[go: up one dir, main page]

CN203891877U - Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine - Google Patents

Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine Download PDF

Info

Publication number
CN203891877U
CN203891877U CN201420306394.9U CN201420306394U CN203891877U CN 203891877 U CN203891877 U CN 203891877U CN 201420306394 U CN201420306394 U CN 201420306394U CN 203891877 U CN203891877 U CN 203891877U
Authority
CN
China
Prior art keywords
drilling
drilling rig
rig
drilling machine
cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420306394.9U
Other languages
Chinese (zh)
Inventor
陈加胜
张友能
魏东
高明中
邓海顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201420306394.9U priority Critical patent/CN203891877U/en
Application granted granted Critical
Publication of CN203891877U publication Critical patent/CN203891877U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine. The drilling machine mainly comprises a steel plate structure member and a hydraulic system, wherein the steel plate structure member of the drilling machine comprises a receiving and releasing main arm, a drilling machine rack, a vertical slewing mechanism and a horizontal slewing mechanism; and the hydraulic transmission system of the drilling machine comprises a drilling hydraulic motor, a horizontal rotary hydraulic motor of the drilling machine, a vertical rotary hydraulic motor of the drilling machine, a hydraulic cylinder with telescopic legs, a drilling machine propelling hydraulic cylinder, a hydraulic control element and a hydraulic auxiliary element. The drilling machine is characterized in that the drilling machine and an excavator are combined into a whole, and are distributed on two sides of a cantilever of the excavator; walking of the drilling machine is achieved by using a travelling mechanism of the excavator, all-around multifunctional drilling can be performed on an excavation roadway, anchor bolt support and roof lithology detection can be achieved, blast hole drilling and drilling of gas drainage boreholes, geological boreholes and the like also can be achieved, and equipment and means are provided for achievement of safe, rapid and efficient roadway construction.

Description

Boom-type roadheader is airborne with pick anchor drilling integrated rig
Technical field
The utility model relates to and is applied to the rig for surrounding rock supporting and geological drilling using in underworkings tunneling process, is specially a kind of boom-type roadheader airborne with pick anchor drilling integrated rig.
Background technology
Bolt support have cost low, become that lane speed is fast, assistant conveyance amount is little, labour intensity is low, drift section utilization rate advantages of higher, thereby be subject to generally paying attention to and increasingly extensive application of each main country of mining of the world, represent the developing direction of Roadway Support Technology.Along with the develop rapidly of bolt support technology, jumbolter has also obtained development fast, but it remains the one of the main reasons of restriction BOLTING TECHNOLOGY TO COAL ROADWAY at China's Rapid Popularization.
Jumbolter mainly contains haplotype jumbolter and bogie type jumbolter, the advantage of haplotype jumbolter: simple in structure, processing and manufacturing is easy, cheap, operating maintenance technical requirements is not high.The shortcoming of haplotype jumbolter: Drilling aperture is less, and hole depth is less, needs a dead lift.
The advantage of bogie type jumbolter: mechanization degree is high, power output is large, and rock breaking capacity is strong, and energy consumption is low, and Drilling aperture is larger, and hole depth is larger, and complete machine is walked automatically, does not need a dead lift, and operating environment is good, is easy to realize automatic control etc.The shortcoming of bogie type jumbolter: price, is not suitable for small section tunnel.
Typical tunnel geological drilling rig has two kinds: one is the split type all-hydraulic drill in colliery; One is HXY type walking rock-core borer.The shortcoming that above-mentioned two kinds of geological drilling rigs are compared with jumbolter is: equipment heaviness, volume is large, underground transportation, movement, fixing, installation and removal is all very difficult, when work plane geological conditions changes when fast, rig needs frequent carrying, fixing, installation and removal, so workload is large, labour intensity is high, tunnelling speed is slow, has seriously restricted the raising of drivage efficiency, even cannot use compared with small section tunnel.
Boom-type roadheader has the functions such as cut, loading, reprinting coal petrography, self walking and spray dust prevention.But jumbolter and geological drilling rig all can not effectively coordinate with development machine, efficiency is low, labor strength is large, driving speed is slow, the Homes Using TV of development machine only has 40% left and right, the advantage of the speedy drivage of boom-type roadheader can not be brought into play, boom-type roadheader need to be researched and developed airborne with the safe, efficient, fast driving of pick anchor drilling integrated rig realization.
The permanent support of current domestic colliery digging laneway designs by rule of thumb, the lithology of back and strata structure can not be verified in time, permanent support design can not be changed in time with top board situation, sometimes because supporting intensity causes roof accident not, sometimes supporting intensity surplus causes waste, has reduced driving speed and benefit.Anchor pole (rope) percentage support in tunnel has reached 80% left and right, need to constantly hole, with skyhook, the country rock of new exposure be carried out to supporting.In addition in tunnelling process, often can run into the complex geological conditions such as Gas Outburst, top board lithology are not clear, underground water, hard difficult cut rock stratum, tomography, need probing.
Summary of the invention
The purpose of this utility model is taking boom-type roadheader as support platform, jumbolter, geological drilling rig and boom-type roadheader are organically combined into one, design is integrated with pick anchor probing rig with boom-type roadheader, to realize Omni bearing multifunctional drill hole, realize bolt support and top board lithology detecting, provide equipment means for realizing tunnelling efficiently safely and fast.
The beneficial effects of the utility model are:
1) realize Omni bearing multifunctional drill hole.Bore anchor pole, anchor cable boring to top board, top board lithology is surveyed simultaneously.To meeting head on, roadway's sides and roadway floor bore various boring.
2) this device is flexible to operation laborsaving, and operating personnel are at the handgrip of safety place direction of operating valve below of holing, and stable action is rapid, act freely, boring accurate positioning, good stability when boring, reduce workman's quantity, reduce workman's labour intensity.
3) rig and development machine are combined into one, and realize the Fast Installation of rig, fixing and movement, do not need manually repeatedly to install, fix and carrying rig.Make full use of the space of development machine cantilever both sides, solve more crowded present situation in rig duty chien shih tunnel.
4) when rig is packed up, physical dimension is little, does not hinder development machine driver's sight line, does not affect the operations such as cut, loading and the walking of development machine.Rig extension stroke is large, can meet the requirement in different section and size tunnel.
5) the one-stop operation circulation 3 row's anchor poles of constructing, should at least can the construct lateral wall anchor pole of 3 kinds of height of same section, each jumbolter operation simultaneously, is independent of each other.
6) use the hydraulic power unit of development machine, do not need to configure separately pumping plant, institute is so that cost, and hydraulic system is simplified.
7) simple and reliable for structure, overall mass is little, is convenient to install, dismantle, keep in repair and maintain in down-hole.
Brief description of the drawings
Fig. 1 is that the utility model rig is realized the schematic diagram that top board lithology is surveyed with probing
Fig. 2 is the utility model rig overall structural arrangement figure
Fig. 3 is the utility model rig and the integrated figure of boom-type roadheader
Fig. 4 is the concrete enforcement figure of the utility model rig to the boring such as blasthole drilling and the leading drawing-off gas of major diameter of meeting head on
Fig. 5 is the utility model rig bores anchor pole, anchor cable and concrete enforcement figure from the boring of top board lithology detecting to top board
Fig. 6 is that the utility model rig bores anchor pole, anchor cable and surveys the concrete enforcement figure holing to roadway's sides
Fig. 7 is the concrete enforcement figure of the utility model rig to roadway floor boring
Mark in figure: the vertical rotary fluid motor of 1-borer frame; 2-borer frame; 3-rig drill-in fluid pressure motor; 4-drilling rod; 5-rig is to inlet hydraulic cylinder; 6-drill pipe clamp; 7-drill bit; 8-rig and development machine cantilever jointed shaft; 9-rig folding and unfolding principal arm inner core; Cylinder in 10-rig folding and unfolding principal arm; 11-rig folding and unfolding principal arm urceolus; 12-rig folding and unfolding principal arm folding and unfolding hydraulic cylinder; 13-support leg jaw; 14-support leg hydraulic cylinder; 15-support leg luffing hydraulic cylinder; 16-adpting flange; 17-rig support leg panoramic table; The connector of 18-rig support leg and borer frame horizontal rotation hydraulic motor; 19-borer frame horizontal rotation hydraulic motor output shaft; 20-borer frame horizontal rotation hydraulic motor; 21-rig folding and unfolding principal arm and development machine cantilever angle regulator solution cylinder pressure; Portion of 22-digging laneway side; Portion of 23-side anchor pole; 24-digging laneway base plate; 25-digging laneway is met head on; 26-Roadway Roof; 27-roofbolt; The cutterhead of 28-development machine; 29-is with pick anchor drilling integrated rig (each one of left and right); 30-development machine cantilever; 31-development machine suspending arm rotary oil cylinder; 32-development machine operating desk; 33-drag conveyor; 34-development machine cantilever elevation hydraulic cylinder; 35-shovel board of development machine.
Detailed description of the invention
As shown in Figure 1, in the time that the mode of the bolt support is selected in tunnel, each driving circulation must be bored bolthole, when boring, top board lithology is surveyed, and adapts to speedy drivage and the fast feature of top board variation of lithological.Flow transmitter, pressure transmitter and hydraulic jumbolter are combined, and the parameter such as pressure and flow to the pressure of inlet hydraulic cylinder and flow, hydraulic motor that records hydraulic jumbolter is passed to the electronic management system of development machine.Pass through data processing, can be in the time that tunnelling be constructed real-time analysis judge the lithology of top board diverse location, provide solid geologic basis for realizing in real time the dynamically design of its support of " quantitatively ", instruct design of its support and the roof control of driving face, guarantee the needs that supporting can meet safety and produce, reduce roof fall accident and occur, for Coal Mine Staff provides a safe and reliable working environment.
As shown in Figure 2, a kind of boom-type roadheader is airborne with pick anchor drilling integrated rig, and concrete structure is: rig is mainly made up of structural part of steel plate and hydraulic system.Structural part of steel plate has: folding and unfolding principal arm, gadder, vertical slew gear and horizontal rotation mechanism etc.Hydraulic Power Transmission System comprises: bore liquid pressure motor, rig horizontal rotation hydraulic motor, the vertical rotary fluid motor of rig, Retractive leg hydraulic cylinder, rig propelling hydraulic cylinder and hydraulic control component (operating valve set, safety valve, hydraulic control one-way valve etc.) and hydraulic pressure auxiliary element (union, sebific duct etc.) composition.Between each structural member and between structural member and Hydraulic Elements, be all connected by bearing pin, bolt etc., pipeline connects and adopts U-shaped card snap joint, and dismounting is easy to maintenance.
As shown in Figure 3, when rig is not worked, rig is retracted into the both sides of development machine cantilever, volume is very little, does not hinder development machine driver's sight line, does not disturb the operations such as cut, loading, reprinting and the walking of development machine.
As shown in Figure 4, rig support leg is extended to recede and is inserted roadway floor support rig, rig rotates under the effect of horizontal rotation hydraulic motor, make the rig boring such as blasthole drilling and the leading firedamp drainage of major diameter of meeting head on to tunnel, can adjust by the lifting of development machine cantilever and revolution the position up and down of boring.Because development machine hydraulic power source power is larger, can export larger hydraulic torque, drive compared with the rod boring larger diameter in extra heavy pipe footpath and darker boring.
As shown in Figure 5, rig support leg is extended downwards and is inserted roadway floor vertical support rig, and rig rotates under the effect of vertical rotary fluid motor, makes rig bore anchor pole, anchor cable and lithology detecting boring to back, and can skyhook and anchor cable.Support leg can ensure rig steady operation, improves the reliability of lithology detecting.
As shown in Figure 6, rig support leg is extended downwards and is inserted roadway floor inclination support rig, borer frame rotates under the effect of horizontal rotation hydraulic motor, makes rig bore anchor pole (anchor cable) eye and skyhook (anchor cable) to roadway's sides.
As shown in Figure 7, the flange plate bolt of the branch sleeve before rig folding and unfolding supporting leg is pulled down, manually rig support leg hydraulic cylinder is holed to roadway floor together with rig Rotate 180 ° in vertical plane, rig support leg is upwards extended and is inserted back vertical support rig.Purpose of design is to reduce a rotary actuator and corresponding oil pipe and hydraulic valve like this, because rig is little to the situation of base plate jewel hole.

Claims (6)

1.一种悬臂式掘进机机载随掘锚钻探一体化钻机,包括(1)钻机机架竖直回转液压马达、(2)钻机机架、(3)钻机钻进液压马达、(4)钻杆、(5)钻机给进液压缸、(6)钻杆夹持器、(7)钻头、(8)钻机与掘进机悬臂铰接轴、(9)钻机收放主臂内筒、(10)钻机收放主臂中筒、(11)钻机收放主臂外筒、(12)钻机收放主臂收放液压缸、(13)支撑支腿扒爪、(14)钻机支撑支腿液压缸、(15)钻机支撑支腿变幅液压缸、(16)连接法兰、(17)钻机支撑支腿回转台、(18)钻机支撑支腿与钻机机架水平旋转液压马达的连接器、(19)钻机机架水平回转液压马达输出轴、(20)钻机机架水平回转液压马达、(21)钻机收放主臂与掘进机悬臂夹角调节液压缸。  1. A cantilever-type roadheader airborne integrated drilling rig for drilling while drilling, including (1) vertical rotary hydraulic motor of the drilling rig frame, (2) drilling rig frame, (3) drilling rig hydraulic motor, (4) Drill pipe, (5) drilling rig feeding hydraulic cylinder, (6) drill pipe holder, (7) drill bit, (8) drilling rig and roadheader cantilever hinge shaft, (9) drilling rig retractable main arm inner cylinder, (10) ) Drilling rig retractable main arm middle barrel, (11) Drilling rig retractable main arm outer cylinder, (12) Drilling rig retractable main arm retractable hydraulic cylinder, (13) Support leg claw, (14) Drill support leg hydraulic pressure Cylinder, (15) luffing hydraulic cylinder for drilling rig support leg, (16) connecting flange, (17) rotary table for drilling rig support leg, (18) connector for drilling rig support leg and horizontal rotation hydraulic motor of drilling rig frame, (19) The output shaft of the drilling rig horizontal rotary hydraulic motor, (20) The horizontal rotary hydraulic motor of the drilling rig frame, (21) The hydraulic cylinder for adjusting the angle between the retractable main arm of the drilling rig and the cantilever of the roadheader. the 其特征在于:实现全方位多功能钻孔,向顶板钻锚杆、锚索钻孔,同时对顶板岩性进行探测,向迎头、巷道两帮和巷道底板钻各种钻孔。  It is characterized in that it realizes all-round multi-functional drilling, drills anchor rods and anchor cables to the roof, detects the lithology of the roof at the same time, and drills various drilling holes to the head, the two sides of the roadway and the bottom plate of the roadway. the 2.如权利要求1所述的一种悬臂式掘进机机载随掘锚钻探一体化钻机,其特征在于:该装置操作方便灵活省力,操作人员在钻孔后方安全地点操作方向阀的手把即可,动作平稳迅速,收放自如,钻孔定位准确,钻孔时稳定性好,减少工人的数量,降低工人的劳动强度。  2. A cantilever roadheader as claimed in claim 1, which is characterized in that: the device is easy to operate, flexible and labor-saving, and the operator operates the handle of the directional valve at a safe place behind the drilling hole. That is, the action is smooth and fast, retractable and retractable, the drilling positioning is accurate, the stability is good when drilling, the number of workers is reduced, and the labor intensity of workers is reduced. the 3.如权利要求1所述的一种悬臂式掘进机机载随掘锚钻探一体化钻机,其特征在于:钻机和掘进机结合成一体,实现钻机的快速安装、固定和移动,不需要人工反复安装、固定和搬运钻机,充分利用掘进机悬臂两侧的空间,解决钻机占空间使巷道内更加拥挤的现状。  3. A cantilever roadheader as claimed in claim 1, wherein the integrated drilling rig for drilling while drilling and drilling is characterized in that: the drilling rig and the roadheader are combined into one body to realize the rapid installation, fixation and movement of the drilling rig without manual labor Repeatedly install, fix and transport the drilling rig, make full use of the space on both sides of the cantilever of the roadheader, and solve the current situation that the drilling rig takes up space and makes the roadway more crowded. the 4.如权利要求1所述的一种悬臂式掘进机机载随掘锚钻探一体化钻机,其特征在于:钻机收起时结构尺寸小,不阻碍掘进机司机的视线,不与其他部件产生干涉,不影响掘进机的截割、装载及行走作业。  4. A cantilever-type roadheader airborne integrated drilling rig with bolt-on-drilling and drilling as claimed in claim 1, characterized in that: when the drill is retracted, the structural size is small, it does not hinder the driver's line of sight, and does not interfere with other components. Interference, does not affect the cutting, loading and walking operations of the roadheader. the 5.如权利要求1所述的一种悬臂式掘进机机载随掘锚钻探一体化钻机,其特征在于:钻机伸展行程大,可以满足不同断面和尺寸巷道的要求,2台锚杆钻机能够同时作业,互不影响。  5. A cantilever-type roadheader as claimed in claim 1, which is characterized in that: the drilling rig has a large extension stroke, which can meet the requirements of roadways with different sections and sizes, and two bolting rigs can Work at the same time without affecting each other. the 6.如权利要求1所述的一种悬臂式掘进机机载随掘锚钻探一体化钻机,其特征在于:使用掘进机的液压泵站,不需单独配置泵站,所以使成本降低,液压系统简化,而且节省了空间。  6. A cantilever-type roadheader airborne integrated drilling rig for anchor-while-drilling drilling as claimed in claim 1, characterized in that: the hydraulic pump station of the roadheader is used without a separate pump station, so the cost is reduced and the hydraulic pressure is reduced. The system is simplified and saves space. the
CN201420306394.9U 2014-06-10 2014-06-10 Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine Expired - Lifetime CN203891877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420306394.9U CN203891877U (en) 2014-06-10 2014-06-10 Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420306394.9U CN203891877U (en) 2014-06-10 2014-06-10 Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine

Publications (1)

Publication Number Publication Date
CN203891877U true CN203891877U (en) 2014-10-22

Family

ID=51718293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420306394.9U Expired - Lifetime CN203891877U (en) 2014-06-10 2014-06-10 Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine

Country Status (1)

Country Link
CN (1) CN203891877U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993879A (en) * 2014-06-10 2014-08-20 安徽理工大学 Boom-type roadheader mounted tunneling anchor-along drilling integrated drilling machine
CN106150382A (en) * 2016-08-27 2016-11-23 中国煤炭科工集团太原研究院有限公司 Bore anchor and visit Multi Role Aircraft
CN110206548A (en) * 2019-05-15 2019-09-06 中铁工程装备集团隧道设备制造有限公司 Multifunctional supporter, development end geology forward probe system and development machine
WO2020034898A1 (en) * 2018-08-16 2020-02-20 济宁泰立重工机械有限公司 Cantilever-type driving and anchoring integrated machine
CN114753775A (en) * 2022-04-29 2022-07-15 辽宁工程技术大学 Drilling device suitable for rapid tunneling and using method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993879A (en) * 2014-06-10 2014-08-20 安徽理工大学 Boom-type roadheader mounted tunneling anchor-along drilling integrated drilling machine
CN103993879B (en) * 2014-06-10 2016-05-11 安徽理工大学 Boom-type roadheader is airborne with pick anchor drilling integrated rig
CN106150382A (en) * 2016-08-27 2016-11-23 中国煤炭科工集团太原研究院有限公司 Bore anchor and visit Multi Role Aircraft
WO2020034898A1 (en) * 2018-08-16 2020-02-20 济宁泰立重工机械有限公司 Cantilever-type driving and anchoring integrated machine
CN110206548A (en) * 2019-05-15 2019-09-06 中铁工程装备集团隧道设备制造有限公司 Multifunctional supporter, development end geology forward probe system and development machine
CN114753775A (en) * 2022-04-29 2022-07-15 辽宁工程技术大学 Drilling device suitable for rapid tunneling and using method thereof

Similar Documents

Publication Publication Date Title
CN103993879B (en) Boom-type roadheader is airborne with pick anchor drilling integrated rig
CN105443037B (en) A kind of top jumbolter and the top roofboltier comprising the drilling machine
CN105626108B (en) A kind of side jumbolter and the side roofboltier comprising the rig
CN203891877U (en) Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN205259938U (en) Anchor rod drilling carriage of four arms group
CN102434154A (en) Development machine-mounted anchor rod drilling rig
CN104695871A (en) Drilling boom device of two-boom hydraulic rock bolt drilling carriage
CN106245985B (en) Hydraulic electric pole pole erecting vehicle
CN104564056A (en) Integrated tunneling and exploring machine
CN205349223U (en) Drilling equipment for building
CN103470184B (en) Double-arm hydraulic tunneling jumbo
CN207905842U (en) Combined type drill boom for punchinging, locking anchor pole and the rock drilling vehicle with the drill boom
CN204609879U (en) A kind of pick anchor all-in-one
CN204371098U (en) A kind of Combined hydraulic jump bit rig
CN104948109A (en) Suspension type omni-directional anchor rod drill carriage
CN203008778U (en) Crawler-type full hydraulic underground drill rig
CN204371334U (en) All-in-one is visited in pick
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN201635656U (en) Side-propping anchor rod-anchor cable construction drill carriage with three movable arms
CN203531749U (en) Double-arm hydraulic tunneling drill carriage
CN204754926U (en) Special full hydraulic rotary rig of entry driving machine
CN204532119U (en) A kind of drill boom device of two-arm hydraulic anchor rod drill carriage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141022

Effective date of abandoning: 20160511

C25 Abandonment of patent right or utility model to avoid double patenting