CN203222734U - Bridge guardrail metal stand column base construction leveling device - Google Patents
Bridge guardrail metal stand column base construction leveling device Download PDFInfo
- Publication number
- CN203222734U CN203222734U CN 201320212954 CN201320212954U CN203222734U CN 203222734 U CN203222734 U CN 203222734U CN 201320212954 CN201320212954 CN 201320212954 CN 201320212954 U CN201320212954 U CN 201320212954U CN 203222734 U CN203222734 U CN 203222734U
- Authority
- CN
- China
- Prior art keywords
- frame
- top frame
- bridge guardrail
- leveling device
- less
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型公开了一种桥梁护栏金属立柱底座施工调平装置,其特征在于,它是由一个竖向的侧框和一个水平的顶框固定连接而成的直角架;所述的侧框是一个封闭框,在侧框的两个腿底部分别设有调平螺栓;所述的顶框是一个开口框,也就是说顶框的末端是敞口的,在顶框的两根横杆上设有一根加强纵杆,在顶框末端与加强纵杆之间的顶框横杆两侧下底面上分别设有两个向内侧伸出的支撑爪,四个支撑爪形成一个平行支撑面;在顶框末端搭接有一个向外探出的U形架。本实用新型通过主体支架、U形搭接架及调平螺栓的共同协调作用,使放在底板上的水准气泡调至水平,为桥梁护栏金属立柱的垂直安装提供了基础。
The utility model discloses a construction leveling device for a metal column base of a bridge guardrail, which is characterized in that it is a right-angle frame formed by fixedly connecting a vertical side frame and a horizontal top frame; the side frame is A closed frame, with leveling bolts at the bottom of the two legs of the side frame; the top frame is an open frame, that is to say the end of the top frame is open, on the two cross bars A reinforcing longitudinal bar is provided, and two supporting claws protruding inward are respectively provided on the lower bottom surfaces on both sides of the top frame cross bar between the end of the top frame and the reinforcing longitudinal bar, and the four supporting claws form a parallel supporting surface; A U-shaped frame protruding outward is overlapped at the end of the top frame. The utility model adjusts the level air bubbles placed on the bottom plate to the level through the coordinated action of the main body bracket, the U-shaped lap frame and the leveling bolts, and provides a basis for the vertical installation of the metal columns of the bridge guardrail.
Description
技术领域technical field
本实用新型涉及一种调平装置,尤其是用于桥梁护栏金属立柱底座施工调平的装置。The utility model relates to a leveling device, in particular to a leveling device used for the construction and leveling of the base of a metal column of a bridge guardrail.
背景技术Background technique
近些年,随着大中型桥梁的出现,金属梁柱式护栏在桥梁上应用不断增加。金属梁柱式护栏结构能有效防护失控车辆,有效降低上述事故发生的概率,减少事故造成的损失,提高高速公路的交通安全水平,同时可作为桥梁景观照明的立柱。要求金属梁柱式护栏立柱在混凝土护栏安装后应保证竖直,否则会在风荷载作用下发生倾倒或扭转,在其自身重力与竖向荷载作用下产生偏心压力,进而使截面产生相对较大弯矩,不利于其正常使用。当风荷载较大或偏心较大时可能超过其控制界面承载能力限值而产生破坏。因此,金属梁柱式护栏立柱在桥体上的竖直安装对其正常使用有很大影响,而金属梁柱式护栏立柱底座安装是否水平是保证其竖直安装的决定因素。In recent years, with the emergence of large and medium-sized bridges, the application of metal beam-column guardrails on bridges has continued to increase. The metal beam-column guardrail structure can effectively protect out-of-control vehicles, effectively reduce the probability of the above-mentioned accidents, reduce the losses caused by accidents, improve the traffic safety level of the expressway, and can also be used as a pillar for bridge landscape lighting. It is required that the metal beam-column guardrail column should be vertical after the concrete guardrail is installed, otherwise it will be toppled or twisted under the action of wind load, and eccentric pressure will be generated under the action of its own gravity and vertical load, which will cause a relatively large section. Bending moment is not conducive to its normal use. When the wind load is large or the eccentricity is large, it may exceed the limit of the bearing capacity of the control interface and cause damage. Therefore, the vertical installation of the metal beam-column guardrail column on the bridge body has a great influence on its normal use, and whether the base of the metal beam-column guardrail column is installed horizontally is a decisive factor to ensure its vertical installation.
为了保证桥梁金属梁柱式护栏立柱竖直安装,一般普遍采用水平尺、吊锤前后矫正的方法,该方法虽然切实可行,但操作过程繁琐,耗费了大量人力、物力、时间,施工速度低下,施工成本较高。In order to ensure the vertical installation of the metal beam-column guardrail column of the bridge, the method of front and rear correction with a level ruler and a hanging hammer is generally used. Although this method is feasible, the operation process is cumbersome, consumes a lot of manpower, material resources, and time, and the construction speed is low. The construction cost is higher.
实用新型内容Utility model content
为了解决现有桥梁金属梁柱式护栏立柱安装调平过程比较繁琐的问题,本实用新型提供一种桥梁金属梁柱式护栏立柱底座施工调平装置。In order to solve the problem that the installation and leveling process of the metal beam-column type guardrail column of the existing bridge is cumbersome, the utility model provides a construction leveling device for the base of the bridge metal beam-column type guardrail column base.
为达到上述目的,本实用新型采取的技术方案是:In order to achieve the above object, the technical scheme that the utility model takes is:
一种桥梁护栏金属立柱底座施工调平装置,它是由一个竖向的侧框和一个水平的顶框固定连接而成的直角架;所述的侧框是一个封闭框,在侧框的两个腿底部分别设有调平螺栓;所述的顶框是一个开口框,也就是说顶框的末端是敞口的,在顶框的两根横杆上设有一根加强纵杆,在顶框末端与加强纵杆之间的顶框横杆两侧下底面上分别设有两个向内侧伸出的支撑爪,四个支撑爪形成一个水平支撑面;在顶框末端搭接有一个向外探出的U形架。为了保证直角架的稳固,在直角架两侧设有斜撑。A bridge guardrail metal column base construction leveling device, which is a right-angle frame formed by fixed connection of a vertical side frame and a horizontal top frame; the side frame is a closed frame, and the two sides of the side frame Leveling bolts are respectively provided at the bottom of each leg; the top frame is an open frame, that is to say, the end of the top frame is open, and a reinforcing longitudinal bar is arranged on the two cross bars of the top frame, and Two supporting claws protruding inward are respectively provided on the bottom surface of both sides of the top frame cross bar between the end of the frame and the reinforcing longitudinal bar, and the four supporting claws form a horizontal support surface; The U-shaped frame protruding from the outside. In order to ensure the stability of the right-angle frame, diagonal braces are provided on both sides of the right-angle frame.
使用时,将本实用新型的U形架搭接在桥体混凝土护栏的外侧模板上,将调平螺栓置于地面;然后将一块与桥梁护栏金属立柱底座大小相适应的钢制底板置于本实用新型调平装置的水平支撑面上,底板上预留有与底座螺孔位置相对应的螺孔;调整直角架使底板上表面与外侧模板顶部处于同一高度;在底板上放置上水准气泡,微调调平螺栓,当水准气泡居中时,说明底板处于水平面,此时立即将底板焊接到桥体混凝土护栏的钢筋骨架上,焊接使用长度适宜的现场切割短钢筋。底板焊接完后,将调平装置沿桥梁横向抽出,以进行下一步操作。底板位置水平保证了底座位置水平,底座位置水平又保证了桥梁护栏金属立柱的竖直。When in use, the U-shaped frame of the utility model is lapped on the outer formwork of the concrete guardrail of the bridge body, and the leveling bolts are placed on the ground; On the horizontal support surface of the utility model leveling device, screw holes corresponding to the positions of the base screw holes are reserved on the bottom plate; adjust the right-angle frame so that the upper surface of the bottom plate is at the same height as the top of the outer formwork; place an upper level bubble on the bottom plate, Fine-tune the leveling bolts. When the level bubble is in the center, it means that the base plate is on the horizontal plane. At this time, the base plate is immediately welded to the steel frame of the concrete guardrail of the bridge body, and short steel bars cut on site with appropriate lengths are used for welding. After the bottom plate is welded, the leveling device is pulled out laterally along the bridge for the next operation. The horizontal position of the bottom plate ensures the horizontal position of the base, and the horizontal position of the base ensures the verticality of the metal columns of the bridge guardrail.
本实用新型通过主体支架、U形搭接架及调平螺栓的共同协调作用,使放在底板上的水准气泡调至水平,为桥梁护栏金属立柱的垂直安装提供了基础。本实用新型原材料取材方便,制作工艺简单,整体轻便方便移动。实际操作过程中,操作过程简便易学,并可以重复利用,施工精度较高,可有效提高施工速度与质量,降低施工成本。The utility model adjusts the level air bubbles placed on the bottom plate to the level through the coordinated action of the main body bracket, the U-shaped lap frame and the leveling bolts, and provides a basis for the vertical installation of the metal columns of the bridge guardrail. The utility model has the advantages of convenient raw material acquisition, simple manufacturing process, and the whole is light and convenient to move. In the actual operation process, the operation process is simple and easy to learn, and can be reused. The construction precision is high, which can effectively improve the construction speed and quality, and reduce the construction cost.
附图说明Description of drawings
图1是本实用新型的主视图;Fig. 1 is the front view of the utility model;
图2是本实用新型的右视图;Fig. 2 is the right view of the utility model;
图3是本实用新型的俯视图。Fig. 3 is a top view of the utility model.
图4、图5是本实用新型使用时的状态图。Fig. 4 and Fig. 5 are state diagrams when the utility model is in use.
图中:1-侧框;2-顶框;3-U形架;4-调平螺栓;5-斜撑;6-支撑爪;7-钢制底板;8-水准气泡;9-加强纵杆。In the figure: 1-side frame; 2-top frame; 3-U-shaped frame; 4-leveling bolt; 5-diagonal brace; 6-support claw; 7-steel bottom plate; pole.
具体实施方式Detailed ways
如图1-3所示,本实用新型的调平装置是由竖向的侧框1和水平的顶框2固定连接而成的直角架;侧框1是一个封闭框,在侧框1的两个腿底部分别设有调平螺栓4;顶框2是一个开口框(见图2和图3),也就是说顶框2的末端是敞口的,在顶框2的两根横杆上设有一根加强纵杆8,在顶框2末端与加强纵杆9之间的顶框横杆两侧下底面上分别设有两个向内侧伸出的支撑钢筋作为支撑爪6,四个支撑爪6形成一个水平支撑面;在顶框2末端搭接有一个向外探出的U形架3。为了保证直角架的稳固,在直角架两侧设有斜撑5。As shown in Figure 1-3, the leveling device of the present utility model is a right-angle frame formed by fixedly connecting the
如4和图5示出了本实用新型的使用状态。使用时,将本实用新型的U形架3搭接在桥体混凝土护栏的外侧模板上,将调平螺栓4置于地面;然后将一块与桥梁护栏金属立柱底座大小相适应的钢制底板7置于支撑爪6上,钢制底板7上预留有与底座螺孔位置相对应的螺孔以及电缆孔;调整直角架使钢制底板7上表面与外侧模板顶部处于同一高度;最后在钢制底板7上放置上水准气泡8,通过微调调平螺栓使水准气泡居中,从而保证底板处于水平面。Shown as 4 and Fig. 5 use state of the present utility model. When in use, the U-shaped
本实用新型各部件的参数最佳要求:The parameter optimum requirement of each part of the utility model:
1、调平螺栓直径应大于8mm,长度不小于300mm,以保证有足够的强度保持整体结构稳定,以及足够的调节空间。1. The diameter of the leveling bolt should be greater than 8mm, and the length should not be less than 300mm, so as to ensure sufficient strength to maintain the stability of the overall structure and sufficient adjustment space.
2、顶框和侧框的杆件直径不宜小于16mm,斜撑杆直径不应小于12mm。顶框长度不宜小于550mm,侧框高度宜为600~1000mm(视施工高度而定),直角架宽度不宜小于300mm;2. The diameter of the rods of the top frame and side frame should not be less than 16mm, and the diameter of the diagonal brace should not be less than 12mm. The length of the top frame should not be less than 550mm, the height of the side frame should be 600-1000mm (depending on the construction height), and the width of the right-angle frame should not be less than 300mm;
3、U形架与顶框横杆的搭接长度不宜小于150mm,U形架伸出顶框横杆长度应为100~200mm。3. The overlapping length of the U-shaped frame and the cross bar of the top frame should not be less than 150mm, and the length of the U-shaped frame protruding from the cross bar of the top frame should be 100-200mm.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320212954 CN203222734U (en) | 2013-04-24 | 2013-04-24 | Bridge guardrail metal stand column base construction leveling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320212954 CN203222734U (en) | 2013-04-24 | 2013-04-24 | Bridge guardrail metal stand column base construction leveling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203222734U true CN203222734U (en) | 2013-10-02 |
Family
ID=49249744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320212954 Expired - Fee Related CN203222734U (en) | 2013-04-24 | 2013-04-24 | Bridge guardrail metal stand column base construction leveling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203222734U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107178034A (en) * | 2017-06-29 | 2017-09-19 | 福建省高速公路有限责任公司 | Collison fence for bridge reinforcing bar three-dimensional localization frame |
CN107620270A (en) * | 2017-08-26 | 2018-01-23 | 河南省公路工程局集团有限公司 | Portable positioning die carrier and its application method for guardrail reinforcing bar colligation |
-
2013
- 2013-04-24 CN CN 201320212954 patent/CN203222734U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107178034A (en) * | 2017-06-29 | 2017-09-19 | 福建省高速公路有限责任公司 | Collison fence for bridge reinforcing bar three-dimensional localization frame |
CN107620270A (en) * | 2017-08-26 | 2018-01-23 | 河南省公路工程局集团有限公司 | Portable positioning die carrier and its application method for guardrail reinforcing bar colligation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243651B (en) | Method for fixedly installing and leveling base of metal upright column of bridge guardrail | |
CN203961992U (en) | Portable full framing chassis | |
CN203430059U (en) | Temporary fixing device used for installing large-span steel structure roof primary truss | |
CN204174935U (en) | A kind of outer wall of basement one side formwork supporting and protection structure | |
CN104453224A (en) | Formwork support structure of basement exterior wall and construction method of formwork support structure | |
CN203222738U (en) | Steel pipe latticed column temporary buttress supporting device | |
CN106013783A (en) | Formwork support and erecting method thereof | |
CN201817814U (en) | Adjustable fixed support of vertical surface sheet steel form | |
CN203222734U (en) | Bridge guardrail metal stand column base construction leveling device | |
CN204081485U (en) | Beam bottom mother plate bracing frame | |
CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN209816665U (en) | Bent cap bracket suitable for round end shape pier stud | |
CN202899639U (en) | Concrete column structure | |
CN102733599A (en) | Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam | |
CN211498507U (en) | Whole reassembling type protection rack | |
CN211846865U (en) | Device for hoisting corrugated pipe | |
CN204940863U (en) | External wall construction outside large form bracket | |
CN204299147U (en) | The chimney top operating platform that a kind of construction cost is low | |
CN204000620U (en) | Bridge girder erection machine carrying device | |
CN203361170U (en) | Supporting upright column pile for building foundation pit support | |
CN203022409U (en) | Iron tower support assembly | |
CN201614739U (en) | Template bracket for roofing oblique beam | |
CN204919567U (en) | Shoring of trench stand shock attenuation construction equipment | |
CN204299146U (en) | A kind of chimney top operating platform | |
CN204504600U (en) | For assistance platform and the bracing or strutting arrangement thereof of the welding of jack up drilling platform spud leg |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131002 Termination date: 20180424 |
|
CF01 | Termination of patent right due to non-payment of annual fee |