[go: up one dir, main page]

CN203161226U - Blasting-type ore extraction device - Google Patents

Blasting-type ore extraction device Download PDF

Info

Publication number
CN203161226U
CN203161226U CN 201320019016 CN201320019016U CN203161226U CN 203161226 U CN203161226 U CN 203161226U CN 201320019016 CN201320019016 CN 201320019016 CN 201320019016 U CN201320019016 U CN 201320019016U CN 203161226 U CN203161226 U CN 203161226U
Authority
CN
China
Prior art keywords
console
blasting
mainframe
ore extraction
type ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320019016
Other languages
Chinese (zh)
Inventor
林波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320019016 priority Critical patent/CN203161226U/en
Application granted granted Critical
Publication of CN203161226U publication Critical patent/CN203161226U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a blasting-type ore extraction device which comprises a main rack (1) and a load bearing frame (2), wherein the main rack (1) is horizontally arranged; the load bearing frame (2) extends laterally along one end of the main rack (1); a cross beam (3) is connected below the other end of the main rack (1); the lower end of the load bearing frame (2) is provided with a console (4); the load bearing frame (2) and the console (4) are connected through a drive frame (5); the console (4) is provided with a drive motor (13); a speed changing box (6) is arranged below the console (4); the top end of the speed changing box (6) is provided with a walking cutter (12); a walking cutter motor (14) is arranged at one side of the walking cutter (12); and a blasting pipe (20) is also arranged below the console (4). The blasting-type ore extraction device provided by the utility model blasts randomly in mining according to the actual situation through the arrangement of the blasting pipe for blasting, accelerates the mining speed by utilizing blasting and mining, and improves the working efficiency.

Description

Blasting type ore extraction equipment
Technical field
The utility model relates to a kind of mining equipment of mine stones, relates in particular to a kind of blasting type ore extraction equipment, belongs to mine ore machinery apparatus field.
Background technology
Mining comprises stone mining, rock salt exploitation etc., and the purpose of ore extraction is in order to obtain stocks such as building, the art work, metal smelting, and rock salt exploitation and sea salt, lake salt etc. all are in order to obtain salt.China's exploitated ore has had the vertical of a plurality of centuries, and according to the buried depth of ore, the mode of exploitation is also different.Early stage mining generally adopts to be burnt or the explosive blasting method, the method of burning is that raw material configuration rock fire cutter cuts out groove with various dyestuffs, stamp borehole then, the gunpowder explosion is installed, obtain stone material in blocks, resolve into fritter more as required, process, and it is well-known, adopt the method exploitation of explosive blasting to have various drawbacks, as poor safety performance, explode that the ore that is irregular, to obtain rate low, second-rate, often need processing such as the bigger manpower and materials of expense sort, screening, the post-processed cost is higher.And after the mining machinery exploitation, prior art all is directly to transport by truck, and do not use other modes to carry out continuous operation, in the process of transhipment, also can be subjected to the influence of working environment, as the restriction of factors such as illumination, condition of road surface, topography and geomorphology, climatic condition.
Various mine quarrying machines have appearred at present on the market, general structure comprises control device, power set, cutter sweep, control device is used for the whole work of control, power set are for the power that provides work to use, cutter sweep is divided into fritter with rock from bulk, is beneficial to various processing.But all there is identical problem in these mine quarrying machines at present, comprising:
1. machine is too heavy, all needs device such as crane to assist in transportation and use and finishes, and when being moved in the position, also needs crane to carry out the transfer of position, and it is very inflexible to take action, dumb.
2. present mine quarrying machine function is comparatively single, can't adapt to when running into dark mining site as the quarrying machhine that can only be used for face of land ore extraction.
3. except exploitation, do not have other function, and all be the machinery control that belongs to traditional, artificial participation is bigger, and operating efficiency is lower.
The utility model content
In order to overcome the deficiencies in the prior art, resolve prior art problems, remedy the existing deficiency of existing product in the market.
The utility model provides a kind of blasting type ore extraction equipment, comprise the mainframe of horizontally set and distolateral to the heavy frame that extends along mainframe one, the other end below of described mainframe is connected with a crossbeam, be provided with controller and brake in the lower end of crossbeam, be provided with under the mainframe main pulley and be connected with main pulley from belt wheel, the lower end of described heavy frame is provided with a console, be connected by gear frame between heavy frame and the console, console is provided with driving motor, console is arranged with gearbox, top at gearbox is provided with feed, and feed one side is provided with a cutting feed, also is provided with a blasting cartridge under console.
Preferably, fixedly connected by a plurality of support bars between above-mentioned mainframe and the crossbeam.
Preferably, be connected by gear frame between above-mentioned heavy frame and the console.
Preferably, above-mentioned controller and brake side are provided with an elevating screw pin.
Preferably, be provided with the lifting swingle between above-mentioned mainframe and the main pulley.
Preferably, be provided with the fixed mount of three-legged structure between the below of above-mentioned mainframe and support bar and the main pulley.
Preferably, be respectively arranged with vertical roller and horizontal roller under above-mentioned controller and brake and the cutting feed.
The blasting type ore extraction equipment that the utility model provides is compared with traditional mine quarrying machine, the blasting type ore extraction equipment that the utility model provides is used for carrying out the blasting cartridge of explosion by setting, carry out explosion at random according to actual conditions when having realized exploitation, utilize explosion and exploitation double action, accelerate the speed of exploitation, improved operating efficiency.
Description of drawings
Fig. 1 is the utility model structural representation.
Mark among the figure: 1-mainframe; The 2-heavy frame; The 3-crossbeam; The 4-console; The 5-gear frame; The 6-gearbox; The 7-main pulley; 8-is from belt wheel; The 9-support bar; The 10-controller; The 11-brake; The 12-feed; The 13-driving motor; The 14-cutting feed; The vertical roller of 15-; The horizontal roller of 16-; 17-elevating screw pin; 18-lifting swingle; The 19-fixed mount; The 20-blasting cartridge.
The specific embodiment
Understand and enforcement the utility model for the ease of those of ordinary skills, below in conjunction with the drawings and the specific embodiments the utility model is described in further detail.
Be illustrated in figure 1 as blasting type ore extraction device structure schematic diagram of the present utility model, comprise the mainframe 1 of horizontally set and distolateral to the heavy frames 2 that extend along mainframe 1 one on the main body, as can be seen, integral device is divided into left, center, right three parts from the figure.
The left side is control section, and the other end below of mainframe 1 is connected with a crossbeam 3, is provided with controller 10 and brake 11 in the lower end of crossbeam 3, and controller 10 and brake 11 sides are provided with an elevating screw pin 17.
The centre is running part, be provided with under the mainframe 1 main pulley 7 and be connected with main pulley 7 from belt wheel 8, fixedly connected by a plurality of support bar 9 between mainframe 1 and the crossbeam 3.Be provided with lifting swingle 18 between mainframe 1 and the main pulley 7.
The right side is the exploitation part, the lower end of described heavy frame 2 is provided with a console 4, is connected by gear frame 5 between heavy frame 2 and the console 4, and console 4 is provided with driving motor 13, console 4 is arranged with gearbox 6, is connected by gear frame 5 between heavy frame 2 and the console 4.
Be provided with the fixed mount 19 of three-legged structure between the below of mainframe 1 and support bar 9 and the main pulley 7, fixed mount 19 is the structure between the three fixedly, can not shake.In addition, for the ease of the movement of four direction all around, controller 10 and brake 11 and cutting feed are respectively arranged with vertical roller 15 and horizontal roller 16 for 14 times.
Innovative point of the present utility model and inventive point are: be provided with feed 12 on the top of gearbox 6, feed 12 1 sides are provided with a cutting feed 14, also are provided with a blasting cartridge 20 for 4 times at console.
The blasting type ore extraction equipment that the utility model provides is compared with traditional mine quarrying machine, the blasting type ore extraction equipment that the utility model provides is used for carrying out the blasting cartridge of explosion by setting, carry out explosion at random according to actual conditions when having realized exploitation, utilize explosion and exploitation double action, accelerate the speed of exploitation, improved operating efficiency.
The specific embodiment of the above is preferred embodiments of the present utility model; be not to limit concrete practical range of the present utility model with this; scope of the present utility model comprises and is not limited to this specific embodiment that the equivalence that all shapes according to the utility model, structure are done changes all in protection domain of the present utility model.

Claims (6)

1. blasting type ore extraction equipment, comprise the mainframe (1) of horizontally set and distolateral to the heavy frame (2) that extends along mainframe (1), the other end below of described mainframe (1) is connected with a crossbeam (3), be provided with controller (10) and brake (11) in the lower end of crossbeam (3), be provided with under the mainframe (1) main pulley (7) and be connected with main pulley (7) from belt wheel (8), the lower end of described heavy frame (2) is provided with a console (4), be connected by gear frame (5) between heavy frame (2) and the console (4), console (4) is provided with driving motor (13), console (4) is arranged with gearbox (6), it is characterized in that: be provided with feed (12) on the top of gearbox (6), feed (12) one sides are provided with a cutting feed (14), also are provided with a blasting cartridge (20) under console (4).
2. blasting type ore extraction equipment according to claim 1 is characterized in that: fixedly connected by a plurality of support bars (9) between described mainframe (1) and the crossbeam (3).
3. blasting type ore extraction equipment according to claim 1, it is characterized in that: described controller (10) and brake (11) side are provided with an elevating screw pin (17).
4. blasting type ore extraction equipment according to claim 1 is characterized in that: be provided with lifting swingle (18) between described mainframe (1) and the main pulley (7).
5. blasting type ore extraction equipment according to claim 1 is characterized in that: the fixed mount (19) that is provided with three-legged structure between the below of described mainframe (1) and support bar (9) and the main pulley (7).
6. according to the described blasting type ore extraction of one of claim 1-5 equipment, it is characterized in that: be respectively arranged with vertical roller (15) and horizontal roller (16) under described controller (10) and brake (11) and the cutting feed (14).
CN 201320019016 2013-01-09 2013-01-09 Blasting-type ore extraction device Expired - Fee Related CN203161226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320019016 CN203161226U (en) 2013-01-09 2013-01-09 Blasting-type ore extraction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320019016 CN203161226U (en) 2013-01-09 2013-01-09 Blasting-type ore extraction device

Publications (1)

Publication Number Publication Date
CN203161226U true CN203161226U (en) 2013-08-28

Family

ID=49022418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320019016 Expired - Fee Related CN203161226U (en) 2013-01-09 2013-01-09 Blasting-type ore extraction device

Country Status (1)

Country Link
CN (1) CN203161226U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111043922A (en) * 2020-01-14 2020-04-21 诸暨高宗自动化科技有限公司 Large stone crushing device capable of blasting at accurate fixed point

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111043922A (en) * 2020-01-14 2020-04-21 诸暨高宗自动化科技有限公司 Large stone crushing device capable of blasting at accurate fixed point

Similar Documents

Publication Publication Date Title
CN202117674U (en) Continuous miner of open coal mine with roller laterally arranged
CN104453906A (en) Opencast machine
CN203189026U (en) Solar ore extraction apparatus
CN203161226U (en) Blasting-type ore extraction device
CN102294755A (en) Method for directly cutting stone slab in pit and direct cutting machine
CN201650332U (en) Hydraulic supporting device for fully-mechanized coal winning working face
CN203161230U (en) Centrifugal-type ore extraction equipment
CN203161237U (en) Cutting type core extraction equipment
CN203189027U (en) Digital intelligent ore extraction apparatus
CN203161233U (en) Hydraulic control ore extraction equipment
CN203161221U (en) Electromagnetic ore extraction apparatus
CN203189028U (en) Real-time monitoring type ore extraction equipment
CN203189024U (en) Fluorescent lighting-type ore extraction equipment
CN203161227U (en) Self-illumination-type ore mining equipment
CN203161223U (en) Anti-blocking ore extraction apparatus
CN203008920U (en) Strike type ore extraction device
CN203161228U (en) Energy-saving ore extraction apparatus
CN203161225U (en) Filtration-assisted ore extraction apparatus
CN203189016U (en) Low-noise ore mining equipment
CN203161231U (en) Navigation-type ore extraction apparatus
CN203161235U (en) Air pressure brake type ore extraction equipment
CN103161461A (en) Reciprocating mine cutting machine
CN203161224U (en) Constant-temperature ore extraction apparatus
CN203161236U (en) Micro-electronics controlled ore extraction equipment
CN203161232U (en) Ore extraction equipment with coating

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20140109