CN203451184U - Large-load high-position operation hanging basket suspension mechanism - Google Patents

Large-load high-position operation hanging basket suspension mechanism Download PDF

Info

Publication number
CN203451184U
CN203451184U CN201320142046.8U CN201320142046U CN203451184U CN 203451184 U CN203451184 U CN 203451184U CN 201320142046 U CN201320142046 U CN 201320142046U CN 203451184 U CN203451184 U CN 203451184U
Authority
CN
China
Prior art keywords
hanging basket
suspension mechanism
load
suspension
hitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320142046.8U
Other languages
Chinese (zh)
Inventor
郑夕健
谢正义
韩泽光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIJIAN ZHENG
Original Assignee
XIJIAN ZHENG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIJIAN ZHENG filed Critical XIJIAN ZHENG
Priority to CN201320142046.8U priority Critical patent/CN203451184U/en
Application granted granted Critical
Publication of CN203451184U publication Critical patent/CN203451184U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

Along with increase of high-rise buildings and increase of work busyness degree, full load rate of a high-position operation hanging basket enlarges gradually, higher requirement is claimed for strength, rigidity and structure form of a suspension mechanism. Based on the fact, the utility model provides a large-load high-position operation hanging basket suspension mechanism which comprises the following components: a fixed pulley, a hanger bracket, a connecting sleeve, a front beam, an upper column, an insertion rod, a front seat, a middle beam, a cable-stayed wire rope, a sheave, a back beam, a back seat and a counterweight. Through changing the structure configuration mode of a traditional suspension mechanism, and arranging two sets of reasonable suspension mechanisms, load bearing condition of the suspension mechanism is improved through the fixed pulley, and the bearing capability of the suspension mechanism is improved, so that a hanging basket and the suspension mechanism only require two suspension points, thereby settling a problem of complicated structure in traditional large-load hanging basket with three or more suspension points because of insufficient strength of the hanging mechanism, reducing deadweight of the hanging basket structure, and satisfying construction equipment requirement of the large-load high-position operation hanging basket to a larger degree.

Description

A kind of large load aerial work basket hitch
Technical field
The present invention relates to aerial work basket hitch in technical field of buildings, especially relate to large load, large span aerial work basket for a kind of aerial work basket hitch of high-rise working.
Background technology
Along with the economic development of China, urbanization process is constantly accelerated, construction work starting rapid growth, make the industries such as building curtain wall, Steel Structure Installation, installing construction enter the high-speed developing period, aerial work basket also increases as the use of important high-rise working construction implement thereupon.At present, a little less than China's hanging basket faces load-carrying capacity, the problem such as span is little, poor safety performance is built the development that the sternness fact that high falling safety misadventure takes place frequently is also restricting China's high-rise working equipment simultaneously.Hitch is as the support fixed mechanism of whole aerial work basket system, and reliable, effective work of hitch is most important to the load-carrying capacity of hanging basket and safety performance.According to the related request to hitch in national up-to-date aerial work basket standard, the present invention carries out innovative design to important load bearing component hitch, meeting on the whole basis requiring, obtain improved hitch structure, for research and development and the technological advance of large load aerial work basket lays the foundation, the design and R&D of like product is had to certain directive significance.。
Summary of the invention
Invent herein and be a kind ofly applicable to large load aerial work basket for the gondola-hanging mechanism of high-rise working---a kind of large load aerial work basket hitch.
For achieving the above object, the present invention is achieved through the following technical solutions:
Hitch comprises fixed pulley, hanger bracket, adapter sleeve, front-axle beam, upper pillar stand, inserted link, front stall, central sill, oblique pull steel rope, rope sheave, the back rest, back seat and counterweight.Counterweight is hung on back seat, and front-axle beam, central sill, the back rest adopt bolt to be linked in sequence, and hanger bracket and front-axle beam, adapter sleeve and front-axle beam, adapter sleeve and the back rest and inserted link and front and back seat are all with bolts.Before two groups of tradition hitches, beam end is settled fixed pulley, and fixed pulley is connected with bolt with two groups of hanger brackets, and this structure is by two groups of tradition hitch rational deployment.The load cable passing from gig is fixed on elevator mounting frame walking around the fixed pulley of hitch front-axle beam, motor drives friction wheel rotating by transmission device, force the dynamic load of gig band upwards climb or move downward along steel rope along steel rope, realize the lifting of suspension platform.
Invention compared with prior art has the following advantages and effect: the present invention passes through two groups of traditional hitch rational deployment, the load cable passing from gig is fixed on elevator mounting frame walking around the fixed pulley of hitch front-axle beam, utilize the principle of pulley component, reduce the external bearer of single traditional hitch, improve hitch stressing conditions, alleviate the deadweight of structure; Meanwhile, mechanism has the features such as dismounting, convenient transportation, synchronism be strong, meets to a great extent the preparation of construction requirement of large load aerial work basket.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is further illustrated
The large load aerial work basket of Fig. 1 the present invention hitch whole 3D solid structural representation of constructing
The large load aerial work basket of Fig. 2 the present invention hitch 3D solid structural representation
Fixed pulley schematic layout pattern in Fig. 3 the present invention
The specific embodiment
In Fig. 1, aerial work basket is comprised of hitch (14), safety lock (16), gig (18) and suspension platform (19) four parts.Two groups of hitches and suspension platform reasonable Arrangement during work, the load cable passing from gig (15) is fixed on (17) on elevator mounting frame walking around the fixed pulley (1) of hitch front-axle beam, motor drives friction wheel rotating by transmission device, force the dynamic load of gig band upwards climb or move downward along steel rope along steel rope, realize the lifting of suspension platform.
As formed large load aerial work basket hitch by fixed pulley (1), hanger bracket (2), adapter sleeve (3), front-axle beam (4), upper pillar stand (5), inserted link (6), front stall (7), central sill (8), oblique pull steel rope (9), rope sheave (10), the back rest (11), back seat (12), counterweight (13) in Fig. 2.Two groups of hitches and suspension platform reasonable Arrangement during work, the load cable passing from gig is fixed on elevator mounting frame walking around the fixed pulley (1) of hitch front-axle beam.Because load cable is walked around the fixed pulley (1) of hitch front-axle beam, half that the speed that load is risen and declined is Hoist Speed, thus reduced dynamic impulsion suspension platform structure being brought because hoisting, braking.
If Fig. 3 is fixed pulley schematic layout pattern, hanger bracket (2) is bolted with front-axle beam (4), the fixed pulley (1) of winding work steel rope (15) is bolted with hanger bracket (2), this structure can reduce the external bearer of single traditional hitch and single wire rope, has improved the intensity of hitch.

Claims (2)

1. a large load aerial work basket hitch, described large load aerial work basket hitch comprises fixed pulley (1), hanger bracket (2), adapter sleeve (3), front-axle beam (4), upper pillar stand (5), inserted link (6), front stall (7), central sill (8), oblique pull steel rope (9), rope sheave (10), the back rest (11), back seat (12) and counterweight (13), it is characterized in that: two oblique pull steel ropes (9) in structure, are connected oblique pull steel rope (9) is carried out to pretension by front and rear beam adapter sleeve (3) respectively.
2. a kind of large load aerial work basket hitch according to claim 1, it is characterized in that: two groups of hanger brackets (2) are bolted in front-axle beam (4) end, by the fixed pulley of arranging between hanger bracket (2), realize bear external force and be distributed in two groups of tradition hitch frames.
CN201320142046.8U 2013-03-27 2013-03-27 Large-load high-position operation hanging basket suspension mechanism Expired - Fee Related CN203451184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320142046.8U CN203451184U (en) 2013-03-27 2013-03-27 Large-load high-position operation hanging basket suspension mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320142046.8U CN203451184U (en) 2013-03-27 2013-03-27 Large-load high-position operation hanging basket suspension mechanism

Publications (1)

Publication Number Publication Date
CN203451184U true CN203451184U (en) 2014-02-26

Family

ID=50131081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320142046.8U Expired - Fee Related CN203451184U (en) 2013-03-27 2013-03-27 Large-load high-position operation hanging basket suspension mechanism

Country Status (1)

Country Link
CN (1) CN203451184U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105752897A (en) * 2014-12-17 2016-07-13 无锡吊蓝机械制造有限公司 Variable span hanging basket suspension mechanism
CN109138466A (en) * 2018-09-01 2019-01-04 江西瑞耐德新材料有限公司 A kind of vertical face of outer wall of building curtain protective device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105752897A (en) * 2014-12-17 2016-07-13 无锡吊蓝机械制造有限公司 Variable span hanging basket suspension mechanism
CN109138466A (en) * 2018-09-01 2019-01-04 江西瑞耐德新材料有限公司 A kind of vertical face of outer wall of building curtain protective device

Similar Documents

Publication Publication Date Title
CN104326356A (en) Construction platform hanger with clear stress and adjustable hanging point
CN103613003A (en) Pulley-type suspension device of large load high-place operation nacelle
CN105621280A (en) Device and method for mounting and dismounting crane boom
CN111287441B (en) Suspended anti-shaking construction platform and construction method thereof
CN205397854U (en) Gasifier hoist and mount hoisting device
CN105060125B (en) High tower structure of cable crane and its method for dismounting
CN203128099U (en) Slipping type pipeline lifting device
CN203451184U (en) Large-load high-position operation hanging basket suspension mechanism
CN205892588U (en) Hoisting equipment
CN107253673A (en) A kind of Architectural Equipment hanging apparatus
CN110498321B (en) Compensation wire harness storage device, skip floor elevator and using method of skip floor elevator
CN103264966A (en) Self-hoisting device and method of dismounting member of tower crane
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN202449763U (en) Simple pneumatic crane
CN114319828A (en) Fixed pull rod type vertical and oblique universal construction hanging basket and construction method thereof
CN206156570U (en) Movable lifting hook of no computer lab elevator steel construction well
CN108946542A (en) A kind of small gun carriage and its construction method
CN205527435U (en) Installation and device of dismantling jib loading boom
CN108016986A (en) A kind of swing arm underhung crane
CN201292222Y (en) Reciprocating swing machine
CN202022693U (en) Ceiling type double-hook electric block
CN204474224U (en) There is the steel rope double end anchor fitting of micro-equilibrium function
CN216007754U (en) All-steel attached lifting scaffold
CN204624957U (en) A kind of hoisting fixture
CN209554695U (en) Anticollision wall template hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140226

Termination date: 20150327