CN204002391U - A kind of fast joint structure of shower house upper sectional material - Google Patents
A kind of fast joint structure of shower house upper sectional material Download PDFInfo
- Publication number
- CN204002391U CN204002391U CN201420487486.1U CN201420487486U CN204002391U CN 204002391 U CN204002391 U CN 204002391U CN 201420487486 U CN201420487486 U CN 201420487486U CN 204002391 U CN204002391 U CN 204002391U
- Authority
- CN
- China
- Prior art keywords
- cross beam
- connector
- shower house
- abaculus
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bathtubs, Showers, And Their Attachments (AREA)
Abstract
The utility model provides a kind of fast joint structure of shower house upper sectional material, comprise connector, column section and cross beam sectional bar, described connector is fixedly connected on described cross beam sectional bar end, the end of described connector is provided with abaculus, the sidewall of described column section is provided with the caulking groove corresponding with described abaculus, and described abaculus is plugged in described caulking groove.Can in advance connector and cross beam sectional bar be fixed, while installing at the scene, only need simple inserting, can realize being connected of cross beam sectional bar and column section, thereby greatly accelerate the speed of assembling.And latch afterbody can stash the tapping screw of connecting cross beam section bar and connector, is convenient to clean.
Description
Technical field
The utility model relates to a kind of fast joint structure of section bar, particularly the sectional material quick connecting structure in a kind of shower house.
Background technology
In prior art, the frame forming between the column adopting in shower house and crossbeam, adopts aluminium alloy extrusions to form more.And when traditional shower house is installed, glass sides edge and upper edge are all to embed respectively in the longitudinal fluting of column section and cross beam sectional bar, then by tapping screw, column section and cross beam sectional bar are fixed together.Be specially and on cross beam sectional bar, be provided with the installing hole entering for tapping screw, on column section, relevant position offers corresponding via hole, and the sidewall that makes tapping screw pass column section is fixed on cross beam sectional bar.But, in general, column section width larger, even at the middle part of column section, be also provided with reinforcement dividing plate, this just need to offer through hole on column section, to avoid tapping screw oversize.And shower house is all each section bar independent packaging conventionally, be transported to that erecting bed assembles again.Obviously, such design, in the time of can making on-the-spot installation, the through hole of offering on the through hole of offering due to column section sidewall and cross beam sectional bar cannot be seen, and make to install difficult, inefficiency, and due to processing and manufacturing and the error brought of assembling, also can cause between column section and cross beam sectional bar, there is certain gap.
Utility model content
(1) technical problem that will solve
Technical problem to be solved in the utility model is to overcome deficiency of the prior art, and a kind of easy for installation, sectional material quick connecting structure in shower house efficiently simple in structure, on-the-spot is provided.
(2) technical scheme
For solving the problems of the technologies described above, the utility model provides a kind of fast joint structure of shower house upper sectional material, comprise connector 1, column section 2 and cross beam sectional bar 3, described connector 1 is fixedly connected on described cross beam sectional bar 3 ends, the end of described connector 1 is provided with abaculus 13, the sidewall of described column section 2 is provided with the caulking groove 21 corresponding with described abaculus 13, and described abaculus 13 is plugged in described caulking groove 21.
For the ease of installing, avoid abaculus 13 to skid off simultaneously, as preferably, the direction of insertion of described abaculus 13 is parallel with the length direction of described column section 2.
In order to improve whole bonding strength, as preferably, described abaculus 13 and described caulking groove 21 are one or more.
For convenient for assembly, improve bonding strength, as preferably, the cross section of described abaculus 13 and described caulking groove 21 is swallow-tail form or T-shaped structure.
For make between connector 1 and cross beam sectional bar 3 fixing quick, accurate positioning is reliable, at described connector 1, be provided with projection 11 with the end face that described cross beam sectional bar 3 coordinates, described projection 11 is towards described cross beam sectional bar 3, on described cross beam sectional bar 3, form the inside groove 31 corresponding with described projection 11, described projection 11 is fastened in described inside groove 31.
Fixing more reliable in order to make between connector 1 and cross beam sectional bar 3, as preferably, on described connector 1, be provided with the first installing hole 12, the front end face of described cross beam sectional bar 3 is provided with second installing hole 32, one screws 4 corresponding with described the first installing hole 12 and passes successively described the first installing hole 12, the second installing hole 32 and described connector 1 is fixed on described cross beam sectional bar 3.
In order to prevent that connector 1 and column section 2 from departing from from inserting direction, as preferably, on described cross beam sectional bar 3, be equipped with latch 5, described latch 5, towards described connector 1, offers the pin hole corresponding with described latch 5 on described connector 1, described column section 2.
Outside screw 4 is exposed to, improve aesthetics, as preferably, the afterbody of described latch 5 is provided with the lid that described the first installing hole 12 can be covered.
(3) beneficial effect
Compared with prior art, the utility model has the advantage of: can utilize a connector to be connected and fixed by mode and the column section of inserting, and can be fixedly connected with in advance between connector and cross beam sectional bar, while installing at the scene, only need to move by simple inserting, without instrument, can realize being fixedly connected with between column section and cross beam sectional bar, simple and convenient, connect reliably, fast fast, without professional, can realize the quick connection of section bar.
Accompanying drawing explanation
Fig. 1 is the perspective view of the sectional material quick connecting structure in the utility model shower house;
Fig. 2 is the three-dimensional exploded view of the sectional material quick connecting structure in the utility model shower house;
Fig. 3 is that connector and the cross beam sectional bar of the sectional material quick connecting structure in the utility model shower house is connected and fixed schematic diagram;
Fig. 4 is the decomposing schematic representation that the connector of the sectional material quick connecting structure in the utility model shower house is connected with cross beam sectional bar;
Fig. 5 is the partial schematic sectional view of assembly structure shown in Fig. 1;
Fig. 6 is the partial schematic sectional view of assembly structure shown in Fig. 2;
Fig. 7 is the cross-sectional schematic of the sectional material quick connecting structure in the utility model shower house;
Fig. 8 is sectional material quick connecting structure connector in the utility model shower house and the action schematic diagram of column section inserting;
Fig. 9 is the action schematic diagram that the sectional material quick connecting structure latch in the utility model shower house is installed;
In figure: 1, connector; 11, projection; 12, the first installing hole; 13, abaculus; 14, the first pin hole; 2, column section; 21, caulking groove; 22, the second pin hole; 3, cross beam sectional bar; 31, inside groove; 32, the second installing hole; 4, screw; 5, latch.
The specific embodiment
Consult Fig. 1~Fig. 9, it is structural representation and the explosive view of the sectional material quick connecting structure in the utility model shower house.The utility model provides a kind of fast joint structure of shower house upper sectional material, comprise connector 1, column section 2 and cross beam sectional bar 3, connector 1 is fixedly connected on cross beam sectional bar 3 ends by screw, in the end of connector 1, be provided with abaculus 13, sidewall at column section 2 is provided with the caulking groove corresponding with this abaculus 13 21, abaculus 13 is plugged in caulking groove 21, thereby realizes being connected of column section 2 and cross beam sectional bar 3; For the ease of installing, avoid abaculus 13 to skid off simultaneously, the direction of insertion of this abaculus 13 is parallel with the length direction of column section 2; In order to improve whole bonding strength, abaculus 13 and caulking groove 21 are one or more; For convenient for assembly, improve bonding strength simultaneously, the cross section of this abaculus 13 and caulking groove 21 is swallow-tail form or T-shaped structure; For make between connector 1 and cross beam sectional bar 3 fixing quick, accurate positioning is reliable, at connector 1, be provided with projection 11 with the end face that described cross beam sectional bar 3 coordinates, projection 11 is towards cross beam sectional bar 3, on cross beam sectional bar 3, form the inside groove corresponding with projection 11 31, projection 11 is just fastened in inside groove 31; Fixing more reliable in order to make between connector 1 and cross beam sectional bar 3, on connector 1, be provided with the first installing hole 12, simultaneously at the front end face of cross beam sectional bar 3, be provided with second installing hole 32, one screws 4 corresponding with the first installing hole 12 successively through the first installing hole 12, the second installing hole 32 and this connector 1 is fixed on cross beam sectional bar 3; In order to prevent that connector 1 and column section 2 from departing from from inserting direction, in the present embodiment, on cross beam sectional bar 3, be equipped with latch 5, this latch 5 is towards connector 1, on connector 1, on column section 2, offer respectively first pin hole 14 corresponding with latch 5 and the second pin hole 22, latch 5 slides left and passes successively the first pin hole 14 and the second pin hole 22, thereby completes location, avoids abaculus 13 to skid off from caulking groove 21.Outside screw 4 is exposed to, prevent that steam from producing corrosion to screw, improve aesthetics simultaneously, in the present embodiment, at the afterbody of latch 5, be provided with the lid that the first installing hole 12 can be covered, it can be by screw concealed.
Below installation steps of the present utility model are simply set forth:
During installation, the projection of connector 1 11 is aimed to the inside groove 31 of cross beam sectional bar 3 and is pressed into, projection 11 is snapped in inside groove 31 completely, now, the first installing hole 12 on connector 1 and the second installing hole 32 on cross beam sectional bar 3 are just in time aimed at, adopt screw 4 successively through the first installing hole 12 and the second installing hole 32, connector 1 is completely fixed on cross beam sectional bar 3.Above step can install in advance before shower house is dispatched from the factory.When curstomer's site is installed, again by the caulking groove on the abaculus of connector 1 left end 13 alignment post section bars 2 21 and toward pressing down, abaculus 13 is pegged graft in caulking groove 21 completely, now, be positioned at the first pin hole 14 on connector 1 and be positioned at the second pin hole 22 on column section 2 in alignment, then, by latch 5 to connector 1 direction slippage, make it successively through the first pin hole 14 and the second pin hole 22, complete the location of connector 1 and column section 2, avoid abaculus 13 to skid off from caulking groove 21, now, the lid that is positioned at latch 5 rear ends just in time covers screw 4, being about to screw 4 stashes, reach the effect that improves aesthetics, can avoid steam to cause corrosion to this screw simultaneously.
During dismounting, step is contrary with installation steps.
Sectional material quick connecting structure in the utility model shower house, can utilize a connector to be connected and fixed by mode and the column section of inserting, and can be fixedly connected with in advance between connector and cross beam sectional bar, while installing at the scene, only need to move by simple inserting, without instrument, can realize being fixedly connected with between column section and cross beam sectional bar, simple and convenient, connect reliably, fast fast, without professional, can realize the quick connection of section bar.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; do not departing under the prerequisite of the utility model know-why; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (8)
1. the fast joint structure of a shower house upper sectional material, it is characterized in that: comprise connector (1), column section (2) and cross beam sectional bar (3), described connector (1) is fixedly connected on described cross beam sectional bar (3) end, the end of described connector (1) is provided with abaculus (13), the sidewall of described column section (2) is provided with the caulking groove (21) corresponding with described abaculus (13), and described abaculus (13) is plugged in described caulking groove (21).
2. the fast joint structure of shower house upper sectional material as claimed in claim 1, is characterized in that: the direction of insertion of described abaculus (13) is parallel with the length direction of described column section (2).
3. the fast joint structure of shower house upper sectional material as claimed in claim 1 or 2, is characterized in that: described abaculus (13) and described caulking groove (21) are one or more.
4. the fast joint structure of shower house upper sectional material as claimed in claim 2, is characterized in that: the cross section of described abaculus (13) and described caulking groove (21) is swallow-tail form or T-shaped structure.
5. the fast joint structure of shower house upper sectional material as claimed in claim 4, it is characterized in that: the end face coordinating with described cross beam sectional bar (3) at described connector (1) is provided with projection (11), described projection (11) is towards described cross beam sectional bar (3), on described cross beam sectional bar (3), form the inside groove (31) corresponding with described projection (11), described projection (11) is fastened in described inside groove (31).
6. the fast joint structure of shower house upper sectional material as claimed in claim 5, it is characterized in that: on described connector (1), be provided with the first installing hole (12), the front end face of described cross beam sectional bar (3) is provided with second installing hole (32) corresponding with described the first installing hole (12), and a screw (4) passes successively described the first installing hole (12), the second installing hole (32) and described connector (1) is fixed on described cross beam sectional bar (3).
7. the fast joint structure of shower house upper sectional material as claimed in claim 6, it is characterized in that: on described cross beam sectional bar (3), be equipped with latch (5), described latch (5), towards described connector (1), offers the pin hole corresponding with described latch (5) on described connector (1), described column section (2).
8. the fast joint structure of shower house upper sectional material as claimed in claim 7, is characterized in that: the afterbody of described latch (5) is provided with the lid that described the first installing hole (12) can be covered.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420487486.1U CN204002391U (en) | 2014-08-27 | 2014-08-27 | A kind of fast joint structure of shower house upper sectional material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420487486.1U CN204002391U (en) | 2014-08-27 | 2014-08-27 | A kind of fast joint structure of shower house upper sectional material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204002391U true CN204002391U (en) | 2014-12-10 |
Family
ID=52042411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420487486.1U Expired - Lifetime CN204002391U (en) | 2014-08-27 | 2014-08-27 | A kind of fast joint structure of shower house upper sectional material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204002391U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105307447A (en) * | 2015-09-25 | 2016-02-03 | 西安华为技术有限公司 | Section frame connection structure |
CN106368575A (en) * | 2016-11-29 | 2017-02-01 | 平湖信达电子塑业有限公司 | Shower door joint |
CN108518087A (en) * | 2018-03-29 | 2018-09-11 | 加泰罗尼亚洁具(宁波)有限公司 | A kind of shower house structure easy to install and shower house |
CN108991965A (en) * | 2018-07-24 | 2018-12-14 | 加泰罗尼亚洁具(宁波)有限公司 | A kind of pre- arrangement of sliding rail and a kind of shower house easy to install |
WO2021056519A1 (en) * | 2019-09-29 | 2021-04-01 | 平湖市贝诺维雅卫浴科技有限公司 | Quick-mounting locking mechanism |
CN112955625A (en) * | 2018-10-23 | 2021-06-11 | 亚萨合莱自动门系统有限公司 | Corner connector for access system |
WO2021147146A1 (en) * | 2020-01-20 | 2021-07-29 | 福建西河卫浴科技有限公司 | Prefabricated cross-beam assembly, prefabricated vertical column assembly, shower room, and installation method for same |
EP4013200A4 (en) * | 2019-08-06 | 2022-10-12 | BOE Technology Group Co., Ltd. | MULTIPLE SCREEN FRAME AND INTERACTION DISPLAY |
US20230235769A1 (en) * | 2022-01-27 | 2023-07-27 | Nattapong Anekadhana | Inner wall frame with grooves for attachment with sleeve joints for aluminum furniture |
WO2023146482A1 (en) * | 2022-01-27 | 2023-08-03 | Anekadhana Nattapong | Inner wall frame with grooves for attachment with sleeve joints for aluminum furniture |
-
2014
- 2014-08-27 CN CN201420487486.1U patent/CN204002391U/en not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105307447A (en) * | 2015-09-25 | 2016-02-03 | 西安华为技术有限公司 | Section frame connection structure |
CN105307447B (en) * | 2015-09-25 | 2019-03-01 | 西安华为技术有限公司 | Section material framework connection structure |
CN106368575A (en) * | 2016-11-29 | 2017-02-01 | 平湖信达电子塑业有限公司 | Shower door joint |
CN108518087A (en) * | 2018-03-29 | 2018-09-11 | 加泰罗尼亚洁具(宁波)有限公司 | A kind of shower house structure easy to install and shower house |
CN108991965A (en) * | 2018-07-24 | 2018-12-14 | 加泰罗尼亚洁具(宁波)有限公司 | A kind of pre- arrangement of sliding rail and a kind of shower house easy to install |
CN112955625A (en) * | 2018-10-23 | 2021-06-11 | 亚萨合莱自动门系统有限公司 | Corner connector for access system |
EP4013200A4 (en) * | 2019-08-06 | 2022-10-12 | BOE Technology Group Co., Ltd. | MULTIPLE SCREEN FRAME AND INTERACTION DISPLAY |
US11645031B2 (en) | 2019-08-06 | 2023-05-09 | Boe Technology Group Co., Ltd. | Frame and multi-screen interactive display device |
WO2021056519A1 (en) * | 2019-09-29 | 2021-04-01 | 平湖市贝诺维雅卫浴科技有限公司 | Quick-mounting locking mechanism |
WO2021147146A1 (en) * | 2020-01-20 | 2021-07-29 | 福建西河卫浴科技有限公司 | Prefabricated cross-beam assembly, prefabricated vertical column assembly, shower room, and installation method for same |
US20230235769A1 (en) * | 2022-01-27 | 2023-07-27 | Nattapong Anekadhana | Inner wall frame with grooves for attachment with sleeve joints for aluminum furniture |
WO2023146482A1 (en) * | 2022-01-27 | 2023-08-03 | Anekadhana Nattapong | Inner wall frame with grooves for attachment with sleeve joints for aluminum furniture |
US12303024B2 (en) * | 2022-01-27 | 2025-05-20 | Nattapong Anekadhana | Inner wall frame with grooves for attachment with sleeve joints for aluminum furniture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204002391U (en) | A kind of fast joint structure of shower house upper sectional material | |
US20140083504A1 (en) | Solar apparatus and mounting system thereof | |
CN202120956U (en) | Connection structure of frame of solar assembly | |
CN203701341U (en) | Special-shaped keel used for partition system | |
CN205171861U (en) | Aluminum alloy sunshading board connection structure | |
CN208733972U (en) | Decorating interior wall plate inner corner trim connection structure | |
CN203821637U (en) | Insertion assembly for partition wall system and specially-shaped keel thereof | |
CN201292630Y (en) | Combined outdoor wallboard | |
CN207620294U (en) | The mounting structure of indoor wall decorative plate | |
CN107355035A (en) | Glass curtain wall hidden frame system | |
CN203701348U (en) | U-shaped groove body used for partition system | |
CN203701342U (en) | Demountable partition wall system | |
CN204801788U (en) | Side wall transition stand template structure | |
CN203701343U (en) | Insertion module used for partition system and special-shaped keel of insertion module | |
CN203925189U (en) | Wooden construction linkage and wooden construction connector | |
CN209384510U (en) | A kind of wallboard for assembled architecture convenient for splicing | |
CN202300130U (en) | Solar sun-shading louver with flexible assembling | |
CN202834928U (en) | Energy-saving lamp convenient to assemble | |
CN203947619U (en) | A kind of connecting structure of wall | |
CN211691287U (en) | Three-dimensional elevator steel frame that installs additional | |
CN204386039U (en) | The hidden frame lighting roof of secondary waterproof type | |
CN105804359B (en) | The mounting assembly of wall decorating veneer | |
CN103352528A (en) | Steel T-bar framework applied to curtain wall door and window | |
CN202405631U (en) | Bus joint connecting device | |
CN203701349U (en) | Pushing module used for partition system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20141210 |