[go: up one dir, main page]

CN203540255U - Fume gas desulfurization defogging device in coal-fired power plant - Google Patents

Fume gas desulfurization defogging device in coal-fired power plant Download PDF

Info

Publication number
CN203540255U
CN203540255U CN201320450555.7U CN201320450555U CN203540255U CN 203540255 U CN203540255 U CN 203540255U CN 201320450555 U CN201320450555 U CN 201320450555U CN 203540255 U CN203540255 U CN 203540255U
Authority
CN
China
Prior art keywords
demister
wire mesh
stage
modules
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320450555.7U
Other languages
Chinese (zh)
Inventor
郭天祥
杜亚荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201320450555.7U priority Critical patent/CN203540255U/en
Application granted granted Critical
Publication of CN203540255U publication Critical patent/CN203540255U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

本实用新型公开了一种燃煤电厂烟气脱硫除雾装置,第一级除雾器为由多个板式除雾器模块组成的板式除雾器或由多个丝网除雾器模块组成的丝网除雾器,第二级除雾器为由多个Λ型板式除雾器模块组成的Λ型板式除雾器,每个Λ型丝网除雾器模块是由两个一字型丝网除雾器模块由中间构件固定而成的;每级除雾器的各模块分别可抽拉地架设在导轨上,导轨固定在横支撑梁上;在第一级除雾器和第二级除雾器的下端和上端分别设置有第一层、第二层、第三层和第四层清洁装置。本实用新型能够使得浆液滴的临界分离粒径降低至5μm以下,同时可有效协同脱除烟气中的PM10和脱除部分PM2.5,从而降低燃煤电厂脱硫系统净烟气带浆量和有效预防GGH阻塞。

Figure 201320450555

The utility model discloses a flue gas desulfurization and demisting device in a coal-fired power plant. Wire mesh demister, the second-stage demister is a Λ-type plate demister composed of multiple Λ-type plate demister modules, each Λ-type wire mesh demister module is composed of two inline wire The net demister module is fixed by the intermediate member; each module of each stage demister can be drawn and erected on the guide rail, and the guide rail is fixed on the horizontal support beam; between the first stage demister and the second stage The lower end and the upper end of the demister are respectively provided with the first layer, the second layer, the third layer and the fourth layer of cleaning devices. The utility model can reduce the critical separation particle size of the slurry droplet to below 5 μm, and at the same time, can effectively remove PM 10 and part of PM 2.5 in the flue gas, thereby reducing the amount of slurry in the net flue gas and the desulfurization system of the coal-fired power plant. Effectively prevent GGH blockage.

Figure 201320450555

Description

A kind of coal fired power plant flue gas desulfurization demister
Technical field
The utility model belongs to gas cleaning process field, relates to a kind of flue-gas purification equipment, relates in particular to a kind of coal fired power plant flue gas desulfurization demister.
Background technology
At present in coal-fired flue-gas, sulfur dioxide is administered conventionally to adopt and after deduster, is installed wet desulfurization system additional and carry out, and most of desulphurization system, in order to improve flue gas diffusion height, is all provided with flue gas heat-exchange unit GGH.GGH often blocks in application process, and Frequent Troubles has a strong impact on the even normal operation of unit of desulphurization system.The clean fume side cigarette of GGH gas carrying liquid slurry is the one of the main reasons that causes GGH to block.Existing desulphurization system is general adopts 2 grades of board-like demisters to remove the slurry drops in flue gas, prevention GGH blocks, demister adopts template more, at right angle setting mode, plate distance is at 20-40mm, overall separation particle diameter is larger, and to the critical separation particles of the slurry drops in flue gas, in 25 μ m left and right, to 25 μ m, especially the slurry drops separating power below 15 μ m is poor below.
Summary of the invention
The purpose of this utility model solves the above-mentioned problems in the prior art exactly, a kind of coal fired power plant flue gas desulfurization demister is provided, this system can make the critical separation particles of slurry drops be reduced to below 15 μ m, simultaneously the effective PM in cooperation-removal flue gas 10remove PM with part 2.5thereby, reduce the clean flue gas band slurry of Desulphurization for Coal-fired Power Plant system and effectively prevent GGH to block.
For completing above-mentioned purpose, technical solution of the present utility model is: a kind of coal fired power plant flue gas desulfurization demister, and it is vertically mounted on the top of desulfuration absorbing tower, and it comprises the cleaning device of two-stage demister and 4 layers of demister; First order demister is from top to bottom the board-like demister being comprised of multiple board-like demister modules or the mesh mist eliminator being comprised of multiple mesh mist eliminator modules, second level demister is the Λ type mesh mist eliminator being comprised of multiple Λ type mesh mist eliminator modules, and each Λ type mesh mist eliminator module is fixedly formed by intermediate member by two yi word pattern mesh mist eliminator modules; The mesh of the mesh mist eliminator module of the first order is greater than the mesh of second level yi word pattern mesh mist eliminator module; Each module of every grade of demister can be erected on guide rail respectively pull, and guide rail is fixed on horizontal support beam, and horizontal support beam is fixed in the top inner wall of desulfuration absorbing tower; The sidepiece of desulfuration absorbing tower has the access hole of first order demister and second level demister; In the lower end of first order demister and upper end, be respectively arranged with just ground floor and the second layer cleaning device of the lower end to first order demister and upper end of nozzle, in the lower end of second level demister and upper end, be respectively arranged with just the 3rd layer and the 4th layer of cleaning device of the lower end to second level demister and upper end of nozzle; Ground floor, the second layer, the 3rd layer and the 4th layer of cleaning device are comprised of multiple nozzles and pipeline respectively, and multiple nozzles are evenly fixed on pipeline, and pipeline is fixed on bracing frame, and bracing frame is fixed on brace summer; The cleaning medium of ground floor, the second layer and the 3rd layer of cleaning device is that the cleaning medium of the 4th layer of cleaning device is air or steam through the fresh water (FW) of softening and film processing; Ground floor, the second layer, the 3rd layer cross with the device for cleaning pipeline of the 4th layer of cleaning device the input channel that the pipe outlet arranging on desulfuration absorbing tower wall is connected cleaning medium.
The utility model has been introduced mesh mist eliminator, it can separate the slurry drops of the following critical separation particles of 5 μ m, it can effectively reduce the clean flue gas band of Desulphurization for Coal-fired Power Plant system slurry amount and effectively prevent flue gas heat-exchange unit GGH to block, and under coal-fired flue-gas condition, 5 μ m and above slurry drops in flue gas is removed completely; The simultaneously effective PM in cooperation-removal flue gas 10remove PM with part 2.5.The utility model is easy to maintenance, and expense is low, stable, easy to utilize, is not only suitable for large-sized boiler, and is applicable to medium or mini type boiler and other coal combustion equipment smoke processing system.
Accompanying drawing explanation
Fig. 1 is top view of the present utility model;
Fig. 2 is the AA cutaway view of the first embodiment of Fig. 1;
Fig. 3 is the AA cutaway view of the second embodiment of Fig. 1;
Fig. 4 is the AA cutaway view of the third embodiment of Fig. 1;
Fig. 5 is the AA cutaway view of the 4th kind of embodiment of Fig. 1;
Fig. 6 is the AA cutaway view of the 5th kind of embodiment of Fig. 1;
Fig. 7 is the AA cutaway view of the 6th kind of embodiment of Fig. 1.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described further.
Embodiment 1, as depicted in figs. 1 and 2, the present embodiment is vertically mounted on the top of desulfuration absorbing tower, and it comprises the cleaning device of two-stage demister and 4 layers of demister.First order demister is the horizontal mesh mist eliminator 8 being comprised of multiple horizontal mesh mist eliminator modules 1 from top to bottom, and second level demister is the Λ type mesh mist eliminator 9 being comprised of multiple Λ type mesh mist eliminator modules 2.Each Λ type mesh mist eliminator module 2 is fixedly formed by intermediate member 15 by two yi word pattern mesh mist eliminator modules 14.The mesh of the horizontal mesh mist eliminator module 1 of the first order is greater than the mesh of second level yi word pattern mesh mist eliminator module 14.Each module of every grade of demister can be erected on guide rail 7 respectively pull, and guide rail 7 is fixed on horizontal support beam 3, and horizontal support beam 3 is fixed in the top inner wall 34 of desulfuration absorbing tower.The sidepiece of desulfuration absorbing tower has the access hole of first order demister and second level demister.In the lower end of first order demister and upper end, be respectively arranged with just ground floor and the second layer cleaning device 10,11 of the lower end to first order demister and upper end of nozzle 6, in the lower end of second level demister and upper end, be respectively arranged with just the 3rd layer and the 4th layer of cleaning device 12,13 of the lower end to second level demister and upper end of nozzle 6.Ground floor, the second layer, the 3rd layer and the 4th layer of cleaning device 10,11,12 and 13 are comprised of multiple nozzles 6 and pipeline 4 respectively, and multiple nozzles 6 are evenly fixed on pipeline 4, and pipeline 4 is fixed on bracing frame 5, and bracing frame 5 is fixed on brace summer 3.The cleaning medium of ground floor, the second layer and the 3rd layer of cleaning device 10,11 and 12 is that the cleaning medium of the 4th layer of cleaning device 13 is air or steam through the fresh water (FW) of softening and film processing.Ground floor, the second layer, the 3rd layer and the 4th layer of cleaning device 10,11,12 and 13 pipeline 4 are connected the input channel of cleaning medium by the pipe outlet arranging on desulfuration absorbing tower wall.35 is the sealing plate between the top inner wall 34 of demister and desulfuration absorbing tower.
Embodiment 2, as shown in figures 1 and 3, other structure of the present embodiment and installation, with embodiment 1, are the board-like demister 17 that first order demister is comprised of multiple board-like demister modules 16.
Embodiment 3, as shown in Figure 1 and Figure 4, other structure of the present embodiment and installation are with embodiment 1, the Λ type mesh mist eliminator 19 that just first order demister is comprised of multiple Λ type mesh mist eliminator modules 18, each Λ type mesh mist eliminator module 18 is fixedly formed by intermediate member 21 by two yi word pattern mesh mist eliminator modules 20.
Embodiment 4, as shown in Figure 1 and Figure 5, other structure of the present embodiment and installation are with embodiment 1, the Λ plate-type demister 23 that just first order demister is comprised of multiple Λ plate-type demister modules 22, each Λ plate-type demister modules 22 is fixedly formed by intermediate member 25 by two board-like demister modules 24 of yi word pattern.
Embodiment 5, as shown in Fig. 1 and Fig. 6, other structure of the present embodiment and installation are with embodiment 1, the V-type mesh mist eliminator 27 that just first order demister is comprised of multiple V-type mesh mist eliminator modules 26, each V-type mesh mist eliminator module 26 is fixedly formed by intermediate member 29 by two yi word pattern mesh mist eliminator modules 28.
Embodiment 6, as shown in Figure 1 and Figure 7, other structure of the present embodiment and installation are with embodiment 1, the V-type plate formula demister 31 that just first order demister is comprised of multiple V-type plate formula demister modules 30, each Λ plate-type demister modules 30 is fixedly formed by intermediate member 33 by two board-like demister modules 32 of yi word pattern.
Above-described embodiment is only preferred and exemplary, and those skilled in the art for example can be according to the description of this patent, adopts one-level demister and the secondary demister of other version, and it is all in the protection domain of this patent.

Claims (6)

1.一种燃煤电厂烟气脱硫除雾装置,其垂直安装在脱硫吸收塔的顶部,其包括两级除雾器,其特征在于:其还包括4层除雾器的清洁装置;从下到上的第一级除雾器为由多个板式除雾器模块组成的板式除雾器或由多个丝网除雾器模块组成的丝网除雾器,第二级除雾器为由多个Λ型丝网除雾器模块组成的Λ型丝网除雾器,每个Λ型丝网除雾器模块是由两个一字型丝网除雾器模块由中间构件固定而成的;第一级的丝网除雾器模块的网孔大于第二级一字型丝网除雾器模块的网孔;每级除雾器的各模块分别可抽拉地架设在导轨上,导轨固定在横支撑梁上,横支撑梁固定在脱硫吸收塔的顶部内壁上;脱硫吸收塔的侧部开有第一级除雾器和第二级除雾器的检修口;在第一级除雾器的下端和上端分别设置有喷嘴正对第一级除雾器的下端和上端的第一层和第二层清洁装置,在第二级除雾器的下端和上端分别设置有喷嘴正对第二级除雾器的下端和上端的第三层和第四层清洁装置;第一层、第二层、第三层和第四层清洁装置分别由多个喷嘴和管道组成,多个喷嘴均匀固定在管道上,管道固定在支撑架上,支撑架固定在支撑梁上;第一层、第二层和第三层清洁装置的清洁介质为经软化和膜处理的工艺水,第四层清洁装置的清洁介质为空气或蒸汽;第一层、第二层、第三层和第四层清洁装置的管道通过脱硫吸收塔壁上设置的管道出口连接清洁介质的输入管道。 1. A coal-fired power plant flue gas desulfurization and mist removal device, which is vertically installed on the top of the desulfurization absorption tower, which includes two-stage demisters, is characterized in that: it also includes cleaning devices for 4-layer demisters; The first-stage mist eliminator above is a plate type mist eliminator composed of multiple plate type mist eliminator modules or a wire mesh eliminator composed of multiple wire mesh eliminator modules, and the second-stage mist eliminator is composed of A Λ-shaped wire mesh demister composed of multiple Λ-shaped wire mesh demister modules, each Λ-shaped wire mesh demister module is composed of two inline wire mesh demister modules fixed by an intermediate member ; The mesh hole of the wire mesh demister module of the first stage is larger than the mesh hole of the second-stage inline wire mesh demister module; each module of each stage demister can be erected on the guide rail separately, and the guide rail It is fixed on the cross support beam, and the cross support beam is fixed on the top inner wall of the desulfurization absorption tower; the side of the desulfurization absorption tower has access ports for the first-stage mist eliminator and the second-stage mist eliminator; The lower end and the upper end of the mist device are respectively provided with the first-layer and second-layer cleaning devices with nozzles facing the lower and upper ends of the first-stage demister, and the lower and upper ends of the second-stage demister are respectively provided with nozzles facing The third and fourth layer cleaning devices at the lower and upper ends of the second stage demister; the first, second, third and fourth layer cleaning devices are respectively composed of multiple nozzles and pipes, and multiple nozzles Evenly fixed on the pipe, the pipe is fixed on the support frame, and the support frame is fixed on the support beam; the cleaning medium of the first, second and third layer cleaning devices is softened and membrane-treated process water, and the fourth layer The cleaning medium of the cleaning device is air or steam; the pipes of the first, second, third and fourth floor cleaning devices are connected to the input pipes of the cleaning medium through the pipe outlets set on the wall of the desulfurization absorption tower. 2.根据权利要求1所述的燃煤电厂烟气脱硫除雾装置,其特征在于:所述的第一级除雾器是由多个水平丝网除雾器模块组成的水平丝网除雾器。 2. The flue gas desulfurization and demisting device of a coal-fired power plant according to claim 1, characterized in that: the first-stage demister is a horizontal wire mesh demister composed of a plurality of horizontal wire mesh demister modules device. 3.根据权利要求1所述的燃煤电厂烟气脱硫除雾装置,其特征在于:所述的第一级除雾器是由多个Λ型丝网除雾器模块组成的Λ型丝网除雾器,每个Λ型丝网除雾器模块是由两个一字型丝网除雾器模块由中间构件固定而成的。 3. The coal-fired power plant flue gas desulfurization and demisting device according to claim 1, characterized in that: the first-stage demister is a Λ-shaped wire mesh composed of a plurality of Λ-shaped wire mesh demister modules Demister, each Λ-shaped wire mesh demister module is composed of two inline wire mesh demister modules fixed by intermediate members. 4.根据权利要求1所述的燃煤电厂烟气脱硫除雾装置,其特征在于:所述的第一级除雾器是由多个Λ型板式除雾器模块组成的Λ型板式除雾器,每个Λ型板式除雾器模块是由两个一字型板式除雾器模块由中间构件固定而成的。 4. The flue gas desulfurization and demisting device of a coal-fired power plant according to claim 1, characterized in that: the first-stage demister is a Λ-type plate demister composed of a plurality of Λ-type plate demister modules Each Λ-shaped plate demister module is composed of two inline plate demister modules fixed by intermediate members. 5.根据权利要求1所述的燃煤电厂烟气脱硫除雾装置,其特征在于:所述的第一级除雾器是由多个V型丝网除雾器模块组成的V型丝网除雾器,每个V型丝网除雾器模块是由两个一字型丝网除雾器模块由中间构件固定而成的。 5. The flue gas desulfurization and demisting device of a coal-fired power plant according to claim 1, wherein the first-stage demister is a V-shaped wire mesh composed of a plurality of V-shaped wire mesh eliminator modules Demister, each V-shaped wire mesh demister module is composed of two inline wire mesh demister modules fixed by intermediate members. 6.根据权利要求1所述的燃煤电厂烟气脱硫除雾装置,其特征在于:所述的第一级除雾器是由多个V型板式除雾器模块组成的V型板式除雾器,每个V型板式除雾器模块是由两个一字型板式除雾器模块由中间构件固定而成的。 6. The flue gas desulfurization and demisting device of a coal-fired power plant according to claim 1, wherein the first-stage demister is a V-shaped plate demister composed of a plurality of V-shaped plate demister modules Each V-shaped plate demister module is composed of two inline plate demister modules fixed by intermediate members.
CN201320450555.7U 2013-07-26 2013-07-26 Fume gas desulfurization defogging device in coal-fired power plant Expired - Fee Related CN203540255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320450555.7U CN203540255U (en) 2013-07-26 2013-07-26 Fume gas desulfurization defogging device in coal-fired power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320450555.7U CN203540255U (en) 2013-07-26 2013-07-26 Fume gas desulfurization defogging device in coal-fired power plant

Publications (1)

Publication Number Publication Date
CN203540255U true CN203540255U (en) 2014-04-16

Family

ID=50458425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320450555.7U Expired - Fee Related CN203540255U (en) 2013-07-26 2013-07-26 Fume gas desulfurization defogging device in coal-fired power plant

Country Status (1)

Country Link
CN (1) CN203540255U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107803101A (en) * 2017-10-31 2018-03-16 中国三冶集团有限公司宁波分公司 The manufacturing process of fume desulfurating absorption tower structure and absorption tower body
CN109316890A (en) * 2018-12-26 2019-02-12 北京国电龙源环保工程有限公司 A high-efficiency coupling dust removal and mist removal device for desulfurization and ultra-low emission transformation
CN113304563A (en) * 2021-06-30 2021-08-27 芜湖凯博环保科技股份有限公司 Steam-water separation device for cooling tower

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107803101A (en) * 2017-10-31 2018-03-16 中国三冶集团有限公司宁波分公司 The manufacturing process of fume desulfurating absorption tower structure and absorption tower body
CN107803101B (en) * 2017-10-31 2019-10-01 中国三冶集团有限公司宁波分公司 The manufacturing process of fume desulfurating absorption tower structure and absorption tower ontology
CN109316890A (en) * 2018-12-26 2019-02-12 北京国电龙源环保工程有限公司 A high-efficiency coupling dust removal and mist removal device for desulfurization and ultra-low emission transformation
CN113304563A (en) * 2021-06-30 2021-08-27 芜湖凯博环保科技股份有限公司 Steam-water separation device for cooling tower

Similar Documents

Publication Publication Date Title
CN204841409U (en) High -efficient gradual change is compound desulfurizing tower in grades
CN104645770B (en) A swirl plate type dust and mist removal device and its use method
CN201179415Y (en) Flue gas desulfurization purification column
CN102698584B (en) Sectional absorption ammonia desulfurization process and device
US9492786B2 (en) Multi-purpose absorber
CN108786398B (en) Flue gas desulfurization and regeneration integrated tower and renewable wet flue gas desulfurization method
CN203540255U (en) Fume gas desulfurization defogging device in coal-fired power plant
CN205730859U (en) A kind of low special demister of low-temperature flue gas processing system
CN203253345U (en) Catalytic cracking flue gas desulfurization and dust removing tower
CN103071362B (en) Dedusting and desulfuration integrated device for smoke and application of integrated device
CN203525501U (en) Baffle plate type demister
CN210057764U (en) Smoke dust removing, desulfurizing and white smoke eliminating tower
CN210057763U (en) Smoke dust removing, desulfurizing and white smoke eliminating tower
CN202654931U (en) Sectional absorption ammonia desulphurization device
CN205127730U (en) Desulfurization absorption tower with liquid layer is held to vortex
CN203447979U (en) Flue gas desulfurization and demisting purification device for coal-fired power plant
CN202590581U (en) Defogger adapted to changes in gas flow
CN108686492B (en) Flue gas dust removal desulfurization tower and dust removal desulfurization method
CN203990228U (en) Wave-shape board water desulfurizing-dusting device
CN204522731U (en) The outer demist wet flue gas desulfurizer of tower
US9566549B1 (en) Apparatus and method for cleaning gas streams from biomass combustion
CN202823155U (en) Single-main-pipe type spray pipe for wet-method fume washing system
CN106823619B (en) One kind penetrating liquid film absorption plant
CN206276200U (en) A kind of catalytic cracking flue gas dust arrester
CN205102148U (en) Coal fired power plant's boiler purifier that discharges fume

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20180726