CN203963252U - A kind of petroleum pipeline bracket - Google Patents
A kind of petroleum pipeline bracket Download PDFInfo
- Publication number
- CN203963252U CN203963252U CN201420373152.1U CN201420373152U CN203963252U CN 203963252 U CN203963252 U CN 203963252U CN 201420373152 U CN201420373152 U CN 201420373152U CN 203963252 U CN203963252 U CN 203963252U
- Authority
- CN
- China
- Prior art keywords
- base
- column
- support body
- hole
- frame body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型具体涉及的是一种石油矿场机械,具体地说是一种石油管道支架。What the utility model specifically relates to is a kind of petroleum mine machinery, specifically a kind of petroleum pipeline bracket.
背景技术Background technique
目前,在石油运输的过程中,需要使用大量的石油管道,这些石油管道或者埋设在地面之下,或者架设在距离地面有一定高度的位置。而当需要将石油管道设置在较高位置时,则只能够利用一些简单的支撑结构进行固定,整体强度不高,给石油管道的铺设带来了不便,然而还有一些石油管道支架虽然高度能够调节,但是其在使用过程中较为麻烦。At present, in the process of oil transportation, a large number of oil pipelines need to be used, and these oil pipelines are either buried under the ground or erected at a certain height from the ground. And when it is necessary to set the oil pipeline at a higher position, it can only be fixed with some simple support structures, and the overall strength is not high, which brings inconvenience to the laying of the oil pipeline. Adjustment, but it is more troublesome during use.
比如一种石油管道支架座,申请号:201120300600.1,其主要通过左右端固定旋钮进行高度调节,需要左右不停的调整比对,这样较为麻烦,造成了大量的劳动,而且在管道铺设中不能够很好地对管道进行固定,因此现在需要一种能够解决上述问题的石油管道架设装置。For example, an oil pipeline support seat, application number: 201120300600.1, which mainly adjusts the height through the left and right fixed knobs, needs constant adjustment and comparison, which is troublesome and causes a lot of labor, and cannot be used in pipeline laying. The pipeline is well fixed, so a kind of oil pipeline erection device that can solve the above problems is needed now.
实用新型内容Utility model content
本实用新型的目的是为解决上述不足,提供一种石油管道支架,从而实现结构简单、稳定可靠、高度调节方便和能很好地对管道进行固定安装的目的。The purpose of this utility model is to solve the above-mentioned shortcomings, and provide a petroleum pipeline support, so as to realize the purpose of simple structure, stable and reliable, convenient height adjustment and good fixed installation of the pipeline.
本实用新型的目的是通过以下技术方案实现的:The purpose of this utility model is achieved by the following technical solutions:
提供了一种石油管道支架,包括架体,架体上端与支撑板连接,支撑板下侧两端对应设置有扣槽,底座上对应安装有立柱,对应安装的立柱靠近底部位置安装有加强座,立柱上设有架体连接孔,架体下端与底座上的立柱通过架体连接孔套接连接,架体和底座的立柱上两端对应设置有固定孔,固定孔边侧位置安装有承重块,固定杆通过贯穿固定孔,并架设在承重块上;底座边端设置有螺栓固定孔,螺栓固定孔上侧安装有倾斜加强板,底座和倾斜加强板通过固定螺栓固定。An oil pipeline support is provided, including a frame body, the upper end of the frame body is connected with a support plate, buckle grooves are correspondingly arranged at both ends of the lower side of the support plate, a column is correspondingly installed on the base, and a reinforcement seat is installed at a position close to the bottom of the correspondingly installed column , the column is provided with frame connection holes, the lower end of the frame body and the column on the base are socketed and connected through the frame body connection holes, the two ends of the frame body and the column of the base are respectively provided with fixing holes, and the sides of the fixing holes are equipped with load-bearing The fixed rod passes through the fixed hole and is erected on the load-bearing block; the edge of the base is provided with a bolt fixing hole, and an inclined reinforcing plate is installed on the upper side of the bolt fixing hole, and the base and the inclined reinforcing plate are fixed by fixing bolts.
其中,所述的支撑板为弧形结构。Wherein, the support plate is an arc structure.
其中,所述的底座上安装有倾斜加强板和加强座。Wherein, an inclined reinforcing plate and a reinforcing seat are installed on the base.
其中,所述的固定孔在架体和立柱上对应的设置有多组。Wherein, the above-mentioned fixing holes are correspondingly arranged in multiple groups on the frame body and the upright column.
其中,所述的固定螺栓能够将倾斜加强板固定在底座上,同时将底座固定在地面上。Wherein, the fixing bolts can fix the inclined reinforcing plate on the base and at the same time fix the base on the ground.
本实用新型具有如下有益的效果:本实用新型结构简单、易于生产和使用方便,通过安装倾斜加强板和加强座,加强了支架的稳定性和提高了支架的安全性;通过固定杆的直接贯穿固定孔固定安装,减少了使用过程中较为繁琐的高度调节工作,降低了工作量;通过扣槽能够将管道在支撑板上进一步固定,增加了支架的可靠性。The utility model has the following beneficial effects: the utility model is simple in structure, easy to produce and convenient to use, the stability of the bracket is strengthened and the safety of the bracket is improved by installing the inclined reinforcement plate and the reinforcement seat; The fixing hole is fixed and installed, which reduces the tedious height adjustment work during use and reduces the workload; the pipe can be further fixed on the support plate through the buckle groove, which increases the reliability of the bracket.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本实用新型实施例所提供的整体结构示意图;Fig. 1 is the overall structure schematic diagram that the utility model embodiment provides;
图2为本实用新型实施例所提供的底座结构示意图;Fig. 2 is a schematic diagram of the structure of the base provided by the embodiment of the present invention;
其中,1.架体,2.支撑板,3.底座,3.1.立柱,3.2.架体连接孔,3.3.螺栓固定孔,4.固定杆,5.固定孔,6.承重块,7.倾斜加强板,8.固定螺栓,9.扣槽,10.加强座。Among them, 1. frame body, 2. support plate, 3. base, 3.1. column, 3.2. frame body connecting hole, 3.3. bolt fixing hole, 4. fixing rod, 5. fixing hole, 6. bearing block, 7. Inclined reinforcement plate, 8. Fixing bolt, 9. Buckle groove, 10. Reinforcement seat.
具体实施方式Detailed ways
以下结合具体实施例对上述方案做进一步说明。应理解这些实施例是用于说明本实用新型而不是限制本实用新型的范围。实施例中采用的实施条件可以根据具体厂家的条件做进一步调整,未注明的实施条件通常为常规实验中的条件。The above solution will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are used to illustrate the utility model rather than limit the scope of the utility model. The implementation conditions used in the examples can be further adjusted according to the conditions of specific manufacturers, and the implementation conditions not indicated are usually the conditions in routine experiments.
请参照图1至图2,图1为本实用新型实施例所提供的整体结构示意图;图2为本实用新型实施例所提供的底座结构示意图。Please refer to Figure 1 to Figure 2, Figure 1 is a schematic diagram of the overall structure provided by the embodiment of the utility model; Figure 2 is a schematic diagram of the structure of the base provided by the embodiment of the utility model.
在一种具体实施例中,提供了一种石油管道支架,包括架体1,架体1上端与支撑板2连接,支撑板2下侧两端对应设置有扣槽9,底座3上对应安装有立柱3.1,对应安装的立柱3.1靠近底部位置安装有加强座10,立柱3.1上设有架体连接孔3.2,架体1下端与底座3上的立柱3.1通过架体连接孔3.2套接连接,架体1和底座3的立柱3.1上两端对应设置有固定孔5,固定孔5边侧位置安装有承重块6,固定杆通4过贯穿固定孔5,并架设在承重块6上;底座3边端设置有螺栓固定孔3.3,螺栓固定孔3.3上侧安装有倾斜加强板7,底座3和倾斜加强板7通过固定螺栓8固定。In a specific embodiment, an oil pipeline support is provided, which includes a frame body 1, the upper end of the frame body 1 is connected to a support plate 2, and the two ends of the lower side of the support plate 2 are correspondingly provided with buckle grooves 9, and the base 3 is correspondingly installed There is a column 3.1, and the corresponding installed column 3.1 is installed with a reinforcing seat 10 near the bottom. The column 3.1 is provided with a frame connecting hole 3.2, and the lower end of the frame 1 is connected to the column 3.1 on the base 3 through the frame connecting hole 3.2. The two ends of the column 3.1 of the frame body 1 and the base 3 are provided with fixing holes 5 correspondingly, and a load-bearing block 6 is installed on the side of the fixing hole 5, and the fixing rod passes through the fixing hole 5 and is erected on the load-bearing block 6; 3 side ends are provided with bolt fixing holes 3.3, and an inclined reinforcing plate 7 is installed on the upper side of the bolt fixing holes 3.3, and the base 3 and the inclined reinforcing plate 7 are fixed by fixing bolts 8.
具体的,所述的支撑板2为弧形结构,根据不同尺寸的管道,选用不同的支撑板2,使支撑板2的尺寸与管道的尺寸符合,增加支架的使用范围;在管道铺设过程中,根据现场具体高度要求,由于所述架体1和底座3两端对应设置有多组固定孔5,且固定孔5边侧靠底座3内端位置对应设置有承重块6,通过将固定杆4通过贯穿相应高度的固定孔5,并架设在承重块6上固定安装,解决一般支架需要左右分别调节高度的难题,降低了工作量,再通过固定螺栓8将支架固定安装在相应的地面上,最后将石油管道架设在支撑板2上,实现了石油管道的固定安装,本支架稳定可靠,对石油管道的架设提供了较大的方便。Specifically, the support plate 2 is an arc-shaped structure, and different support plates 2 are selected according to the pipelines of different sizes, so that the size of the support plate 2 conforms to the size of the pipeline, and the scope of use of the support is increased; , according to the specific height requirements on site, since the two ends of the frame body 1 and the base 3 are correspondingly provided with multiple sets of fixing holes 5, and the sides of the fixing holes 5 are correspondingly provided with load-bearing blocks 6 at the inner end of the base 3, by placing the fixing rod 4 Through the fixing hole 5 of the corresponding height, and erected on the load-bearing block 6 for fixed installation, it solves the problem that the height of the general bracket needs to be adjusted separately from the left and right, and reduces the workload, and then the bracket is fixed and installed on the corresponding ground through the fixing bolt 8 , and finally the oil pipeline is erected on the support plate 2 to realize the fixed installation of the oil pipeline. This support is stable and reliable, and provides greater convenience for the erection of the oil pipeline.
进一步的,所述的底座3上安装有倾斜加强板7和加强座10,通过倾斜加强板7和加强座10的固定功能,能够很好地加强支架的稳定性,提高支架的安全性,同时,倾斜加强板7和加强座10结构简单,易于生产,安装方便。Further, the base 3 is equipped with an inclined reinforcing plate 7 and a reinforcing seat 10, through the fixing function of the inclined reinforcing plate 7 and the reinforcing seat 10, the stability of the bracket can be well strengthened, and the safety of the bracket can be improved, and at the same time , The inclined reinforcing plate 7 and the reinforcing seat 10 are simple in structure, easy to produce and easy to install.
进一步的,所述的固定孔5在架体1和立柱3.1上对应的设置有多组,通过固定杆4的直接贯穿固定孔5固定安装,减少了使用过程中较为繁琐的高度调节工作,为使用带来了方便。Further, there are multiple groups of fixing holes 5 on the frame body 1 and the column 3.1, and the fixed rods 4 directly penetrate through the fixing holes 5 to be fixed and installed, which reduces the tedious height adjustment work during use, and provides Use brings convenience.
进一步的,所述的扣槽9能够通过使用固定带或者其他固定用具对铺设的管道在支撑板2上进行固定,防止管道从支撑板2内滑落,增强支架的可靠性。Further, the buckle groove 9 can fix the laid pipeline on the support plate 2 by using a fixing belt or other fixing tools, so as to prevent the pipeline from slipping from the support plate 2 and enhance the reliability of the bracket.
进一步的,所述的固定螺栓8能够将倾斜加强板7固定在底座3上,同时将底座3固定在地面上。Further, the fixing bolts 8 can fix the inclined reinforcing plate 7 on the base 3 and at the same time fix the base 3 on the ground.
最后应当说明的是,以上实施例仅用于说明本实用新型的技术方案而非对本实用新型保护范围的限制。尽管参照较佳实施例对本实用新型作了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的实质和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than limit the protection scope of the utility model. Although the utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that the technical solution of the utility model can be modified or equivalently replaced without departing from the spirit and scope of the utility model's technical solution.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420373152.1U CN203963252U (en) | 2014-07-02 | 2014-07-02 | A kind of petroleum pipeline bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420373152.1U CN203963252U (en) | 2014-07-02 | 2014-07-02 | A kind of petroleum pipeline bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203963252U true CN203963252U (en) | 2014-11-26 |
Family
ID=51923834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420373152.1U Expired - Fee Related CN203963252U (en) | 2014-07-02 | 2014-07-02 | A kind of petroleum pipeline bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203963252U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104455744A (en) * | 2014-11-28 | 2015-03-25 | 成都锦汇科技有限公司 | Petroleum pipeline supporting frame |
CN104565555A (en) * | 2014-11-28 | 2015-04-29 | 成都锦汇科技有限公司 | Double-layer petroleum pipeline support frame |
CN104976425A (en) * | 2015-07-12 | 2015-10-14 | 成都科盛石油科技有限公司 | Improved petroleum pipeline clamping device |
CN104989879A (en) * | 2015-07-12 | 2015-10-21 | 成都科盛石油科技有限公司 | Improved structure for oil pipeline holding device |
CN105065781A (en) * | 2015-07-12 | 2015-11-18 | 成都科盛石油科技有限公司 | Petroleum pipeline holding frame based on improvement of stability of fixing plate |
CN108105470A (en) * | 2017-12-19 | 2018-06-01 | 盛江 | A kind of petroleum pipeline bracket |
CN109519605A (en) * | 2018-12-03 | 2019-03-26 | 广东省建筑工程机械施工有限公司 | A kind of laboratory ventilation pipeline fixing device |
-
2014
- 2014-07-02 CN CN201420373152.1U patent/CN203963252U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104455744A (en) * | 2014-11-28 | 2015-03-25 | 成都锦汇科技有限公司 | Petroleum pipeline supporting frame |
CN104565555A (en) * | 2014-11-28 | 2015-04-29 | 成都锦汇科技有限公司 | Double-layer petroleum pipeline support frame |
CN104565555B (en) * | 2014-11-28 | 2016-08-17 | 成都锦汇科技有限公司 | A kind of double-deck petroleum pipeline bracing frame |
CN104976425A (en) * | 2015-07-12 | 2015-10-14 | 成都科盛石油科技有限公司 | Improved petroleum pipeline clamping device |
CN104989879A (en) * | 2015-07-12 | 2015-10-21 | 成都科盛石油科技有限公司 | Improved structure for oil pipeline holding device |
CN105065781A (en) * | 2015-07-12 | 2015-11-18 | 成都科盛石油科技有限公司 | Petroleum pipeline holding frame based on improvement of stability of fixing plate |
CN108105470A (en) * | 2017-12-19 | 2018-06-01 | 盛江 | A kind of petroleum pipeline bracket |
CN108105470B (en) * | 2017-12-19 | 2019-06-25 | 广东西南石化装备有限公司 | A kind of petroleum pipeline bracket |
CN109519605A (en) * | 2018-12-03 | 2019-03-26 | 广东省建筑工程机械施工有限公司 | A kind of laboratory ventilation pipeline fixing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203963252U (en) | A kind of petroleum pipeline bracket | |
CN204059799U (en) | A kind of installation constitution of railing angular adjustment | |
CN103821136B (en) | Hang single-row of scaffold and construction method thereof | |
CN206874312U (en) | A kind of novel shield tunnel pre-buried channel flow dedicated shock-proof support | |
CN206591525U (en) | Pipe trench entirety punching block suspension device | |
CN206280607U (en) | A kind of pipe support that can adjust height | |
CN103247981B (en) | A kind of cable end method for supporting | |
CN104480959A (en) | General tower crane supporting base | |
CN204491420U (en) | A kind of reinforcement structure of bracket | |
CN204211397U (en) | Assembly type standard knot | |
CN204000867U (en) | Sill anchor assembling support | |
CN103335172A (en) | Oil platform pipeline protection tube capable of meeting different pipe diameters | |
CN203322513U (en) | Double-supporting-leg type petroleum pipeline protective device | |
CN203322510U (en) | Bidirectional petroleum platform pipeline fixing device | |
CN207109828U (en) | A kind of water conservancy construction suspension device | |
CN103322317B (en) | A kind of I-shaped oil platform pipeline protection pipe fitting | |
CN203336137U (en) | Petroleum pipeline connector protection tube | |
CN103322324B (en) | A kind of Two-pipe oil platform pipeline protection pipe | |
CN203336050U (en) | Assistant locating pipe of oil platform pipeline | |
CN204059898U (en) | A kind of convenient inner scaffold regulating height | |
CN203413232U (en) | Pipeline protection tube of oil platform available for vertical height adjustment | |
CN208058126U (en) | A kind of city integrated piping lane water supply heavy type holder | |
CN203322512U (en) | Dual-ring protective steel bushing of petroleum pipeline platform | |
CN204753584U (en) | Location for building adjustable earth anchor | |
CN203336038U (en) | Petroleum pipeline and platform connection pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141126 Termination date: 20150702 |
|
EXPY | Termination of patent right or utility model |