CN203895631U - Grounding wire assembling and disassembling special-purpose device - Google Patents

Grounding wire assembling and disassembling special-purpose device Download PDF

Info

Publication number
CN203895631U
CN203895631U CN201420155180.6U CN201420155180U CN203895631U CN 203895631 U CN203895631 U CN 203895631U CN 201420155180 U CN201420155180 U CN 201420155180U CN 203895631 U CN203895631 U CN 203895631U
Authority
CN
China
Prior art keywords
hook
grounding wire
ground wire
arranges
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420155180.6U
Other languages
Chinese (zh)
Inventor
贾栋尚
季素云
冯忠奎
崔金辉
张元标
巩方伟
李强
韩爱华
于磊
张元生
吴卫东
成晓俊
刘新生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420155180.6U priority Critical patent/CN203895631U/en
Application granted granted Critical
Publication of CN203895631U publication Critical patent/CN203895631U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型涉及一种接地线装拆专用装置,属于输、变、配电设备领域,包括接地线挂钩(1)和配套的绝缘操作杆(16),所述的接地线挂钩(1)为∩型,∩型接地线挂钩(1)内部设置压紧机构(2),∩型接地线挂钩(1)一侧的上部和下部轴对称设置半圆形高强度钢片(3),∩型接地线挂钩(1)一端的底部设置螺母与软铜线压接口(4),所述的绝缘操作杆(16)包括相连接的上部杆头(11)和下部杆头(14),上部杆头(11)和下部杆头(14)连接处设置两个与接地线挂钩(1)相适应的半圆形挂钩(12)。本实用新型杜绝了在操作过程中因设备意外来电所造成的带电挂接地线恶性电气误操作事故的发生,确保了操作人员的人身及电网设备的安全。

The utility model relates to a special device for installing and disassembling grounding wires, which belongs to the field of power transmission, transformation and distribution equipment, and comprises a grounding wire hook (1) and a matching insulating operating rod (16). The grounding wire hook (1) is ∩ Type, ∩-type grounding wire hook (1) is equipped with a pressing mechanism (2) inside, and the upper and lower parts of the ∩-type grounding wire hook (1) are axially symmetrically provided with semi-circular high-strength steel sheets (3), ∩-type grounding wire The bottom of one end of the wire hook (1) is provided with a nut and an annealed copper wire crimping interface (4), and the insulating operating rod (16) includes a connected upper rod head (11) and a lower rod head (14), and the upper rod head Two semicircular hooks (12) compatible with the grounding wire hook (1) are arranged at the joint between (11) and the lower rod head (14). The utility model eliminates the occurrence of vicious electrical misoperation accidents caused by the unexpected call of the equipment during the operation process, and ensures the safety of the operator's personal and power grid equipment.

Description

接地线装拆专用装置Special device for installing and disassembling the grounding wire

技术领域technical field

本实用新型涉及一种接地线装拆专用装置,属于输、变、配电设备领域。The utility model relates to a special device for installing and disassembling ground wires, which belongs to the field of power transmission, transformation and power distribution equipment.

背景技术Background technique

挂、拆临时接地线在变电站倒闸操作中是保证作业人员人身安全的一项重要安全技术措施,目前常用的装置是临时接地线线夹,包括地线压接挂钩和操作杆,两者配合使用来进行地线的挂、拆操作。Hanging and removing the temporary grounding wire is an important safety technical measure to ensure the personal safety of the operators in the switching operation of the substation. At present, the commonly used device is the temporary grounding wire clip, including the ground wire crimping hook and the operating lever. Use it to hang and remove the ground wire.

在实际操作中,受导线长度不同及自身重力影响,装设地线的导线部分不可能都是水平角度,这样就造成了用现有的操作杆装设的难度,即便用可调角度的操作杆也很难保证一次角度调整正确;其次,现有操作杆上部卡爪口径很小,在地面上用操作杆连接地线压接头时不宜对位,需要监护人员配合,不符合《国家电网公司电力安全工作规程》倒闸操作过程中有关监护人的安全责任规定;再次,室外地线挂钩挂接上后,受风力及导线摆动的影响,挂钩下部接头角度不可避免的会发生偏移,此时操作杆上部卡爪更不宜对位,给操作人员拆除地线带来了麻烦;最后,操作杆内部用带齿条的金属连杆作为传动机构,本身重量很大,操作起来很不方便;同时现有操作杆金属把手通过杆内金属连杆下部的齿条连接到上部的卡爪,内部传动机构本身相当于导电体,通过握压把手带动金属连杆操作时,安全距离不足。操作过程中虽然佩带绝缘手套,在验电器验电后,因装设地线时间跨度过长,即便最熟练的操作人员也需要9-10分钟,无法可靠避因免设备意外来电所造成的“带电挂接地线”恶性电气误操作事故的发生,对操作人员的人身及电网设备的安全构成了潜在的威胁。In actual operation, due to the different lengths of the wires and the influence of their own gravity, the wires where the ground wire is installed cannot be at a horizontal angle, which makes it difficult to install with the existing operating lever, that is, the angle-adjustable operation It is also difficult to ensure that the angle is adjusted correctly once; secondly, the claws on the upper part of the existing operating rod have a small diameter, and it is not suitable for alignment when connecting the ground wire crimping joint with the operating rod on the ground. Safety responsibilities of guardians during the switching operation of the Electrical Safety Work Regulations; Thirdly, after the hook of the outdoor ground wire is hooked up, affected by the wind force and the swing of the wire, the angle of the lower joint of the hook will inevitably shift. The claws on the upper part of the operating rod are not suitable for alignment, which brings trouble to the operator to remove the ground wire; finally, the metal connecting rod with a rack is used as the transmission mechanism inside the operating rod, which is heavy and inconvenient to operate; The metal handle of the existing operating rod is connected to the upper claw through the rack at the lower part of the metal connecting rod inside the rod. The internal transmission mechanism itself is equivalent to a conductor. When the metal connecting rod is driven by pressing the handle to operate, the safety distance is insufficient. Although wearing insulating gloves during the operation, after the electrical inspection of the electroscope, because the time span of installing the ground wire is too long, even the most skilled operator needs 9-10 minutes, and it is impossible to reliably avoid the " The occurrence of vicious electrical misoperation accidents, such as live connection to the ground wire, constitutes a potential threat to the personal safety of operators and the safety of power grid equipment.

实用新型内容Utility model content

根据以上现有技术中的不足,本实用新型要解决的问题是:提供一种重量轻,安全性能好,操作简单,实用性强,提高工作效率的接地线装拆专用装置。According to the deficiencies in the prior art above, the problem to be solved by the utility model is: to provide a special device for installing and disassembling the grounding wire which is light in weight, good in safety performance, simple in operation, strong in practicability, and improves working efficiency.

本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:

所述的接地线装拆专用装置,包括接地线挂钩和配套的绝缘操作杆,所述的接地线挂钩为∩型,∩型接地线挂钩内部设置压紧机构,∩型接地线挂钩一侧的上部和下部轴对称设置半圆形高强度钢片,∩型接地线挂钩一端的底部设置螺母与软铜线压接口,所述的绝缘操作杆包括相连接的上部杆头和下部杆头,上部杆头和下部杆头连接处设置两个与接地线挂钩相适应的半圆形挂钩。The special device for installing and disassembling the grounding wire includes a grounding wire hook and a matching insulating operating rod. The grounding wire hook is ∩-shaped, and a pressing mechanism is arranged inside the ∩-shaped grounding wire hook. The upper part of one side of the ∩-shaped grounding wire hook The semicircular high-strength steel sheet is arranged symmetrically with the lower part, and the bottom of one end of the ∩-shaped grounding wire hook is provided with a nut and an annealed copper wire. Two semicircular hooks adapted to the grounding wire hook are arranged at the junction of the head and the lower rod head.

所述的接地线装拆专用装置的接地线挂钩为∩型结构,装卸方便,且通过接地线挂钩和绝缘操作杆的半圆形高强度钢片和半圆形挂钩可以轻松的进行装拆,单人可轻松快速操作,能够显著提高操作人员的工作效率及确保人身和设备的安全水平,装置采用铝合金材料,重量轻,安全性能好,操作简单,实用性强。The grounding wire hook of the special device for installing and disassembling the grounding wire is a ∩-shaped structure, which is convenient for loading and unloading, and can be easily assembled and disassembled through the semicircular high-strength steel sheet and the semicircular hook of the grounding wire hook and the insulating operating rod. It can be operated easily and quickly by humans, which can significantly improve the work efficiency of operators and ensure the safety of personnel and equipment. The device is made of aluminum alloy, with light weight, good safety performance, simple operation and strong practicability.

进一步地优选,压紧机构包括结构相同且轴对称设置的两个弧形压接片,∩型接地线挂钩上部两端对称设置压接片上部活动槽,压接片上部活动槽下方设置平行弹簧固定口,平行弹簧固定口下方设置压接片下部连接槽,弧形压接片上部放置在压接片上部活动槽内,下部通过旋转轴固定在压接片下部连接槽内,中部连接弹簧的一端,弹簧的另一端安装在平行弹簧固定口内,安装在∩型接地线挂钩内部的两片弧形压接片呈八字形,且上部形成导线固定圆孔。将∩型接地线挂钩挂至导线时,导线挤压压紧机构两侧的弧形压接片,弧形压接片的上部在接地线挂钩上部的压接片上部活动槽内向两侧移动,将导线挤入上端的导线固定圆孔内,然后两侧弹簧将两片弧形压接片复位,将接地线挂钩挂到导线上,使用方便,省时省力。Further preferably, the pressing mechanism includes two arc-shaped crimping pieces with the same structure and arranged axially symmetrically. The upper two ends of the ∩-shaped ground wire hook are symmetrically provided with upper movable grooves of the crimping pieces, and parallel springs are arranged below the upper movable grooves of the crimping pieces. Fixed port, the lower connection groove of the crimping piece is set under the parallel spring fixed port, the upper part of the arc-shaped crimping piece is placed in the upper movable groove of the crimping piece, the lower part is fixed in the lower connecting groove of the crimping piece through the rotating shaft, and the middle part is connected to the spring. One end, the other end of the spring is installed in the parallel spring fixing port, and the two arc-shaped crimping pieces installed inside the ∩-shaped grounding wire hook are in the shape of a figure-eight, and the upper part forms a wire fixing round hole. When the ∩-type grounding wire hook is hung on the wire, the wire squeezes the arc-shaped crimping pieces on both sides of the compression mechanism, and the upper part of the arc-shaped crimping piece moves to both sides in the upper movable groove of the crimping piece on the upper part of the grounding wire hook , Squeeze the wire into the wire fixing round hole at the upper end, and then the springs on both sides reset the two arc-shaped crimping pieces, and hang the grounding wire hook on the wire, which is convenient to use and saves time and effort.

进一步地优选,上部杆头的下部设置两个挂钩安装槽,半圆形挂钩安装在挂钩安装槽内,上部杆头的下部插入下部杆头内,通过螺丝固定。半圆形挂钩卡入挂钩安装槽内,通过下部杆头将其固定在内部,同时通过螺丝紧固,方便更换半圆形挂钩钢片。Further preferably, the bottom of the upper rod head is provided with two hook installation grooves, the semicircular hook is installed in the hook installation grooves, the lower part of the upper rod head is inserted into the lower rod head, and fixed by screws. The semicircular hook is snapped into the hook installation groove, fixed inside by the lower rod head, and fastened by screws at the same time, which is convenient for replacing the steel sheet of the semicircular hook.

进一步地优选,上部杆头上端设置验电器连接口,下部杆头的下端设置万向轴连接口。验完电后即可直接进行地线挂钩的挂设操作,将以往通过验电器验电后再用操作杆挂接地线头的间隔时间极大缩短,保证了人身和设备安全,有效解决了误操作意外事故的发生。万向轴可以使绝缘操作杆全方位转动。Further preferably, an electroscope connection port is provided at the upper end of the upper rod head, and a cardan shaft connection port is provided at the lower end of the lower rod head. After the power test, you can directly carry out the installation operation of the ground wire hook, which greatly shortens the interval time before using the operating rod to hang the ground wire head after the electroscope electric test, which ensures the safety of people and equipment, and effectively solves the problem of misuse. Accidents happen. The cardan shaft can make the insulated operating rod rotate in all directions.

进一步地优选,半圆形挂钩分别设置在上部杆头的两端,两个半圆形挂钩一个向上开口,另一个向下开口。方便装拆,使用灵活方便。Further preferably, the semicircular hooks are respectively arranged at both ends of the upper rod head, and one of the two semicircular hooks opens upwards and the other opens downwards. Easy to assemble and disassemble, flexible and convenient to use.

本实用新型所具有的有益效果是:The beneficial effects that the utility model has are:

1、使用方便,挂钩右侧安装槽内装有半圆型高强度钢片,通过专用杆头两侧的半圆形挂钩可轻松进行地线挂钩的对位、挂接操作。1. It is easy to use. The installation groove on the right side of the hook is equipped with a semicircular high-strength steel sheet. Through the semicircular hooks on both sides of the special rod head, the alignment and hooking operations of the ground wire hook can be easily performed.

2、操作杆杆头通过万象轴与下部绝缘杆体相连接,可以进行角度的自由设置及调整;挂钩的内侧壁上设有平行弹簧卡紧机构,压接片可根据导线尺寸自动调节,适用于所有35(10)kV、110(220)kV的尺寸的导线。2. The head of the operating rod is connected with the lower insulating rod body through the Vientiane shaft, and the angle can be set and adjusted freely; the inner wall of the hook is equipped with a parallel spring clamping mechanism, and the crimping piece can be automatically adjusted according to the size of the wire, which is suitable for All 35 (10) kV, 110 (220) kV size conductors.

3、通过专用绝缘操作杆杆头上部的验电器,验完电后即可直接进行地线挂钩的挂设操作,将以往通过验电器验电后再用操作杆挂接地线头的间隔时间极大缩短,保证了人身和设备安全,有效解决了误操作意外事故的发生。3. Through the electroscope on the upper part of the special insulated operating rod, you can directly carry out the installation operation of the ground wire hook after the power test, and the interval time between using the operating rod to hang the ground wire head after the electroscope test in the past is extremely large shortening, ensuring the safety of personal and equipment, and effectively solving the misoperation accidents.

4、本装置绝缘操作杆重量轻,安全性能好,单人即可轻松快速操作,克服了现有操作杆内部采用通体式金属齿条连杆作为传动机构所造成的杆体自身沉重,操作时费力情况。4. The insulated operating rod of this device is light in weight and has good safety performance. It can be easily and quickly operated by a single person, which overcomes the heavy rod body itself caused by the use of a whole-body metal rack and connecting rod as the transmission mechanism inside the existing operating rod, and laborious operation. Condition.

5、专用型操作杆除杆头部位为金属结构,下部杆体全部为绝缘部分,解决了现有操作杆内部整个传动机构为金属导体,在握压金属把手操作时,所造成的安全距离不足的问题。5. Except for the metal structure of the rod head, the special-purpose operating rod is all insulating parts at the lower part, which solves the problem that the entire transmission mechanism inside the existing operating rod is a metal conductor, and the safety distance caused by pressing the metal handle is insufficient. question.

附图说明Description of drawings

图1为本实用新型的接地线挂钩结构示意图;Fig. 1 is the structural representation of ground wire hook of the present utility model;

图2为本实用新型的接地线挂钩剖视图;Fig. 2 is a sectional view of the ground wire hook of the present utility model;

图3为本实用新型的绝缘操作杆结构示意图;Fig. 3 is a structural schematic diagram of the insulating operating rod of the present invention;

其中,1、接地线挂钩;2、压紧机构;3、半圆形高强度钢片;4、螺母与软铜线压接口;5、压接片上部活动槽;6、平行弹簧固定口;7、压接片下部连接槽;8、弧形压接片;9、弹簧;10、验电器连接口;11、上部杆头;12、半圆形挂钩;13、挂钩安装槽;14、下部杆头;15、万向轴连接口;16、绝缘操作杆;17、导线固定圆孔。Among them, 1. Ground wire hook; 2. Compression mechanism; 3. Semicircular high-strength steel sheet; 4. Nut and annealed copper wire crimping interface; 5. Crimping piece upper movable groove; 6. Parallel spring fixing port; 7. The lower connecting groove of the crimping piece; 8. The arc-shaped crimping piece; 9. The spring; 10. The connection port of the electroscope; 11. The upper rod head; 12. The semicircular hook; 13. The hook installation groove; 14. The lower part Rod head; 15, cardan shaft connection port; 16, insulating operating rod; 17, wire fixing round hole.

具体实施方式Detailed ways

下面结合附图对本实用新型的实施例做进一步描述:Embodiments of the utility model are further described below in conjunction with the accompanying drawings:

如图1、图2、图3所示,本实用新型所述的接地线装拆专用装置,包括接地线挂钩1和配套的绝缘操作杆16,所述的接地线挂钩1为∩型,∩型接地线挂钩1内部设置压紧机构2,∩型接地线挂钩1一侧的上部和下部轴对称设置半圆形高强度钢片3,∩型接地线挂钩1一端的底部设置螺母与软铜线压接口4,所述的绝缘操作杆16包括相连接的上部杆头11和下部杆头14,上部杆头11和下部杆头14连接处设置两个与接地线挂钩1相适应的半圆形挂钩12。As shown in Figure 1, Figure 2, and Figure 3, the special device for installing and disassembling the grounding wire described in the utility model includes a grounding wire hook 1 and a matching insulating operating rod 16, and the grounding wire hook 1 is ∩ type, ∩ type The grounding wire hook 1 is equipped with a pressing mechanism 2 inside, the upper and lower parts of the ∩-shaped grounding wire hook 1 are axially symmetrically provided with a semicircular high-strength steel sheet 3, and the bottom of one end of the ∩-shaped grounding wire hook 1 is provided with a nut and an annealed copper wire The pressure port 4, the insulating operating rod 16 includes the connected upper rod head 11 and the lower rod head 14, and two semicircular rings suitable for the grounding wire hook 1 are arranged at the junction of the upper rod head 11 and the lower rod head 14. Hook12.

压紧机构2包括结构相同且轴对称设置的两个弧形压接片8,∩型接地线挂钩1上部两端对称设置压接片上部活动槽5,压接片上部活动槽5下方设置平行弹簧固定口6,平行弹簧固定口6下方设置压接片下部连接槽7,弧形压接片8上部放置在压接片上部活动槽5内,下部通过旋转轴固定在压接片下部连接槽7内,中部连接弹簧9的一端,弹簧9的另一端安装在平行弹簧固定口6内,安装在∩型接地线挂钩1内部的两片弧形压接片8呈八字形,且上部形成导线固定圆孔17。The pressing mechanism 2 includes two arc-shaped crimping pieces 8 with the same structure and arranged axially symmetrically. The upper two ends of the ∩-shaped ground wire hook 1 are symmetrically provided with the upper movable groove 5 of the crimping piece, and the upper movable groove 5 of the crimping piece is arranged below a parallel The spring fixing port 6, the lower connecting groove 7 of the crimping piece is set under the parallel spring fixing port 6, the upper part of the arc-shaped crimping piece 8 is placed in the upper movable groove 5 of the crimping piece, and the lower part is fixed in the lower connecting groove of the crimping piece through the rotating shaft 7, the middle part connects one end of the spring 9, and the other end of the spring 9 is installed in the parallel spring fixing port 6, and the two arc-shaped crimping pieces 8 installed inside the ∩-shaped grounding wire hook 1 are in the shape of a figure-eight, and the upper part forms a wire Fix the circular hole 17.

其中,上部杆头11的下部设置两个挂钩安装槽13,半圆形挂钩12安装在挂钩安装槽13内,上部杆头11的下部插入下部杆头14内,通过螺丝固定,上部杆头11上端设置验电器连接口10,下部杆头14的下端设置万向轴连接口15。半圆形挂钩12分别设置在上部杆头11的两端,两个半圆形挂钩12一个向上开口,另一个向下开口。Wherein, two hook mounting grooves 13 are arranged on the bottom of the upper rod head 11, the semicircular hook 12 is installed in the hook mounting groove 13, the bottom of the upper rod head 11 is inserted in the lower rod head 14, fixed by screws, the upper rod head 11 An electroscope connecting port 10 is arranged at the upper end, and a cardan shaft connecting port 15 is arranged at the lower end of the lower rod head 14 . The semicircular hooks 12 are respectively arranged on the two ends of the upper rod head 11, one of the two semicircular hooks 12 opens upwards, and the other opens downwards.

本实用新型的工作原理和使用过程:Working principle and application process of the utility model:

所述的接地线装拆专用装置使用时,将三相线固定螺母与软铜线压接口4内,通过配套的绝缘操作杆16一侧的向上开口的半圆形挂钩12与接地线挂钩1一侧上部向下开口的半圆形高强度钢片3卡合后提升,将∩型接地线挂钩挂至导线上,然后再通过绝缘操作杆16一侧的向下开口的半圆形挂钩12与接地线挂钩1一侧下部向上开口的半圆形高强度钢片3卡合使劲往下一拉,将导线挤入压紧机构2上部的导线固定圆孔17内即可。When the special device for installing and disassembling the grounding wire is used, press the three-phase line fixing nut and the annealed copper wire into the interface 4, and connect the grounding wire hook 1 with the upwardly opening semicircular hook 12 on one side of the matching insulating operating rod 16. The semicircular high-strength steel sheet 3 opening downwards on the upper side of the side is lifted after being engaged, and the ∩-shaped grounding wire hook is hung on the wire, and then the semicircular hook 12 opening downwards on one side of the insulating operating rod 16 is connected with the The semicircular high-strength steel sheet 3 that opens upwards at the lower part of the grounding wire hook 1 side engages and pulls down firmly, and the wire is squeezed into the wire fixing circular hole 17 on the top of the pressing mechanism 2 to get final product.

本实用新型为了在操作时根据导线的下垂角度灵活的改变挂钩的悬挂方向,操作杆杆头通过万象轴与绝缘操作杆16下部相连接,可以进行角度的自由设置及调整;杆头两侧安装有半圆形挂钩1,通过与接地线挂钩1右侧的半圆形高强度钢片3进行接地线挂钩的装、拆操作;操作杆的顶部通过绝缘管与验电器相连接,验电器绝缘连接管的长度可根据不同的电压等级配套安装,绝缘管长度满足《国家电网公司电力安全工作规程》规定的可靠安全距离,实现了验电、接地快速操作。杜绝了以往因验电后装设地线时间跨度长以及现有操作杆内部传动机构通体式金属连杆造成的安全距离不足,在操作过程中因设备意外来电所造成的“带电挂接地线”恶性电气误操作事故的发生,确保了操作人员的人身及电网设备的安全。In order to flexibly change the hanging direction of the hook according to the sagging angle of the wire during operation, the utility model connects the head of the operating rod with the lower part of the insulating operating rod 16 through the Vientiane shaft, so that the angle can be freely set and adjusted; There is a semicircular hook 1, and the installation and disassembly of the grounding wire hook is performed through the semicircular high-strength steel sheet 3 on the right side of the grounding wire hook 1; the top of the operating rod is connected to the electroscope through an insulating tube, and the electroscope is insulated. The length of the connecting pipe can be installed according to different voltage levels. The length of the insulating pipe meets the reliable and safe distance stipulated in the "State Grid Corporation of China Electricity Safety Work Regulations", which realizes the rapid operation of electric inspection and grounding. Eliminate the lack of safety distance caused by the long time span of installing the ground wire after the electric test and the whole-body metal connecting rod of the existing operating rod internal transmission mechanism, and the "live hanging ground wire" caused by the accidental power call of the equipment during operation The occurrence of vicious electrical misoperation accidents ensures the safety of operators and power grid equipment.

Claims (5)

1. an earth connection is installed and removed special purpose device, comprise clamp for ground wire (1) and supporting insulating bar (16), it is characterized in that: described clamp for ground wire (1) is ∩ type, ∩ type clamp for ground wire (1) inside arranges hold-down mechanism (2), the upper and lower axial symmetry of ∩ type clamp for ground wire (1) one side arranges semicircle high strength steel disc (3), the bottom of ∩ type clamp for ground wire (1) one end arranges nut and annealed copper wire crimping mouth (4), described insulating bar (16) comprises upper bar head (11) and the lower pole head (14) being connected, upper bar head (11) and lower pole head (14) junction arrange two semicircle hooks (12) that adapt with clamp for ground wire (1).
2. earth connection according to claim 1 is installed and removed special purpose device, it is characterized in that: described hold-down mechanism (2) comprises two arc compressing pieces (8) that structure is identical and axial symmetry arranges, ∩ type clamp for ground wire (1) both upper ends thereof is symmetrical arranged compressing piece top movable groove (5), compressing piece top movable groove (5) below arranges parallel spring fixing port (6), parallel spring fixing port (6) below arranges compressing piece bottom link slot (7), arc compressing piece (8) top is placed in compressing piece top movable groove (5), bottom is fixed in compressing piece bottom link slot (7) by rotating shaft, one end of middle part linking springs (9), the other end of spring (9) is arranged in parallel spring fixing port (6), be arranged on the inner two arc compressing pieces (8) of ∩ type clamp for ground wire (1) and be splayed, and fixedly circular hole (17) of wire is formed at top.
3. earth connection according to claim 1 is installed and removed special purpose device, it is characterized in that: the bottom of described upper bar head (11) arranges two hook mounting grooves (13), semicircle hook (12) is arranged in hook mounting groove (13), insert in lower pole head (14) bottom of upper bar head (11), is screwed.
4. earth connection mounting or dismounting special purpose device according to claim 1, is characterized in that: described upper bar head (11) upper end arranges electroscope connector (10), and the lower end of lower pole head (14) arranges universal drive shaft connector (15).
5. earth connection mounting or dismounting special purpose device according to claim 1, is characterized in that: described semicircle hook (12) is separately positioned on the two ends of upper bar head (11), (12) upward openings of two semicircle hooks, and another is under shed.
CN201420155180.6U 2014-04-01 2014-04-01 Grounding wire assembling and disassembling special-purpose device Expired - Fee Related CN203895631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420155180.6U CN203895631U (en) 2014-04-01 2014-04-01 Grounding wire assembling and disassembling special-purpose device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420155180.6U CN203895631U (en) 2014-04-01 2014-04-01 Grounding wire assembling and disassembling special-purpose device

Publications (1)

Publication Number Publication Date
CN203895631U true CN203895631U (en) 2014-10-22

Family

ID=51721991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420155180.6U Expired - Fee Related CN203895631U (en) 2014-04-01 2014-04-01 Grounding wire assembling and disassembling special-purpose device

Country Status (1)

Country Link
CN (1) CN203895631U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104953304A (en) * 2015-06-30 2015-09-30 国网上海市电力公司 Universal hook type ground lead connector for ultrahigh voltage transformer substation
CN106898890A (en) * 2017-04-18 2017-06-27 国网辽宁省电力有限公司丹东供电公司 High-voltage earthing line apparatus
CN107834222A (en) * 2017-10-12 2018-03-23 国家电网公司 A kind of low-voltage grounding wire group
CN108649358A (en) * 2018-05-09 2018-10-12 襄阳先义电力科技有限公司 A kind of GPS positioning detects hang type ground wire hanging head and its application method automatically
CN113690647A (en) * 2021-08-31 2021-11-23 国网河南省电力公司濮阳供电公司 Anti-loosening type self-locking clamp hook wire clamp for grounding wire and working method of anti-loosening type self-locking clamp hook wire clamp

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104953304A (en) * 2015-06-30 2015-09-30 国网上海市电力公司 Universal hook type ground lead connector for ultrahigh voltage transformer substation
CN106898890A (en) * 2017-04-18 2017-06-27 国网辽宁省电力有限公司丹东供电公司 High-voltage earthing line apparatus
CN107834222A (en) * 2017-10-12 2018-03-23 国家电网公司 A kind of low-voltage grounding wire group
CN108649358A (en) * 2018-05-09 2018-10-12 襄阳先义电力科技有限公司 A kind of GPS positioning detects hang type ground wire hanging head and its application method automatically
CN113690647A (en) * 2021-08-31 2021-11-23 国网河南省电力公司濮阳供电公司 Anti-loosening type self-locking clamp hook wire clamp for grounding wire and working method of anti-loosening type self-locking clamp hook wire clamp
CN113690647B (en) * 2021-08-31 2024-02-06 国网河南省电力公司濮阳供电公司 Anti-loosening type self-locking clip hook clamp for grounding wire and working method thereof

Similar Documents

Publication Publication Date Title
CN203895631U (en) Grounding wire assembling and disassembling special-purpose device
CN201638948U (en) A throw-pull grounding wire for transmission lines
CN204230457U (en) Universal connector earth wire operation rod
CN204144479U (en) A kind of earth connection
CN104485530B (en) Mechanical ground wire connecting operation platform
CN109731251A (en) A fixed seat belt suspension device with high working efficiency
CN201515026U (en) A vertical ground clamp
CN204216250U (en) Mechanization earth connection operating platform
CN204391308U (en) The electrical lead maintenance grounding wire device of convenient operation
CN201717384U (en) High and low pressure ground wire hook capable of adjusting direction
CN203300837U (en) Throwing-hanging type ground wire
CN107171162A (en) Parallel groove clamp assembly and disassembly operations instrument
CN102185267B (en) 66KV ground potential hot-line make-and-break bypassing method
CN211351018U (en) New intelligent plugging and automatic warning grounding device
CN106299764B (en) A kind of wired earth wire clamp with double hanging wire modes
CN108987963A (en) Ultra-high-tension power transmission line assembly and disassembly ground line auxiliary device
CN205051016U (en) General earth bar with adjustable
CN104269669B (en) A kind of earth lead
CN203085783U (en) 10kV overhead line fixed-point installation grounding device
CN206148640U (en) A wire ground clamp with double hanging wire mode
CN211208698U (en) Novel complete set grounding device for 220kV power transmission line
CN103107428B (en) Fixed point connection method for targeted installation grounding device via overhead line 10 kv overhead line
CN209193357U (en) Pre- arch tube type bus hanging apparatus
CN203631773U (en) Side-pull type wire clamp for hanging wires
CN203216951U (en) Terminal rods for lightning arresters

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20190401