[go: up one dir, main page]

CN203833526U - Energy recycling system for main winch descending of rotary drilling rig - Google Patents

Energy recycling system for main winch descending of rotary drilling rig Download PDF

Info

Publication number
CN203833526U
CN203833526U CN201420253769.XU CN201420253769U CN203833526U CN 203833526 U CN203833526 U CN 203833526U CN 201420253769 U CN201420253769 U CN 201420253769U CN 203833526 U CN203833526 U CN 203833526U
Authority
CN
China
Prior art keywords
energy
master winch
recycling system
pump
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420253769.XU
Other languages
Chinese (zh)
Inventor
孙志强
郄严静
钱林林
贾延林
田吉伟
单坤山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lovol Heavy Industry Co Ltd
Original Assignee
Foton Lovol International Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foton Lovol International Heavy Industries Co Ltd filed Critical Foton Lovol International Heavy Industries Co Ltd
Priority to CN201420253769.XU priority Critical patent/CN203833526U/en
Application granted granted Critical
Publication of CN203833526U publication Critical patent/CN203833526U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

The utility model discloses an energy recycling system for main winch descending of a rotary drill rig. The energy recycling system comprises an engine and a main winch device, the main winch device is connected with an energy recovery motor in a transmission mode, and the engine is connected with an energy regeneration pump through a gear bank in a transmission mode. The energy recovery motor is communicated with the energy regeneration pump through an oil outlet pipeline and an oil return pipeline. According to the scheme, because each working cycle of the rotary drill rig needs drill-down, drill-down time will be prolonged along with the increase of the hole depth, within working time of the whole rotary drill rig, the time proportion of time of drill-down reaches over 20%, and the energy recycling system is additionally arranged to reduce oil consumption of the rotary drill rig obviously.

Description

A kind of rotary drilling rig master winch is transferred energy recycling system
Technical field
The utility model relates to a kind of rotary drilling rig master winch and transfers energy recycling system, belongs to rotary drilling rig equipment technical field.
Background technology
Working cycle of rotary drilling rig comprises that lower brill-unit head revolves dig-unit head brill-upper-part rotation-unload soil-upper-part rotation-lower the boring of reversing-carry, rotary drilling rig in the past does not mostly have energy-recuperation system, as shown in Figure 1, the drilling rod 15 of rotary drilling rig, drilling bucket 14 are directly connected with master winch device 8 by steel rope, by the retractable rope of master winch device 8 reels, are realized and are carried brill, lower brill.
Carry while boring, driving engine 12 drives main pump 1, and the high pressure oil of main pump 1 output, by pipeline, after change-over valve and balance cock, acts in master winch CD-ROM drive motor, and motor driving reductor, master winch reel rotate, and realize the lifter motion of drilling rod 15, drilling bucket 14.
During lower brill, drilling rod, drilling bucket, under the effect of gravity, fall automatically, and whole gravitional force becomes thermal energy consumption by balance cock throttling and falls.
When master winch is transferred, operated pilot handle 7, the guide oil flowing out from pioneer pump 5 is through pilot handle 7, along transferring the first conduit of side, promoting valve core of main valve 10 moves up, the high pressure oil flowing out from main pump 1, from the valve core of main valve of opening, flow through, arrive master winch and promote motor 3, branch's fluid is opened and is reached balance cock 11, and CD-ROM drive motor and hoisting mechanism rotate under drilling rod, drilling bucket effect, and oil return forms throttling high pressure at balance cock place, weight equalizer is steadily at the uniform velocity transferred, and lowering velocity is along with the increase of main pump delivery quality.Drilling bucket drives hoisting mechanism to be rotated further, and high pressure oil, after balance cock throttling, decompression, returns to fuel tank along pipeline through valve core of main valve 10.In this process, the potential energy of drilling rod and drilling bucket and kinetic energy are all converted into heat energy at balance cock 11.
When master winch rises, operated pilot handle 7, the guide oil flowing out from pioneer pump 5, through pilot handle 7, along the first conduit of upthrow side, promotes valve core of main valve 10 and moves down, the high pressure oil flowing out from main pump 1, from the valve core of main valve of opening, flow through, through the check valve of balance cock, arrive master winch and promote motor 3, CD-ROM drive motor drives hoisting mechanism to rotate, and hoisting mechanism drives steel rope, drilling rod, drilling bucket upward movement.Meanwhile, from master winch, promote the hydraulic oil process pipeline that motor 3 flows out, through valve core of main valve 10, return to fuel tank, the speed of rising depends on the flow of the high pressure oil that main pump 1 flows out.
In going down process, the potential energy of drilling rod and drilling bucket and kinetic energy can be converted into thermal loss completely and fall.For fear of this part thermal loss, at present, recycling scheme mostly adopts and on pipeline, increases hydraulic accumulator and store, or increases motor and be converted to electric energy, by electric capacity, battery etc., stores, while again moving, discharge the energy storing, reach the object that reclaims and utilize.
But this rotary drilling rig master winch system is transferred energy recycling system and is had following defect:
1, because the brill of rotary drilling rig is deeply larger, the time of transferring is long, and while transferring master winch generally without other actions, need the energy that reclaims more and can not transform at once, the capacity of the energy storage that recuperated energy is used or electric capacity, battery is larger.
2, increased energy storing device, large to space requirement, it is large that rig arranges that palpus is done larger adjustment.
When 3, energy storage releases energy, control difficulty larger, electric capacity, battery energy storage fault rate are high, and cost is high.
Utility model content
Problem to be solved in the utility model is to transfer the above defect of energy recycling system in order to overcome traditional rotary drilling rig master winch system, a kind of energy recycle device that can pass through to increase is provided, master winch is transferred to potential energy to be reclaimed and reacts on driving engine by pump, utilize engine power energy brake principle, lower driving engine and transfer the fuel oil consumption under operating mode at master winch, the rotary drilling rig master winch that reaches energy-saving and cost-reducing effect is transferred energy recycling system.
In order to address the above problem, the utility model by the following technical solutions:
A kind of rotary drilling rig master winch is transferred energy recycling system, comprise driving engine and master winch device, described master winch device upper driving is connected with energy and reclaims motor, described driving engine is connected with energy regeneration pump by gear cluster, and energy reclaims between motor and energy regeneration pump by fuel-displaced pipeline and two pipeline connections of oil return line.
Below the further optimization of the utility model to such scheme:
Energy regeneration pump is communicated with displacement control valve.
Further optimize: described master winch device has master winch to promote motor by pipeline connection, and described driving engine has main pump by pipeline connection, main pump promotes motor by main valve and balance cock with master winch and is communicated with.
Further optimize: energy regeneration pump is connected with pioneer pump, and described pioneer pump is communicated with main valve by pilot handle.
Further optimize: between two pipelines of fuel-displaced pipeline and oil return line, be connected with pressure sensor.
The utility model is in order to reach the object that reclaims master winch energy, first on master winch device, increase a set of energy and reclaim motor, when lower brill, master winch device drives energy to reclaim motor, energy reclaims the high pressure oil of motor output, drive the master winch being connected with driving engine to promote motor, finally driving engine and main pump are applied to forward drive power, be equivalent at drilling rod, between drilling bucket and driving engine, having increased by one is flexible coupling, by drilling rod, drilling bucket drives driving engine operation, now driving engine is in power vent damped condition, without oil spout with only need to spray a small amount of oil and just can maintain the needs of whole equipment operation, potential energy and kinetic energy when simultaneously reclaiming motor and absorbed part drilling bucket and drilling rod and transfer due to energy, need the energy that balance cock throttling consumes to reduce accordingly, the heat that whole hydraulic efficiency pressure system produces also can reduce accordingly, when reducing the oil consumption of rotary drilling rig working cycle, reduced hydraulic efficiency pressure system heat dissipation capacity, improved the heat radiation situation of hydraulic efficiency pressure system.
The utility model adopts such scheme, has the following advantages:
1, because each working cycle of rotary drilling rig needs lower brill, and along with the increase of hole depth, the lower brill time also can increase, in the work-hours of whole rotary drilling rig, the shared time scale of lower brill, more than 20%, therefore increases this covering device very obvious to the improvement of the oil consumption of rotary drilling rig.
2, the heat producing due to hydraulic efficiency pressure system reduces, and has improved the heat radiation situation of rig.
3, noenergy storage medium, the energy of recovery directly acts on driving engine, and whole system is simple, and probability of failure is little.
4, very little to the change of rotary drilling rig, and operation, efficiency are not had to other influences.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Accompanying drawing explanation
The structure principle chart that accompanying drawing 1 is transferred for the rotary drilling rig master winch system of traditional noenergy recycling system;
Accompanying drawing 2 is the structural representation of the utility model embodiment.
In figure: 1-main pump; 2-energy regeneration pump; 3-master winch promotes motor; 4-energy reclaims motor; 5-pioneer pump; 6-pressure sensor; 7-pilot handle; 8-master winch device; 9-displacement control valve; 10-main valve; 11-balance cock; 12-driving engine; 13-gear cluster; 14-drilling bucket; 15-drilling rod.
The specific embodiment
Embodiment, as shown in Figure 2, a kind of rotary drilling rig master winch is transferred energy recycling system, comprise driving engine 12 and master winch device 8, described master winch device 8 has master winch to promote motor 3 by pipeline connection, described driving engine 12 has main pump 1 by pipeline connection, and main pump 1 promotes motor 3 by main valve 10 and balance cock 11 with master winch and is communicated with.
Described master winch device 8 upper drivings are connected with energy and reclaim motor 4, and described driving engine 12 is connected with energy regeneration pump 2 by gear cluster 13, and energy reclaims between motor 4 and energy regeneration pump 2 by fuel-displaced pipeline and two pipeline connections of oil return line.
Energy regeneration pump 2 is communicated with displacement control valve 9.
Energy regeneration pump 2 is connected with pioneer pump 5, and described pioneer pump 5 is communicated with main valve 10 by pilot handle 7.
Between two pipelines of fuel-displaced pipeline and oil return line, be connected with pressure sensor 6.
When master winch is transferred action, operated pilot handle 7, drilling rod 15, drilling bucket 14 drives master winch device 8 rotate and do not have energy-recuperation system identical, simultaneously, master winch device 8 also drives energy to reclaim motor 4 and rotates, the high pressure liquid force feed that energy reclaims motor 4 pump operating modes generations arrives energy regeneration pump 2 motor operating modes by the road, driving-energy regenerative pump 2 controllers are according to pressure sensor 6, the rotating speed of driving engine, energy reclaims the rotating speed of motor 4, control displacement control valve 9, adjust the discharge capacity of energy regeneration pump 2, energy regeneration pump 2 Host actuating pumps 1 and driving engine 12, be equivalent to be flexible coupling at master winch device 8 and 12 one of increases of driving engine, reach recycling master winch and transfer the object of energy, reduce engine loading or make driving engine in power vent braking mode, thereby make the fuel consumption reduction of rig when having master winch to transfer action.
During master winch enhancing action, operated pilot handle 7, energy regeneration pump 2 can reclaim motor 4 auxiliary powers by driving-energy, main pump 1 drives master winch to promote motor 3 active forces, identical with noenergy recovery system, and two motors drive master winch device 8 to drive drilling rod 15, drilling bucket 14 upwards to rotate simultaneously, with Time Controller according to the signal of pressure sensor 6, control displacement control valve 9, adjust the discharge capacity of energy regeneration pump 2, prevent due to two asynchronous degradations of energy that cause of motor.
At master winch, promote operating mode, energy reclaims motor 4 and promotes 8 work of the common driving master winch of motor 3 device as driver element and master winch.
The utility model is in order to reach the object that reclaims master winch energy, first on master winch device 8, increase a set of energy and reclaim motor 4, when lower brill, master winch device 8 drives energy to reclaim motor 4, energy reclaims the high pressure oil of motor 4 outputs, drive the master winch being connected with driving engine 12 to promote motor 3, finally driving engine 12 and main pump 1 are applied to forward drive power, be equivalent at drilling rod 15, between drilling bucket 14 and driving engine 12, having increased by one is flexible coupling, by drilling rod 15, drilling bucket 14 drives driving engine 12 operations, now driving engine 12 is in power vent damped condition, without oil spout with only need to spray a small amount of oil and just can maintain the needs of whole equipment operation, potential energy and kinetic energy when simultaneously reclaiming motor 4 and absorbed part drilling bucket 15 and drilling rod 14 and transfer due to energy, need the energy that balance cock 11 throttlings consume to reduce accordingly, the heat that whole hydraulic efficiency pressure system produces also can reduce accordingly, when reducing the oil consumption of rotary drilling rig working cycle, reduced hydraulic efficiency pressure system heat dissipation capacity, improved the heat radiation situation of hydraulic efficiency pressure system.

Claims (5)

1. a rotary drilling rig master winch is transferred energy recycling system, comprise driving engine (12) and master winch device (8), it is characterized in that: described master winch device (8) upper driving is connected with energy and reclaims motor (4), described driving engine (12) is connected with energy regeneration pump (2) by gear cluster (13), and energy reclaims between motor (4) and energy regeneration pump (2) by fuel-displaced pipeline and two pipeline connections of oil return line.
2. a kind of rotary drilling rig master winch according to claim 1 is transferred energy recycling system, it is characterized in that: energy regeneration pump (2) is communicated with displacement control valve (9).
3. a kind of rotary drilling rig master winch according to claim 2 is transferred energy recycling system, it is characterized in that: described master winch device (8) has master winch to promote motor (3) by pipeline connection, described driving engine (12) has main pump (1) by pipeline connection, and main pump (1) promotes motor (3) by main valve (10) and balance cock (11) with master winch and is communicated with.
4. a kind of rotary drilling rig master winch according to claim 3 is transferred energy recycling system, it is characterized in that: energy regeneration pump (2) is connected with pioneer pump (5), and described pioneer pump (5) is communicated with main valve (10) by arriving first handle (7).
5. a kind of rotary drilling rig master winch according to claim 4 is transferred energy recycling system, it is characterized in that: between two pipelines of fuel-displaced pipeline and oil return line, be connected with pressure sensor (6).
CN201420253769.XU 2014-05-19 2014-05-19 Energy recycling system for main winch descending of rotary drilling rig Expired - Fee Related CN203833526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420253769.XU CN203833526U (en) 2014-05-19 2014-05-19 Energy recycling system for main winch descending of rotary drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420253769.XU CN203833526U (en) 2014-05-19 2014-05-19 Energy recycling system for main winch descending of rotary drilling rig

Publications (1)

Publication Number Publication Date
CN203833526U true CN203833526U (en) 2014-09-17

Family

ID=51511397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420253769.XU Expired - Fee Related CN203833526U (en) 2014-05-19 2014-05-19 Energy recycling system for main winch descending of rotary drilling rig

Country Status (1)

Country Link
CN (1) CN203833526U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104555741A (en) * 2014-12-31 2015-04-29 中联重科股份有限公司 Main winch control system of rotary drilling rig and rotary drilling rig
CN104806201A (en) * 2015-03-19 2015-07-29 重庆科技学院 Hydraulic energy based petroleum drilling machine going-down kinetic energy recovery and utilization device
CN105443514A (en) * 2014-11-24 2016-03-30 徐州重型机械有限公司 Winching energy recovery and reutilization compound control method and system and crane
CN105776046A (en) * 2015-12-31 2016-07-20 徐州重型机械有限公司 Combined winch hydraulic system and crane using same
CN106560439A (en) * 2016-03-31 2017-04-12 徐工集团工程机械有限公司 Potential energy recovery utilization system, control method and engineering machinery equipment
US10359063B2 (en) 2014-11-24 2019-07-23 Xuzhou Heavy Machinery Co.., Ltd. Method and system for recovering and utilizing operating energy of crane, and crane
CN114195033B (en) * 2021-12-14 2024-05-28 上海中联重科桩工机械有限公司 Winch speed reducer synchronous braking system and rotary drilling rig

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443514A (en) * 2014-11-24 2016-03-30 徐州重型机械有限公司 Winching energy recovery and reutilization compound control method and system and crane
US10359063B2 (en) 2014-11-24 2019-07-23 Xuzhou Heavy Machinery Co.., Ltd. Method and system for recovering and utilizing operating energy of crane, and crane
CN104555741A (en) * 2014-12-31 2015-04-29 中联重科股份有限公司 Main winch control system of rotary drilling rig and rotary drilling rig
CN104806201A (en) * 2015-03-19 2015-07-29 重庆科技学院 Hydraulic energy based petroleum drilling machine going-down kinetic energy recovery and utilization device
CN105776046A (en) * 2015-12-31 2016-07-20 徐州重型机械有限公司 Combined winch hydraulic system and crane using same
CN105776046B (en) * 2015-12-31 2018-06-26 徐州重型机械有限公司 A kind of hybrid hoisting hydraulic system and the crane using the system
CN106560439A (en) * 2016-03-31 2017-04-12 徐工集团工程机械有限公司 Potential energy recovery utilization system, control method and engineering machinery equipment
CN114195033B (en) * 2021-12-14 2024-05-28 上海中联重科桩工机械有限公司 Winch speed reducer synchronous braking system and rotary drilling rig

Similar Documents

Publication Publication Date Title
CN203833526U (en) Energy recycling system for main winch descending of rotary drilling rig
CN104832464B (en) A kind of rotary drilling rig master winch transfers potential energy recovery device
CN102691484B (en) Winch heave compensation device of marine floating drilling platform
CN104632729B (en) Rotary drilling rig main winch hydraulic system
CN204628112U (en) A kind of rotary drilling rig master winch transfers potential energy recovery system
CN104389533B (en) Offshore Drilling Double Drawworks Heave Compensation and Automatic Drilling System
CN104627881B (en) Super deep floating type drilling multifunctional energy-saving type heavy compensation winch and operation method thereof
CN201297307Y (en) Hydraulic motor energy recycling system used as energy accumulator for hybrid electric engineering machinery
CN201288722Y (en) Energy recovery system of mixed power mechanical actuator
CN103552457B (en) Oil/electric hybrid rotary drilling rig driving system
CN102889273B (en) Electro-hydraulic system for recycling and releasing potential energy of engineering machinery
CN201835810U (en) Rotary drilling rig one-key drilling control device
CN201972595U (en) Rotary drilling rig energy-recuperation hydraulic device
CN101403405A (en) Energy recovery system of hybrid single-pump multi-execution component engineering machinery
CN101408213A (en) Energy recovery system of hybrid power engineering machinery energy accumulator-hydraulic motor
CN101408212A (en) Energy recovery system of hybrid power engineering machinery actuating element
CN104372823B (en) Recovering system for slewing and braking energy of excavator
CN205838429U (en) Hydraulic disc type braking deivce for winch
CN202131037U (en) Rapid releasing interflow fuel-return regeneration system of main winch of rotary drilling rig
CN205772987U (en) A kind of semi-active type marine drilling compensates winch
CN112125194B (en) Energy-saving driving system of ocean drilling compensation winch
CN114604791A (en) Power recovery system and power recovery method for hoisting mechanism of engineering machinery
CN104358722A (en) Hydraulic control system for ocean engineering crane
CN106144855A (en) The method and apparatus that a kind of tractive driving apparatus of load balance and energy regenerating utilize
CN204553361U (en) A kind of rotary drilling rig master winch hydraulic system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 261200 No. 192 South Beihai Road, Fangzi District, Shandong, Weifang

Patentee after: LOVOL HEAVY INDUSTRY CO., LTD.

Address before: 261200 No. 192 North Sea Road, Fangzi District, Shandong, Weifang

Patentee before: Futian Leiwo International Heavy Industry Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20170519

CF01 Termination of patent right due to non-payment of annual fee