CN203881876U - Modularized and integrated system for dynamic simulation and terminal detection of power distribution network - Google Patents
Modularized and integrated system for dynamic simulation and terminal detection of power distribution network Download PDFInfo
- Publication number
- CN203881876U CN203881876U CN201420310305.8U CN201420310305U CN203881876U CN 203881876 U CN203881876 U CN 203881876U CN 201420310305 U CN201420310305 U CN 201420310305U CN 203881876 U CN203881876 U CN 203881876U
- Authority
- CN
- China
- Prior art keywords
- phase
- simulator
- distribution network
- module
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种模块化配电网动态模拟与终端测试一体化系统。The utility model relates to an integrated system of dynamic simulation and terminal testing of a modular distribution network.
背景技术Background technique
配电网是电网的重要组成部分,是控制和保证用户供电可靠性和供电质量的关键环节。我国配电网的网架设计、运行监控和试验研究相对输变电明显落后,是我国现代电网建设中最为薄弱的一个环节。近年来,随着大量分布式新能源、微网和多元化负荷接入配电网,传统配电网由无源网变为有源网,潮流由单向变为多向,配电网的运行特性与保护、控制策略日益复杂。由于配电网运行特性的复杂性,在进行理论分析、数字仿真的同时必须进行物理模拟试验研究,三者缺一不可。配电网动态模拟是分析电力系统特征、测试继电保护及二次设备的重要手段。配电网动态模拟试验可以在原型(10kV)线路上进行,也可以在等值低压模型(一般为380~1000V)上模拟进行。此外,配电网动态模拟系统也是配电自动化终端功能及性能的在线测试平台。配电自动化系统是提高供电可靠性的重要手段,由一次设备、配电终端、通信网络和主站系统组成。配电自动化系统通过配电终端,实现对配电一次设备的远程监测和控制。配电终端生产厂家多、产品型号多,运行于室外环境,其产品质量的检测与控制十分重要。但目前电自动化系统的测试联调一般只能在现场10kV配电网上进行,可测试项目少、风险高且效率低,无法有效检测配电自动化系统存在的不足和缺陷。The distribution network is an important part of the power grid and a key link to control and ensure the reliability and quality of power supply for users. Compared with power transmission and transformation, the grid design, operation monitoring and experimental research of my country's distribution network are obviously behind, and it is the weakest link in the construction of my country's modern power grid. In recent years, with a large number of distributed new energy sources, micro-grids and diversified loads connected to the distribution network, the traditional distribution network has changed from a passive network to an active network, and the power flow has changed from unidirectional to multi-directional. The operating characteristics, protection and control strategies are becoming more and more complex. Due to the complexity of the operating characteristics of the distribution network, it is necessary to carry out physical simulation test research while carrying out theoretical analysis and digital simulation, and the three are indispensable. Distribution network dynamic simulation is an important means to analyze power system characteristics, test relay protection and secondary equipment. The dynamic simulation test of the distribution network can be carried out on the prototype (10kV) line, or on the equivalent low-voltage model (generally 380-1000V). In addition, the distribution network dynamic simulation system is also an online test platform for the function and performance of distribution automation terminals. Distribution automation system is an important means to improve the reliability of power supply, which consists of primary equipment, distribution terminals, communication network and master station system. The power distribution automation system realizes remote monitoring and control of power distribution primary equipment through power distribution terminals. There are many manufacturers and product models of power distribution terminals, and they operate in outdoor environments. The detection and control of product quality is very important. However, at present, the test joint debugging of the electric automation system can only be carried out on the on-site 10kV distribution network. There are few test items, high risk and low efficiency, and it is impossible to effectively detect the deficiencies and defects of the distribution automation system.
实用新型内容Utility model content
本实用新型为了解决上述问题,提出了一种模块化配电网动态模拟与终端测试一体化系统,该系统综合考虑配电网动态特性研究与配电自动化主站系统及终端的测试需要,为研究配电网暂态特性、分析配电设备故障和进行配电自动化测试提供基础平台。In order to solve the above problems, the utility model proposes a modular distribution network dynamic simulation and terminal testing integrated system, which comprehensively considers the research on the dynamic characteristics of the distribution network and the testing needs of the distribution automation master station system and terminals, and provides It provides a basic platform for studying the transient characteristics of the distribution network, analyzing the faults of the distribution equipment, and conducting distribution automation tests.
为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种模块化配电网动态模拟与终端测试一体化系统,包括模拟组态屏、电源模块、线路模块、开关模块、负荷及无功补偿模块、分布电源模块、故障发生器模拟模块和配电终端模块;其中,模拟组态屏连接电源模块、线路模块、开关模块、负荷及无功补偿模块、分布电源模块、故障发生器模拟模块和配电终端模块;各个模块包括若干个不同的模拟器,所述模拟组态屏从屏体背面或侧面接入所有模拟器的两端进出线。An integrated system for dynamic simulation and terminal testing of a modular distribution network, including an analog configuration screen, a power supply module, a line module, a switch module, a load and reactive power compensation module, a distributed power supply module, a fault generator simulation module and a power distribution Terminal module; among them, the analog configuration screen is connected to the power supply module, line module, switch module, load and reactive power compensation module, distributed power supply module, fault generator simulation module and power distribution terminal module; each module includes several different simulators , the analog configuration screen is connected to the incoming and outgoing lines of all simulators from the back or side of the screen.
所述电源模块,包括三相可编程交流电源、变压器模拟器和变压器接地单元模拟器;所述三相可编程交流电源的容量为30kVA,电压、频率及初始相位可调,每相电压可调范围0—300V,电源频率可调范围45-65Hz。The power module includes a three-phase programmable AC power supply, a transformer simulator and a transformer grounding unit simulator; the three-phase programmable AC power supply has a capacity of 30kVA, and the voltage, frequency and initial phase are adjustable, and the voltage of each phase is adjustable Range 0-300V, power frequency adjustable range 45-65Hz.
所述变压器接地单元模拟器通过内置开关接入所述三相变压器中性点抽头,可模拟中性点不接地、小电阻接地或消弧线圈接地方式,不同接地方式通过手动操作改变。The transformer grounding unit simulator is connected to the neutral point tap of the three-phase transformer through a built-in switch, and can simulate neutral point non-grounding, small resistance grounding or arc suppressing coil grounding, and different grounding modes can be changed by manual operation.
所述线路模块,包括出线断路器、架空线路模拟器、电缆线路模拟器和电缆分支线路模拟器。The line module includes an outlet circuit breaker, an overhead line simulator, a cable line simulator and a cable branch line simulator.
所述出线断路器连接所述三相变压器出线,额定电流63A,可手动或遥控分合,具备完善的保护功能,包括速断保护、定时限速断保护和过流保护。The outlet circuit breaker is connected to the outlet of the three-phase transformer, with a rated current of 63A, which can be opened and closed manually or remotely, and has complete protection functions, including quick-break protection, time-limited quick-break protection, and overcurrent protection.
所述开关模块,包括电压型开关模拟器、电流型开关模拟器、环网柜模拟器和分界开关模拟器。The switch module includes a voltage-type switch simulator, a current-type switch simulator, a ring network cabinet simulator and a boundary switch simulator.
所述负荷及无功补偿模块,包括三相可编程负荷模拟器和无功补偿模拟器;所述三相可编程负荷模拟器为三相隔离变压器,采用干式变压器,变比为400V/400V,容量30kVA;中性点抽头引出,可选取“Yy”或“Yd”接线方式。The load and reactive power compensation module includes a three-phase programmable load simulator and a reactive power compensation simulator; the three-phase programmable load simulator is a three-phase isolation transformer using a dry-type transformer with a transformation ratio of 400V/400V ,The capacity is 30kVA; the neutral point tap leads out, and the connection mode of "Yy" or "Yd" can be selected.
所述配电终端模块,包括保护测控装置、电压型开关控制器、电流型开关控制器、环网柜控制器和分界开关控制器;The power distribution terminal module includes a protection measurement and control device, a voltage-type switch controller, a current-type switch controller, a ring network cabinet controller and a boundary switch controller;
所述故障发生器模块包括三相可编程故障发生器,所述分布电源模块包括分布式电源模拟器;所述三相可编程故障模拟器进线端配带延时投入继电器的手动断路器,手动投入故障,故障持续时间可设置,模拟各种类型的配电线路故障:包括相间短路、三相短路、单相接地、两相接地和三相接地故障,每个短路回路配备限流电阻,限流值为30A,设备可远程或本地控制,可编程设置和自动转换故障类型。The fault generator module includes a three-phase programmable fault generator, and the distributed power supply module includes a distributed power supply simulator; the input terminal of the three-phase programmable fault simulator is equipped with a manual circuit breaker with a delay input relay, Manual input fault, fault duration can be set, simulate various types of distribution line faults: including phase-to-phase short circuit, three-phase short circuit, single-phase ground fault, two-phase ground fault and three-phase ground fault, each short circuit is equipped with current limiting Resistor with a current limit of 30A, the device can be controlled remotely or locally, with programmable settings and automatic switching of fault types.
所述电压型开关模拟器,用于模拟电压型分段开关,可手动遥控分合;电压型分段开关配置A、B、C三相CT,CT变比10:5;开关电源侧和负荷侧安装AB、BC相间PT,PT二次侧输出电压为AC220V,作为电压采集信号和控制器外部供电电源。The voltage-type switch simulator is used for simulating the voltage-type sectional switch, which can be opened and closed by manual remote control; the voltage-type sectional switch is equipped with A, B, and C three-phase CTs, and the CT ratio is 10:5; the switching power supply side and the load AB and BC phase-to-phase PTs are installed on the side, and the output voltage of the PT secondary side is AC220V, which is used as the voltage acquisition signal and the external power supply of the controller.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1.可组合模拟实际10kV配电线路,实现电源波动、负荷曲线和故障类型的可编程设置,可用于实验室研究配电网稳态与暂态特性,以及配电自动化终端的在线测试,具有很高的扩展性和灵活性;1. It can be combined to simulate the actual 10kV distribution line, and realize the programmable setting of power fluctuation, load curve and fault type. It can be used in the laboratory to study the steady state and transient characteristics of the distribution network, as well as the online test of the distribution automation terminal. High scalability and flexibility;
2.根据所研究的实际10kV配电线路,通过模拟组态屏,组合出相应的配电网模拟测试系统,通过模拟配电网不同接地方式下正常运行、停送电操作、电源波动、接地或短路故障,记录并研究配电网暂态及稳态运行特性;此外,该系统还能模拟馈线自动化动作及处理过程,测试配电自动化开关控制器的功能与性能。2. According to the actual 10kV power distribution line studied, the corresponding distribution network simulation test system is combined through the simulation configuration screen, and the normal operation, power supply stop operation, power fluctuation, and grounding of the distribution network are simulated under different grounding methods. or short-circuit faults, record and study the transient and steady-state operating characteristics of the distribution network; in addition, the system can simulate the automatic action and processing of the feeder, and test the function and performance of the distribution automation switch controller.
附图说明Description of drawings
图1为本实用新型的系统组成结构示意图;Fig. 1 is the system composition structure schematic diagram of the present utility model;
图2为本实用新型的模拟两个变电站和2条手拉手线路的接线图。Fig. 2 is the wiring diagram of simulating two substations and two hand-in-hand lines of the present invention.
其中,1.模拟组态屏,2.电源模块,3.线路模块,4.开关模块,5.负荷及无功补偿模块,6.分布电源模块,7.故障发生器,8.配电终端,9.三相可编程交流电源,10.变压器模拟器,11.变压器接地单元模拟器,12.出线断路器,13.架空路模拟器,14.电缆线路模拟器,15.电缆分支线路模拟器,16.电压型开关模拟器,17.电流型开关模拟器,18.环网柜模拟器,19.分界开关模拟器,20.三相可编程负荷模拟器,21.无功补偿模拟器,22.分布式电源模拟器,23.三相可编程故障模拟器,24.故障录波器,25.保护测控装置,26.电压型开关模拟器,27.电流型开关模拟器,28.环网柜控制器,29.分界开关控制器。Among them, 1. Analog configuration screen, 2. Power supply module, 3. Line module, 4. Switch module, 5. Load and reactive power compensation module, 6. Distributed power supply module, 7. Fault generator, 8. Power distribution terminal , 9. Three-phase programmable AC power supply, 10. Transformer simulator, 11. Transformer grounding unit simulator, 12. Outgoing circuit breaker, 13. Overhead road simulator, 14. Cable line simulator, 15. Cable branch line simulation 16. Voltage-type switch simulator, 17. Current-type switch simulator, 18. Ring main unit simulator, 19. Boundary switch simulator, 20. Three-phase programmable load simulator, 21. Reactive power compensation simulator , 22. Distributed power supply simulator, 23. Three-phase programmable fault simulator, 24. Fault recorder, 25. Protection measurement and control device, 26. Voltage-type switch simulator, 27. Current-type switch simulator, 28. Ring network cabinet controller, 29. Demarcation switch controller.
具体实施方式:Detailed ways:
下面结合附图与实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
如图1所示,本实用新型采用以下技术方案,配电网动态模拟与配电自动化测试一体化系统由模拟组态屏1、电源模块2、线路模块3、开关模块4、负荷及无功补偿模块5、分布电源模块6、故障发生器7和配电终端8组成。所述电源模块2由三相可编程交流电源、变压器模拟器、变压器接地单元模拟器组成;所述线路模块3由出线断路器、架空线路模拟器、电缆线路模拟器14、电缆分支线路模拟器15组成;所述开关模块4由电压型开关模拟器16、电流型开关模拟器17、环网柜模拟器18、分界开关模拟器19组成;负荷及无功补偿模块5由三相可编程负荷模拟器20和无功补偿模拟器21组成;分布电源模块6由分布式电源模拟器组成;故障发生器7模块由三相可编程故障发生器组成;配电终端8模块由保护测控装置、电压型开关控制器、电流型开关控制器、环网柜控制器、分界开关控制器组成。As shown in Figure 1, the utility model adopts the following technical scheme. The integrated system of distribution network dynamic simulation and distribution automation test consists of a simulation configuration screen 1, a power module 2, a line module 3, a switch module 4, loads and reactive power Compensation module 5, distributed power supply module 6, fault generator 7 and power distribution terminal 8 are composed. The power module 2 is composed of a three-phase programmable AC power supply, a transformer simulator, and a transformer grounding unit simulator; the line module 3 is composed of an outlet circuit breaker, an overhead line simulator, a cable circuit simulator 14, and a cable branch circuit simulator 15; the switch module 4 is composed of a voltage-type switch simulator 16, a current-type switch simulator 17, a ring main unit simulator 18, and a boundary switch simulator 19; the load and reactive power compensation module 5 is composed of a three-phase programmable load Composed of simulator 20 and reactive power compensation simulator 21; distributed power supply module 6 is composed of distributed power supply simulator; fault generator 7 module is composed of three-phase programmable fault generator; power distribution terminal 8 module is composed of protection measurement and control device, voltage Type switch controller, current type switch controller, ring network cabinet controller, boundary switch controller.
所述模拟组态屏1从屏体背面或侧面接入所有模拟器的两端进出线,分别连接到组态屏前面板上一体式三相插孔,通过三相插头连接线进行各模拟器连接方式的自由组合,可模拟不同接线方式的配电线路,以及配电线路上负荷及无功补偿模块5、分布电源模块6、故障发生器7模块的不同接入位置。The analog configuration screen 1 is connected to the inlet and outlet lines of all simulators from the back or side of the screen body, respectively connected to the integrated three-phase jack on the front panel of the configuration screen, and each simulator is connected through the three-phase plug connection line. The free combination of connection modes can simulate distribution lines with different wiring modes, and different access positions of load and reactive power compensation module 5, distributed power supply module 6, and fault generator 7 modules on distribution lines.
所述三相可编程交流电源9的容量为30kVA,电压、频率及初始相位可调,可遥控投入和退出。每相电压可调范围0—300V,电源频率可调范围45-65Hz。具备承受短时故障电流的冲击能力;具备自保护能力,能够在电流大到一定程度时自动切断电源。The three-phase programmable AC power supply 9 has a capacity of 30kVA, adjustable voltage, frequency and initial phase, and can be input and exited by remote control. The adjustable range of each phase voltage is 0-300V, and the adjustable range of power frequency is 45-65Hz. It has the ability to withstand the impact of short-term fault current; it has self-protection ability and can automatically cut off the power supply when the current is too large.
所述三相变压器模拟器10为三相隔离变压器,采用干式变压器,变比为400V/400V,容量30kVA;中性点抽头引出,可选取“Yy”或“Yd”接线方式。具备承受短时故障电流的冲击和自保护能力。The three-phase transformer simulator 10 is a three-phase isolation transformer, using a dry-type transformer with a transformation ratio of 400V/400V and a capacity of 30kVA; the neutral point tap is drawn out, and the connection mode "Yy" or "Yd" can be selected. It has the ability to withstand the impact of short-term fault current and self-protection.
所述变压器接地单元模拟器11,由电阻、电抗、电容组成RLC负荷,其电阻、电抗、电容参数可调。所述变压器接地单元通过内置开关接入所述三相变压器中性点抽头,可模拟中性点不接地、小电阻接地或消弧线圈接地方式,不同接地方式通过手动操作控制。The transformer grounding unit simulator 11 is composed of resistance, reactance and capacitance to form an RLC load, and its resistance, reactance and capacitance parameters are adjustable. The transformer grounding unit is connected to the neutral point tap of the three-phase transformer through a built-in switch, which can simulate neutral point non-grounding, small resistance grounding or arc suppressing coil grounding, and different grounding modes are controlled by manual operation.
所述变电站出线断路器12模拟变电站10kV线路出线断路器,接至所述三相变压器出线,额定电流63A,可手动或遥控分合。出线断路器配置保护测控装置,具备完善的保护功能,包括速断保护、定时限速断保护、过流保护。The outlet circuit breaker 12 of the substation simulates the outlet circuit breaker of the 10kV line of the substation, and is connected to the outlet of the three-phase transformer with a rated current of 63A, which can be opened and closed manually or remotely. The outlet circuit breaker is equipped with a protection measurement and control device, and has complete protection functions, including quick-break protection, definite time-limit quick-break protection, and overcurrent protection.
所述架空线路模拟器13模拟一段长度为2km、截面积240mm2的三相铝质架空绝缘线路,采用RLC串并联设计,额定电流为30A,短路容量为100-250A。The overhead line simulator 13 simulates a three-phase aluminum overhead insulated line with a length of 2 km and a cross-sectional area of 240 mm 2 , which adopts RLC series-parallel design, with a rated current of 30A and a short-circuit capacity of 100-250A.
所述电缆线路模拟器14模拟一段长度为1km、模拟截面积240mm2三相铜质电缆线路,采用采用RLC串并联设计,额定电流为30A,短路容量为100-250A。The cable line simulator 14 simulates a three-phase copper cable line with a length of 1 km and a simulated cross-sectional area of 240 mm 2 , adopting an RLC series-parallel design with a rated current of 30A and a short-circuit capacity of 100-250A.
所述电缆分支线路模拟器15模拟一段长度为0.5km、模拟截面积120mm2三相铜质电缆线路,采用采用RLC串并联设计,额定电流为15A,短路容量为50-120A。The cable branch line simulator 15 simulates a three-phase copper cable line with a length of 0.5 km and a simulated cross-sectional area of 120 mm. It adopts an RLC series -parallel design with a rated current of 15A and a short-circuit capacity of 50-120A.
所述电压型分段开关模拟器16模拟电压型分段开关,可手动遥控分合。电压型分段开关配置A、B、C三相CT,CT变比10:5;开关电源侧和负荷侧安装AB、BC相间PT,PT二次侧输出电压为AC220V,作为电压采集信号和控制器外部供电电源。电压型分段开关具备“来电保持、无压释放”的特点,当开关一端带电时,电压型开关控制器的合闸回路输出AC220V,该电压使电压型分段开关保持合位,当控制器合闸回路输出电压小于AC80V(线路无压或发生短路故障时),电压型分段开关即自动分开。电压型分段开关模拟器的配套控制器为电压型分段开关控制器,电压型分段开关与其控制器通过通讯线缆相连。The voltage-type sectional switch simulator 16 simulates a voltage-type sectional switch, which can be opened and closed by manual remote control. The voltage-type sectional switch is equipped with A, B, and C three-phase CTs, and the CT ratio is 10:5; AB and BC phase-to-phase PTs are installed on the switching power supply side and the load side, and the output voltage of the PT secondary side is AC220V, which is used as a voltage acquisition signal and control The external power supply of the device. The voltage-type sectional switch has the characteristics of "incoming call hold, no-voltage release". When one end of the switch is charged, the closing circuit of the voltage-type switch controller outputs AC220V, which keeps the voltage-type sectional switch closed. When the controller When the output voltage of the closing circuit is less than AC80V (when there is no voltage in the line or a short-circuit fault occurs), the voltage-type sectional switch is automatically separated. The supporting controller of the voltage-type sectional switch simulator is a voltage-type sectional switch controller, and the voltage-type sectional switch and its controller are connected through a communication cable.
所述电流型分段开关17模拟配电网电流型分段开关,其配套控制器为电流型控制器,模拟器与控制器通过通讯线缆线相连。电流型分段开关的电源侧和负荷侧安装AB、BC相间PT,作为电压采集信号和控制器外部供电电源。PT变比380/220,二次侧输出电压为220V,容量200VA。线路首端的分段开关只接电源侧AB相PT。配置A、B、C三相CT,CT变比10:5。The current type sectional switch 17 simulates the current type sectional switch of the distribution network, and its supporting controller is a current type controller, and the simulator and the controller are connected through a communication cable. AB and BC phase-to-phase PTs are installed on the power supply side and load side of the current-type section switch as the voltage acquisition signal and external power supply for the controller. The PT ratio is 380/220, the secondary side output voltage is 220V, and the capacity is 200VA. The section switch at the head end of the line is only connected to the AB phase PT on the power supply side. Configure A, B, C three-phase CT, CT transformation ratio 10:5.
所述分界开关模拟器19模拟用户分界开关,可手动或遥控分,但仅能手动合。其配套控制器为分界开关控制器,分界开关控制器通过航空插头和电缆线与分界开关模拟器相连。配置A、C相和零序CT,CT变比10:1;开关电源侧安装BC相间PT,PT二次侧输出电压为AC220V,作为电压采集信号和控制器外部供电电源。The boundary switch simulator 19 simulates a user boundary switch, which can be opened manually or remotely, but can only be closed manually. The matching controller is a boundary switch controller, which is connected with the boundary switch simulator through an aviation plug and a cable. Configure A, C phase and zero-sequence CT, CT transformation ratio 10:1; BC interphase PT is installed on the switching power supply side, and the output voltage of the PT secondary side is AC220V, which is used as the voltage acquisition signal and the external power supply of the controller.
所述环网柜模拟器18模拟2进2出环网柜,由2个进线开关、2个出线开关和公共母线组成。进线开关采集A、B、C三相电流,出线开关采集A、C相和零序电流,母线采集3个线电压。环网柜模拟器配套控制器为环网柜控制器。The ring network cabinet simulator 18 simulates a 2-in, 2-out ring network cabinet, and is composed of 2 incoming line switches, 2 outgoing line switches and a common bus. The incoming line switch collects A, B, and C three-phase current, the outgoing line switch collects A, C phase and zero-sequence current, and the busbar collects three line voltages. The supporting controller of the ring network cabinet simulator is the ring network cabinet controller.
所述三相可编程负荷模拟器20采用可编程RLC模拟装置,模拟器功率0-6kVA可调,具备自保护能力,组屏安装。阻性负载、容性负载、感性负载独立可调,阻性、感性、容性部分可自由组合;模拟负载装置吸收的有功、无功、功率因数静态或稳态分相可调;同时能够根据事先设定的负荷特性或负荷预测曲线在不同的时间点处分相波动。通过遥控或手动控制,可投切单相、两相或三相负荷,以模拟配网三相负荷不平衡情况。阻性负载:单相:0.1KW、0.2kw、0.3KW、0.4kw合计1kw,三相合计3KW。感性负载:单相:0.1KVA、0.2KVA、0.3KVA、0.4KVA合计1KVA,三相合计3KVA。容性负载:单相:0.1KVA、0.2KVA、0.3KVA、0.4KVA合计1KVA,三相合计3KVA。带有参数测量功能,能测试加载的电压、电流、有功、无功、功率因素、三相不平衡、谐波等参数。The three-phase programmable load simulator 20 adopts a programmable RLC simulation device, the simulator power is adjustable from 0 to 6kVA, has self-protection capability, and is installed in groups of screens. Resistive load, capacitive load, and inductive load are independently adjustable, and the resistive, inductive, and capacitive parts can be freely combined; the active power, reactive power, and power factor absorbed by the analog load device can be adjusted in static or steady state; at the same time, it can be adjusted according to The pre-set load characteristics or load forecast curves fluctuate in different phases at different time points. Through remote control or manual control, single-phase, two-phase or three-phase loads can be switched to simulate the unbalanced three-phase load of the distribution network. Resistive load: single-phase: 0.1KW, 0.2kw, 0.3KW, 0.4kw total 1kw, three-phase total 3KW. Inductive load: single-phase: 0.1KVA, 0.2KVA, 0.3KVA, 0.4KVA total 1KVA, three-phase total 3KVA. Capacitive load: single-phase: 0.1KVA, 0.2KVA, 0.3KVA, 0.4KVA total 1KVA, three-phase total 3KVA. With parameter measurement function, it can test the loaded voltage, current, active power, reactive power, power factor, three-phase unbalance, harmonic and other parameters.
所述无功补偿模拟器21补偿容量在0-3kVar,分相、分组可调,以并联或串联方式接入,具备承受短时故障电流冲击和自保护能力。The reactive power compensation simulator 21 has a compensation capacity of 0-3kVar, is adjustable in phases and groups, is connected in parallel or in series, and has the ability to withstand short-term fault current impacts and self-protection.
所述分布式电源模拟器容量0-6kW可调节,由直流可编程电源和三相并网逆变器组成,可模拟各类DG的出力特性和并网控制策略,有功、无功及谐波可调节并在设定的出力预测曲线的不同时间点处波动,具备承受短时故障电流冲击和自保护能力。测试带有新能源接入的电网,在电网故障时候,新能源接入自身保护特性对电网的影响。The distributed power simulator has an adjustable capacity of 0-6kW and is composed of a DC programmable power supply and a three-phase grid-connected inverter. It can simulate the output characteristics of various DGs and grid-connected control strategies, active power, reactive power and harmonics It can be adjusted and fluctuates at different time points of the set output prediction curve, and has the ability to withstand short-term fault current impact and self-protection. Test the power grid with new energy access, and when the grid fails, the impact of the self-protection characteristics of new energy access on the power grid.
所述三相可编程故障模拟器进线端配带延时投入继电器的手动断路器,手动投入故障,故障持续时间可设置。能模拟各种类型的配电线路故障:包括相间短路、三相短路、单相接地、两相接地、三相接地等故障。每个短路回路配备限流电阻,限流值为30A,设备可远程或本地控制,可编程设置和自动转换故障类型。The input terminal of the three-phase programmable fault simulator is equipped with a manual circuit breaker with a delay input relay, and the fault is manually activated, and the fault duration can be set. It can simulate various types of distribution line faults: including phase-to-phase short circuit, three-phase short circuit, single-phase grounding, two-phase grounding, three-phase grounding and other faults. Each short-circuit circuit is equipped with a current-limiting resistor with a current-limiting value of 30A. The device can be controlled remotely or locally, with programmable settings and automatic conversion of fault types.
所述故障录波器通过高速采样计算配电网运行时的所监测点的电压、电流等参数,当系统发生故障或振荡(短路、接地、系统振荡、频率崩溃、电压崩溃等)时,对故障时刻前后的数据采集波形进行录波。The fault recorder calculates the parameters such as voltage and current of the monitored point during the operation of the distribution network through high-speed sampling. When the system fails or oscillates (short circuit, grounding, system oscillation, frequency collapse, voltage collapse, etc.), the The data acquisition waveform before and after the fault moment is recorded.
以上配电网设备模拟器均采用模块化设计,进出主接线为三相插接口,模拟开关控制器内置PT和CT,各模拟器内部状态采集及控制回路外部接口统一。The above distribution network equipment simulators all adopt a modular design, the main wiring in and out is a three-phase plug interface, the analog switch controller has built-in PT and CT, and the internal state acquisition of each simulator and the external interface of the control loop are unified.
模块化配电网动态模拟与配电终端测试一体化系统的工作方法:本方案可模拟多个变电站的多条配电线路出线,组成一个小型配电网络,进行配电网动态运行特性的模拟和配电终端的测试。所述三相可编程交流电源作为上级电源点,接入所述变压器模拟器,变压器接地单元模拟器可模拟中性不接地、经消弧线圈接地和小电阻接地等多种中性点接地方式。所述出线断路器模拟变电站出线开关,接入变压器模拟器的出线侧。配电线路由多个架空线路模拟器、电缆线路模拟器通过开关模拟器(包括电压型开关模拟器、电流型开关模拟器、环网柜模拟器)相连接,组成模拟架空线路、电缆线路或架空与电缆的混合线路。所述三相可编程负荷模拟器作为用户负荷通过所述分界开关接入配电线路,用于模拟用户负荷。所述三相可编程故障模拟器按预设的故障点接入,可模拟各种配电线路故障。所述配电终端与相应的分段开关模拟器、环网柜模拟器和分界开关模拟器相连。通过所述三相可编程交流电源模拟配电网外部电源的波动,通过所述三相可编程负荷模拟器,预先设定负荷曲线,模拟各种负荷波动情况。所述三相可编程故障模拟器可模拟配电网单相接地、两相接地、两相接地短路、三相接地和三相接地短路等故障类型,故障类型预先设定后,通过遥控操作启动故障。通过改变模拟配电网的负荷和故障情况,测试所述配电终端的实时监测和保护功能。The working method of the integrated system of modular distribution network dynamic simulation and distribution terminal testing: this scheme can simulate multiple distribution lines outgoing from multiple substations to form a small distribution network to simulate the dynamic operation characteristics of the distribution network and testing of power distribution terminals. The three-phase programmable AC power supply is used as a superior power supply point, connected to the transformer simulator, and the transformer grounding unit simulator can simulate various neutral point grounding methods such as neutral non-grounding, arc-suppression coil grounding, and small resistance grounding. . The outlet circuit breaker simulates the outlet switch of the substation and is connected to the outlet side of the transformer simulator. The distribution line is connected by multiple overhead line simulators and cable line simulators through switch simulators (including voltage switch simulators, current switch simulators, and ring network cabinet simulators) to form simulated overhead lines, cable lines or Mixed overhead and cable lines. The three-phase programmable load simulator, as a user load, is connected to the power distribution line through the boundary switch for simulating the user load. The three-phase programmable fault simulator is connected according to preset fault points, and can simulate various distribution line faults. The power distribution terminal is connected with corresponding section switch simulators, ring network cabinet simulators and boundary switch simulators. The fluctuation of the external power supply of the distribution network is simulated by the three-phase programmable AC power supply, and the load curve is preset by the three-phase programmable load simulator to simulate various load fluctuation situations. The three-phase programmable fault simulator can simulate fault types such as single-phase grounding, two-phase grounding, two-phase grounding short circuit, three-phase grounding and three-phase grounding short circuit of the distribution network. After the fault type is preset, Start the malfunction by remote operation. By changing the load and fault conditions of the simulated distribution network, the real-time monitoring and protection functions of the distribution terminal are tested.
如图2所示,模块化配电网动态模拟与配电终端测试一体化系统,模拟2个变电站:站A与站B,站A出线2条,分别为1#架空线路、2#架空线路;站B出线2条,分别为1#电缆线路、2#电缆线路。站A与站B的模拟电源系统,分别由三相可编程交流电源9、变压器模拟器10、变压器接地单元模拟器11组成。As shown in Figure 2, the integrated system of modular distribution network dynamic simulation and distribution terminal testing simulates two substations: station A and station B, and there are two outgoing lines from station A, namely 1# overhead line and 2# overhead line ; There are 2 outgoing lines from station B, which are respectively 1# cable line and 2# cable line. The analog power supply systems of station A and station B are composed of a three-phase programmable AC power supply 9, a transformer simulator 10, and a transformer grounding unit simulator 11, respectively.
1#架空线路以站A出线断路器12为起点,由4段架空线路模拟器和4个电压型开关模拟器依次相连,每个电压型开关模拟器配置一个电压型开关控制器26,1#架空线路前3个电压型开关模拟器正常运行时处于合位,最后一个电压型开关模拟器作为与1#电缆线路的联络开关使用,正常运行时为分位。The 1# overhead line starts from the outlet circuit breaker 12 of station A, and is connected successively by 4 overhead line simulators and 4 voltage-type switch simulators. Each voltage-type switch simulator is equipped with a voltage-type switch controller 26, 1# The first three voltage-type switch simulators of the overhead line are in the closed position during normal operation, and the last voltage-type switch simulator is used as a contact switch with the 1# cable line, and it is in the off position during normal operation.
2#架空线路以站A出线断路器12为起点,由4段架空线路模拟器和4个电流型开关模拟器依次相连,每个电流型开关模拟器配置一个电流型开关控制器27,2#架空线路前3个电流型开关模拟器正常运行时处于合位,最后一个电流型开关模拟器作为与2#电缆线路的联络开关使用,正常运行时为分位。The 2# overhead line starts from the outlet circuit breaker 12 of station A, and is connected successively by 4 overhead line simulators and 4 current-mode switch simulators. Each current-mode switch simulator is equipped with a current-mode switch controller 27, 2# The first three current-type switch simulators of the overhead line are in the closed position during normal operation, and the last current-type switch simulator is used as a contact switch with the 2# cable line, and is in the off position during normal operation.
1#电缆线路以站B出线断路器12为起点,由3段电缆线路模拟器和2个环网柜模拟器组成,每个环网柜模拟器配置一个环网柜控制器28,环网柜控制器的两个进线开关正常工作时均处于合位,两个出线开关根据需要设定。The 1# cable line starts from the outlet circuit breaker 12 of station B, and consists of 3 cable line simulators and 2 ring network cabinet simulators. Each ring network cabinet simulator is equipped with a ring network cabinet controller 28, and the ring network cabinet The two incoming line switches of the controller are in the closed position during normal operation, and the two outgoing line switches are set as required.
2#电缆线路以站B出线断路器12为起点,由3段电缆线路模拟器和2个环网柜模拟器组成,每个环网柜模拟器配置一个环网柜控制器,环网柜控制器的两个进线开关正常工作时均处于合位,两个出线开关根据需要设定。The 2# cable line starts from the outlet circuit breaker 12 of station B, and consists of 3 section cable line simulators and 2 ring network cabinet simulators. Each ring network cabinet simulator is equipped with a ring network cabinet controller, and the ring network cabinet controls The two incoming line switches of the device are in the close position during normal operation, and the two outgoing line switches are set as required.
1#架空线路与1#电缆线路以一个电压型开关模拟器作为联络开关,形成手拉手线路;2#架空线路与2#电缆线路以一个电流型开关模拟器作为联络开关,形成手拉手线路。1# overhead line and 1# cable line use a voltage-type switch simulator as a contact switch to form a hand-in-hand line; 2# overhead line and 2# cable line use a current-type switch simulator as a contact switch to form a hand-in-hand line.
4个三相可编程负荷模拟器29通过分界开关19与电缆分支线路模拟器15分别连接到2条架空线路和2条电缆线路,用来模拟配电网负荷变化情况。1个就地型无功补偿模拟器21接入2#架空线路;2台分布式能源发电模拟器22分别接入1#和2#架空线路,用于模拟小功率分布新能源发电接入对配电网的影响。Four three-phase programmable load simulators 29 are respectively connected to 2 overhead lines and 2 cable lines through boundary switches 19 and cable branch line simulators 15 to simulate distribution network load changes. 1 local reactive power compensation simulator 21 is connected to 2# overhead line; 2 distributed energy generation simulators 22 are respectively connected to 1# and 2# overhead lines, which are used to simulate the access pair of low-power distributed new energy generation impact on the distribution network.
2个三相可编程故障模拟器23分别接入2#架空线路和1#电缆线路,用于模拟配电线路接地及短路故障,2个三相可编程故障模拟器可依次或同时模拟配电线路两个并发或继发故障。2个故障录波装置24分别接入架空线路和电缆线路的电压及电流信号,可以不同频率记录配电线路正常运行及故障时电压及电流波形。Two three-phase programmable fault simulators 23 are respectively connected to 2# overhead line and 1# cable line to simulate grounding and short-circuit faults of distribution lines. The two three-phase programmable fault simulators can simulate power distribution sequentially or simultaneously Two concurrent or secondary faults on the line. The two fault recording devices 24 are respectively connected to the voltage and current signals of the overhead line and the cable line, and can record the voltage and current waveforms of the distribution line during normal operation and faults at different frequencies.
本实用新型在满足电力系统相似判据的条件下,按等比缩小容量的原则,采用400V低压设备模拟10kV配电网实际设备,设计出一系列模块化的配电网设备模拟器,根据所研究的实际10kV配电线路接线情况,组合出与实际配电线路一致的配电网模拟测试系统。Under the condition of satisfying the similarity criterion of the power system, the utility model uses 400V low-voltage equipment to simulate the actual equipment of the 10kV distribution network according to the principle of proportionally reducing the capacity, and designs a series of modular distribution network equipment simulators. Based on the actual 10kV distribution line wiring situation studied, a distribution network simulation test system consistent with the actual distribution line is combined.
如图2所示,本实用新型模拟了配电网两条手拉手线路,1#架空线路与1#电缆线路通过电压型开关9联络;2#架空线路与2#电缆线路通过电流型开关13联络。所述三相可编程交流电源9、变压器模拟器10、变压器接地单元模拟器11、出线断路器12组成电源系统,模拟配电线路上级变电站。三相可编程交流电源9可通过编程或手动调整来模拟电源功率、电压幅值、频率及相角的变化。变压器接地单元模拟器可模拟配电线路不接地、消弧线圈接地或直接接地等不同接地方式。出线断路器12及其保护测控装置25具备三段过流保护功能。As shown in Figure 2, the utility model simulates two hand-in-hand lines in the distribution network. The 1# overhead line and the 1# cable line are connected through the voltage switch 9; the 2# overhead line and the 2# cable line are connected through the current type switch 13 connection. The three-phase programmable AC power supply 9, the transformer simulator 10, the transformer grounding unit simulator 11, and the outlet circuit breaker 12 form a power supply system, simulating the upper substation of the distribution line. The three-phase programmable AC power supply 9 can simulate changes in power supply, voltage amplitude, frequency and phase angle through programming or manual adjustment. The transformer grounding unit simulator can simulate different grounding methods such as ungrounded distribution lines, arc suppression coil grounding or direct grounding. The outlet circuit breaker 12 and its protection, measurement and control device 25 have three-stage overcurrent protection functions.
所述三相可编程负荷模拟器20通过分界开关模拟器19和电缆分支线路模拟器15接入配电网,用户负荷曲线可编程设置,用来模拟配电线路负荷的变化。所述三相可编程故障模拟器20可接入架空线路模拟器、电缆线路模拟器或电缆分支线路模拟器的任意端节点,预设接地或短路故障后,通过远程或手动遥控投入故障。所述无功补偿模拟器21可根据所监测节点的电压大小,控制无功补偿模拟器内部大容量关联电容的投切,进行就地无功补偿。所述分布式能源发电模拟器22可根据风电、光伏等新能源发电的能量输出和调节特点,设置电压及电流输出曲线,模拟分布式新能源发电与配电网的并网运行情况。The three-phase programmable load simulator 20 is connected to the distribution network through the boundary switch simulator 19 and the cable branch line simulator 15, and the user load curve can be programmed to simulate the change of the distribution line load. The three-phase programmable fault simulator 20 can be connected to any end node of an overhead line simulator, a cable line simulator or a cable branch line simulator. After a preset grounding or short-circuit fault, the fault can be enabled by remote or manual remote control. The reactive power compensation simulator 21 can control the switching of large-capacity associated capacitors inside the reactive power compensation simulator according to the voltage of the monitored node to perform on-site reactive power compensation. The distributed energy generation simulator 22 can set voltage and current output curves according to the energy output and adjustment characteristics of new energy generation such as wind power and photovoltaics, and simulate the grid-connected operation of distributed new energy generation and distribution network.
上述虽然结合附图对本实用新型的具体实施方式进行了描述,但并非对本实用新型保护范围的限制,所属领域技术人员应该明白,在本实用新型的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本实用新型的保护范围以内。Although the specific implementation of the utility model has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the utility model. Those skilled in the art should understand that on the basis of the technical solution of the utility model, those skilled in the art do not need to Various modifications or deformations that can be made with creative efforts are still within the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420310305.8U CN203881876U (en) | 2014-06-11 | 2014-06-11 | Modularized and integrated system for dynamic simulation and terminal detection of power distribution network |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420310305.8U CN203881876U (en) | 2014-06-11 | 2014-06-11 | Modularized and integrated system for dynamic simulation and terminal detection of power distribution network |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203881876U true CN203881876U (en) | 2014-10-15 |
Family
ID=51682360
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420310305.8U Expired - Lifetime CN203881876U (en) | 2014-06-11 | 2014-06-11 | Modularized and integrated system for dynamic simulation and terminal detection of power distribution network |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203881876U (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104101799A (en) * | 2014-06-11 | 2014-10-15 | 国家电网公司 | Modular distribution network dynamic simulation and terminal test integration system |
| CN104597899A (en) * | 2015-02-04 | 2015-05-06 | 国家电网公司 | Technical performance test platform of distribution automation device |
| CN106159920A (en) * | 2016-08-30 | 2016-11-23 | 泉州维盾电气有限公司 | A kind of 10kV electrical network feeder fault processes physics simulator |
| CN106251747A (en) * | 2016-10-08 | 2016-12-21 | 国家电网公司 | A kind of power distribution network analog systems |
| CN106597144A (en) * | 2016-11-18 | 2017-04-26 | 国电南瑞科技股份有限公司 | Centralized FA planning function detection method based on simulated transmission |
| CN107918349A (en) * | 2017-11-27 | 2018-04-17 | 国网山东省电力公司聊城供电公司 | A kind of distribution network protection debugging apparatus and its method of work |
| CN108153167A (en) * | 2018-02-01 | 2018-06-12 | 上海金智晟东电力科技有限公司 | It can flexible configurations power distribution network dynamic model experiment platform and its method |
| CN109001591A (en) * | 2018-06-19 | 2018-12-14 | 国网江苏省电力有限公司电力科学研究院 | A kind of 10kV power distribution network primary equipment intelligence fortune inspection engineering test platform |
| CN112305340A (en) * | 2020-09-29 | 2021-02-02 | 国网江苏省电力有限公司电力科学研究院 | True test platform of low-voltage power distribution Internet of things |
| CN112462188A (en) * | 2020-10-16 | 2021-03-09 | 国网山东省电力公司济宁供电公司 | Grounding circulation simulation device and detection method based on running transmission cable line |
| CN112924904A (en) * | 2021-02-23 | 2021-06-08 | 青岛鼎信通讯股份有限公司 | Aviation plug line sequence recognition tool suitable for feeder terminal |
-
2014
- 2014-06-11 CN CN201420310305.8U patent/CN203881876U/en not_active Expired - Lifetime
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104101799B (en) * | 2014-06-11 | 2017-04-26 | 国家电网公司 | Modular distribution network dynamic simulation and terminal test integration system |
| CN104101799A (en) * | 2014-06-11 | 2014-10-15 | 国家电网公司 | Modular distribution network dynamic simulation and terminal test integration system |
| CN104597899A (en) * | 2015-02-04 | 2015-05-06 | 国家电网公司 | Technical performance test platform of distribution automation device |
| CN106159920A (en) * | 2016-08-30 | 2016-11-23 | 泉州维盾电气有限公司 | A kind of 10kV electrical network feeder fault processes physics simulator |
| CN106251747A (en) * | 2016-10-08 | 2016-12-21 | 国家电网公司 | A kind of power distribution network analog systems |
| CN106597144B (en) * | 2016-11-18 | 2019-05-17 | 国电南瑞科技股份有限公司 | A centralized FA planning function detection method based on simulated letter sending |
| CN106597144A (en) * | 2016-11-18 | 2017-04-26 | 国电南瑞科技股份有限公司 | Centralized FA planning function detection method based on simulated transmission |
| CN107918349A (en) * | 2017-11-27 | 2018-04-17 | 国网山东省电力公司聊城供电公司 | A kind of distribution network protection debugging apparatus and its method of work |
| CN108153167A (en) * | 2018-02-01 | 2018-06-12 | 上海金智晟东电力科技有限公司 | It can flexible configurations power distribution network dynamic model experiment platform and its method |
| CN109001591A (en) * | 2018-06-19 | 2018-12-14 | 国网江苏省电力有限公司电力科学研究院 | A kind of 10kV power distribution network primary equipment intelligence fortune inspection engineering test platform |
| CN112305340A (en) * | 2020-09-29 | 2021-02-02 | 国网江苏省电力有限公司电力科学研究院 | True test platform of low-voltage power distribution Internet of things |
| CN112462188A (en) * | 2020-10-16 | 2021-03-09 | 国网山东省电力公司济宁供电公司 | Grounding circulation simulation device and detection method based on running transmission cable line |
| CN112924904A (en) * | 2021-02-23 | 2021-06-08 | 青岛鼎信通讯股份有限公司 | Aviation plug line sequence recognition tool suitable for feeder terminal |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104101799B (en) | Modular distribution network dynamic simulation and terminal test integration system | |
| CN203881876U (en) | Modularized and integrated system for dynamic simulation and terminal detection of power distribution network | |
| CN104330979B (en) | Complicated Distribution Network ASS | |
| CN103605014B (en) | A kind of test platform for large-scale energy accumulation current converter | |
| CN201540676U (en) | A comprehensive automatic training device for factory power supply | |
| CN103605357B (en) | The test macro of power distribution network boundary switch control device | |
| CN103472393B (en) | A kind of high-voltage ride through of wind power generating set test macro | |
| WO2015176687A1 (en) | Integrated high and low voltage ride through test system | |
| CN202066924U (en) | Voltage sag simulation device | |
| CN102916436B (en) | Transient analysis method and system of high-voltage direct-current transmission | |
| CN102967826A (en) | Test method for electric endurance of switching capacitor set beaker of extra-high voltage project | |
| CN108153167A (en) | It can flexible configurations power distribution network dynamic model experiment platform and its method | |
| CN103645410A (en) | Dynamic simulation system and method of small current grounding systems in power grid | |
| CN104124916B (en) | High aititude photovoltaic plant electric network fault simulated testing system mobile detection apparatus | |
| CN111579897B (en) | Experimental platform for evaluating performance of power distribution and utilization system of full-direct-current building | |
| CN104764952B (en) | A kind of the STATCOM detection platforms and detection method of 10kV voltage class | |
| CN103941111A (en) | Voltage sag simulation method and device | |
| CN105527545A (en) | DC power distribution network dynamic simulation experimental device and method | |
| CN204089727U (en) | High aititude photovoltaic plant electric network fault simulated testing system mobile detection apparatus | |
| CN103559406A (en) | Simulation system and method for withstand voltage test of extra-high voltage GIS | |
| CN103995201B (en) | Wind power generation set islanding test device | |
| CN202488143U (en) | Real-time digital simulation platform used for transformer station parallel capacitor device fault analysis | |
| CN201667165U (en) | A factory power supply technology training device | |
| CN104932288A (en) | Closed-loop test system and test method of fast switching capacitor automatic device | |
| CN204759078U (en) | Closed-loop test system of fast switching capacitor automatic device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20141015 |
|
| CX01 | Expiry of patent term |