CN203284814U - Transformer substation prefabricated concrete water-scattering device - Google Patents

Transformer substation prefabricated concrete water-scattering device Download PDF

Info

Publication number
CN203284814U
CN203284814U CN2013203509387U CN201320350938U CN203284814U CN 203284814 U CN203284814 U CN 203284814U CN 2013203509387 U CN2013203509387 U CN 2013203509387U CN 201320350938 U CN201320350938 U CN 201320350938U CN 203284814 U CN203284814 U CN 203284814U
Authority
CN
China
Prior art keywords
aproll
water
concrete
precast concrete
silicone weather
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203509387U
Other languages
Chinese (zh)
Inventor
许克崃
徐晨
洪辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi electric power design institute
Original Assignee
Jiangxi electric power design institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi electric power design institute filed Critical Jiangxi electric power design institute
Priority to CN2013203509387U priority Critical patent/CN203284814U/en
Application granted granted Critical
Publication of CN203284814U publication Critical patent/CN203284814U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种变电站预制混凝土散水(1),所述散水由预制混凝土、构造钢筋、沥青砂(5)和硅酮耐候胶(4)组成,构造钢筋设在预制混凝土内,沥青砂(5)灌缝在二块混凝土散水之间,硅酮耐候胶涂在散水缝表面。所述散水宽度B为0.8~1m,长度为0.6~1.2m;四边倒角,倒角半径R为35mm,厚度H为100mm;散水与建(构)筑物间留20mm变形缝,每块预制散水之间留缝5mm,缝下部为沥青砂灌缝,表面10㎜厚硅酮耐候胶封闭。本实用新型可有效解决由于回填土压实不均匀或超长结构带来的温度应力导致散水开裂、断裂现象。本实用新型不仅适用于国网系统内的各变电站中,同时也适用于其它工程行业,具有很强的适用性。

Figure 201320350938

A substation prefabricated concrete bulk water (1), the bulk water is composed of precast concrete, structural reinforcement, asphalt sand (5) and silicone weather-resistant adhesive (4), the structural reinforcement is set in the prefabricated concrete, and the asphalt sand (5) fills the joints Between the two concrete sprinklers, the silicone weather-resistant adhesive is applied to the surface of the sprinkler joints. The width B of the sprinkling water is 0.8-1m, and the length is 0.6-1.2m; the four sides are chamfered, the chamfering radius R is 35mm, and the thickness H is 100mm; a 20mm deformation joint is left between the sprinkling water and the building (structure). A 5mm seam is left between the scattered water, the lower part of the seam is filled with asphalt sand, and the surface is sealed with 10mm thick silicone weather-resistant adhesive. The utility model can effectively solve the phenomena of water cracking and fracture caused by temperature stress brought about by uneven compaction of backfill soil or super-long structure. The utility model is not only applicable to each substation in the national grid system, but also applicable to other engineering industries, and has strong applicability.

Figure 201320350938

Description

A kind of transformer station precast concrete aproll
Technical field
The utility model relates to a kind of transformer station precast concrete aproll, belongs to electrical equipment technical field.
Background technology
In order to protect the wall base not to be subjected to rain erosion, the exterior wall surrounding of being everlasting is made ground outward-dipping domatic, so as with the Water in Rainwater Drainage of roofing at a distance, be called aproll, this is one of effective measures of protection house foundation.
In existing national grid substation project is built; the cast-in-situ concrete aproll is because structure foundation excavates, and the inhomogeneous or reason thermal stresses brought due to overlength of backfill compaction often there will be crackle, phenomenon of rupture even, has not both had drainage; not attractive in appearance again, affect impression.
Summary of the invention
The purpose of this utility model is that in order to solve cast-in-situ concrete aproll cracking phenomena, the utility model discloses a kind of transformer station precast concrete aproll.
The technical solution of the utility model is, change the cast-in-situ concrete aproll into the precast concrete aproll, and every aproll length L is 0.6~1.2m, thick H is 100mm, in join distributing bar, four limit chamferings, stay between every aproll the seam 5mm, the 1:1 sand asphalt cementation of fissures is adopted in the seam bottom, surperficial silicone weather resistant glue sealing.
A kind of transformer station of the utility model precast concrete aproll is comprised of precast concrete, distributing bar, sand asphalt and silicone weather resistant glue, distributing bar is located in precast concrete, the sand asphalt cementation of fissures is between two block concrete aprolls, and silicone weather resistant glue is coated in the aproll seam surface.
The beneficial effects of the utility model are, aproll adopts prefabricated units, and have the following advantages: a large amount of members are completed batch production in factory, and production efficiency is higher; Its secondary member is produced with mould, and process conditions are better, reduced the impact of personnel's variable on quality, improved quality level, and the quality of production is not subjected to the impact in weather and season; The 3rd is that prefabricated units are easy to realize modularization, standardization, large-scale production, and price is relatively low; The 4th is the impact that reduces surrounding enviroment, and the mud that produces in the manufacturing process of site concrete, noise and waste material are larger to surrounding environment influence; The 5th is effectively to have solved the inhomogeneous or thermal stresses that bring due to overlength of backfill compaction to cause aproll cracking, phenomenon of rupture.
The utility model is because form compare is succinct, and the making of its mould is also relatively simple, and size can be unified, can be general in state intrasystem each transformer station of net, have good compliance and benefit.
Description of drawings
Fig. 1 is the utility model transformer station precast concrete aproll floor map;
Fig. 2 is the utility model transformer station precast concrete aproll mounting structure schematic diagram;
Picture in picture number: the 1st, the precast concrete aproll; The 2nd, the cement mortar screeding layer; The 3rd, the pea gravel concreten bed course; The 4th, silicone weather resistant glue; The 5th, sand asphalt.
The specific embodiment
The specific embodiment of the present utility model as depicted in figs. 1 and 2.
Precast concrete aproll 1 adopts the C25 clear-water concrete, and the loose B of aproll is 0.8~1m, and when the inorganization draining, aproll is loose can emit 0.2~0.3m by the cornice line, length L is generally 0.6~1.2m, four limit chamferings, and chamfer radius R is 35mm, thickness H is 100mm, in mix anti-crack fiber, distributing bar.Stay the 20mm deformation joint between aproll and building, stay seam 5mm between every prefabricated aproll, 1:1 sand asphalt 5 cementation of fissures are adopted in the seam bottom, surperficial 10 thick silicone weather resistant glue 4 sealings of ㎜, and other ways are with the cast-in-situ concrete aproll.
More than be the construction installation method of precast concrete aproll.

Claims (2)

1. transformer station's precast concrete aproll, it is characterized in that, described aproll is comprised of precast concrete, distributing bar, sand asphalt and silicone weather resistant glue, and distributing bar is located in precast concrete, the sand asphalt cementation of fissures is between two block concrete aprolls, and silicone weather resistant glue is coated in the aproll seam surface.
2. a kind of transformer station according to claim 1 precast concrete aproll, is characterized in that, described aproll width is 0.8~1m, and length is for being 0.6~1.2m; Four limit chamferings, chamfer radius R is 35mm, thickness H is 100mm; Stay the 20mm deformation joint between aproll and building, stay seam 5mm between every prefabricated aproll, the seam bottom is the sand asphalt cementation of fissures, the surperficial 10 thick silicone weather resistant glue sealings of ㎜.
CN2013203509387U 2013-06-19 2013-06-19 Transformer substation prefabricated concrete water-scattering device Expired - Fee Related CN203284814U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203509387U CN203284814U (en) 2013-06-19 2013-06-19 Transformer substation prefabricated concrete water-scattering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203509387U CN203284814U (en) 2013-06-19 2013-06-19 Transformer substation prefabricated concrete water-scattering device

Publications (1)

Publication Number Publication Date
CN203284814U true CN203284814U (en) 2013-11-13

Family

ID=49541186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203509387U Expired - Fee Related CN203284814U (en) 2013-06-19 2013-06-19 Transformer substation prefabricated concrete water-scattering device

Country Status (1)

Country Link
CN (1) CN203284814U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457309A (en) * 2018-04-09 2018-08-28 天津中铁建业集团有限公司 A kind of novel sprinkling structure and its construction method
CN111005592A (en) * 2019-12-20 2020-04-14 中冶天工集团有限公司 Novel water dispersion support frame and construction method thereof
CN115305967A (en) * 2022-07-06 2022-11-08 安徽中擎建设发展有限公司 PC prefabricated water dispersion member

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457309A (en) * 2018-04-09 2018-08-28 天津中铁建业集团有限公司 A kind of novel sprinkling structure and its construction method
CN111005592A (en) * 2019-12-20 2020-04-14 中冶天工集团有限公司 Novel water dispersion support frame and construction method thereof
CN115305967A (en) * 2022-07-06 2022-11-08 安徽中擎建设发展有限公司 PC prefabricated water dispersion member
CN115305967B (en) * 2022-07-06 2023-07-28 安徽中擎建设发展有限公司 PC prefabricated water dispersion component

Similar Documents

Publication Publication Date Title
CN202416331U (en) Lattice component used in slope protection
CN103774699B (en) Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN204551532U (en) Assembling cable shaft
CN107853008A (en) Prefabricated assembled plant walls
CN110117965A (en) A kind of pin-connected panel anchor draws retaining wall and method
CN105019597A (en) Lightweight partition board with net rack and fiber-reinforced hollows and splicing method thereof
CN110258640A (en) A kind of construction method of the overlapping wall system of covered back-digging
CN105113435A (en) Culvert mouth of corrugated steel pipe culvert
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN203808113U (en) Concrete engineering expansion joint vertical water-stop structure
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN110067311A (en) The connection structure and method of new-old concrete component junction
CN102587329B (en) Arched combined faceplate for earth-rock dam and construction method thereof
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN104389360A (en) Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof
CN204676607U (en) Poured band of outer wall of basement plugging structure
CN203701716U (en) Transformer substation enclosure pre-cast concrete coping
CN111305590A (en) Assembly type low-energy-consumption transformation structure and rapid transformation method for existing building balcony
CN116876871A (en) Structure connection at door and window openings of single-panel wall reinforced masonry structure and construction method thereof
CN207211896U (en) A kind of transforming plant main transformer oil sump wall precast concrete is hollow to bear down on one
CN104727276B (en) The manufacture method of the double; two water sealing structure of concrete extension joint
CN208782449U (en) A kind of cable duct bank
CN207619951U (en) Structure for improving external pressure resistance stability of pressure steel pipe
CN105804109B (en) A concrete prefabricated foundation
CN222349771U (en) Ribbed folding line plate and basement outer wall post-pouring strip sealing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131113

CU01 Correction of utility model
CU01 Correction of utility model

Correction item: Termination upon expiration of patent

Correct: Revocation of Patent Expiration and Termination

False: On July 7, 2023, the expiration and termination of the 39 volume 2702 patent

Number: 27-02

Volume: 39

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131113