CN204023632U - Pile penetration monitoring device in a kind of PHC pile tube pile driving process - Google Patents

Pile penetration monitoring device in a kind of PHC pile tube pile driving process Download PDF

Info

Publication number
CN204023632U
CN204023632U CN201420475318.0U CN201420475318U CN204023632U CN 204023632 U CN204023632 U CN 204023632U CN 201420475318 U CN201420475318 U CN 201420475318U CN 204023632 U CN204023632 U CN 204023632U
Authority
CN
China
Prior art keywords
pile
follower
scale
pile follower
phc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420475318.0U
Other languages
Chinese (zh)
Inventor
胡德帅
吴培忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201420475318.0U priority Critical patent/CN204023632U/en
Application granted granted Critical
Publication of CN204023632U publication Critical patent/CN204023632U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses pile penetration monitoring device in a kind of PHC pile tube pile driving process, it comprises pile follower bar, scale and pile follower cap, described pile follower masthead portion is fixedly installed circular pile follower masthead plate, pile follower cap is arranged on pile follower bar and PHC pile tube contact jaw by being welded and fixed, pile follower cap 5 adopts the steel plate of δ=12 ㎜ to make, high 300mm, hanger is fixedly installed in pile follower bar bilateral symmetry, described scale is fixedly installed on pile follower bar, scale is that ф 6 round steel is made, scale range from 1000mm on pile follower cap in 1000mm under pile follower masthead plate, this scale gauge length is 30mm.Pile penetration monitoring device in a kind of PHC pile tube pile driving process that the utility model proposes, not only structure is simple, and it is convenient to monitor, and reduces construction cost, ensures pile sinking quality, decreases rate of loss pile.

Description

Pile penetration monitoring device in a kind of PHC pile tube pile driving process
Technical field
The utility model relates to a kind of building piling construction servicing unit, particularly pile penetration monitoring device in a kind of PHC pile tube pile driving process.
Background technology
At present, in PHC pile tube pile driving process, pile penetration monitoring mostly adopts interim scale to be bonded on pile follower bar or adopts crayon to be painted on Pile feeder, then observes with level gauge.For subsurface geology complicated condition, without typical geology section, PHC pile tube pile sinking difficulty is large, and pile follower absolute altitude is darker; Accurately and timely pile penetration monitoring is even more important.Adopt above monitoring mode, not only time-consuming, take a lot of work, operation inconvenience, and strengthen field control difficulty, as PHC pile tube pile sinking absolute altitude does not reach design elevation at the scene, but because of not promptly and accurately pile penetration monitoring, may cause that blow counts is many, pile body is tired or pile crown is damaged, rate of loss pile is high.Cause larger economic loss.
Utility model content
Technical problem to be solved in the utility model is to provide pile penetration monitoring device in a kind of PHC pile tube pile driving process, and structure is simple, and it is convenient to monitor, and reduces construction cost, ensures pile sinking quality, reduces rate of loss pile.
For achieving the above object, pile penetration monitoring device in a kind of PHC pile tube of the utility model pile driving process, it comprises pile follower bar, scale and pile follower cap, described pile follower masthead portion is fixedly installed circular pile follower masthead plate, pile follower cap is arranged on pile follower bar and PHC pile tube contact jaw by being welded and fixed, pile follower cap 5 adopts the steel plate of δ=12 ㎜ to make, high 300mm, hanger is fixedly installed in pile follower bar bilateral symmetry, described scale is fixedly installed on pile follower bar, scale is that ф 6 round steel is made, scale range from 1000mm on pile follower cap in 1000mm under pile follower masthead plate, this scale gauge length is 30mm.
Pile penetration is monitored: in pile follower process with natural ground for object of reference, range estimation scale and record blow counts, calculate pile penetration, finally determine to stop hammer.
Pile follower cap: then because pile sinking difficulty is large, hammer jump degree is higher, prevents pile follower bar and PHC pipe pile termination eccentric force, reduces PHC pile tube at pile follower pile head loss percentage.
Pile penetration monitoring device in a kind of PHC pile tube pile driving process that the utility model proposes, not only structure is simple, and it is convenient to monitor, and reduces construction cost, ensures pile sinking quality, decreases rate of loss pile.
Accompanying drawing explanation
Fig. 1 is pile penetration monitoring device structural representation in a kind of PHC pile tube pile driving process.
Fig. 2 is the top view of Fig. 1.
Detailed description of the invention
See accompanying drawing, pile penetration monitoring device in a kind of PHC pile tube pile driving process, it comprises pile follower bar 1, scale 4 and pile follower cap 5, described pile follower masthead portion is fixedly installed circular pile follower masthead plate 2, pile follower cap is arranged on pile follower bar and PHC pile tube contact jaw by being welded and fixed, pile follower cap 5 adopts the steel plate of δ=12 ㎜ to make, high 300mm, hanger 3 is fixedly installed in pile follower bar bilateral symmetry, described scale is fixedly installed on pile follower bar, scale is that ф 6 round steel is made, scale range from 1000mm on pile follower cap in 1000mm under pile follower masthead plate, this scale gauge length is 30mm.
Pile penetration is monitored: in pile follower process with natural ground for object of reference, range estimation scale and record blow counts, calculate pile penetration, finally determine to stop hammer.
Pile follower cap: then because pile sinking difficulty is large, hammer jump degree is higher, prevents pile follower bar and PHC pipe pile termination eccentric force, reduces PHC pile tube at pile follower pile head loss percentage.
Pile penetration monitoring device in a kind of PHC pile tube pile driving process that the utility model proposes, not only structure is simple, and it is convenient to monitor, and reduces construction cost, ensures pile sinking quality, decreases rate of loss pile.

Claims (1)

1. pile penetration monitoring device in a PHC pile tube pile driving process, it is characterized in that it comprises pile follower bar, scale and pile follower cap, described pile follower masthead portion is fixedly installed circular pile follower masthead plate, pile follower cap is arranged on pile follower bar and PHC pile tube contact jaw by being welded and fixed, pile follower cap 5 adopts the steel plate of δ=12 ㎜ to make, high 300mm, hanger is fixedly installed in pile follower bar bilateral symmetry, described scale is fixedly installed on pile follower bar, scale is that ф 6 round steel is made, scale range from 1000mm on pile follower cap in 1000mm under pile follower masthead plate, this scale gauge length is 30mm.
CN201420475318.0U 2014-08-22 2014-08-22 Pile penetration monitoring device in a kind of PHC pile tube pile driving process Expired - Fee Related CN204023632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420475318.0U CN204023632U (en) 2014-08-22 2014-08-22 Pile penetration monitoring device in a kind of PHC pile tube pile driving process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420475318.0U CN204023632U (en) 2014-08-22 2014-08-22 Pile penetration monitoring device in a kind of PHC pile tube pile driving process

Publications (1)

Publication Number Publication Date
CN204023632U true CN204023632U (en) 2014-12-17

Family

ID=52063519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420475318.0U Expired - Fee Related CN204023632U (en) 2014-08-22 2014-08-22 Pile penetration monitoring device in a kind of PHC pile tube pile driving process

Country Status (1)

Country Link
CN (1) CN204023632U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532840A (en) * 2014-12-30 2015-04-22 中淳高科桩业股份有限公司 Embedded type construction precast pile following rod and pile following method thereof
CN104563171A (en) * 2015-01-21 2015-04-29 中交四航局第二工程有限公司 Device and method for detecting penetration of hammering piling for steel pipe pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532840A (en) * 2014-12-30 2015-04-22 中淳高科桩业股份有限公司 Embedded type construction precast pile following rod and pile following method thereof
CN104563171A (en) * 2015-01-21 2015-04-29 中交四航局第二工程有限公司 Device and method for detecting penetration of hammering piling for steel pipe pile
CN104563171B (en) * 2015-01-21 2016-03-02 中交四航局第二工程有限公司 A kind of pile penetration checkout gear of steel pipe pile hammer piling and detection method

Similar Documents

Publication Publication Date Title
EP2713309A3 (en) Method and device for detecting drivable region of road
WO2015169080A8 (en) Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
EP2957714A3 (en) A wellbore servicing method using a delayed activation activatable stimulation assembly
CN204514514U (en) A kind of device detecting anchor axial force and bending moment force
CN204023632U (en) Pile penetration monitoring device in a kind of PHC pile tube pile driving process
CN103043434B (en) Stacking machine forward stock stop
CN204676523U (en) A kind of Novel construction steel pile
CN206385576U (en) A kind of clinometer probe not damaged fishing device
PH12015500722B1 (en) Steel pipe insertion work steel pipe strain detection structure.
CN204112379U (en) Inclinometer pipe casing in supporting pile body
CN205157346U (en) Ceramic tile intensity detection device
CN204592761U (en) Adjustable laser frame
CN201843139U (en) Prestress control of anchor rod or anchor cable
CN203265342U (en) Non-central-spindle screw blade turn-knob machine
CN204122735U (en) A kind of plug draw-out device
CN203077188U (en) Device for adjusting space between driving sliding contact lines
CN204086581U (en) Pipe and cable detector
CN205114844U (en) A pipe hoist for steel pipe snatchs
CN202903389U (en) Thick plate fan-shaped segment driving roll pressure detection system capable of accurately determining surface quality of slab
CN202711644U (en) Lifting and hanging device for banner
CN204627491U (en) A kind of multi-functional fishing device
CN204000842U (en) Vibration tube device in joint bar castinplace pile after a kind of twist drill concrete pump piles
CN204608774U (en) A kind of PHC pile tube pile top
CN203794571U (en) Adjustable rope lifting device for maintaining cableway supporting roller
CN203918402U (en) Mine locomotive buffer press-loading apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217