[go: up one dir, main page]

CN203719458U - Rapid cement cooler - Google Patents

Rapid cement cooler Download PDF

Info

Publication number
CN203719458U
CN203719458U CN201320842296.2U CN201320842296U CN203719458U CN 203719458 U CN203719458 U CN 203719458U CN 201320842296 U CN201320842296 U CN 201320842296U CN 203719458 U CN203719458 U CN 203719458U
Authority
CN
China
Prior art keywords
cement
cooler
cooling box
cooling
cooler bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320842296.2U
Other languages
Chinese (zh)
Inventor
王盛伟
孙敬民
许维芳
杨祥和
丁洪林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing China United Cement Co Ltd
Original Assignee
Nanjing China United Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing China United Cement Co Ltd filed Critical Nanjing China United Cement Co Ltd
Priority to CN201320842296.2U priority Critical patent/CN203719458U/en
Application granted granted Critical
Publication of CN203719458U publication Critical patent/CN203719458U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a rapid cement cooler which comprises air blowers, a cooling box and a dust collection device, wherein a hot cement inlet is formed above the cooling box and a cold cement outlet is formed below the cooling box; a dual-layer cooling water pipe and a gasifying device are arranged in the cooling box; the air blowers are communicated with the cooling box and are adjacent to the cooling water pipe; the dust collection device is communicated with the top of the cooling box; every two of the four air blowers are distributed on each of two sides of the cooling box. According to the rapid cooler disclosed by the utility model, the temperature of cement can be rapidly reduced by 20-30 DEG C, so that the temperature of delivered cement is lower than 70 DEG C; moreover, the rapid cooler can achieve a cement handling capacity to 80 tons per hour; compared with original equipment, the rapid cooler has a good cooling effect and is high in handling capacity.

Description

A kind of cement flash cooler
Technical field
The utility model relates to a kind of cooler, specifically cement cooler.
Background technology
This technology applies to building material industry, and cement producing line enterprise or cement are used enterprise, as enterprises such as building enterprise, Cement Concrete Mixing.The high serviceability that affects cement of cement temperature, especially makes cement concrete loss of slump large, affects concrete service property (quality), uses construction quality to go wrong.Similar product has " cement highly efficient cooler " at present, cooling for outbound cement.Cement, from bottom of the reservior emits, enters " cement highly efficient cooler ", through air heat exchange, and the cooling laggard bulk cement carrier that enters of cement.Original equipment makes the cement temperature 10-15 ℃ that can only decline, if while making outbound cement temperature be down to 70 ℃, this equipment can not reach due requirement.It is 60 tons of following abilities that original equipment can only be processed delivering amount per hour, is greater than 60 tons per hour, and cement temperature declines and is less than 10 ℃, and disposal ability is little.
Utility model content
The purpose of this utility model is the deficiency existing for prior art, provides a kind of cement that can make cooling fast, increases the cement flash cooler of efficiency of construction.
For realizing above-mentioned utility model object, the technical solution adopted in the utility model is a kind of cement flash cooler, comprises air blast, cooler bin, dust arrester installation; Described cooler bin top is provided with Hot Cement entrance, bottom is provided with cold cement exit, and inside is provided with double-deck cooling water pipe and gasification installation, and air blast and cooler bin are connected, and adjacent with cooling water pipe, and dust arrester installation and cooler bin top are connected; Described air blast has four, is distributed between two the both sides of cooler bin.
Described dust arrester installation comprises the dust collecting fan that gathers dust cloth bag and join with the cloth bag that gathers dust of connecting with cooler bin.
On described four air blasts and dust collecting fan, be all connected to motor.
Hot Cement enters cooling box through air conveyer flume, and air is through air blast, cooling by double-deck cooling water pipe, makes cold air (about 6-8 ℃) enter cooling box, and cement and cold air fully seethe with excitement, and heat exchanging exchange, reduces cement temperature.The cooling fluid bed effect by gasification installation of cement, flows out casing, enters cement bin, and in casing, gas is with heat, enter dust arrester installation, the cement of accepting simultaneously, enters cement bin, after gas purification, discharge, after this process, cement temperature declines 20~30 ℃.
Beneficial effect: the utility model can make cement temperature fast-descending 20-30 ℃, makes outbound cement temperature be less than 70 ℃.And cement treated amount per hour can reach 80 tons, and than original equipment good cooling effect, disposal ability is large.
Accompanying drawing explanation
Fig. 1 is the utility model syndeton block diagram.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, further illustrate the utility model, the present embodiment is implemented take technical solutions of the utility model under prerequisite, should understand these embodiment and only for the utility model is described, be not used in restriction scope of the present utility model.
As shown in Figure 1, a kind of cement flash cooler, comprises air blast 1, cooler bin 2, dust arrester installation 3.Dust arrester installation 3 comprises the dust collecting fan 9 that gathers dust cloth bag 8 and join with the cloth bag 8 that gathers dust of connecting with cooler bin 2.Cooler bin 2 tops are provided with Hot Cement entrance 4, bottom is provided with cold cement exit 5, and inside is provided with double-deck cooling water pipe 6 and gasification installation 7, and air blast 1 is connected with cooler bin 2, and adjacent with cooling water pipe 6, and dust arrester installation 3 is connected with cooler bin 2 tops; Air blast 1 has four, is distributed between two the both sides of cooler bin 2.On four air blasts 1 and dust collecting fan 9, be all connected to motor 10.
Air enters casing through water-cooled, improves cooling capacity, and cold air and cement carry out heat convection, makes the cement temperature 20-30 ℃ that declines immediately, the satisfied cement temperature control requirement of dispatching from the factory.

Claims (3)

1. a cement flash cooler, is characterized in that: comprise air blast (1), cooler bin (2), dust arrester installation (3); Described cooler bin (2) top is provided with Hot Cement entrance (4), bottom is provided with cold cement exit (5), inside is provided with double-deck cooling water pipe (6) and gasification installation (7), air blast (1) is connected with cooler bin (2), and adjacent with cooling water pipe (6), dust arrester installation (3) is connected with cooler bin (2) top; Described air blast (1) has four, is distributed between two the both sides of cooler bin (2).
2. a kind of cement flash cooler according to claim 1, is characterized in that: the cloth bag that gathers dust (8) that described dust arrester installation (3) comprises and cooler bin (2) is connected and the dust collecting fan (9) joining with the cloth bag that gathers dust (8).
3. a kind of cement flash cooler according to claim 2, is characterized in that: on described four air blasts (1) and dust collecting fan (9), be all connected to motor (10).
CN201320842296.2U 2013-12-19 2013-12-19 Rapid cement cooler Expired - Lifetime CN203719458U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320842296.2U CN203719458U (en) 2013-12-19 2013-12-19 Rapid cement cooler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320842296.2U CN203719458U (en) 2013-12-19 2013-12-19 Rapid cement cooler

Publications (1)

Publication Number Publication Date
CN203719458U true CN203719458U (en) 2014-07-16

Family

ID=51158604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320842296.2U Expired - Lifetime CN203719458U (en) 2013-12-19 2013-12-19 Rapid cement cooler

Country Status (1)

Country Link
CN (1) CN203719458U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103743264A (en) * 2013-12-19 2014-04-23 南京中联水泥有限公司 Cement rapid cooler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103743264A (en) * 2013-12-19 2014-04-23 南京中联水泥有限公司 Cement rapid cooler

Similar Documents

Publication Publication Date Title
CN104689755B (en) System and process for granulating calcium carbide liquid at high temperature and recycling heat
CN204224467U (en) Limestone kiln and system for producing calcium carbide
CN203719458U (en) Rapid cement cooler
CN104390211B (en) A kind of air-water combined slag cooler with breaker
CN104197365B (en) High temperature sludge exhaust heat stepped recovery warm-up combustion-supporting air device
CN202898237U (en) Efficient cement cooler
CN211626048U (en) Vertical cold waste heat recovery and utilization system for sinter
CN204281343U (en) Light ash products cooling system
CN103743264A (en) Cement rapid cooler
CN112573843A (en) Industrial waste residue masonry cement based on biomass fuel calcined clinker and preparation method thereof
CN207845500U (en) A kind of strength gaseous suspension cooling device for producing powdery active lime system
CN203639349U (en) Environmental-friendly energy-saving program control automatic lime kiln
CN203700451U (en) Recovering system for high iron sulfuric acid magnetized slag
CN104515402B (en) A kind of residual-heat utilization method of sintering system and device
CN103896501B (en) A kind of lime production line kiln tail ventilation system and kiln tail ventilation technics
CN207913437U (en) The cooling down of a kind of dust-removing waste gas cools down and utilizes device
CN206529069U (en) A kind of New water jacket cools down dilute phase pneumatic conveying system
CN110514019B (en) A high-temperature powdery material cooling process and device
CN103105067B (en) Granular material suspension heat exchange device and granular material heat-exchange system
CN203610197U (en) Reverse ventilation structure of micro-powder processing system
CN107445165A (en) A kind of carbide liquid shaping and the system and method for carbide liquid UTILIZATION OF VESIDUAL HEAT IN
CN108955277A (en) A kind of system for realizing inexpensive denitration using sinter waste-heat sintered discharge gas
CN110526596B (en) Quick cooling and discharging mixed lime kiln
CN202958744U (en) Cooling system for feed production
CN208449024U (en) A kind of Handling Blast Furnace Granulated Slag circulatory system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140716

CX01 Expiry of patent term