The automatically standby gluing equipment of a kind of lamp bar Download PDFInfo
- Publication number
- CN203979040U CN203979040U CN201420237929.1U CN201420237929U CN203979040U CN 203979040 U CN203979040 U CN 203979040U CN 201420237929 U CN201420237929 U CN 201420237929U CN 203979040 U CN203979040 U CN 203979040U
- Authority
- CN
- China
- Prior art keywords
- light bar
- preparation equipment
- automatic glue
- glue preparation
- light
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及液晶产品加工领域,尤其涉及一种灯条自动备胶设备。The utility model relates to the field of liquid crystal product processing, in particular to an automatic glue preparation equipment for a light bar.
背景技术Background technique
现有的背光源使用灯条,是将已经裁切好的双面胶贴覆到LED灯条上,属于纯手工贴覆,因手工贴覆存在效率低下、人力成本太高等问题,一些灯条贴覆治具随之产生。如将灯条放入治具上轻压固定灯条,在灯条上贴灯条胶带,撕去灯条胶带离心纸,现有方法存在问题:The existing backlight uses a light strip, which is to paste the cut double-sided tape on the LED light strip, which is purely manual. Because of the problems of low efficiency and high labor cost, some light strips The sticking fixture is produced accordingly. If you put the light bar into the fixture and lightly press it to fix the light bar, paste the light bar tape on the light bar, and tear off the centrifuge paper of the light bar tape, there are problems in the existing method:
1.双面胶需双面背胶,浪费一面离型纸,增加成本;1. Double-sided tape needs double-sided adhesive, which wastes one side of the release paper and increases the cost;
2.手工贴覆需要一定的人力,造成人力成本;2. Manual pasting requires a certain amount of manpower, resulting in labor costs;
3.双面胶属于柔性基材,手工贴覆存在定位不准,贴覆歪斜造成物料浪费;3. The double-sided adhesive is a flexible base material, and manual application has inaccurate positioning, causing material waste due to skewed application;
4.手工贴覆,存在效率低下的问题。4. Manual sticking has the problem of low efficiency.
实用新型内容Utility model content
为了解决上述技术问题,本实用新型提供一种灯条自动备胶设备,提高贴附精度,提高生产效率。In order to solve the above-mentioned technical problems, the utility model provides an automatic glue preparation equipment for light strips, which improves the attachment accuracy and improves the production efficiency.
为了达到上述目的,本实用新型采用的技术方案是:一种灯条自动备胶设备,包括:In order to achieve the above purpose, the technical solution adopted by the utility model is: an automatic glue preparation equipment for light bars, including:
用于提供双面胶的供料装置;Feeding device for providing double-sided adhesive tape;
用于将所述双面胶中待贴附的第一部分输送至第一位置的第一输送装置;A first conveying device for conveying the first part to be attached in the double-sided adhesive tape to the first position;
用于将灯条输送至与所述第一位置相对应的第二位置的灯条输送装置;a light strip conveying device for conveying the light strip to a second position corresponding to the first position;
用于控制位于所述第二位置的灯条升降以将灯条与所述第一部分贴附的升降装置。A lifting device for controlling the lifting of the light bar at the second position so as to attach the light bar to the first part.
进一步的,所述供料装置包括:Further, the feeding device includes:
第一转轴;first shaft;
设置在所述第一转轴上的第一缠绕结构,所述第一缠绕结构上沿所述第一转动轴的轴向间隔缠绕多层所述双面胶。A first winding structure arranged on the first rotating shaft, on which multiple layers of the double-sided adhesive tape are wound at intervals along the axial direction of the first rotating shaft.
进一步的,所述第一输送装置包括:Further, the first delivery device includes:
第二转轴;second shaft;
设置在所述第二转轴上的第二缠绕结构,所述双面胶的一端连接于所述第二缠绕结构,所述第二缠绕结构在所述第二转轴带动下转动,将所述第一部分输送至所述第一位置。A second winding structure arranged on the second rotating shaft, one end of the double-sided adhesive is connected to the second winding structure, the second winding structure is driven by the second rotating shaft to rotate, and the first A portion is delivered to the first location.
进一步的,所述第二缠绕结构上与所述第一部分相对应的区域设有用于吸附贴附有灯条的所述第一部分的真空吸附装置。Further, the area of the second winding structure corresponding to the first part is provided with a vacuum suction device for absorbing the first part on which the light bar is attached.
进一步的,所述第二缠绕结构为正六边形结构,每一边的长度与灯条的长度相对应,所述真空吸附装置包括设置于所述正六边形结构与所述第二转轴之间的真空吸附管。Further, the second winding structure is a regular hexagonal structure, the length of each side corresponds to the length of the light bar, and the vacuum adsorption device includes a regular hexagonal structure and the second rotating shaft Vacuum tube.
进一步的,所述每一边的两端设有第一感应装置;Further, a first induction device is provided at both ends of each side;
所述灯条自动备胶设备还包括根据所述第一感应装置传输的信号、在所述第二缠绕结构转动以将贴附有灯条的所述第一部分转动到第三位置时裁切所述第一部分的切割装置。The automatic glue preparation equipment for the light bar also includes: cutting the first part attached to the light bar to the third position when the second winding structure rotates according to the signal transmitted by the first sensing device. The first part of the cutting device.
进一步的,所述切割装置包括激光切割器。Further, the cutting device includes a laser cutter.
进一步的,还包括用于将裁切后的所述第一部分取下的卸载装置。Further, an unloading device for removing the cut first part is also included.
进一步的,所述卸载装置包括:Further, the unloading device includes:
第一导轨;first rail;
具有真空吸附盘的伸缩杆,所述伸缩杆可移动的设置在所述第一导轨上。There is a telescopic rod for a vacuum suction plate, and the telescopic rod is movably arranged on the first guide rail.
进一步的,还包括用于将所述卸载装置取下的贴附有灯条的所述第一部分输出以进行下一工艺的第二输送装置。Further, it also includes a second conveying device for outputting the first part attached with the light bar removed from the unloading device for the next process.
进一步的,所述灯条输送装置包括:Further, the light bar conveying device includes:
第二导轨;second rail;
承载有灯条的支撑台,所述支撑台可移动的设置在所述第二导轨上。A support platform carrying a light bar, the support platform is movably arranged on the second guide rail.
进一步的,所述升降装置包括:Further, the lifting device includes:
升降柱,承载有灯条的承载台通过所述升降柱设置于所述支撑台上;Lifting column, the bearing platform carrying the light bar is set on the support platform through the lifting column;
用于感应灯条上升距离的第二感应装置,设置于所述支撑台上。The second sensing device for sensing the rising distance of the light bar is arranged on the support platform.
用于根据所述第二感应装置传输的信号控制所述升降柱上升速度的控制装置。A control device for controlling the rising speed of the lifting column according to the signal transmitted by the second sensing device.
本实用新型的有益效果是:实现灯条自动贴附双面胶,提高双面胶的贴附精度,提高效率并解决物料浪费和人力成本高的问题。The beneficial effects of the utility model are: realizing the automatic attachment of the double-sided adhesive to the light bar, improving the attachment precision of the double-sided adhesive, improving the efficiency and solving the problems of material waste and high labor cost.
附图说明Description of drawings
图1表示本实用新型灯条自动备胶设备结构示意图Fig. 1 shows the schematic diagram of the structure of the utility model lamp bar automatic glue preparation equipment
图2表示本实用新型灯条自动备胶设备局部放大结构示意图。Fig. 2 shows a schematic diagram of a partial enlarged structure of the automatic glue preparation equipment for light strips of the present invention.
具体实施方式Detailed ways
以下结合附图对本实用新型结构和原理进行详细说明,所举实施例仅用于解释本实用新型,并非以此限定本实用新型的保护范围。The structure and principle of the utility model will be described in detail below in conjunction with the accompanying drawings. The examples given are only used to explain the utility model, not to limit the protection scope of the utility model.
如图1和图2所示,本实施例提供一种灯条自动备胶设备,包括:As shown in Figure 1 and Figure 2, this embodiment provides an automatic glue preparation equipment for light strips, including:
用于提供双面胶的供料装置1;A feeding device 1 for providing double-sided adhesive tape;
用于将所述双面胶中待贴附的第一部分输送至第一位置的第一输送装置3;A first conveying device 3 for conveying the first part to be attached in the double-sided tape to the first position;
用于将灯条输送至与所述第一位置相对应的第二位置的灯条输送装置2;a light bar conveying device 2 for transporting the light bar to a second position corresponding to the first position;
用于控制位于所述第二位置的灯条升降以将灯条与所述第一部分贴附的升降装置。A lifting device for controlling the lifting of the light bar at the second position so as to attach the light bar to the first part.
实现灯条自动贴附双面胶,直接进行双面胶的贴附,而后裁剪,无需浪费现有技术中的一面离型纸的物料,并且能够提高双面胶的贴附精度,提高效率并解决人力成本高的问题。Realize the automatic attachment of double-sided tape to the light bar, directly attach the double-sided tape, and then cut it, without wasting the material of one side of the release paper in the prior art, and can improve the attachment accuracy of the double-sided tape, improve efficiency and Solve the problem of high labor costs.
所述供料装置1的结构形式有多种,实现提供双面胶即可,本实施例中,所述供料装置1包括:There are various structural forms of the feeding device 1, and it is only necessary to provide double-sided adhesive tape. In this embodiment, the feeding device 1 includes:
第一转轴1.1;First shaft 1.1;
设置在所述第一转轴1.1上的第一缠绕结构,所述第一缠绕结构上沿所述第一转动轴的轴向间隔缠绕多层所述双面胶1.3。The first winding structure is arranged on the first rotating shaft 1.1, and multiple layers of the double-sided adhesive tape 1.3 are wound on the first winding structure at intervals along the axial direction of the first rotating shaft.
如图1和图2所示,随着所述第一转轴1.1的转动,缠绕在所述第一缠绕结构上的双面胶1.3被释放,所述第一缠绕结构采用一缠绕筒,缠绕筒的外壁沿所述第一转轴1.1的轴向间隔缠绕多层所述双面胶1.3,为了方便双面胶1.3的缠绕,在缠绕筒的外壁设有间距相等的凹槽1.2。As shown in Figures 1 and 2, with the rotation of the first rotating shaft 1.1, the double-sided adhesive tape 1.3 wrapped on the first winding structure is released, and the first winding structure adopts a winding drum, and the winding drum The outer wall of the winding cylinder is wound with multiple layers of double-sided adhesive tape 1.3 at intervals along the axial direction of the first rotating shaft 1.1. In order to facilitate the winding of the double-sided adhesive tape 1.3, grooves 1.2 with equal spacing are provided on the outer wall of the winding cylinder.
本实施例中,所述第一缠绕结构通过轴承套装于所述第一转轴1.1上。In this embodiment, the first winding structure is sleeved on the first rotating shaft 1.1 through a bearing.
所述第一输送装置3的结构形式可以有多种,实现将所述双面胶1.3中待贴附的第一部分输送至第一位置即可,本实施例中,所述第一输送装置3包括:The structural forms of the first conveying device 3 can be various, and it is enough to realize that the first part to be attached in the double-sided adhesive tape 1.3 is conveyed to the first position. In this embodiment, the first conveying device 3 include:
第二转轴3.5;The second shaft 3.5;
设置在所述第二转轴3.5上的第二缠绕结构,所述双面胶1.3的一端连接于所述第二缠绕结构,所述第二缠绕结构在所述第二转轴3.5带动下转动,将所述第一部分输送至所述第一位置。The second winding structure arranged on the second rotating shaft 3.5, one end of the double-sided adhesive tape 1.3 is connected to the second winding structure, and the second winding structure is driven by the second rotating shaft 3.5 to rotate, and the The first portion is delivered to the first location.
本实施例中,所述供料装置1和所述第一输送装置3均采用可转动的方式分别对双面胶1.3进行释放和缠绕,所述第一转轴1.1和所述第二转轴3.5相对转动,如图1所示,所述第一转轴1.1顺时针转动(图1中箭头所指的方向)和所述第二转轴3.5逆时针转动,所述双面胶1.3的一端(起始端)连接于所述第二缠绕结构,则在所述供料装置1与所述第一输送装置3的配合下,所述双面胶1.3中待贴附的第一部分被输送至第一位置。需要说明的是,所述供料装置1和所述第一输送装置3的结构形式并不限于上述描述,也并不是必须成对存在的,只要实现双面胶1.3的输送即可。In this embodiment, the feeding device 1 and the first conveying device 3 both release and wrap the double-sided adhesive tape 1.3 in a rotatable manner, and the first rotating shaft 1.1 and the second rotating shaft 3.5 are opposite to each other. Rotation, as shown in Figure 1, the first rotating shaft 1.1 rotates clockwise (the direction indicated by the arrow in Figure 1) and the second rotating shaft 3.5 rotates counterclockwise, one end (starting end) of the double-sided adhesive tape 1.3 Connected to the second winding structure, under the cooperation of the feeding device 1 and the first conveying device 3, the first part to be attached in the double-sided adhesive tape 1.3 is conveyed to the first position. It should be noted that the structural form of the feeding device 1 and the first conveying device 3 is not limited to the above description, and they do not necessarily exist in pairs, as long as the conveyance of the double-sided adhesive tape 1.3 can be realized.
在灯条与所述双面胶中的所述第一部分贴附后,贴附有灯条的所述第一部分随着所述第二缠绕结构转动,为了防止由于灯条重力作用灯条脱落或者灯条带动贴附的双面胶1.3松动以致影响下一步骤的工艺的操作,所述第二缠绕结构上与所述第一部分相对应的区域设有用于吸附贴附有灯条的所述双面胶1.3的第一部分的真空吸附装置。After the light bar is attached to the first part of the double-sided tape, the first part to which the light bar is attached rotates with the second winding structure, in order to prevent the light bar from falling off due to the gravity of the light bar or The light bar drives the double-sided adhesive 1.3 attached to loosen so as to affect the operation of the next step of the process. The area corresponding to the first part on the second winding structure is provided with the double-sided tape for absorbing and pasting the light bar. Vacuum suction device for the first part of the face glue 1.3.
所述第二缠绕结构和所述真空吸附装置的结构均有多种,本实施例中,所述第二缠绕结构为正六边形结构(也可以是其他多边形结构),每一边的长度与灯条的长度相对应,所述真空吸附装置包括设置于所述正六边形结构与所述第二转轴3.5之间的真空吸附管3.4,如图2所示,所述真空吸附管3.4的真空吸附口3.1外露于所述正六边形结构。There are various structures of the second winding structure and the vacuum adsorption device. In this embodiment, the second winding structure is a regular hexagonal structure (or other polygonal structures), and the length of each side is the same as that of the lamp. Corresponding to the length of the bar, the vacuum adsorption device includes a vacuum adsorption tube 3.4 arranged between the regular hexagonal structure and the second rotating shaft 3.5, as shown in Figure 2, the vacuum adsorption of the vacuum adsorption tube 3.4 Port 3.1 is exposed to the regular hexagonal structure.
如图1所示,所述第一位置为所述正六边形结构中位于最下方的一边所在的位置,所述正六边形结构上对应于所述供料装置1中缠绕的多层双面胶,也可以同时对多个灯条进行双面胶的贴附,此时,所述正六边形的每一边上设有与所述供料装置1上的凹槽1.2数量、位置相对应的凹槽以同时缠绕并输送多条双面胶1.3。As shown in Figure 1, the first position is the position of the lowermost side of the regular hexagonal structure, and the regular hexagonal structure corresponds to the multi-layer double-sided coil wound in the feeding device 1. Adhesive, double-sided adhesive can also be attached to a plurality of light bars at the same time, at this time, each side of the regular hexagon is provided with grooves 1.2 corresponding to the number and position of the feeding device 1 Groove to simultaneously wind and convey a plurality of double-sided adhesive tape 1.3.
双面胶1.3贴附结束后则需要将贴附双面胶1.3的灯条取下,由于本实施例中并不是采用与灯条等长的双面胶1.3直接贴附的,需要进行对贴附有灯条的第一部分进行裁切,此步骤的操作可以人工也可以自动,本实施例中,所述每一边的两端设有第一感应装置3.3;After the double-sided adhesive 1.3 is attached, the light bar with the double-sided adhesive 1.3 needs to be removed. Since the double-sided adhesive 1.3 of the same length as the light bar is not directly attached in this embodiment, it needs to be pasted The first part with the light bar is cut. The operation of this step can be manual or automatic. In this embodiment, the two ends of each side are provided with a first sensing device 3.3;
所述灯条自动备胶设备还包括根据所述第一感应装置3.3传输的信号、在所述第二缠绕结构转动以将贴附有灯条的所述第一部分转动到第三位置时裁切所述第一部分的切割装置4。The automatic glue preparation equipment for light strips also includes cutting according to the signal transmitted by the first sensing device 3.3 when the second winding structure rotates to rotate the first part attached to the light strips to the third position. The cutting means 4 of the first part.
本实施例中,所述第一感应装置3.3采用红外感应器,但并不以此为限。In this embodiment, the first sensing device 3.3 uses an infrared sensor, but it is not limited thereto.
本实施例中,所述切割装置4包括激光切割器,但并不以此为限。In this embodiment, the cutting device 4 includes a laser cutter, but it is not limited thereto.
所述第三位置的设定根据所述切割装置4所在的位置确定,本实施例中,所述第三位置为所述正六边形结构中位于最上方的一边所在的位置。The setting of the third position is determined according to the position of the cutting device 4 , and in this embodiment, the third position is the position of the uppermost side of the regular hexagonal structure.
本实施例中,灯条自动备胶设备还包括用于将裁切后的所述第一部分取下的卸载装置5。In this embodiment, the automatic glue preparation equipment for light strips further includes an unloading device 5 for removing the cut first part.
所述卸载装置5的结构形式可以有多种,本实施例中,所述卸载装置5包括:The structural form of described unloading device 5 can have multiple, in the present embodiment, described unloading device 5 comprises:
第一导轨5.1;The first guide rail 5.1;
具有真空吸附盘5.3的伸缩杆5.2,所述伸缩杆5.2可移动的设置在所述第一导轨5.1上。There is a telescopic rod 5.2 with a vacuum suction plate 5.3, and the telescopic rod 5.2 is movably arranged on the first guide rail 5.1.
卸载时,所述伸缩杆5.2沿着所述第一导轨5.1移动到与裁切后的所述第一部分相对应的位置,通过所述真空吸附盘5.3吸取贴有灯条的所述第一部分,然后所述伸缩杆5.2沿着所述第一导轨5.1将贴有灯条的所述第一部分7运走。When unloading, the telescopic rod 5.2 moves along the first guide rail 5.1 to a position corresponding to the cut first part, and the vacuum suction plate 5.3 absorbs the first part with the light bar attached, Then the telescopic rod 5.2 transports the first part 7 with the light bar attached thereto along the first guide rail 5.1.
如图1所示,本实施例中,所述卸载装置5包括可移动的设置在所述第一导轨5.1上的支架,所述伸缩杆5.2的一端连接于所述支架上,所述伸缩杆5.2的另一端设置有所述真空吸附盘5.3。As shown in Figure 1, in this embodiment, the unloading device 5 includes a movable bracket arranged on the first guide rail 5.1, one end of the telescopic rod 5.2 is connected to the bracket, and the telescopic rod 5.2 The other end of 5.2 is provided with the vacuum suction plate 5.3.
卸载时,所述支架带动所述伸缩杆5.2沿着所述第一导轨5.1移动到所述第三位置的上方,所述伸缩杆5.2向下伸张以使得所述真空吸附盘5.3靠近位于所述第三位置的所述第一部分,所述第一输送装置3上的真空吸附管3.4卸去对贴附有灯条的所述第一部分的吸附作用,所述真空吸附盘5.3吸附所述第一部分,所述伸缩杆5.2收缩,所述支架带动所述伸缩杆5.2沿着所述导轨反向移动回位。When unloading, the bracket drives the telescopic rod 5.2 to move above the third position along the first guide rail 5.1, and the telescopic rod 5.2 stretches downward so that the vacuum suction plate 5.3 is located close to the For the first part at the third position, the vacuum adsorption tube 3.4 on the first conveying device 3 removes the adsorption effect on the first part attached with the light bar, and the vacuum adsorption plate 5.3 adsorbs the first part , the telescopic rod 5.2 shrinks, and the bracket drives the telescopic rod 5.2 to reversely move back along the guide rail.
本实施例中,灯条自动备胶设备还包括用于将所述卸载装置5取下的贴附有灯条的所述第一部分输出以进行下一工艺的第二输送装置。In this embodiment, the automatic glue preparation equipment for light strips also includes a second conveying device for outputting the first part attached with light strips removed from the unloading device 5 for the next process.
所述第二输送装置的结构形式可以有多种,本实施例中,所述第二输送装置包括:There can be various structural forms of the second conveying device. In this embodiment, the second conveying device includes:
输送带;conveyor;
位于所述输送带两端的传动轴6.1。Drive shafts 6.1 located at both ends of the conveyor belt.
如图1所示,本实施例中,所述支架沿着所述第一导轨5.1带动所述伸缩杆5.2移动到所述输送带的上方,根据所述输送带与所述真空吸附盘5.3上的所述第一部分之间的距离,所述伸缩杆5.2伸张一定的长度,所述真空吸附盘5.3卸去吸附作用以将所述第一部分放置于所述输送带上,所述输送带在所述传动轴6.1的带动下将贴附有双面胶1.3的灯条输送至下一工艺。As shown in Figure 1, in this embodiment, the bracket drives the telescopic rod 5.2 to move above the conveyor belt along the first guide rail 5.1, according to the conveyor belt and the vacuum suction plate 5.3 The distance between the first part, the telescopic rod 5.2 stretches a certain length, and the vacuum suction plate 5.3 removes the adsorption effect to place the first part on the conveyor belt, and the conveyor belt is in the Driven by the transmission shaft 6.1, the light bar attached with the double-sided adhesive tape 1.3 is transported to the next process.
所述灯条输送装置2的结构形式可以有多种,只有实现与所述第一输送装置3配合以将双面胶1.3自动、精确的贴附于灯条上即可,本实施例中,如图1和图2所示,所述灯条输送装置2包括:The structure of the light bar conveying device 2 can be various, and it only needs to cooperate with the first conveying device 3 to automatically and accurately attach the double-sided adhesive 1.3 to the light bar. In this embodiment, As shown in Figures 1 and 2, the light bar conveying device 2 includes:
第二导轨2.2;Second rail 2.2;
承载有灯条的支撑台2.3,所述支撑台2.3可移动的设置在所述第二导轨2.2上。A support platform 2.3 carrying a light bar, the support platform 2.3 is movably arranged on the second guide rail 2.2.
本实施例中,所述升降装置包括:In this embodiment, the lifting device includes:
升降柱2.5,承载有灯条的承载台2.7通过所述升降柱2.5设置于所述支撑台2.3上;The lifting column 2.5, the carrying platform 2.7 carrying the light bar is set on the supporting platform 2.3 through the lifting column 2.5;
用于感应灯条上升距离的第二感应装置2.4,设置于所述支撑台2.3上。The second sensing device 2.4 for sensing the rising distance of the light bar is arranged on the supporting platform 2.3.
用于根据所述第二感应装置2.4传输的信号控制所述升降柱2.5上升速度的控制装置。A control device for controlling the rising speed of the lifting column 2.5 according to the signal transmitted by the second sensing device 2.4.
如图1和图2所示,所述第二导轨2.2设置于一底座2.1上,但不限于此。As shown in Fig. 1 and Fig. 2, the second guide rail 2.2 is arranged on a base 2.1, but it is not limited thereto.
本实施例中,所述第二感应装置2.4采用红外感应器,但不以此为限。In this embodiment, the second sensing device 2.4 uses an infrared sensor, but it is not limited thereto.
支撑台2.3通过第二导轨2.2移动到与所述第一位置对应的第二位置后,升降柱2.5将载有灯条的灯条承载台2.7上升到距离所述第一部分很近的位置,然后,缓慢压合灯条,使灯条贴覆到双面胶1.3上。升降柱2.5下降到原来位置,向第二导轨2.2右边退出进行灯条备料(可人工或机械手臂自动备料)。After the supporting platform 2.3 moves to the second position corresponding to the first position through the second guide rail 2.2, the lifting column 2.5 lifts the light bar carrying platform 2.7 carrying the light bar to a position very close to the first part, and then , and slowly press the light bar so that the light bar is attached to the double-sided adhesive tape 1.3. The lifting column 2.5 descends to the original position, and exits to the right of the second guide rail 2.2 to prepare the light bar (it can be manually or automatically prepared by the mechanical arm).
所述双面胶1.3上待贴附的所述第一部分运动到第一位置、与灯条运动到第二位置与所述第一部分的对位,可以通过所述第一感应装置3.3和所述第二感应装置2.4来实现,也可以通过其他方式实现。The first part to be attached on the double-sided adhesive tape 1.3 moves to the first position, and the light bar moves to the second position to align with the first part, which can be achieved through the first sensing device 3.3 and the The second induction device 2.4 can also be realized by other methods.
为了防止所述升降柱2.5上升距离过大以致损伤灯条,所述支撑台2.3上还设有用于限位所述升降柱2.5上升距离的定位柱2.6。In order to prevent the rising distance of the lifting column 2.5 from being too large to damage the light bar, the support platform 2.3 is also provided with a positioning column 2.6 for limiting the rising distance of the lifting column 2.5.
需要说明的是,实际使用时,双面胶的起始端是要被裁切掉的,即第二转轴3.5旋转使得所述双面胶的起始端位于备胶区3.2时,所述双面胶待贴附的所述第一部分运动到所述第二缠绕结构的最下方即第一位置。It should be noted that, in actual use, the starting end of the double-sided adhesive will be cut off, that is, when the second rotating shaft 3.5 rotates so that the starting end of the double-sided adhesive is located at the glue preparation area 3.2, the double-sided adhesive The first part to be attached moves to the lowest position of the second winding structure, that is, to the first position.
以上为本实用新型较佳实施例,需要指出的是,对于本领域普通技术人员来说,在不脱离本实用新型所述原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型保护范围。The above are the preferred embodiments of the present utility model. It should be pointed out that those skilled in the art can also make some improvements and modifications without departing from the principle of the present utility model. It should be regarded as the protection scope of the utility model.
Claims (12)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420237929.1U CN203979040U (en) | 2014-05-09 | 2014-05-09 | The automatically standby gluing equipment of a kind of lamp bar |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420237929.1U CN203979040U (en) | 2014-05-09 | 2014-05-09 | The automatically standby gluing equipment of a kind of lamp bar |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203979040U true CN203979040U (en) | 2014-12-03 |
Family
ID=51976492
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420237929.1U Expired - Fee Related CN203979040U (en) | 2014-05-09 | 2014-05-09 | The automatically standby gluing equipment of a kind of lamp bar |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203979040U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106629210A (en) * | 2016-12-30 | 2017-05-10 | 深圳市沃特美机械有限公司 | Release paper adhering/tearing double faced adhesive tape machine |
| CN108196381A (en) * | 2018-01-02 | 2018-06-22 | 京东方科技集团股份有限公司 | Adhesive tape attaching device |
| CN109407361A (en) * | 2018-11-21 | 2019-03-01 | 福建捷联电子有限公司 | A kind of lamp bar adhesive tape automatic attachment device and its method |
| CN109680885A (en) * | 2018-12-24 | 2019-04-26 | 合肥巍华钢结构有限公司 | A kind of steel structure roof ridge splash guard construction equipment |
| CN110594255A (en) * | 2019-09-17 | 2019-12-20 | 合肥京东方显示光源有限公司 | Jig for assembling backlight module and method for assembling backlight module |
| CN113878887A (en) * | 2021-09-30 | 2022-01-04 | 吴冬梅 | Heat-conducting adhesive or double-sided adhesive tape automatic pasting process method for lamp assembly |
-
2014
- 2014-05-09 CN CN201420237929.1U patent/CN203979040U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106629210A (en) * | 2016-12-30 | 2017-05-10 | 深圳市沃特美机械有限公司 | Release paper adhering/tearing double faced adhesive tape machine |
| CN108196381A (en) * | 2018-01-02 | 2018-06-22 | 京东方科技集团股份有限公司 | Adhesive tape attaching device |
| CN108196381B (en) * | 2018-01-02 | 2020-11-03 | 京东方科技集团股份有限公司 | Tape attachment equipment |
| CN109407361A (en) * | 2018-11-21 | 2019-03-01 | 福建捷联电子有限公司 | A kind of lamp bar adhesive tape automatic attachment device and its method |
| CN109680885A (en) * | 2018-12-24 | 2019-04-26 | 合肥巍华钢结构有限公司 | A kind of steel structure roof ridge splash guard construction equipment |
| CN110594255A (en) * | 2019-09-17 | 2019-12-20 | 合肥京东方显示光源有限公司 | Jig for assembling backlight module and method for assembling backlight module |
| CN113878887A (en) * | 2021-09-30 | 2022-01-04 | 吴冬梅 | Heat-conducting adhesive or double-sided adhesive tape automatic pasting process method for lamp assembly |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203979040U (en) | The automatically standby gluing equipment of a kind of lamp bar | |
| CN108147180B (en) | Rolling machine | |
| CN104037445B (en) | Automatic battery wrapping film machine | |
| CN104961361A (en) | Laminating machine for special glass | |
| CN204038052U (en) | Label absorption and laminating apparatus | |
| CN105880785A (en) | Solar cell piece series welding device | |
| CN112173204A (en) | Automatic adhesive tape winding device for full-sealed package of express box | |
| CN204368548U (en) | Paving paper machine | |
| CN105035729A (en) | Automatic slitting machine | |
| CN111746887A (en) | A label peeling machine and its working method | |
| WO2021036079A1 (en) | Pcb edge wrapping mechanism | |
| CN106628358B (en) | A kind of ceramic tile automatic paper-cutting laminating apparatus | |
| CN101733830A (en) | Gypsum board covering machine | |
| CN204124873U (en) | A kind of film rewinder automatically | |
| CN203832777U (en) | Mechanism for packaging plastic pipe by winding protective film around plastic pipe automatically | |
| CN106697461B (en) | Automatic adhesive tape sticking machine for long-rod plastic parts | |
| CN212220791U (en) | Automatic positioning and labeling device for round bottles | |
| CN212981361U (en) | A stacking tray feeder and unloader | |
| CN204382348U (en) | Composite mold cutting machine is pasted in moxibustion | |
| CN102795507B (en) | A kind of machine of automatic patch double faced adhesive tape | |
| CN206569801U (en) | A light strip glue sticking equipment | |
| CN201597107U (en) | Gypsum board overedging machine | |
| CN203910916U (en) | Automatic adhesive film coating machine for batteries | |
| CN111376529A (en) | An automatic laminating machine | |
| CN211944962U (en) | Conveying device for sleeper truss unstacking mechanism |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141203 |
|