CN203947758U - Novel hydraulic automatic climbing discharging platform - Google Patents
Novel hydraulic automatic climbing discharging platform Download PDFInfo
- Publication number
- CN203947758U CN203947758U CN201420266118.4U CN201420266118U CN203947758U CN 203947758 U CN203947758 U CN 203947758U CN 201420266118 U CN201420266118 U CN 201420266118U CN 203947758 U CN203947758 U CN 203947758U
- Authority
- CN
- China
- Prior art keywords
- climbing
- discharging platform
- platform
- plane
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 75
- 238000007599 discharging Methods 0.000 title claims abstract description 75
- 238000012423 maintenance Methods 0.000 claims abstract description 16
- 238000004513 sizing Methods 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 16
- 239000010959 steel Substances 0.000 claims description 16
- 238000010276 construction Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 2
- 238000007493 shaping process Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 claims 1
- 238000006243 chemical reaction Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a kind of novel hydraulic automatic climbing discharging platform.By hydraulic climbing discharging platform seat in the plane (2), be attached to building structure, by main operation landing beam (3), the operating platform beam (4) that climbs, maintenance operating platform beam (5), connect hydraulic climbing discharging platform seat in the plane (2), sizing discharging platform (1) is installed on main operation landing beam (3), protection system (38) is arranged on the utility model outside and forms totally-enclosed protection, can be along agent structure automatic climbing.The utility model scientific structure, safety, simple, peace are torn open conveniently; Can be attached to body of wall or floor, width, the span scope of design of sizing discharging platform are large, and one time climb altitude is high, and applicability is strong; Supporting capacity is significantly higher than traditional discharging platform; Conversion between floor, without taking the tower crane time, can realize automatic climbing.
Description
Technical field
The technology of the present invention relates to the workbench of material transport in a kind of building operations, i.e. discharging platform.
Background technology
Discharging platform, as the Key Platform of transporting material between floor, is can not or lack in engineering construction, and especially, in high-building construction, the use of discharging platform is more frequent.Traditional discharging platform supporting capacity is only 1KN/m
2; In use need installation and removal repeatedly; And safeguard measure adopts wire rope and superstructure structure diagonal to drawknot, further increased the operation easier of installation, dismounting; Installation and removal needs more personnel's operation each time, takies tower crane 3 and just can complete to 4 hours; And safeguard procedures are used steel pipe to set up, and protect simple and crude, imprecision, have major safety risks.Current discharging platform can not meet high-building construction to safe, labour intensity is little, use cost is low, efficiency of construction is high, supporting capacity is large, operate the requirements such as simple and easy.
Summary of the invention
The object of the invention is to propose a kind of novel hydraulic automatic climbing discharging platform for the deficiency of traditional discharging platform.The present invention includes two cover hydraulic climbing discharging platform seats in the plane, shape discharging platform, three group platform beams, an a set of protection system etc.Every cover hydraulic climbing discharging platform seat in the plane is comprised of attachment device, through-wall bolt, anti-dumping plate, upper climbing device, oil cylinder, oil pump, lower climbing device, guide rail, primary load bearing frame, crown wall supporting leg, hanger etc.Protection system comprises discharging operating platform protecting wire net assembly, the operating platform protecting wire net assembly that climbs, maintenance operating platform protecting wire net assembly.
The technical solution adopted for the present invention to solve the technical problems is: when the present invention works as traditional discharging platform, use through-wall bolt that attachment device and body of wall are fixed, by anti-dumping plate, hydraulic climbing discharging platform seat in the plane is connected with attachment device, and regulate crown wall supporting leg fully to contact with body of wall, to guarantee that load passes to building structure.Between two cover hydraulic climbing discharging platform seats in the plane, adopt landing beam and landing beam U-bolt to connect.Sizing discharging platform is installed on main operation landing beam, by landing beam U-bolt, connects sizing discharging platform girder and landing beam, and supporting capacity can reach 4KN/m
2.The jacking and the reset that go out cylinder and receive the lower climbing device of cylinder drive of control cabinet control oil cylinder, for climbing of guide rail provides automatic climbing system with climbing of support body.Protection system comprises discharging operating platform protecting wire net assembly, the operating platform protecting wire net assembly that climbs, maintenance operating platform protecting wire net assembly, is installed on the present invention outside and forms totally-enclosed protection.When the present invention climbs, first at the last layer body of wall of the appended floor of work of the present invention, attachment device is installed, again upper climbing device and lower climbing device are adjusted to the state of lifting rail, utilize jacking and the reset of lower climbing device, guide rail is risen to last layer attachment device fixing, then upper climbing device and lower climbing device are adjusted to the state of the support body that climbs, regulate crown wall supporting leg to leave body of wall, extract anti-dumping plate, utilize jacking and the reset of lower climbing device, the supreme one deck attachment device of the support body that climbs, finally insert anti-dumping plate, regulate crown wall supporting leg fully to contact with body of wall, climb and put in place.
The invention has the beneficial effects as follows: (1) avoids using traditional discharging platform that dangerous, loaded down with trivial details pre-buried draw ring and wire rope are installed.(2) by through-wall bolt, attachment device, anti-dumping plate, crown wall supporting leg, load is effectively passed to building structure, guaranteed the safety in construction, and made supporting capacity reach 4KN/m
2thereby, significantly promote the supporting capacity of discharging platform.(3) according to construction needs, can be attached to body of wall or floor, sizing discharging platform width can be set to 3m~5m, and hydraulic climbing discharging platform seat in the plane span can be set to 2m~6m.(4) floor calibrated altitude is when 3m~6m scope, and the present invention can once climb and put in place.(5) hydraulic climbing discharging platform seat in the plane is as the carrier of traditional discharging platform, and discharging platform can automatic climbing, and without taking the tower crane time, simple to operate, climbing speed is fast.(6) scientific structure, safety, simple, peace are torn open conveniently.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention will be further described.
Fig. 1 is novel hydraulic automatic climbing discharging platform schematic diagram
Fig. 2 is hydraulic climbing discharging platform seat in the plane schematic diagram
Fig. 3 is sizing discharging platform schematic diagram
Fig. 4 is novel hydraulic automatic climbing discharging platform protection system schematic diagram
Fig. 5 is landing beam connection diagram
Fig. 6 is protection system connection diagram
Concrete enforcement
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, the present invention includes the compositions such as a sizing discharging platform (1), two cover hydraulic climbing discharging platform seats in the plane (2), four main operation landing beams (3), three operating platform beams (4) that climb, two maintenance operating platform beams (5), a set of protection system (38).Use through-wall bolt (6) that attachment device (8) is installed on to wall outer side face.By anti-dumping plate (7), hydraulic climbing discharging platform seat in the plane (2) is fixed on attachment device (8).Regulate crown wall supporting leg (13) fully to contact with body of wall, and make hydraulic climbing discharging platform seat in the plane (2) perpendicular to body of wall.Adopt landing beam U-bolt (35) that the two ends of main operation landing beam (3) are separately fixed to two primary load bearing framves (12) top, the two ends of the operating platform beam (4) that climbs are separately fixed to the top of two primary load bearing framves (12) base cross members, the two ends of maintenance operating platform beam (5) are separately fixed to the top of two hangers (15) base cross members, thereby connect two cover hydraulic climbing discharging platform seats in the plane (2).Adopt landing beam U-bolt (35) discharging platform (1) girder (18) of shaping to be fixed on the top of main operation landing beam (3), discharging platform secondary beam (17) is welded in sizing discharging platform (1) girder (18) top successively, adopt flitch, veneer to lay discharging operating platform (31) in discharging platform secondary beam (17) top, its effect is to provide that material is temporary, the operating platform of material transfer; Adopt flitch, veneer to lay main operation platform (32) in main operation landing beam (3) top, its effect is to provide security protection, and as the carrier of discharging operating platform (31); With checkered steel plate and rectangular steel pipe, in operating platform beam (4) top of climbing, lay the operating platform (33) that climbs, its effect is to provide the operating platform that the present invention climbs; With checkered steel plate and rectangular steel pipe, in maintenance operating platform beam (5) top, lay maintenance operating platform (34), its effect is to provide safeguards platform of the present invention the operating platform of removing as attachment device.Protection system (38) is arranged on the present invention outside and forms totally-enclosed protection.
Upper climbing device (9) in hydraulic climbing discharging platform seat in the plane (2), oil cylinder (10), lower climbing device (11), guide rail (14) have formed automatic climbing system of the present invention.Guide rail (14) is fixed on attachment device (8), guide rail (14) welds a plurality of pieces of marking time (38) from top to bottom near a side of primary load bearing frame (12), and the distance between the every piece of marking time (38) is just in time consistent with the flexible stroke of oil cylinder (10).Oil cylinder (10) upper end connects upper climbing device (9), upper climbing device (9) upper end is connected with primary load bearing frame (12), and be slidably connected with guide rail (14), lower climbing device (11) upper end is connected with oil cylinder (10), and is slidably connected with guide rail (14).Upper climbing device (9) and lower climbing device (11) can be adjusted to lifting rail, support body two states climbs, by the climbing device (11) and guide rail (14) effect and reset under cylinder and the drive of receipts cylinder that go out of oil cylinder (10), realize automatic climbing function of the present invention.
Sizing discharging platform forms by protecting enclosing (16), secondary beam (17), girder (18) etc.Girder (18) is welded by channel-section steel is back-to-back, is evenly distributed in main operation landing beam (3) top and is fixed with landing beam U-bolt (35).Secondary beam (17) adopts channel-section steel to be evenly welded in successively girder (18) top.Protection enclosing (16) adopts angle steel to be welded, at every secondary beam (17) two ends difference vertical position welding angle steel, and from the upper even vertical position welding angle steel of a wall secondary beam (17) farthest, finally with all vertical position welding angle steel of twice angle steel transverse weld, form enclosing.
Protection system (38) comprises discharging operating platform protecting wire net assembly (19), the operating platform protecting wire net assembly (20) that climbs, maintenance operating platform protecting wire net assembly (21), is arranged on the present invention outside and forms totally-enclosed protection.Discharging operating platform protecting wire net assembly (19) carries out totally-enclosed protection along sizing discharging platform (1) outside, by protecting wire net U-bolt (36), be arranged on and connect joist (37) above, connect joist (37) and be bolted on sizing discharging platform (1).The operating platform protecting wire net assembly (20) that climbs carries out totally-enclosed protection along primary load bearing frame (12) outside, climb operating platform left side protecting wire net (24), climb operating platform right side protecting wire net (29) and main operation landing beam (3) welding, the operating platform end protecting wire net (25) that climbs is arranged on and is connected joist (37) above by protecting wire net U-bolt (36), connects joist (37) and is bolted on primary load bearing frame (12).Maintenance operating platform protecting wire net assembly (21) carries out totally-enclosed protection along hanger (15) outside, maintenance operating platform left side protecting wire net (26), maintenance operating platform right side protecting wire net (30) and operating platform beam (4) welding of climbing, maintenance operating platform end protecting wire net (27) is arranged on and is connected joist (37) above by protecting wire net U-bolt (36), connects joist (37) and is bolted on hanger (15).
Above-described embodiment is described the preferred embodiment of the present invention; not scope of the present invention is limited; do not departing under the prerequisite of design philosophy of the present invention; the various changes and improvements that those skilled in the art make technical scheme of the present invention, all should fall in the definite protection domain of the claims in the present invention book.
Claims (7)
1. novel hydraulic automatic climbing discharging platform, is characterized in that: comprise sizing discharging platform (1), hydraulic climbing discharging platform seat in the plane (2), main operation landing beam (3), the operating platform beam (4) that climbs, maintenance operating platform beam (5), protection system (38); Hydraulic climbing discharging platform seat in the plane (2) is attached to body of wall, by main operation landing beam (3), the operating platform beam (4) that climbs, maintenance operating platform beam (5), connect hydraulic climbing discharging platform seat in the plane (2), and the discharging platform (1) of shaping is installed on main operation landing beam (3), protection system (38) is arranged on novel hydraulic automatic climbing discharging platform outside and forms totally-enclosed protection, along major structure of construction automatic climbing.
2. novel hydraulic automatic climbing discharging platform according to claim 1, it is characterized in that: described main operation landing beam (3), the operating platform beam (4) that climbs, maintenance operating platform beam (5) adopt section steel manufacture, and usage platform beam U-bolt (35) is connected with hydraulic climbing discharging platform seat in the plane (2).
3. novel hydraulic automatic climbing discharging platform according to claim 1, is characterized in that: according to construction requirement, described attachment device (8) is attached to body of wall or floor; Described sizing discharging platform (1) width is set to 3m~5m, and hydraulic climbing discharging platform seat in the plane (2) span is set to 2m~6m; When floor calibrated altitude is during in 3m~6m scope, novel hydraulic automatic climbing discharging platform can once climb and put in place.
4. novel hydraulic automatic climbing discharging platform according to claim 1, is characterized in that: the upper climbing device (9) in described hydraulic climbing discharging platform seat in the plane (2), oil cylinder (10), lower climbing device (11), guide rail (14) form from climbing system; Upper climbing device (9) top is connected with primary load bearing frame (12), bottom is connected with oil cylinder (10), and be slidably connected with guide rail (14), lower climbing device (11) top is connected with oil cylinder (10), and is slidably connected with guide rail (14).
5. novel hydraulic automatic climbing discharging platform according to claim 1, it is characterized in that: the automatic climbing mode of described hydraulic climbing discharging platform seat in the plane (2): guide rail (14), under the jacking active force of lower climbing device (11), oil cylinder (10), rises to last layer attachment device (8) fixing; Primary load bearing frame (12), under the jacking active force of lower climbing device (11), oil cylinder (10), rises to last layer attachment device (8) fixing along guide rail (14); Guide rail (14) and primary load bearing frame (12) climb and hocket, and have realized guide rail (14) along the step-by-step movement that attachment device (8) climbs, primary load bearing frame (12) climbs along guide rail (14) process of climbing.
6. novel hydraulic automatic climbing discharging platform according to claim 1, is characterized in that: described sizing discharging platform (1) comprises protection enclosing (16), secondary beam (17), girder (18); Girder (18) adopts that channel-section steel is back-to-back to be welded; Secondary beam (17) adopts channel-section steel to be evenly arranged on girder (18) top; Protection enclosing (16) adopts angle steel to be welded, and forms the enclosing of three sides.
7. novel hydraulic automatic climbing discharging platform according to claim 1, is characterized in that: described protection system (38) comprises discharging operating platform protecting wire net assembly (19), the operating platform protecting wire net assembly (20) that climbs, maintenance operating platform protecting wire net assembly (21); Every class protecting wire net assembly has designed left side, right side, three of ends protecting wire net, and totally-enclosed protection has been carried out in novel hydraulic automatic climbing discharging platform outside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420266118.4U CN203947758U (en) | 2014-05-23 | 2014-05-23 | Novel hydraulic automatic climbing discharging platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420266118.4U CN203947758U (en) | 2014-05-23 | 2014-05-23 | Novel hydraulic automatic climbing discharging platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203947758U true CN203947758U (en) | 2014-11-19 |
Family
ID=51889802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420266118.4U Expired - Fee Related CN203947758U (en) | 2014-05-23 | 2014-05-23 | Novel hydraulic automatic climbing discharging platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203947758U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103967263A (en) * | 2014-05-23 | 2014-08-06 | 北京市建筑工程研究院有限责任公司 | Novel hydraulic automatic climbing discharging platform |
CN106121252A (en) * | 2016-08-30 | 2016-11-16 | 中建三局第建设工程有限责任公司 | A kind of hydraulic stepping turns material device and method from climbing |
CN108735313A (en) * | 2017-04-14 | 2018-11-02 | 江苏核电有限公司 | A kind of reactor protection tube assembly position adjusts workbench |
CN111852048A (en) * | 2020-08-11 | 2020-10-30 | 中发腾龙建设有限公司 | High-rise building construction discharge apparatus |
-
2014
- 2014-05-23 CN CN201420266118.4U patent/CN203947758U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103967263A (en) * | 2014-05-23 | 2014-08-06 | 北京市建筑工程研究院有限责任公司 | Novel hydraulic automatic climbing discharging platform |
CN103967263B (en) * | 2014-05-23 | 2016-04-20 | 北京市建筑工程研究院有限责任公司 | Hydraulic automatic jumping discharging platform |
CN106121252A (en) * | 2016-08-30 | 2016-11-16 | 中建三局第建设工程有限责任公司 | A kind of hydraulic stepping turns material device and method from climbing |
CN106121252B (en) * | 2016-08-30 | 2018-04-27 | 中建三局第一建设工程有限责任公司 | A kind of hydraulic stepping is from climbing material transfering device and method |
CN108735313A (en) * | 2017-04-14 | 2018-11-02 | 江苏核电有限公司 | A kind of reactor protection tube assembly position adjusts workbench |
CN111852048A (en) * | 2020-08-11 | 2020-10-30 | 中发腾龙建设有限公司 | High-rise building construction discharge apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN206768611U (en) | Bridge pier hanging basket mounting operation platform | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN203487803U (en) | Safety protection structure for elevator shaft construction | |
CN103967263B (en) | Hydraulic automatic jumping discharging platform | |
CN202247713U (en) | Combined protective shed frame | |
CN205348727U (en) | A promote formula operation platform for in shaft | |
CN201665992U (en) | Whole lifting platform of large steel net frame | |
CN106150057A (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN104291222A (en) | Rigid protection and crane integration system inside super high-rise building core tube | |
CN101876209A (en) | Supertall building core tube construction safety fire protection system and device | |
CN203531352U (en) | Hanging type movable working platform for storage tank maintenance | |
CN202882377U (en) | Hanging scaffold for integral hanging construction of truss | |
CN102425123A (en) | Combined protective shed frame and construction method thereof | |
CN103422432B (en) | A kind of examination and repair system of single plane cable stayed bridge suspension cable and application thereof | |
CN210239080U (en) | Maintenance platform for space high-position operation | |
CN204185146U (en) | Construction of Steel Structure overhang crane between skyscraper two tall buildings | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN214828569U (en) | Portable internal climbing tower crane spandrel girder hoisting device | |
CN203715115U (en) | Supporting point structure for self-hoisting system of portal crane | |
CN203022328U (en) | Climbing operation platform | |
CN201722937U (en) | Sliding platform for installation of net rack | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141119 Termination date: 20160523 |