CN203319500U - Reinforcing cage abutting-joint adjusting device - Google Patents
Reinforcing cage abutting-joint adjusting device Download PDFInfo
- Publication number
- CN203319500U CN203319500U CN2013203023364U CN201320302336U CN203319500U CN 203319500 U CN203319500 U CN 203319500U CN 2013203023364 U CN2013203023364 U CN 2013203023364U CN 201320302336 U CN201320302336 U CN 201320302336U CN 203319500 U CN203319500 U CN 203319500U
- Authority
- CN
- China
- Prior art keywords
- pulley
- vertical plate
- vertical
- steel
- plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003014 reinforcing effect Effects 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 59
- 239000010959 steel Substances 0.000 claims abstract description 59
- 230000002787 reinforcement Effects 0.000 claims description 22
- 230000007704 transition Effects 0.000 claims 1
- 210000001503 joint Anatomy 0.000 abstract description 9
- 238000003032 molecular docking Methods 0.000 description 11
- 238000000034 method Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本实用新型公开了一种钢筋笼对接调整装置,属于钢筋笼起吊装置领域。它包括第一滑轮、挂钩,还包括第二滑轮、滑轮固定装置,所述的滑轮固定装置由上而下依次设有斜板、第一竖直板、连接板、第二竖直板;所述的斜板有两个,且两斜板构成倒V形结构;所述的两斜板之间的夹角为45-60°;所述的第一竖直板有两个;所述的第二竖直板有两个且平行设置;所述的第一竖直板与第二竖直板互相垂直;所述的第一滑轮位于第二滑轮的正上方;所述的第一滑轮钢丝与第二滑轮钢丝呈十字交叉状。本实用新型可以缩短两节钢筋笼对接所需时间,同时保证每根钢筋笼对接完好达到规范要求。其具有结构简单、使用方便等优点。
The utility model discloses a steel cage butt joint adjustment device, which belongs to the field of steel cage lifting devices. It includes a first pulley, a hook, a second pulley, and a pulley fixing device. The pulley fixing device is sequentially provided with a sloping plate, a first vertical plate, a connecting plate, and a second vertical plate from top to bottom; There are two slant plates, and the two slant plates form an inverted V-shaped structure; the angle between the two slant plates is 45-60°; there are two first vertical plates; the The second vertical plate has two and is arranged in parallel; The first vertical plate and the second vertical plate are perpendicular to each other; The first pulley is located directly above the second pulley; The first pulley steel wire It is in the shape of a cross with the second pulley steel wire. The utility model can shorten the time required for the butt joint of two steel bar cages, and at the same time ensure that the butt joint of each steel bar cage is in good condition and meets the standard requirements. It has the advantages of simple structure, convenient use and the like.
Description
技术领域technical field
本发明属于钢筋笼起吊装置领域,更具体地说,涉及一种钢筋笼对接调整装置。The invention belongs to the field of steel cage lifting devices, and more specifically relates to a steel cage butt joint adjustment device.
背景技术Background technique
目前,由于部分工程桩过长而不能通过一次吊装完成整个桩的钢筋笼吊装,从而采用分段吊装。分段吊装两节钢筋笼之间的连接方式一般采用焊接或其他固接方式,而通过焊接方式连接所花费的时间太长从而容易造成塌孔、断桩现象,进而影响工程质量造成重大安全隐患,所以宜采用机械连接。但是机械连接需要有钢筋笼起吊装置相配合,例如中国专利号为201120172116.5,公开日为2012年2月22日,公开的一种钢筋笼起吊装置的专利文件,该发明提供一种结构简单,使用方便,能够对钢筋笼整体吊装,且吊装过程中稳定性好,方便装入桩孔的钢筋笼起吊装置。包括有一根平衡梁,平衡梁设置于于钢筋笼上方中间,其方向与钢筋笼轴线方向平行,平衡梁的下表面两端对称设置有两组固定钢丝绳,并分别将每组固定钢丝绳的两端对称固定在钢筋笼的轴向两端的两边,在平衡梁的中间正上方,还设置有滑轮,滑轮上穿过有活动钢丝绳,并将活动钢丝绳的两端对称固定在平衡梁的上表面。该发明结构简单,使用方便,能够对钢筋笼整体吊装,且吊装过程中稳定性好,可以方便的将钢筋笼吊放到桩孔中。At present, because some engineering piles are too long to complete the steel cage hoisting of the whole pile by one hoisting, segmental hoisting is adopted. Welding or other fastening methods are generally used for the connection between the two sections of steel cages in segmental hoisting, but the time spent on the connection by welding is too long, which may easily cause collapsed holes and broken piles, which will affect the quality of the project and cause major safety hazards , so a mechanical connection should be used. However, the mechanical connection needs to be matched with a steel cage lifting device. For example, the Chinese patent number is 201120172116.5, and the disclosure date is February 22, 2012. The disclosed patent document of a steel cage lifting device provides a simple structure, easy to use It is convenient to hoist the steel cage as a whole, and has good stability during the hoisting process, and it is convenient to install the steel cage hoisting device into the pile hole. It includes a balance beam. The balance beam is set in the middle of the upper part of the reinforcement cage, and its direction is parallel to the direction of the axis of the reinforcement cage. Two sets of fixed steel wire ropes are arranged symmetrically on both ends of the lower surface of the balance beam, and the two ends of each set of fixed steel wire ropes are respectively It is symmetrically fixed on both sides of the axial two ends of the reinforcement cage, and a pulley is also arranged directly above the middle of the balance beam, and a movable wire rope passes through the pulley, and the two ends of the movable wire rope are symmetrically fixed on the upper surface of the balance beam. The invention is simple in structure, easy to use, capable of hoisting the reinforcement cage as a whole, and has good stability during the hoisting process, and can conveniently hoist the reinforcement cage into the pile hole.
又如,中国专利号为201220066562.2,公开日为2012年11月7日,公开的一种起吊钢筋笼的吊具结构的专利文件,该发明涉及一种起吊钢筋笼的吊具结构,包括吊机上的主钩、扁担梁、吊索,扁担梁两端分别设置一个滑轮,每个滑轮上绕有吊索,吊索的两端通过扣件分别扣住钢筋笼上下两端,形成二个吊点;扁担梁上端设有V字形吊钩。该发明能够用一台吊机就能把钢筋笼吊放到桩孔内,使钢筋笼起吊后不变形,且结构简单,容易实现。As another example, the Chinese patent number is 201220066562.2, and the publication date is November 7, 2012. It discloses a patent document for a sling structure for lifting a steel cage. The invention relates to a sling structure for lifting a steel cage, including The main hook, the pole beam, and the sling, and a pulley is set at both ends of the pole beam, and a sling is wound around each pulley, and the two ends of the sling are fastened to the upper and lower ends of the steel cage by fasteners to form two lifting points. ; The upper end of the pole beam is provided with a V-shaped hook. The invention can use a crane to hoist the reinforcement cage into the pile hole, so that the reinforcement cage does not deform after hoisting, and has a simple structure and is easy to realize.
但是以上的两份文献所公开的钢筋笼起吊装置在对钢筋笼起吊操作过程中存在不易控制两节钢筋笼端面平行而保证每根钢筋完全对接的问题,而且吊起时钢筋笼会摆动,不易调整,吊装时需要多个工人配合,费时费力,安装成本高。However, the reinforcement cage lifting device disclosed in the above two documents has the problem that it is difficult to control the parallelism of the end faces of the two reinforcement cages to ensure that each reinforcement cage is completely connected to each other during the lifting operation of the reinforcement cage, and the reinforcement cage will swing during lifting, which is not easy Adjustment and hoisting require the cooperation of multiple workers, which is time-consuming and labor-intensive, and the installation cost is high.
发明内容Contents of the invention
1、要解决的问题1. Problems to be solved
针对现有钢筋笼起吊操作过程中不易控制两节钢筋笼端面平行而保证每根钢筋完全对接的问题,本发明提供了一种钢筋笼对接调整装置,其是一种能缩短两节钢筋笼对接所花费的时间,而且能较容易地控制两节钢筋笼端面平行而保证每根钢筋完全对接钢筋笼对接调整装置。Aiming at the problem that it is difficult to control the end faces of the two steel cages to be parallel to ensure the complete docking of each steel bar during the hoisting operation of the existing steel cage, the present invention provides a butt joint adjustment device for the steel cage, which is a device that can shorten the butt joint of the two steel cages. It takes less time, and it is easier to control the end faces of the two steel cages to be parallel to ensure that each steel bar is completely docked with the steel cage docking adjustment device.
2、技术方案2. Technical solution
本发明采用的技术方案如下:The technical scheme that the present invention adopts is as follows:
一种钢筋笼对接调整装置,包括第一滑轮、挂钩,还包括第二滑轮、滑轮固定装置,所述的挂钩设于滑轮固定装置的顶端,所述的滑轮固定装置由上而下依次设有斜板、第一竖直板、连接板、第二竖直板;所述的斜板有两个,且两斜板构成倒V形结构;所述的两斜板之间的夹角为45-60°;所述的第一竖直板有两个,两第一竖直板平行设置,其上端与两斜板连接,其下端与连接板垂直连接;所述的第一竖直板的中部开有通孔;所述的第一滑轮通过轴固定于两通孔之间;所述的第二竖直板为V形板;所述的第二竖直板有两个且平行设置,其上端与连接板垂直连接;所述的第二竖直板的底端设有通孔;所述的第二滑轮通过轴固定于两第二竖直板之间;所述的第一竖直板与第二竖直板互相垂直;所述的第一滑轮位于第二滑轮的正上方;所述的第一滑轮上绕有第一滑轮钢丝;所述的第二滑轮上绕有第二滑轮钢丝;所述的第一滑轮钢丝与第二滑轮钢丝呈十字交叉状。A steel cage docking adjustment device, including a first pulley, a hook, and a second pulley, a pulley fixing device, the hook is arranged on the top of the pulley fixing device, and the pulley fixing device is sequentially arranged from top to bottom A slant plate, a first vertical plate, a connecting plate, and a second vertical plate; there are two slant plates, and the two slant plates form an inverted V-shaped structure; the angle between the two slant plates is 45° -60°; there are two first vertical plates, the two first vertical plates are arranged in parallel, the upper end is connected with the two inclined plates, and the lower end is vertically connected with the connecting plate; the first vertical plate of the There is a through hole in the middle; the first pulley is fixed between the two through holes through a shaft; the second vertical plate is a V-shaped plate; there are two second vertical plates arranged in parallel, Its upper end is vertically connected with the connecting plate; the bottom end of the second vertical plate is provided with a through hole; the second pulley is fixed between the two second vertical plates through a shaft; the first vertical plate The plate and the second vertical plate are perpendicular to each other; the first pulley is located directly above the second pulley; the first pulley wire is wound on the first pulley; the second pulley is wound on the second pulley Steel wire; the first pulley steel wire and the second pulley steel wire are in a cross shape.
进一步,所述的第一滑轮与第二滑轮的直径比为4:3。Further, the diameter ratio of the first pulley to the second pulley is 4:3.
进一步,所述的第一滑轮、第二滑轮各自与相应的滑轮轴的连接都是通过滑动轴承连接。Further, the connection between the first pulley and the second pulley and the corresponding pulley shaft is through sliding bearings.
进一步,所述的第一滑轮内圆面的凹槽尺寸根据第一滑轮钢丝的半径R确定,设定第一滑轮内圆面的凹槽曲线上任意一点B,B到凹槽底部的垂直距离为Y,B到凹槽径向中心线的距离为X,所述的X与Y的关系为 Further, the groove size of the inner circular surface of the first pulley is determined according to the radius R of the steel wire of the first pulley, and the vertical distance from any point B on the groove curve of the inner circular surface of the first pulley, B to the bottom of the groove is set is Y, the distance from B to the radial centerline of the groove is X, and the relationship between X and Y is
更进一步,所述的挂钩中间部位的断面形状为葫芦形结构,所述的葫芦形结构由一个大圆和一个小圆相交构成,大圆和小圆的中间设过渡圆弧连接,所述的大圆在挂钩的内侧。Furthermore, the cross-sectional shape of the middle part of the hook is a gourd-shaped structure, and the gourd-shaped structure is formed by the intersection of a large circle and a small circle, and a transitional arc is connected between the large circle and the small circle. inside of the hook.
3、有益效果3. Beneficial effects
相比于现有技术,本发明的有益效果为:Compared with the prior art, the beneficial effects of the present invention are:
(1)本发明钢筋笼对接调整装置包括第一滑轮、第二滑轮、滑轮固定装置,滑轮固定装置由上而下依次设有斜板、第一竖直板、连接板、第二竖直板,第一滑轮位于第二滑轮的正上方;第一滑轮上绕有第一滑轮钢丝;第二滑轮上绕有第二滑轮钢丝;第一滑轮钢丝与第二滑轮钢丝呈十字交叉状,可以缩短两节钢筋笼对接所需时间,同时还能保证每根钢筋笼对接完好达到规范要求,在钢筋笼与吊钩之间仅需加入钢筋笼对接调整装置,结构简单;(1) The steel cage docking adjustment device of the present invention includes a first pulley, a second pulley, and a pulley fixing device. The pulley fixing device is sequentially provided with a slant plate, a first vertical plate, a connecting plate, and a second vertical plate from top to bottom. , the first pulley is located directly above the second pulley; the first pulley wire is wound on the first pulley; the second pulley wire is wound on the second pulley; the first pulley wire and the second pulley wire are in a cross shape, which can be shortened The time required for the butt joint of the two steel cages can also ensure that the butt joint of each steel cage is in good condition to meet the specification requirements. Only a steel cage docking adjustment device needs to be added between the steel cage and the hook, and the structure is simple;
(2)本发明钢筋笼对接调整装置的第一滑轮与第二滑轮的直径比为4:3,增强了对接过程中的稳定性;(2) The diameter ratio of the first pulley and the second pulley of the steel cage docking adjustment device of the present invention is 4:3, which enhances the stability during the docking process;
(3)本发明钢筋笼对接调整装置的第一滑轮内圆面的凹槽尺寸根据第一滑轮钢丝的半径R确定,设定第一滑轮内圆面的凹槽曲线上任意一点B,B到凹槽底部的垂直距离为Y,B到凹槽径向中心线的距离为X,所述的X与Y的关系为从而可以最大程度减少钢丝绳与滑轮间的摩擦力;(3) The size of the groove on the inner surface of the first pulley of the butt joint adjusting device of the steel cage of the present invention is determined according to the radius R of the steel wire of the first pulley, and any point B on the groove curve of the inner surface of the first pulley is set, B to The vertical distance from the bottom of the groove is Y, the distance from B to the radial centerline of the groove is X, and the relationship between X and Y is Thereby, the friction force between the wire rope and the pulley can be minimized;
(4)本发明钢筋笼对接调整装置的第一滑轮、第二滑轮各自与相应的滑轮轴的连接都是通过滑动轴承连接,方便拆卸、安装;(4) The connection between the first pulley and the second pulley of the steel cage docking adjustment device of the present invention and the corresponding pulley shafts are all connected by sliding bearings, which is convenient for disassembly and installation;
(5)本发明钢筋笼对接调整装置的挂钩中间部位的断面形状为葫芦形结构,可增强挂钩与吊钩之间的稳定性。(5) The section shape of the middle part of the hook of the reinforcing cage docking adjustment device of the present invention is a gourd-shaped structure, which can enhance the stability between the hook and the lifting hook.
附图说明Description of drawings
图1是本发明正立面结构示意图;Fig. 1 is a schematic diagram of the front elevation structure of the present invention;
图2是本发明的侧立面结构示意图;Fig. 2 is a side elevation structural representation of the present invention;
图3是第一滑轮的凹槽结构示意图。Fig. 3 is a schematic diagram of the groove structure of the first pulley.
图中:1、吊绳;2、第一滑轮;3、第二滑轮;4、第一滑轮钢丝;5、第二滑轮钢丝;6、斜板;7、第一竖直板;8、连接板;9、第二竖直板。In the figure: 1, hanging rope; 2, the first pulley; 3, the second pulley; 4, the first pulley steel wire; 5, the second pulley steel wire; 6, inclined plate; 7, the first vertical plate; 8, connection plate; 9, the second vertical plate.
具体实施方式Detailed ways
为了便于本领域技术人员理解,下面结合附图对发明作进一步的说明。In order to facilitate the understanding of those skilled in the art, the invention will be further described below in conjunction with the accompanying drawings.
实施例1Example 1
如图1、图2和图3所示,一种钢筋笼对接调整装置,包括第一滑轮2、挂钩,还包括第二滑轮3、滑轮固定装置,挂钩设于滑轮固定装置的顶端,滑轮固定装置由上而下依次设有斜板6、第一竖直板7、连接板8、第二竖直板9;斜板6有两个,且两斜板6构成倒V形结构;两斜板6之间的夹角可以为45-60°,在此范围内都可以,斜板6最安全,如果角度太大,吊装的钢筋笼的重量过大,则两个斜板6之间的连接处很容易被撕开,导致整个装置的报废;如果角度太小,斜板6的长度需要加长,造成资源的浪费,本实施例优选地选择45°,这样最节约材料;第一竖直板7有两个,两第一竖直板7平行设置,其上端与两斜板6连接,其下端与连接板8垂直连接;第一竖直板7的中部开有通孔;第一滑轮2通过轴固定于两通孔之间;第二竖直板9为V形板;第二竖直板9有两个且平行设置,其上端与连接板8垂直连接;第二竖直板9的底端设有通孔;第二滑轮3通过轴固定于两第二竖直板9之间;第一竖直板7与第二竖直板9互相垂直;第一滑轮2位于第二滑轮3的正上方;第一滑轮2上绕有第一滑轮钢丝4;第二滑轮3上绕有第二滑轮钢丝5;第一滑轮钢丝4与第二滑轮钢丝5呈十字交叉状。As shown in Figure 1, Figure 2 and Figure 3, a steel cage docking adjustment device includes a
第一滑轮2与第二滑轮3的直径比为4:3。第一滑轮2、第二滑轮3各自与相应的滑轮轴的连接都是通过滑动轴承连接,第一滑轮钢丝4的半径R为3.4mm。挂钩中间部位的断面形状为葫芦形结构,葫芦形结构由一个大圆和一个小圆相交构成,大圆和小圆的中间设过渡圆弧连接,大圆在挂钩的内侧。The diameter ratio of the
钢筋笼起吊前,挂钩挂在吊绳1上,第一滑轮钢丝4两端分别与钢筋笼两边连接,第二滑轮钢丝5两端分别与钢筋笼的另两边连接,钢筋笼起吊后、对接前用两根足够长的钢管插在两个箍筋之间,通过钢筋笼中心并保证两钢管垂直,以便于通过人力调节使两节钢筋笼端面平行。Before the reinforcement cage is hoisted, the hook is hung on the
实施例2Example 2
同实施例1,所不同的是,两斜板6之间的夹角为50°,第一滑轮钢丝4的半径R为4mm。Same as
实施例3Example 3
同实施例1,所不同的是,两斜板6之间的夹角为60°。Same as
以上内容仅仅是对本发明结构所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的构思或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。The above content is only an example and description of the structure of the present invention. Those skilled in the art make various modifications or supplements to the described specific embodiments or replace them in similar ways, as long as they do not deviate from the concept of the invention or Anything beyond the scope defined in the claims shall belong to the protection scope of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203023364U CN203319500U (en) | 2013-05-27 | 2013-05-27 | Reinforcing cage abutting-joint adjusting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203023364U CN203319500U (en) | 2013-05-27 | 2013-05-27 | Reinforcing cage abutting-joint adjusting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203319500U true CN203319500U (en) | 2013-12-04 |
Family
ID=49658869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203023364U Expired - Fee Related CN203319500U (en) | 2013-05-27 | 2013-05-27 | Reinforcing cage abutting-joint adjusting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203319500U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103264953A (en) * | 2013-05-27 | 2013-08-28 | 南京工程学院 | Butt-joint adjusting device of steel bar cage |
CN106006367A (en) * | 2016-06-30 | 2016-10-12 | 江苏联峰能源装备有限公司 | Multi-degree of freedom steel ingot stripping hanger |
-
2013
- 2013-05-27 CN CN2013203023364U patent/CN203319500U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103264953A (en) * | 2013-05-27 | 2013-08-28 | 南京工程学院 | Butt-joint adjusting device of steel bar cage |
CN106006367A (en) * | 2016-06-30 | 2016-10-12 | 江苏联峰能源装备有限公司 | Multi-degree of freedom steel ingot stripping hanger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202080812U (en) | Dedicated sling system for large-scaled reinforcing cage | |
CN101717035B (en) | Special hanger for hoisting super huge block steel box girder | |
CN204310721U (en) | A kind of overhead hoist for the lifting of narrow regions slab | |
CN205397854U (en) | Gasifier hoist and mount hoisting device | |
CN203319500U (en) | Reinforcing cage abutting-joint adjusting device | |
CN103264953B (en) | Butt-joint adjusting device of steel bar cage | |
CN205296844U (en) | Precast box girder steel strand wires hoisting point | |
CN203806947U (en) | Self-balancing steel plate hoisting fixture | |
CN202658867U (en) | Overhanging construction platform | |
CN210122723U (en) | Novel steel reinforcement cage gallows | |
CN102408070A (en) | Standard knot for crane and tower crane | |
CN204778268U (en) | A special lifting device for hoist and mount of large -tonnage precast box girder | |
CN208008293U (en) | Tilting is double to roller counterweight | |
CN202558444U (en) | Steel penstock hoisting balance beam device | |
CN201228192Y (en) | Hanging arrangement equipment | |
CN205170157U (en) | Turn round king's block handling instrument | |
CN201952736U (en) | Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder | |
CN202936088U (en) | T-shaped beam steel lifting bracket | |
CN202164027U (en) | Folded plate lifting device | |
CN207713240U (en) | A kind of magnetic force boom hoisting suitable for different size steel plates | |
CN207618879U (en) | Horizontal hanging beam hoisting structure | |
CN205820776U (en) | Four-wheel-type corner block | |
CN202226574U (en) | Standard knot for crane and tower crane | |
CN204689375U (en) | A kind of load hook bearing assembly | |
CN205555889U (en) | Jack -up lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131204 Termination date: 20140527 |