从上述技术方案可以看出,本申请提供了一种水泥线杆的霜雪清除工具,该霜雪清除工具包括擦除部和与该擦除部相连接的握持部。擦除部包括弧形卡口,卡口设置有钢丝刷,钢丝刷用于擦除水泥线杆的霜雪;与擦除部相连接的握持部用于为运维人员提供握持的把手,以控制该擦除部对水泥线杆上的霜雪进行清除。由于水泥线杆上的霜雪能够利用本工具清除干净,也就能够避免运维人员登杆作业时滑落,从而保证运维人员安全地进行登杆作业。 It can be seen from the above technical solutions that the present application provides a frost and snow removal tool for a cement pole, the frost and snow removal tool includes an erasing part and a holding part connected with the erasing part. The erasing part includes a curved bayonet, and the bayonet is equipped with a wire brush, which is used to erase the frost and snow on the cement pole; the grip part connected with the erasing part is used to provide a handle for the operation and maintenance personnel to hold , to control the erasing part to remove the frost and snow on the cement pole. Since the frost and snow on the cement line pole can be cleaned with this tool, it can also prevent the operation and maintenance personnel from slipping when climbing the pole, thereby ensuring that the operation and maintenance personnel can safely carry out the pole climbing operation. the
附图说明 Description of drawings
为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。 In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only It is an embodiment of the present application, and those skilled in the art can also obtain other drawings according to the provided drawings without creative work. the
图1为本申请实施例提供的一种水泥线杆的霜雪清除工具的结构图; Fig. 1 is the structural diagram of the frost and snow removal tool of a kind of cement utility pole that the embodiment of the present application provides;
图2为本申请实施例提供的另一种水泥线杆的霜雪清除工具的结构图; Fig. 2 is the structural diagram of the frost and snow removal tool of another kind of cement utility pole that the embodiment of the present application provides;
图3为本申请另一实施例提供的一种水泥线杆的霜雪清除工具的结构图。 Fig. 3 is a structural diagram of a tool for removing frost and snow from a cement utility pole provided by another embodiment of the present application. the
具体实施方式 Detailed ways
下面将结合本实用新型实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。 The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application. the
实施例一 Embodiment one
图1为本申请实施例提供的一种水泥线杆的霜雪清除工具的结构图。 Fig. 1 is a structural diagram of a tool for removing frost and snow from a cement utility pole provided by an embodiment of the present application. the
如图1所示,本实施例提供的水泥线杆的霜雪清除工具包括擦除部10,和与该擦除部10相连接的握持部20。 As shown in FIG. 1 , the tool for removing frost and snow from a cement utility pole provided in this embodiment includes an erasing part 10 and a gripping part 20 connected to the erasing part 10 . the
擦除部10包括托板11,托板11的为片状的金属板,在金属板的边沿设置有弧形卡口,弧形卡口设置有钢丝刷12。 The erasing part 10 includes a supporting plate 11, which is a sheet-shaped metal plate, and an arc-shaped bayonet is arranged on the edge of the metal plate, and a wire brush 12 is arranged on the arc-shaped bayonet. the
托板11由三片钢片组成,包括第一钢片111、第二钢片112和第三钢片113。第一钢片111的两端分别与第二钢片112的一端、第三钢片113的一端通过螺栓114连接在一起,共同构成该托板11。第二钢片112与第三钢片113均可以相对第一钢片111运动,从而可以调节其形成的弧形卡口的弧度,从而可以适应不同直径的水泥线杆。 The pallet 11 is composed of three steel sheets, including a first steel sheet 111 , a second steel sheet 112 and a third steel sheet 113 . Two ends of the first steel sheet 111 are respectively connected with one end of the second steel sheet 112 and one end of the third steel sheet 113 by bolts 114 to form the supporting plate 11 together. Both the second steel sheet 112 and the third steel sheet 113 can move relative to the first steel sheet 111, so that the radian of the arc bayonet formed by them can be adjusted, so as to adapt to cement rods of different diameters. the
握持部20用于方便握持,以带动擦除部10擦除霜雪。握持部20为杆形部件,利用其长度将擦除部10伸到高处,对高处的霜雪进行清除。 The holding part 20 is used for convenient holding, so as to drive the wiping part 10 to wipe off frost and snow. The gripping part 20 is a rod-shaped component, and the erasing part 10 is extended to a high place by its length, so as to clear the frost and snow on the high place. the
从上述技术方案可以看出,本实施例提供了一种水泥线杆的霜雪清除工具,该霜雪清除工具包括擦除部和与该擦除部相连接的握持部。擦除部包括弧形卡口,卡口设置有钢丝刷,钢丝刷用于擦除水泥线杆的霜雪;与擦除部相连接的握持部用于为运维人员提供握持的把手,以控制该擦除部对水泥线杆上的霜雪进行清除。由于水泥线杆上的霜雪能够利用本工具清除干净,也就能够避免运维人员登杆作业时滑落,从而保证运维人员安全地进行登杆作业。 It can be seen from the above technical solution that this embodiment provides a tool for removing frost and snow from a cement utility pole. The tool for removing frost and snow includes an erasing part and a holding part connected with the erasing part. The erasing part includes a curved bayonet, and the bayonet is equipped with a wire brush, which is used to erase the frost and snow on the cement pole; the grip part connected with the erasing part is used to provide a handle for the operation and maintenance personnel to hold , to control the erasing part to remove the frost and snow on the cement pole. Since the frost and snow on the cement line pole can be cleaned with this tool, it can also prevent the operation and maintenance personnel from slipping when climbing the pole, thereby ensuring that the operation and maintenance personnel can safely carry out the pole climbing operation. the
本实施例中的握持部20可以利用操纵电力器件的绝缘杆替代,这样相应能够减少外出施工携带的工具的数量。 The gripping part 20 in this embodiment can be replaced by an insulating rod for manipulating electric devices, which can correspondingly reduce the number of tools carried out for construction. the
为了对水泥线杆的高处和低处的霜雪都能进行清除,握持部还可以优选由多个套管组成的可伸缩长杆21,如图2所示。这样处于收缩状态时可以清除低处的霜雪,而将可伸缩套管拉长后又可以清理高处的霜雪。 In order to clear the frost and snow from the high and low places of the cement pole, the grip part can also preferably be a telescopic long rod 21 composed of multiple sleeves, as shown in FIG. 2 . In this way, the frost and snow at low places can be removed when in the contracted state, and the frost and snow at high places can be cleaned after the telescopic sleeve is stretched. the
实施例二 Example two
图3为本申请另一实施例提供的一种水泥线杆的霜雪清除工具的结构图。 Fig. 3 is a structural diagram of a tool for removing frost and snow from a cement utility pole provided by another embodiment of the present application. the
如图3所示,本实施例提供的霜雪清除工具是在上一实施例的基础上增设了十字联轴节30。 As shown in FIG. 3 , the frost and snow removal tool provided in this embodiment is based on the previous embodiment with an additional Oldham coupling 30 . the
该十字联轴节30用来连接握持部20与擦除部10,这样一来擦除部10相对于握持部20的方向和角度均可以不受限制地调节,以适应清除水泥线杆的不同部位不同角度的表面的霜雪的需要。使用起来更为方便,清除的效果相对也就会更好。 The Oldham coupling 30 is used to connect the gripping part 20 and the erasing part 10, so that the direction and angle of the erasing part 10 relative to the gripping part 20 can be adjusted without restriction, so as to adapt to the removal of cement lines The need for frost and snow on the surface of different parts and different angles. It is more convenient to use, and the cleaning effect is relatively better. the
最后,还需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。 Finally, it should also be noted that in this text, relational terms such as first and second etc. are only used to distinguish one entity or operation from another, and do not necessarily require or imply that these entities or operations, any such actual relationship or order exists. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element. the
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。 Each embodiment in this specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts of each embodiment can be referred to each other. the
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本申请。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本申请的精神或范围的情况下,在其它实施例中实现。因此,本申请将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。 The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the application. Therefore, the present application will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein. the
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420348355.5U CN204134937U (en) | 2014-06-26 | 2014-06-26 | A kind of frost and snow cleanout tool of cement pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420348355.5U CN204134937U (en) | 2014-06-26 | 2014-06-26 | A kind of frost and snow cleanout tool of cement pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204134937U true CN204134937U (en) | 2015-02-04 |
Family
ID=52411655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420348355.5U Expired - Lifetime CN204134937U (en) | 2014-06-26 | 2014-06-26 | A kind of frost and snow cleanout tool of cement pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204134937U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105013725A (en) * | 2015-06-15 | 2015-11-04 | 国家电网公司 | Line sweeping device |
CN111293657A (en) * | 2020-03-25 | 2020-06-16 | 安徽安康塑业有限公司 | Handheld plastic brush structure for cable snow separation |
-
2014
- 2014-06-26 CN CN201420348355.5U patent/CN204134937U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105013725A (en) * | 2015-06-15 | 2015-11-04 | 国家电网公司 | Line sweeping device |
CN105013725B (en) * | 2015-06-15 | 2017-08-01 | 国家电网公司 | Line Cleaning Device |
CN111293657A (en) * | 2020-03-25 | 2020-06-16 | 安徽安康塑业有限公司 | Handheld plastic brush structure for cable snow separation |
CN111293657B (en) * | 2020-03-25 | 2021-02-26 | 安徽安康塑业有限公司 | Handheld plastic brush structure for cable snow separation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104084358B (en) | A kind of oil pipeline mopping device | |
CN103354334A (en) | Tool capable of cleaning hanging object on electric transmission line | |
CN204134937U (en) | A kind of frost and snow cleanout tool of cement pole | |
CN202715555U (en) | Cleaning device for porcelain insulator | |
CN204271533U (en) | Transmission line foreign matter cleaning device | |
CN202474696U (en) | Bird nest removing tool | |
CN204046061U (en) | Electric line foreign matter extracts instrument | |
CN203839835U (en) | Transmission line foreign matter cleaning device | |
CN204156409U (en) | There is the overhead network barrier-clearance instrument of illumination functions | |
CN202219251U (en) | Insulator cleaning tool for high-voltage electric power equipment | |
CN204271508U (en) | Electric snow removal special tool for electric equipment | |
CN205199986U (en) | Insulator cleaning device | |
CN204030421U (en) | Power transmission line foreign matter cleaner | |
CN202423988U (en) | Tool for cleaning tree barriers | |
CN202094543U (en) | Cable bending machine | |
CN105429043A (en) | Remote power distribution line foreign matter handling apparatus | |
CN202424001U (en) | Convenient circuit foreign matter removing tool | |
CN204725438U (en) | R type pin special-purpose taking pin pliers | |
CN205224041U (en) | Special foreign matter duster of safety measure pole jack | |
CN203983859U (en) | Charged cleaning hanger special tool utensil | |
CN218114780U (en) | Curb hoisting accessory | |
CN204012419U (en) | Pincers type bird's nest remover | |
CN203300834U (en) | Compass-type grounding wire device | |
CN202111412U (en) | A special device for maintaining high-voltage lines | |
CN205833667U (en) | A kind of miniature circuit breaker clearing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20150204 |
|
CX01 | Expiry of patent term |