CN204059329U - A kind of foundation structure of combining employing piling prepressing and heavy tamping treatment - Google Patents
A kind of foundation structure of combining employing piling prepressing and heavy tamping treatment Download PDFInfo
- Publication number
- CN204059329U CN204059329U CN201420537801.7U CN201420537801U CN204059329U CN 204059329 U CN204059329 U CN 204059329U CN 201420537801 U CN201420537801 U CN 201420537801U CN 204059329 U CN204059329 U CN 204059329U
- Authority
- CN
- China
- Prior art keywords
- layer
- foundation structure
- soil
- rice
- piling prepressing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002689 soil Substances 0.000 claims abstract description 46
- 239000010410 layer Substances 0.000 claims abstract description 43
- 238000000034 method Methods 0.000 claims abstract description 22
- 238000010276 construction Methods 0.000 claims abstract description 19
- 239000004576 sand Substances 0.000 claims abstract description 16
- 241000209094 Oryza Species 0.000 claims abstract description 14
- 235000007164 Oryza sativa Nutrition 0.000 claims abstract description 14
- 235000009566 rice Nutrition 0.000 claims abstract description 14
- 238000003756 stirring Methods 0.000 claims abstract description 8
- 239000002344 surface layer Substances 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 5
- 230000009286 beneficial effect Effects 0.000 claims description 3
- 239000004927 clay Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 4
- 238000007596 consolidation process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000003672 processing method Methods 0.000 description 2
- 238000010298 pulverizing process Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010327 methods by industry Methods 0.000 description 1
- 230000009972 noncorrosive effect Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model provides a kind of and combines the foundation structure adopting piling prepressing and heavy tamping treatment, in the process range of described foundation structure, comprises duricrust soil layer, coarse sands layer, silt soil strata, mud, gutter, sand drain, process border; Described duricrust soil layer is the hard soil body of 1-3 rice thickness, adds carrier, simultaneously for the heavy-duty machinery walking surface layer of Foundation Treatment as the construction surface layer of heavy tamping treatment and piling prepressing; Described coarse sands layer is the coarse sand of 1-5 rice thickness, as the radial drainage layer of foundation structure, adds carrier simultaneously also as piling prepressing; Described silt soil strata and mud are the initial pending soil layer of foundation structure; Described gutter and sand drain are the longitudinal drainage structure of foundation structure; Process border can be set to concrete grey and stir diaphragm wall, and it is 0.6-1.5 rice that described concrete grey stirs continuous wall body thickness, and the degree of depth is 6-15 rice.
Description
Technical field
The utility model relates to construction work foundation treatment technology field, is specifically related to a kind of foundation structure of combining employing piling prepressing and heavy tamping treatment.
Background technology
At present, for the soft foundation be made up of large area mucky soil, silt soil, conventional processing method mainly contains: preloading, change and fill out Sand-gravel-cushion Technioue, dynamic compaction.The ground larger for hole and water content weak cohesive soil ground within the specific limits, tamping or strong rammer can be adopted, its principle is that soil layer is under huge impact energy effect, very large pressure and shock wave is produced in soil, soil body hole is caused to compress, produce the good drainage channel in crack in certain depth around tamping point, the pore water in soil (gas) is discharged smoothly, the rapid consolidation of the soil body; Pounding Method process groundwork bearing capacity can obtain certain raising, and compressibilty can reduce by 200% ~ 1000%; When soft layer thickness is not very large, soft layer within the scope of weak soil partly or entirely can be excavated, then change the material (the gravel material that normally seepage of water is good) filling out the larger soil of intensity or good, the non-corrosive property of other stability and be called to change and fill out or Sand-gravel-cushion Technioue; The economical and practical height of this method process is generally 2 ~ 3m, if soft layer thickness is excessive, then adopts cushion can increase the side of abandoning and get earth volume and increase engineering cost; Preloading, be before engineering construction with the filled load being more than or equal to design load, impel ground to shift to an earlier date consolidation settlement to improve the intensity of ground, reduce settlement after construction.But, part of the foundation process engineering, incorrect according to above-mentioned single processing method, consider engineering cost, construction period and construction technology difficulty, select to combine and adopt piling prepressing and heavy tamping treatment construction technology to obtain new foundation structure form, have important practical significance.
Utility model content
For achieving the above object, the technical solution adopted in the utility model is: a kind of foundation structure of combining employing piling prepressing and heavy tamping treatment, in the process range of described foundation structure, comprise duricrust soil layer, coarse sands layer, silt soil strata, mud, gutter, sand drain, process border; Described duricrust soil layer is the hard soil body, adds carrier, simultaneously for the heavy-duty machinery walking surface layer of Foundation Treatment as the construction surface layer of heavy tamping treatment and piling prepressing; Described coarse sands layer selects the grit material with good water seepage function, as the radial drainage layer of foundation structure, adds carrier simultaneously also as piling prepressing; Described silt soil strata and mud are the initial pending soil layer of foundation structure; Described gutter and sand drain are the longitudinal drainage structure of foundation structure; Process border can be set to concrete grey and stir diaphragm wall.
As preferably, described duricrust soil layer is the hard soil body of 1-3 rice thickness, and preferably adopt the clay being beneficial to the construction of insert row water pipe, the described hard soil body can not select the building debris without pulverization process, avoids affect gutter intubate and constructs.
As preferably, described gross sand thickness is 1-5 rice.
As preferably, it is 0.6-1.5 rice that described concrete grey stirs continuous wall body thickness, and the degree of depth is 6-15 rice.
As preferably, the construction process required by the utility model structure and technique are: first on silt soil strata, successively lay coarse sands layer and preset sand drain structure; Then on coarse sands layer, adopt intubate machinery to carry out the construction of gutter intubate; On coarse sands layer, successively lay duricrust soil layer again, rezone and repeatedly carry out heavy tamping treatment construction.
Accompanying drawing explanation
Fig. 1 is structural profile schematic diagram of the present utility model.
Fig. 2 is the utility model coarse sands layer gutter and sand drain location arrangements schematic diagram.
Wherein: 1 is duricrust soil layer, 2 is coarse sands layer, and 3 is silt soil strata, and 4 is mud, and 5 is gutter, and 6 is process border, and 7 is sand drain.
Detailed description of the invention
Below in conjunction with embodiment, the utility model is further described.
Consult Fig. 1, Fig. 2, a kind of foundation structure of combining employing piling prepressing and heavy tamping treatment, concrete enforcement comprises duricrust soil layer 1, coarse sands layer 2, silt soil strata 3, mud 4, gutter 5, process border 6, sand drain 7.
In concrete enforcement, duricrust soil layer 1 is the hard soil body of 1-3 rice thickness, and preferably adopt the clay being beneficial to the construction of insert row water pipe, the described hard soil body can not select the building debris without pulverization process, and avoiding affects the construction of gutter intubate.
In concrete enforcement, coarse sands layer 2 selects the grit material with good water seepage function, and the thickness of described coarse sands layer 2 is 1-5 rice, as the radial drainage layer of foundation structure, adds carrier simultaneously also as piling prepressing.
Described silt soil strata 3 and mud 4 are the initial pending soil layer of foundation structure; Described gutter 5 and sand drain 7 are the longitudinal drainage structure of foundation structure; Process border 6 can be set to concrete grey and stir diaphragm wall.
In concrete enforcement, concrete grey stirs continuous wall body thickness can be designed to 1.2 meters, and the degree of depth is 12 meters.
In concrete enforcement, the construction process required by the utility model structure and technique are: first on silt soil strata 3, successively lay coarse sands layer 2 and preset sand drain 7; Then on coarse sands layer 2, adopt intubate machinery to carry out the construction of gutter 5 intubate; Gutter 5 on coarse sands layer 2 and the location arrangements of sand drain 7 can select quincuncial pile shape to be staggeredly arranged.
After gutter 5 intubate has been constructed, more successively lay duricrust soil layer 1 on coarse sands layer 2, rezone and repeatedly carry out heavy tamping treatment construction, till the designing requirement reaching foundation treatment engineering.
Claims (3)
1. combine the foundation structure adopting piling prepressing and heavy tamping treatment, it is characterized in that: in the process range of described foundation structure, comprise duricrust soil layer, coarse sands layer, silt soil strata, mud, gutter, sand drain, process border; Described duricrust soil layer is the hard soil body, adds carrier, simultaneously for the heavy-duty machinery walking surface layer of Foundation Treatment as the construction surface layer of heavy tamping treatment and piling prepressing; Described coarse sands layer selects the grit material with good water seepage function, as the radial drainage layer of foundation structure, adds carrier simultaneously also as piling prepressing; Described silt soil strata and mud are the initial pending soil layer of foundation structure; Described gutter and sand drain are the longitudinal drainage structure of foundation structure; Process border can be set to concrete grey and stir diaphragm wall.
2. a kind of foundation structure of combining employing piling prepressing and heavy tamping treatment according to claim 1, is characterized in that: described duricrust soil layer is the hard soil body of 1-3 rice thickness, adopts the clay being beneficial to the construction of insert row water pipe to lay and is formed.
3. a kind of foundation structure of combining employing piling prepressing and heavy tamping treatment according to claim 1, is characterized in that: described gross sand thickness is 1-5 rice; It is 0.6-1.5 rice that described concrete grey stirs continuous wall body thickness, and the degree of depth is 6-15 rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420537801.7U CN204059329U (en) | 2014-09-18 | 2014-09-18 | A kind of foundation structure of combining employing piling prepressing and heavy tamping treatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420537801.7U CN204059329U (en) | 2014-09-18 | 2014-09-18 | A kind of foundation structure of combining employing piling prepressing and heavy tamping treatment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204059329U true CN204059329U (en) | 2014-12-31 |
Family
ID=52200873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420537801.7U Expired - Fee Related CN204059329U (en) | 2014-09-18 | 2014-09-18 | A kind of foundation structure of combining employing piling prepressing and heavy tamping treatment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204059329U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809065A (en) * | 2022-04-13 | 2022-07-29 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of transmission tower foundation structure and construction method |
-
2014
- 2014-09-18 CN CN201420537801.7U patent/CN204059329U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809065A (en) * | 2022-04-13 | 2022-07-29 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of transmission tower foundation structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101250868B (en) | Precipitation prepressing association motive power induration deep densification method | |
CN101265701A (en) | Soft soil foundation reinforcing means | |
CN104088208B (en) | A kind of wet and soft earth foundation processing method | |
CN103233468A (en) | Polymer gravel pile grouting method | |
CN102888834B (en) | A kind of construction method of major diameter broken stone pile | |
CN101806055B (en) | Vacuum pre-pressed joint rigid pile composite foundation reinforcing method | |
CN110761264A (en) | Secondary dynamic compaction gravel replacement and reinforcement method for coastal sludge soft soil foundation | |
CN105200973A (en) | Comprehensive treatment method of soft foundation | |
CN103452093A (en) | Compound foundation formed by serial connection of water-permeable concrete pile and gravel pile and foundation treatment method | |
CN104264653B (en) | Ultra high energy level strong rammer construction technology compatible with displacement | |
CN114109394A (en) | Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement | |
CN104947650A (en) | Post-grouting closing and reinforcing method used after sand drain surcharge preloading | |
CN106567404A (en) | Expansive soil cutting semi-rigid top retaining wall design and construction method | |
CN102296591A (en) | Rapid drainage solidifying treatment method of soft soil foundation | |
CN204000848U (en) | A kind of socketed pile for subaqueous construction | |
CN204059329U (en) | A kind of foundation structure of combining employing piling prepressing and heavy tamping treatment | |
CN104674782A (en) | Foundation processing method based on sand well dynamic compaction composition of muddy soft soil | |
CN104164883A (en) | Recompaction and plant covering combined protection method for loose unsaturated soil slope shallow layer | |
RU2662841C1 (en) | Method of sealing the bases broken by weak mineral soils | |
CN207228101U (en) | A kind of sand compaction pile for being used in the soft soil foundation of deep water off-lying sea reinforce vertical type shore protection | |
CN103015438A (en) | Collapsible loess subgrade landslide treatment method | |
CN101892665A (en) | Construction method for grouting and vibro-replacement stone pile composite foundation | |
CN106049508B (en) | A kind of swag type depression earth rock placement structure and construction method | |
CN104294817B (en) | The construction method of concrete-pile | |
CN103774698B (en) | Drainage-free construction method for soil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20150918 |
|
EXPY | Termination of patent right or utility model |