CN203628139U - High-pressure glass fiber pipeline installation and pipe damage maintenance device - Google Patents

High-pressure glass fiber pipeline installation and pipe damage maintenance device Download PDF

Info

Publication number
CN203628139U
CN203628139U CN201320723456.1U CN201320723456U CN203628139U CN 203628139 U CN203628139 U CN 203628139U CN 201320723456 U CN201320723456 U CN 201320723456U CN 203628139 U CN203628139 U CN 203628139U
Authority
CN
China
Prior art keywords
pipeline
glass steel
jig
injecting glue
sealing fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320723456.1U
Other languages
Chinese (zh)
Inventor
梁爱国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201320723456.1U priority Critical patent/CN203628139U/en
Application granted granted Critical
Publication of CN203628139U publication Critical patent/CN203628139U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Abstract

A high-pressure glass fiber pipeline installation and pipe damage maintenance device belongs to the technical field of pipeline installation and pipe damage maintenance. The fixture is of a double-arc-surface structure and is divided into an upper disc and a lower disc, the upper disc and the lower disc are connected through a strip-shaped clamping lug with a bolt to form a tubular structure, and two sealing joints are fixed in the fixture; the upper and lower discs are respectively provided with a strip-shaped glue injection groove, four mutually connected sealing cavities are formed after buckling, namely two annular sealing cavities at two ends of the clamp and two strip-shaped sealing cavities at the joint surface of the upper and lower discs; for medium and low pressure glass fiber reinforced plastic pipeline, the glue injection groove is 5-10 mm deep and 8-15 mm wide, and for high pressure glass fiber reinforced plastic pipeline, the glue injection groove is 10-20 mm deep and 15-25 mm wide; the joint surface clearance between the upper disc and the lower disc of the fixture is less than 0.1mm, the joint surface clearance between the fixture and the glass steel tube is less than 0.5mm, the glue injection holes are uniformly arranged along the sealing cavity, and the distances between the straight line and the arc line between the two holes are less than 100 mm.

Description

Damaged maintenance unit is installed and managed to a kind of high-pressure glass fiber pipeline
Technical field
The utility model relates to a kind of high-pressure glass fiber pipeline to be installed and manages damaged maintenance unit, belongs to pipeline and installs and manage damaged maintenance technique field.
Background technique
The Connecting format of the high-pressure glass Pressure fiberglass Line (hereinafter to be referred as Glass Steel Tube) that Oil Field uses is threaded and is connected two kinds with flange.Placement professional standard SY/T6769.1-2010 between Glass Steel Tube, recommend adoption is threaded, Glass Steel Tube is connected recommendation steel crossover sub and connects with steel pipe, with being connected of valve or steel pipe, recommendation flange connects. when pipe laying, pipe rotates pipeline according to female end successively towards the direction of medium source, and internal and external threads engagement is tightened; Thread locking adhesive is smeared at screw thread place.This thread connecting mode, need to be at the two ends of damaged pipeline in the time of the damaged fracture maintenance of pipeline, the bonding outside thread of site operation, by steel pipe hoop joint steel pipe respectively, then,, by electric welding field joint steel pipe, complete pipeline maintainance operation, there is following shortcoming (disadvantage) in existing maintenance mode: construction sequence is loaded down with trivial details, execution conditions require high, and it is clean, dry that pipeline fracture requires, for part long-distance transport pipes, the exhausting pipeline time is long, and the preparation of construction time is longer; Nonmetal pipe line need to be connected into metal segments, needs fire operation, meets inflammable and explosive medium, has fire, risk of explosion.
Compared with steel pipe, glass steel pipeline has corrosion-resistantly because of it, and the feature such as the fast and construction investment of speed of application is few, has obtained at field produces scene applying more widely; Also affect not in time the normal production of oil gas field because of the special reparation of its method for maintaining simultaneously, therefore need the maintenance of glass steel pipeline to develop with the new method being connected and new process and perfect.
Summary of the invention
In order to overcome the deficiencies in the prior art, the utility model provides a kind of high-pressure glass fiber pipeline to install and manage damaged maintenance unit, the glass steel pipeline after maintenance connects, and performance is not less than former design, realize not fire operation of pipeline maintainance, improve the Security of maintenance operation.
Damaged maintenance unit is installed and managed to a kind of high-pressure glass fiber pipeline, its water conservancy diversion pipeline connects inflation leather bag, glass steel pipeline connects inflation leather bag, between glass steel pipeline and inflation leather bag, be connected with rubber stopper ring, inflation line connects gas charging valve and inflation leather bag, and the other end of gas charging valve 4 connects air pump; Glass steel pipeline has 1 ° of 45 ' male cone (strobilus masculinus) of cone angle; One side of SEALING FITTING has and the inner conical surface of glass steel pipeline male cone (strobilus masculinus) with cone angle; Inner lining protection slips is upper liner slips and lower liner slips, mates with annular groove specification, and the staggered overlap joint of upper liner slips and lower liner slips, upper liner slips is connected with annular groove with lower liner slips; Glass steel pipeline is connected with one end of SEALING FITTING, and the other end of SEALING FITTING is connected with another SEALING FITTING, and the excircle of connection part has annular groove; SEALING FITTING excircle connects upper dish, the lower wall of jig; Jig is two globoidal structures, point upper dish, lower wall two-part, and upper dish, lower wall are connected to form tubular structure by the bar clevis ear with bolt hole, and two SEALING FITTING are fixed in jig; In upper dish, lower wall, have respectively bar shaped injecting glue groove, four Seal cages that after fastening, formation is connected each other, are respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper dish, lower wall mating face; On the circumference of upper dish, lower wall, there is hole for injecting glue.
For mesolow glass steel pipeline, bar shaped injecting glue groove deep 5-10mm, wide 8-15mm, for high-pressure glass fibre reinforced plastic pipe line, bar shaped injecting glue groove deep 10-20mm, wide 15-25mm.
For the performance parameter of Glass Steel Tube self and the physics of fed sheet of a media, chemical property, in the bonding special glass steel SEALING FITTING of damaged pipeline two ends difference, coordinate custom-designed metal jig that pipeline is connected, realize the sealing of pipe joint jig by injecting glue mode, step is as follows;
The damaged face cutting of step 1. Glass Steel Tube pipeline;
Excision pipeline damaged portion, makes fracture end face neat intact, and fracture two ends spacing is not more than 20mm.When pipeline damaged portion is longer, length kill pipes that can be on request, considers removable parts pipeline, forms two fractures.
Step 2. medium water conservancy diversion technique;
In case of long-distance transport pipes being difficult for to emptying or emptying time is long, for shortening the engineering time, can implement medium water conservancy diversion.Inflation leather bag with honeycomb duct, gas tube is put into pipeline, air pump is inflated to leather bag by inflation line, leather bag expands, shutoff pipeline, with rubber seal stop leather bag outwards migrate, make medium diversed to specified position from channelizing line, can make pipeline fracture keep clean, dry, possess lower step execution conditions.
The finishing of step 3. Glass Steel Tube pipeline end face;
With making cone device or other special tools, pipeline fracture two ends are repaired respectively to 1 ° of cone angle-5 ° of male cone (strobilus masculinus)s, wherein h2 is pipeline wall thickness, h1, for repairing rear reserve part, requires h1/h2 to be not less than 1/2,
Step 4. SEALING FITTING is made;
Same caliber (internal diameter) is with material Glass Steel Tube, and wall thickness increases 10mm and makes long 200mm annular pipe nipple, and a side repairs with pipeline male cone (strobilus masculinus) the inner conical surface with length with cone angle with beating cone device or other special tool in-line walls; Opposite side tube wall thins 6mm, prolongs the axial wide 150mm of pipeline, the neat formation docking of end face pipe nipple, and sealing joint also can be prefabricated in the factory according to line size.H3 is not less than 10mm; H4 is pipeline internal diameter; H2 is pipeline wall thickness, h5=h2+h3-6mm.
Step 5. adhering and sealing joint;
Cleaning surface of contact, evenly brushing binder, make it mutually bonding, with heat tape or other heating plant caking faces, heating and temperature control is below 70 DEG C, until binder is completely curing, after bonding the completing of the sealed at both ends joint of pipeline notch, both sides butt joint is repaired docking, the neat formation annular groove of interface interface;
Step 6. inner lining protection slips;
Press annular groove specification and make liner slips (wall thickness 6mm), point staggered overlap joint of upper and lower two dish, is stuck on annular groove and is filled and led up.Inner lining protection slips material selection 45# steel.
The making of step 7. seal clamp and installation
Jig is two globoidal structures, point upper dish, lower wall two-part, and upper and lower dish is connected to form tubular structure by the bar clevis ear with bolt, and two SEALING FITTING are fixed in jig; In upper and lower dish, be designed with respectively bar shaped injecting glue groove, four Seal cages that after fastening, formation is connected each other, are respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper and lower dish mating face.For mesolow glass steel pipeline, injecting glue groove deep 5-10mm, wide 8-15mm, for high-pressure glass fibre reinforced plastic pipe line, injecting glue groove deep 10-20mm, wide 15-25mm.
Mating face gap L EssT.LTssT.LT0.1mm between the upper and lower dish of jig, jig and Glass Steel Tube mating face gap L EssT.LTssT.LT0.5mm, hole for injecting glue is prolonged Seal cage and is evenly arranged, straight line and the equal <100mm of camber line spacing between two holes.Seal clamp material selection boilers and pressure vessel steel.The wall thickness of seal clamp is definite according to the rated pressure of glass steel pipeline, and it is qualified being not less than 1.5 times of pipeline rated pressures at simulation segment seal pressure test pressure.
Selecting of step 8. injecting sealant
Select uncured type injecting sealant, 0 DEG C-280 DEG C of serviceability temperatures, working pressure <60MPa.
Step 9. injecting glue seal operation method
Before operation, test determines that glass steel pipeline causes the external pressure (critical pressure) of pipeline unstability, and checks that confirmation contacts pipeline section fine status with sealer, and injecting sealant (glue rod) adds before using
Heat is to 90 DEG C-120 DEG C, and when operation, injection pressure is controlled at below 70% of pipeline critical pressure, and is not less than pipeline rated pressure.
Step 10. is wrapped up seal clamp completely with slip-type plastics gum cover, and included butter is anticorrosion.
The utility model has the advantages that medium water conservancy diversion technique described in the utility model, meeting, oil field long-distance transport pipes emptying time is long, or because gate is tight, pipeline is completely when emptying, stifled every with water conservancy diversion pipeline in residual medium, make pipeline fracture keep clean, dry, so that next-step operation can carry out smoothly, greatly shorten the repair time of pipeline.
The making of pipeline SEALING FITTING and installation; make sealing engagement face to measure to damaged pipeline; upper button inner lining protection slips; can glass steel pipeline be risen and be supported and protective action, while making pipeline pressurized, still can keep certain circularity, outer button Special seal jig; the sealing of enforcement injecting glue; can safely, effectively complete the reparation of the Glass Steel Tube pipeline of different pressures grade, and overcome the shortcoming that Glass Steel Tube is threaded, a kind of new pipeline connection and maintenance renovation technique are provided.
The every technical performance index of pipeline after reparation is not less than former pipeline designs.
Brief description of the drawings
When considered in conjunction with the accompanying drawings, by the detailed description with reference to below, can more completely understand better the utility model and easily learn wherein many advantages of following, but accompanying drawing described herein is used to provide further understanding of the present utility model, form a part of the present utility model, schematic description and description of the present utility model is used for explaining the utility model, do not form improper restriction of the present utility model, as schemed wherein:
Fig. 1 is the medium water conservancy diversion process schematic representation in the utility model specific embodiment;
Fig. 2 is the Glass Steel Tube pipeline end face finishing structural representation in the utility model specific embodiment;
Fig. 3 is the Glass Steel Tube pipeline end face enlarged view in the utility model specific embodiment;
Fig. 4 is the seal joint structure sectional view in the utility model specific embodiment;
Fig. 5 is the seal joint structure schematic diagram in the utility model specific embodiment;
Fig. 6 is the inner lining protection slips schematic diagram in the utility model specific embodiment;
Fig. 7 is the bonding schematic diagram of the SEALING FITTING in the utility model specific embodiment;
Fig. 8 is the seal clamp scheme of installation in the utility model specific embodiment;
Fig. 9 is the seal clamp structural representation in the utility model specific embodiment;
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Embodiment
Obviously the many modifications and variations that, those skilled in the art do based on aim of the present utility model belong to protection domain of the present utility model.
Embodiment 1: damaged maintenance unit is installed and managed to a kind of high-pressure glass fiber pipeline, as shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9,
Water conservancy diversion pipeline 2 connects inflation leather bag 1, and glass steel pipeline 6 connects inflation leather bag 1, between glass steel pipeline 6 and inflation leather bag 1, is connected with rubber stopper ring 7, and inflation line 3 connects gas charging valve 4 and inflation leather bag 1, and the other end of gas charging valve 4 connects air pump 5;
Glass steel pipeline 6 has 1 ° of 45 ' male cone (strobilus masculinus) of cone angle;
One side of SEALING FITTING 8 has and the inner conical surface of glass steel pipeline 6 male cone (strobilus masculinus)s with cone angle;
Inner lining protection slips is upper liner slips 9 and lower liner slips 10, mates with annular groove 11 specifications, and upper liner slips 9 and the staggered overlap joint of lower liner slips 10, upper liner slips 9 is connected with annular groove 11 with lower liner slips 10;
Glass steel pipeline 6 is connected with one end of SEALING FITTING 8, and the other end of SEALING FITTING 8 is connected with another SEALING FITTING, and the excircle of connection part is annular groove 11;
SEALING FITTING 8 excircles connect upper dish 13, the lower wall 17 of jig;
Jig is two globoidal structures, point upper dish 13, lower wall 17 two-part, and upper dish 13, lower wall 17 are connected to form tubular structure by the bar clevis ear with bolt hole 15, and two SEALING FITTING 8 are fixed in jig; In upper dish 13, lower wall 17, have respectively bar shaped injecting glue groove 12, four Seal cages that after fastening, formation is connected each other, are respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper dish 13, lower wall 17 mating faces; On the circumference of upper dish 13, lower wall 17, there is hole for injecting glue 14; For mesolow glass steel pipeline, bar shaped injecting glue groove 12 groove depth 5-10mm, wide 8-15mm, for high-pressure glass fibre reinforced plastic pipe line, bar shaped injecting glue groove 12 groove depth 10-20mm, wide 15-25mm.
Embodiment 2: damaged maintenance unit is installed and managed to a kind of high-pressure glass fiber pipeline,
As shown in Figure 1, water conservancy diversion pipeline 2 connects inflation leather bag 1, and glass steel pipeline 6 connects inflation leather bag 1, between glass steel pipeline 6 and inflation leather bag 1, is connected with rubber stopper ring 7, inflation line 3 connects gas charging valve 4 and inflation leather bag 1, and the other end of gas charging valve 4 connects air pump 5.
As shown in Figure 2 and Figure 3, glass steel pipeline 6 use are made cone device pipeline fracture are repaired respectively to 1 ° of 45 ' male cone (strobilus masculinus) of cone angle.Wherein h2 is 7.2mm, and h1 is 2.8mm.
As shown in Figure 4, Figure 5, SEALING FITTING 8 is same material Glass Steel Tube, internal diameter 190.5mm, and external diameter 225mm makes long 200mm annular pipe nipple, and a side repairs and the inner conical surface of pipeline male cone (strobilus masculinus) with cone angle with beating cone device in-line wall; Opposite side tube wall thins 6mm, prolongs the axial wide 150mm of pipeline, the neat formation docking of end face pipe nipple, h3=10mm in figure; H4=190.5mm; H5=11.2mm.
As shown in Figure 6, inner lining protection slips is upper liner slips 9 and lower liner slips 10, makes liner slips (wall thickness 6mm, external diameter 225mm) by annular groove 11 specifications, and point staggered overlap joint of upper and lower two dish, is stuck on annular groove and is filled and led up; Inner lining protection slips material selection 45# steel.
As shown in Figure 7, glass steel pipeline 6 is connected with one end of SEALING FITTING 8, and the other end of SEALING FITTING 8 is connected with another SEALING FITTING, and the excircle of connection part is annular groove 11, upper liner slips 9 and lower liner slips 10 connecting ring connected in stars 11;
As shown in Figure 8, glass steel pipeline 6 is connected with SEALING FITTING 8, and SEALING FITTING 8 excircles connect upper dish 13, the lower wall 17 of jig;
As shown in Figure 9, jig is two globoidal structures, point upper dish 13, lower wall 17 two-part, and upper dish 13, lower wall 17 are connected to form tubular structure by the bar clevis ear with bolt hole 15, and two SEALING FITTING 8 are fixed in jig; In upper dish 13, lower wall 17, have respectively bar shaped injecting glue groove 12, four Seal cages that after fastening, formation is connected each other, are respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper dish 13, lower wall 17 mating faces; On the circumference of upper dish 13, lower wall 17, there is hole for injecting glue 14; For mesolow glass steel pipeline, bar shaped injecting glue groove 12 groove depth 5-10mm, wide 8-15mm, for high-pressure glass fibre reinforced plastic pipe line, bar shaped injecting glue groove 12 groove depth 10-20mm, wide 15-25mm.
Embodiment 3: as shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, with 30km5.5MPa, internal diameter 190.5mm, the long defeated pipe maintenance of glass fibre reinforced plastics of external diameter 205mm is example;
Step 1:. the damaged face cutting of Glass Steel Tube pipeline;
Excision pipeline damaged portion, makes fracture end face face neat intact, and fracture two ends spacing is not more than 20mm.
Step 2: medium water conservancy diversion technique;
For shortening the engineering time, implement medium water conservancy diversion technique.Inflation leather bag with honeycomb duct, gas tube is put into pipeline, air pump is inflated to leather bag by inflation line, leather bag expands, shutoff pipeline, with rubber seal stop leather bag outwards migrate, make medium diversed to specified position from channelizing line, can make pipeline fracture keep clean, dry, possess lower step execution conditions.Inflation leather bag pressurising 1MPa, external diameter 200mm.
Step 3: the damaged face finishing of Glass Steel Tube pipeline;
With making cone device, pipeline fracture is repaired respectively to 1 ° of 45 ' male cone (strobilus masculinus) of cone angle.Wherein h2 is 7.2mm, and h1 is 2.8mm.
Step 4: SEALING FITTING is made;
With material Glass Steel Tube, internal diameter 190.5mm, external diameter 225mm makes long 200mm annular pipe nipple, and a side repairs and the inner conical surface of pipeline male cone (strobilus masculinus) with cone angle with beating cone device in-line wall; Opposite side tube wall thins 6mm, prolongs the axial wide 150mm of pipeline, the neat formation docking of end face pipe nipple, h3=10mm in figure; H4=190.5mm; H5=11.2mm.
Step 5: adhering and sealing joint;
Cleaning surface of contact, at the even brushing binder of interior male cone (strobilus masculinus), make it mutually bonding, with heat tape or other heating plant caking faces, heating and temperature control is below 70 DEG C, until binder is completely curing, after bonding the completing of the sealed at both ends joint of pipeline notch, both sides butt joint is repaired docking, the neat formation annular groove of interface interface.
Step 6: inner lining protection slips;
Press annular groove specification and make liner slips (wall thickness 6mm, external diameter 225mm), point staggered overlap joint of upper and lower two dish, is stuck on annular groove and is filled and led up.Inner lining protection slips material selection 45# steel.
Step 7: the making of seal clamp and installation;
Seal clamp material selection boilers and pressure vessel steel, wall thickness 15mm.Realize after injecting glue sealing at simulation pipeline section with seal clamp, quiet clear water pressure testing 16MPa is qualified.
Jig is two globoidal structures, point upper dish, lower wall two-part, and upper and lower dish is connected to form tubular structure by the bar clevis ear with bolt, two SEALING FITTING can be fixed in jig.In upper and lower dish, be designed with respectively bar shaped injecting glue groove, four Seal cages that after fastening, formation is connected each other, respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper and lower dish mating face, hole for injecting glue is prolonged Seal cage and is evenly arranged, annular seal space hole for injecting glue distributes and adopts 8 cellular types, and the distribution of bar shaped Seal cage hole for injecting glue adopts 6 cellular types.Injecting glue groove deep 10mm, wide 20mm.
Anchorage clip ear snail bolt, makes mating face gap L EssT.LTssT.LT0.1mm between the upper and lower dish of jig, jig and Glass Steel Tube mating face gap L EssT.LTssT.LT0.5mm.
Step 8: the selecting of injecting sealant;
Select uncured type injecting sealant, 0 DEG C-280 DEG C of serviceability temperatures, working pressure <60MPa.
Step 9: injecting glue seal operation method;
Before operation, test determines that glass steel pipeline causes the external pressure (critical pressure) of pipeline unstability to be greater than 60MPa.Injecting sealant (glue rod) is heated to 90 DEG C-120 DEG C before using, and injects successively along hole for injecting glue, and when operation, injecting glue is walked glue laminated power and is controlled at below 30MPa, and after full glue, injection pressure rises to 40MPa and stops note, seals hole for injecting glue with bolt.
Step 10: seal clamp is wrapped up completely with slip-type plastics gum cover, included 5kg butter is anticorrosion.
Embodiment 4: with 5.5MPa, and internal diameter 190.5mm, the glass steel pipeline of external diameter 205mm is connected to example;
Step 1: Glass Steel Tube pipeline end face finishing;
With making cone device, pipeline fracture is repaired respectively to 1 ° of 45 ' male cone (strobilus masculinus) of cone angle.Wherein h2 is 7.2mm, and h1 is 2.8mm.
Step 2: SEALING FITTING is made;
With material Glass Steel Tube, internal diameter 190.5mm, external diameter 225mm makes long 200mm annular pipe nipple, and a side repairs and the inner conical surface of pipeline male cone (strobilus masculinus) with cone angle with beating cone device in-line wall; Opposite side tube wall thins 6mm, prolongs the axial wide 150mm of pipeline, the neat formation docking of end face pipe nipple, h3=10mm in figure; H4=190.5mm; H5=11.2mm.
Step 3: adhering and sealing joint;
Cleaning surface of contact, at the even brushing binder of interior male cone (strobilus masculinus), make it mutually bonding, with heat tape or other heating plant caking faces, heating and temperature control is below 70 DEG C, until binder is completely curing, after bonding the completing of the sealed at both ends joint of pipeline notch, both sides butt joint is repaired docking, the neat formation annular groove of interface interface.
Step 4: inner lining protection slips;
Press annular groove specification and make liner slips (wall thickness 6mm, external diameter 225mm), point staggered overlap joint of upper and lower two dish, is stuck on annular groove and is filled and led up.Inner lining protection slips material selection 45# steel.
Step 5: the making of seal clamp and installation;
Seal clamp material selection boilers and pressure vessel steel, wall thickness 15mm.Realize after injecting glue sealing at simulation pipeline section with seal clamp, quiet clear water pressure testing 16MPa is qualified.
Jig is two globoidal structures, point upper dish, lower wall two-part, and upper and lower dish is connected to form tubular structure by the bar clevis ear with bolt, two SEALING FITTING can be fixed in jig.In upper and lower dish, be designed with respectively bar shaped injecting glue groove, four Seal cages that after fastening, formation is connected each other, respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper and lower dish mating face, hole for injecting glue is prolonged Seal cage and is evenly arranged, annular seal space hole for injecting glue distributes and adopts 8 cellular types, and the distribution of bar shaped Seal cage hole for injecting glue adopts 6 cellular types.Injecting glue groove deep 10mm, wide 20mm.
Anchorage clip ear snail bolt, makes mating face gap L EssT.LTssT.LT0.1mm between the upper and lower dish of jig, jig and Glass Steel Tube mating face gap L EssT.LTssT.LT0.5mm.
Step 6: the selecting of injecting sealant;
Select uncured type injecting sealant, 0 DEG C-280 DEG C of serviceability temperatures, working pressure <60MPa.
Step 7: injecting glue seal operation method;
Before operation, test determines that glass steel pipeline causes the external pressure (critical pressure) of pipeline unstability to be greater than 60MPa.Injecting sealant (glue rod) is heated to 90 DEG C-120 DEG C before using, and injects successively along hole for injecting glue, and when operation, injecting glue is walked glue laminated power and is controlled at below 30MPa, and after full glue, injection pressure rises to 40MPa and stops note, seals hole for injecting glue with bolt.
Step 8: seal clamp is wrapped up completely with slip-type plastics gum cover, included 5kg butter is anticorrosion.
As mentioned above, embodiment of the present utility model is explained, but as long as not departing from fact inventive point of the present utility model and effect can have a lot of distortion, this will be readily apparent to persons skilled in the art.Therefore, within such variation is also all included in protection domain of the present utility model.

Claims (2)

1. damaged maintenance unit is installed and managed to a high-pressure glass fiber pipeline, it is characterized in that water conservancy diversion pipeline connects inflation leather bag, glass steel pipeline connects inflation leather bag, between glass steel pipeline and inflation leather bag, be connected with rubber stopper ring, inflation line connects gas charging valve and inflation leather bag, and the other end of gas charging valve 4 connects air pump; Glass steel pipeline has 1 ° of 45 ' male cone (strobilus masculinus) of cone angle; One side of SEALING FITTING has and the inner conical surface of glass steel pipeline male cone (strobilus masculinus) with cone angle; Inner lining protection slips is upper liner slips and lower liner slips, mates with annular groove specification, and the staggered overlap joint of upper liner slips and lower liner slips, upper liner slips is connected with annular groove with lower liner slips; Glass steel pipeline is connected with one end of SEALING FITTING, and the other end of SEALING FITTING is connected with another SEALING FITTING, and the excircle of connection part has annular groove; SEALING FITTING excircle connects upper dish, the lower wall of jig; Jig is two globoidal structures, point upper dish, lower wall two-part, and upper dish, lower wall are connected to form tubular structure by the bar clevis ear with bolt hole, and two SEALING FITTING are fixed in jig; In upper dish, lower wall, have respectively bar shaped injecting glue groove, four Seal cages that after fastening, formation is connected each other, are respectively two annular seal spaces at jig two ends, two long strip Seal cages on upper dish, lower wall mating face; On the circumference of upper dish, lower wall, there is hole for injecting glue.
2. a kind of high-pressure glass fiber pipeline according to claim 1 is installed and manages damaged maintenance unit, it is characterized in that for mesolow glass steel pipeline bar shaped injecting glue groove deep 5-10mm, wide 8-15mm, for high-pressure glass fibre reinforced plastic pipe line, bar shaped injecting glue groove deep 10-20mm, wide 15-25mm.
CN201320723456.1U 2013-11-13 2013-11-13 High-pressure glass fiber pipeline installation and pipe damage maintenance device Expired - Fee Related CN203628139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320723456.1U CN203628139U (en) 2013-11-13 2013-11-13 High-pressure glass fiber pipeline installation and pipe damage maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320723456.1U CN203628139U (en) 2013-11-13 2013-11-13 High-pressure glass fiber pipeline installation and pipe damage maintenance device

Publications (1)

Publication Number Publication Date
CN203628139U true CN203628139U (en) 2014-06-04

Family

ID=50814615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320723456.1U Expired - Fee Related CN203628139U (en) 2013-11-13 2013-11-13 High-pressure glass fiber pipeline installation and pipe damage maintenance device

Country Status (1)

Country Link
CN (1) CN203628139U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104633377A (en) * 2013-11-13 2015-05-20 中国石油天然气股份有限公司 High-pressure glass fiber pipeline installation and pipe damage maintenance device and process method
CN105818202A (en) * 2015-01-08 2016-08-03 中国石油天然气股份有限公司 A trompil auxiliary device for glass fiber tube
CN108626513A (en) * 2018-03-28 2018-10-09 国投新疆罗布泊钾盐有限责任公司 Glass steel pipeline quick coupling
CN111456647A (en) * 2020-04-29 2020-07-28 邹城兖矿泰德工贸有限公司 Fireproof glue injection steel pipe

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104633377A (en) * 2013-11-13 2015-05-20 中国石油天然气股份有限公司 High-pressure glass fiber pipeline installation and pipe damage maintenance device and process method
CN104633377B (en) * 2013-11-13 2016-10-12 中国石油天然气股份有限公司 High-pressure glass fiber pipeline installation and pipe damage maintenance device and process method
CN105818202A (en) * 2015-01-08 2016-08-03 中国石油天然气股份有限公司 A trompil auxiliary device for glass fiber tube
CN108626513A (en) * 2018-03-28 2018-10-09 国投新疆罗布泊钾盐有限责任公司 Glass steel pipeline quick coupling
CN108626513B (en) * 2018-03-28 2023-11-24 国投新疆罗布泊钾盐有限责任公司 Quick connector for glass fibre reinforced plastic pipeline
CN111456647A (en) * 2020-04-29 2020-07-28 邹城兖矿泰德工贸有限公司 Fireproof glue injection steel pipe

Similar Documents

Publication Publication Date Title
CN104633377B (en) High-pressure glass fiber pipeline installation and pipe damage maintenance device and process method
CN203628139U (en) High-pressure glass fiber pipeline installation and pipe damage maintenance device
CN203585707U (en) Track plug-in type pipeline restoration sleeve
CN108240524B (en) Diameter-variable pipeline sealing clamp and pipeline maintenance method
CN113507087B (en) Corrosion-resistant anti-aging MPP electric power pipe with self-repairing function
RU148064U1 (en) UNIVERSAL CONE COUPLING
JP6144125B2 (en) Pipe lining method and pipe lining pipe
CN204717225U (en) A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit
CN108240522B (en) Pipeline sealing and lapping fixture and pipeline maintenance method
CN105605364A (en) Sealing clamp for pipe fitting and pipe fitting sealing method thereof
CN103470913B (en) The linkage structure of metglass Steel Lining rubber and plastic submerged pipeline and making connecting means
CN204187173U (en) A kind of breakdown joint that can adapt to pipeline extension
CN102021945A (en) Method for connecting HDPE double-wall ripple drainage pipe
CN203730941U (en) Steel-plastic winding pipe easy to connect and connecting structure
RU2374551C2 (en) Method for repair of pipeline defects
CN108953773A (en) A kind of band seal ring exempts from casing water supply and sewerage pipeline through walls
CN102734574A (en) Fitting assembly and safety lock line connection system including the assembly
CN108253225B (en) A kind of welding petroleum pipeline device for plugging
WO2016010455A1 (en) Universal conical coupling
CN208153896U (en) A kind of slide-in self-anchored type socket joint connection structure
CN2929421Y (en) No-resistance axial compensator
CN207569421U (en) A kind of socket joint connecting tube for being capable of automatic aligning
CN113090854A (en) Domino clamp assembly for pipeline leakage maintenance and clamp comprising domino clamp assembly
CN112460380A (en) Clamping plate type on-site joint coating method for heat-insulating pipeline
RU2527282C2 (en) External insulation of pipeline joint of steel pipes with outer coating

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20211113

CF01 Termination of patent right due to non-payment of annual fee