[go: up one dir, main page]

CN203321479U - Multi-section fracturing string for oil field horizontal well - Google Patents

Multi-section fracturing string for oil field horizontal well Download PDF

Info

Publication number
CN203321479U
CN203321479U CN2013203201145U CN201320320114U CN203321479U CN 203321479 U CN203321479 U CN 203321479U CN 2013203201145 U CN2013203201145 U CN 2013203201145U CN 201320320114 U CN201320320114 U CN 201320320114U CN 203321479 U CN203321479 U CN 203321479U
Authority
CN
China
Prior art keywords
fracturing
horizontal well
string
packer
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203201145U
Other languages
Chinese (zh)
Inventor
王峰
霍春林
刘长宇
杨富军
张应安
许建国
叶勤友
王鸿伟
佘国锋
刘佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2013203201145U priority Critical patent/CN203321479U/en
Application granted granted Critical
Publication of CN203321479U publication Critical patent/CN203321479U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A multi-section fracturing string for an oil field horizontal well is characterized in that a release packer (1), a fracturing sliding sleeve (2), a detachable packer (3) and a constant pressure ball seat (4) are sequentially connected together through an oil pipe. The utility model is used for in the horizontal well staged fracturing, can the oil recovery casing string as the working string to adopt the bowling to open formula fracturing sliding sleeve (2) step by step, thereby simplify the operation procedure, reduce the liquid friction resistance in the pit, and can realize once constructing the multistage fracturing.

Description

Oilfield horizontal well multistage fracturing string
Technical field: the utility model relates to a kind of flow string technology, especially for a kind of oilfield horizontal well multistage fracturing string of horizontal well production.
Background technology: before the utility model, each oilfield horizontal well is adopted drawing type or mechanical type fracturing strings more, because this tubing string is to adopt tubing string as work string, and need repeatedly to propose, put the brill operation in work progress, not only complicated operation, down-hole fluid flow frictional resistance are large, have also limited the hop count of staged fracturing.
Summary of the invention: the purpose of this utility model is: for staged fracturing of horizontal well provides a kind of oilfield horizontal well multistage fracturing string, because this tubing string is to using the long string post as work string, and adopt pitching opening type fracturing sliding bush step by step, thereby simplified operation sequence, reduced the down-hole fluid flow frictional resistance, improved the possibility that increases the staged fracturing hop count.
The purpose of this utility model realizes by following measures: a kind of oilfield horizontal well multistage fracturing string, comprise back-off packer, fracturing sliding bush, the packer that can disconnect, level pressure ball seat, it is characterized in that back-off packer, fracturing sliding bush, the packer that can disconnect, level pressure ball seat be connected in turn by oil pipe.
The purpose of this utility model can also realize by following measures: in oilfield horizontal well multistage fracturing string, can consist of multistage fracturing sliding sleeve, the packer that can disconnect.
The utility model is for staged fracturing of horizontal well, can the long string post as work string, and adopt pitching opening type fracturing sliding bush step by step, thereby simplified operation sequence, reduce the down-hole fluid flow frictional resistance, and can realize the constructing multi-section pressure break one time.
Accompanying drawing explanation: the schematic diagram that Fig. 1 is oilfield horizontal well multistage fracturing string.
The specific embodiment: oilfield horizontal well multistage fracturing string comprises back-off packer 1, fracturing sliding bush 2, the packer 3 that can disconnect, level pressure ball seat 4 etc., back-off packer 1, fracturing sliding bush 2, the packer 3 that can disconnect, level pressure ball seat 4 are connected in turn by oil pipe, and the pressure break combination wherein consisted of fracturing sliding bush 2, the packer 3 that can disconnect is should be 10-15 level relative to stratum 5.
The specific embodiment of oilfield horizontal well multistage fracturing string, Ji Ping-3 horizontal well multistage fracturing string performance:
10 sections totally 36 bunches of 2000 meters of this well finishing drilling well depths, 1000 meters of vertical depths, horizontal movement 816m, approximately 100 ℃ of formation temperatures, target zone mean permeability 1.5 millidarcies, degree of porosity 11%, shale content 20%, casing cementing completion, extended horizontal depth 546m, perforation, adopt the multistage many bunches of volumes transformation of sleeve pipe inner sliding sleeve segmentation fracturing string.Design fracture half-length 150-170 rice, 5 cubes m/mins of pressing crack construction discharge capacities, full well adding ceramic 580 cubic metres of (every grade approximately 60 cubic metres), total 9699 cubic metres of liquid measures (the crosslinked fracturing fluid of water base hydroxypropyl guar organic boron), prepad fluid accounts for total liquid measure 40%, fracture pressure 41 MPas, sand than 13.2%-14.5%, operation pressure 30-42.5 MPa, clossing pressure 44 MPas.
1, fracturing string---by design pipe string structural order fracturing tubing string, structure is shown in Fig. 1 (grade HT-93 sliding sleeve+1, grade Y441-114 packer+10, oil pipe+10 grade PSQ-93 ball seat), and tubing string removes speed and is no more than 10 m/mins;
2, well head is installed---adopt 700 type fracture well heads and 700 type pressure break elbows, spot cars, adapter line, surface line circulation, configuration fracturing fluid (additive therefor and water clean and accurate-metering);
3, press front the preparation---the packer magnetic orientation degree of depth is checked, the through wash well, presses accurate deadline and the pressure break time interval to be no more than 12 hours;
4, ground pressure testing---plug valve upper accepting water horizontal well plug dropping feeder, pressure break elbow, 27/8 inch high pressure pipe joint, surface line pressure testing 65 MPas are also monitored not sting in 10 minutes and are not leaked rear pressure release;
5, the Feng Qiguan that rises---this well is once constructed for 10 sections pressure breaks of cover inner sliding sleeve, first oil pipe pressurization makes whole packers envelope that rises, improve again pressure and open first paragraph pressure break passage, safety joint is thrown off in pitching, then trip out the top oil pipe, carry out sleeve pipe pressure break step by step, each section of constructing is all to realize the unlatching of sliding sleeve by delivering the lightweight ball;
6, pump prepad fluid---operation pressure prediction (extending pressure gradient=0.017-0.022) well head pressure 40-48 MPa (pump truck power 3918--4083 water horse power), employing can be made in advance seam and can observe the gelled fracturing fluid of fracture extension situation for load fluid;
7, pump load fluid---the employing stage adds the sand sand mo(u)ld, occurs in work progress that pressure raises suddenly, should stop immediately adding sand and suitably improves operational discharge capacity or end construction, the empty anti-row if sand plug begins to rehearse immediately;
8, pump displacement fluid---stop adding after sand when load fluid density drops to density own and start to measure displacement fluid, replacement can not be excessive;
9, closing well open flow---the closed-in time should be no less than the fracturing fluid break time, selects the suitable oil nozzle row of returning fast, returns continuously in time discharge fracturing fluid after stop-spraying.

Claims (2)

1. an oilfield horizontal well multistage fracturing string, comprise back-off packer, fracturing sliding bush, the packer that can disconnect, level pressure ball seat, and it is characterized in that: back-off packer, fracturing sliding bush, the packer that can disconnect, level pressure ball seat are connected in turn by oil pipe.
2. oilfield horizontal well multistage fracturing string according to claim 1 is characterized in that: fracturing sliding bush, the packer that can disconnect are multistagely to connect successively.
CN2013203201145U 2013-06-05 2013-06-05 Multi-section fracturing string for oil field horizontal well Expired - Fee Related CN203321479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203201145U CN203321479U (en) 2013-06-05 2013-06-05 Multi-section fracturing string for oil field horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203201145U CN203321479U (en) 2013-06-05 2013-06-05 Multi-section fracturing string for oil field horizontal well

Publications (1)

Publication Number Publication Date
CN203321479U true CN203321479U (en) 2013-12-04

Family

ID=49660842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203201145U Expired - Fee Related CN203321479U (en) 2013-06-05 2013-06-05 Multi-section fracturing string for oil field horizontal well

Country Status (1)

Country Link
CN (1) CN203321479U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106795747A (en) * 2014-10-03 2017-05-31 埃克森美孚上游研究公司 Method for remedying sand fallout during completion
CN112324415A (en) * 2020-11-05 2021-02-05 中国石油天然气股份有限公司 Combined segmented reconstruction method for selective repeated reconstruction of old well
CN113123762A (en) * 2020-01-16 2021-07-16 中国石油天然气股份有限公司 Fracturing method for coal bed gas multi-branch horizontal well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106795747A (en) * 2014-10-03 2017-05-31 埃克森美孚上游研究公司 Method for remedying sand fallout during completion
CN106795747B (en) * 2014-10-03 2019-05-17 埃克森美孚上游研究公司 Method for remedying sand fallout during complete well
CN113123762A (en) * 2020-01-16 2021-07-16 中国石油天然气股份有限公司 Fracturing method for coal bed gas multi-branch horizontal well
CN112324415A (en) * 2020-11-05 2021-02-05 中国石油天然气股份有限公司 Combined segmented reconstruction method for selective repeated reconstruction of old well

Similar Documents

Publication Publication Date Title
CN102094612B (en) Active water fracturing technology of coal-bed gas well
CN201802376U (en) Open hole well completion hydraulic sand blasting immovable pipe string staged fracturing pipe string
CN103306643B (en) A kind of water drainage gas production device and method
CN105332676B (en) Close the mining control method and device of layer exploitation coal bed gas well top payzone exposure
CN105332684A (en) A Coalbed Methane Displacement Drainage Technology Combined with High Pressure Water Explosion and CO2 Fracturing
CN106014346A (en) Method and device for water drainage and gas production by speed string matched with plunger gas lift
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN104563974B (en) Hydrate device is exploited in a kind of supercritical carbon dioxide jet jet drilling
CN104879159A (en) Gas permeability-increase extraction device and method for soft coal seam stoping face
CN102817604B (en) CO2 refracturing process technology for low-permeability gas well
CN101942986A (en) Abrasive jet injection multiple fracturing device
CN103244094A (en) Carbonate rock multi-slug injection type fracturing method
CN108678722A (en) A kind of more well joint hot dry rocks are manually warm to store up building system and method for construction
CN104564001A (en) Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
CN102817603A (en) Method communicating ground with underground mining coal bed gas
CN106978993A (en) A kind of medium and deep sandstone underground heat horizontal well recovery method and structure
CN104213895A (en) Hydraulic sand-blasting perforation fracturing and sand-filling combined process method
CN103603643A (en) Coal bed gas U-shaped well staged fracturing exploitation technology
CN203321479U (en) Multi-section fracturing string for oil field horizontal well
CN106640018A (en) Method for mining coalbed gas through V-shaped well set
CN103821489A (en) Horizontal well mechanical layering and hydraulic jet fracture acidizing compound technique pipe
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN104234682B (en) A kind ofly be applicable to separate stratum fracturing of continuous oil pipe method that is many, girdle
CN102352747A (en) Pressure-control injection yield-increasing method for coal-bed gas well
CN204436341U (en) A kind of supercritical carbon dioxide jet jet drilling production of water compound device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20210605