CN202936799U
CN202936799U CN 201220616860 CN201220616860U CN202936799U CN 202936799 U CN202936799 U CN 202936799U CN 201220616860 CN201220616860 CN 201220616860 CN 201220616860 U CN201220616860 U CN 201220616860U CN 202936799 U CN202936799 U CN 202936799U
Authority
CN
China
Prior art keywords
well
foundation pit
water
recharge
stop curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220616860
Other languages
Chinese (zh)
Inventor
瞿成松
徐丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN 201220616860 priority Critical patent/CN202936799U/en
Application granted granted Critical
Publication of CN202936799U publication Critical patent/CN202936799U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a foundation pit dewatering bracing structure based on an environment control purpose. The foundation pit dewatering bracing structure can alleviate land subsidence of peripheral land of a foundation pit caused by foundation pit excavation and foundation pit dewatering in a state with an ultra-thick confined aquifer, slow down the subsidence, reduce the subsidence size and inhibit peripheral land subsidence caused by foundation pit dewatering, is capable of greatly reducing the depth of an underground diaphragm wall functioning as a waterproof curtain, is energy-saving and environment-friendly, reduces underground obstructions and realizes sustainable development. The bracing structure comprises a waterproof curtain, a pressure reducing well and a recharge well, wherein the waterproof curtain is partially inserted into a confined aquifer to function as a foundation pit bracing, the pressure reducing well is arranged inside the waterproof curtain, the recharge well is arranged outside the waterproof curtain, confined water inside the pressure reducing well is communicated with confined water inside the recharge well, the pressure reducing well is arranged inside the foundation pit, the lower part of the pressure reducing well and the lower part of the recharge well are respectively provided with a filter, and the bottoms of the filters are higher than the bottom of the waterproof curtain.

Description

Foundation pit dewatering space enclosing structure based on ring control target
Technical field
The utility model relates to the base pit engineering technical field, specifically, relates to a kind of foundation pit dewatering space enclosing structure based on ring control target.
Background technology
Base pit engineering is for excavating the earthwork at engineering underground structure place, guarantees foundation ditch and safety of surrounding environment and the general name of the engineering measures such as going along with sb. to guard him of taking, support, precipitation, reinforcing, shoveling and backfill.Groundwater control is for Foundation Pit Construction and reduces draining, precipitation, the sealing that impact is taked on surrounding enviroment or the measure such as recharge.Foundation pit dewatering is at the inside and outside well casing of burying underground of foundation ditch, utilizes plant equipment to draw water, the engineering means that groundwater level is reduced.Foundation depth was more shallow in the past, excavation of foundation pit adopts the slope mode of putting, increase along with the excavation of foundation pit degree of depth, water-stop curtain and groundwater recharge structure can not be ignored the effect of foundation ditch peripheral distortion reducing excavation of foundation pit and foundation pit dewatering, and especially in foundation ditch being had to the huge thick aquifer of artesian water of destruction, water-stop curtain and groundwater recharge structure applications effect are remarkable.
Control the foundation pit dewatering design of target based on environment and at first select dewatering mode in hole; the dewatering well strainer should be embedded in the water-stop curtain bottom with within shallow 5.00m; recharging the engineering suitability is: the huge thick artesian aquifer that affects the foundation ditch safety and stability is not cut off by water-stop curtain; one-level foundation ditch first class of protection, meet regional land subsidence and control requirement.Arranging of water-stop curtain and recharge well is mainly to lengthen the seepage flow approach of underground water to foundation ditch harm, the strengthening fender body is controlled the measure of decline of groundwater level amplitude outward, Main Function is to reduce the surface settlement that fender body outside environment causes due to excavation of foundation pit and precipitation, slow down the time that sedimentation occurs, reduce the size that sedimentation occurs, suppress the surrounding ground sedimentation that foundation pit dewatering causes.Water-stop curtain is relevant with the seepage flow characteristics of underground water on the impact of sedimentation with groundwater recharge, according to the underground water seepage flow characteristics, consider cost performance and execution conditions, when space enclosing structure can not be blocked artesian aquifer, water-stop curtain and recharge the following pattern of pattern optimum selection: under foundation ditch, artesian aquifer is partially enclosed by water-stop curtain, precipitation well in foundation pit strainer buried depth is no more than the water-stop curtain degree of depth, the outer artesian water recharge well strainer buried depth of foundation ditch is no more than the water-stop curtain degree of depth, the underground water that in foundation ditch, pumped well is extracted out not ingress of air accesses recharge well as recharging water source under reducing condition, precipitation is synchronizeed with recharging.Recharge well regularly returns and raises maintenance.
The utility model content
The purpose of this utility model is to provide a kind of surface settlement foundation ditch peripheral ground caused because of excavation of foundation pit and foundation pit dewatering that can reduce under huge thick artesian aquifer state, slow down time and size that sedimentation occurs, and suppress the foundation pit dewatering space enclosing structure of the surrounding ground sedimentation that foundation pit dewatering causes, use this structure can greatly save the degree of depth of water-stop curtain diaphragm wall, energy-conserving and environment-protective, reduce underground obstacle and realize sustainable development.
The purpose of this utility model is achieved in that
A kind of foundation pit dewatering space enclosing structure based on ring control target, comprise water-stop curtain, pressure reduction well and recharge well, described water-stop curtain partly inserts in artesian aquifer as bracing of foundation pit, inside at described water-stop curtain is provided with pressure reduction well, outside is provided with recharge well, and the artesian water in described pressure reduction well and recharge well is communicated with, and described pressure reduction well is located at foundation ditch inside, the bottom of described pressure reduction well and recharge well is respectively equipped with strainer, and the bottom of described strainer is shallower than the bottom of described water-stop curtain.
Further, the spacing between described water-stop curtain and recharge well is not less than 6 meters; The bottom of described strainer is not less than 5 meters than the difference in height between the bottom of water-stop curtain.
Wherein, described water-stop curtain is diaphragm wall or three axle agitation piles.
The utility model is owing to having adopted technique scheme, compare with conventional art and have following beneficial effect: the utility model space enclosing structure is placed in artesian aquifer, by by water-stop curtain partial insertion artesian aquifer, foundation ditch is partially enclosed by water-stop curtain, precipitation well in foundation pit strainer buried depth is no more than the water-stop curtain degree of depth, the outer artesian water recharge well strainer buried depth of foundation ditch is no more than the water-stop curtain degree of depth, the underground water that in foundation ditch, pumped well is extracted out not ingress of air accesses recharge well as recharging water source under reducing condition, precipitation is synchronizeed with recharging, recharge well regularly returns and raises maintenance.Formed artificial effective water proof border in aquifer, significant to underground engineering structures and the harmonious symbiosis of underground water geological environment, promote the sustainable development of underground space development.
The accompanying drawing explanation
By following embodiments of the invention description taken together with the accompanying drawings, other advantage of the present invention and feature are shown, this embodiment provides with the form of example, but is not limited to this, wherein:
The structural representation that Fig. 1 is a kind of foundation pit dewatering space enclosing structure based on ring control target of the utility model.
The specific embodiment
The foundation pit dewatering space enclosing structure based on ring control target as shown in Figure 1, comprise water-stop curtain 3, pressure reduction well 1 and recharge well 2, and water curtain 3 is diaphragm wall or three axle agitation piles.Water-stop curtain 3 partly inserts in artesian aquifer 4 as bracing of foundation pit, be provided with pressure reduction well 1 in the inside of water-stop curtain 3, outside is provided with recharge well 2, artesian water in pressure reduction well 1 and recharge well 2 is communicated with, pressure reduction well 1 is located at foundation ditch inside, the bottom of pressure reduction well 1 and recharge well 2 is respectively equipped with strainer, and the bottom of the strainer of pressure reduction well 1 and recharge well 2 all is shallower than the bottom of water-stop curtain 3.
Wherein, the spacing between water-stop curtain 3 and recharge well 2 is not less than 6 meters; The bottom of the strainer of pressure reduction well 1 is not less than 5 meters than the difference in height between the bottom of water-stop curtain 3.
During work, pressure reduction well 1 requires " step-down as required; dynamically step-down ", have to dash forward to gush through 5 pairs of foundation ditch bottom surfaces 7 of aquitard to artesian water and do the used time during the corresponding excavation of foundation pit degree of depth when pressure water head 6 is high, start to open pressure reduction well 1, the underground water that in foundation ditch, pumped well 1 is extracted out not ingress of air accesses recharge well 2 as recharging water source in water pipe under reducing condition, the underground water that the unnecessary pressure reduction well 1 of part is extracted out enters municipal pipeline after three grades of precipitations.Recharge well 2 recharges with pressure reduction well 1 and draws water and synchronize, precipitation, recharge that synchronous adjustment is drawn water, recharge well number and pump-out, the amount of recharging draw water as required and recharge as required, recharge well 2 regularly returns and raises maintenance.Until dell 8 excavations, maintaining underground water under different excavation bottom surface 7 situations is having the seepage flow dynamic equilibrium under water-stop curtain 3 effects.Similarly, after dell 8 base plates water, lift on underground pressure water head 6 in pressure reduction well 1 and recharge well 2, maintain the seepage action of ground water dynamic equilibrium under water-stop curtain 3 effects, guarantee that pressure water head 6 has prominent gushing lower than artesian water through 5 pairs of foundation ditch bottom surfaces 7 of aquitard and makes used time pressure water head 6.Until pressure reduction well 1 and recharge well 2 work finish simultaneously.

Claims (4)

1. the foundation pit dewatering space enclosing structure based on ring control target, comprise water-stop curtain, pressure reduction well and recharge well, it is characterized in that: described water-stop curtain partly inserts in artesian aquifer as bracing of foundation pit, inside at described water-stop curtain is provided with pressure reduction well, outside is provided with recharge well, artesian water in described pressure reduction well and recharge well is communicated with, described pressure reduction well is located at foundation ditch inside, the bottom of described pressure reduction well and recharge well is respectively equipped with strainer, and the bottom of described strainer is shallower than the bottom of described water-stop curtain.
2. space enclosing structure as claimed in claim 1, it is characterized in that: the spacing between described water-stop curtain and recharge well is not less than 6 meters.
3. space enclosing structure as claimed in claim 1, it is characterized in that: the bottom of described strainer is not less than 5 meters than the difference in height between the bottom of water-stop curtain.
4. space enclosing structure as claimed in claim 1, it is characterized in that: described water-stop curtain is diaphragm wall or three axle agitation piles.
CN 201220616860 2012-11-20 2012-11-20 Foundation pit dewatering bracing structure based on environment control purpose Expired - Lifetime CN202936799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220616860 CN202936799U (en) 2012-11-20 2012-11-20 Foundation pit dewatering bracing structure based on environment control purpose

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220616860 CN202936799U (en) 2012-11-20 2012-11-20 Foundation pit dewatering bracing structure based on environment control purpose

Publications (1)

Publication Number Publication Date
CN202936799U true CN202936799U (en) 2013-05-15

Family

ID=48321045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220616860 Expired - Lifetime CN202936799U (en) 2012-11-20 2012-11-20 Foundation pit dewatering bracing structure based on environment control purpose

Country Status (1)

Country Link
CN (1) CN202936799U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510501A (en) * 2013-10-23 2014-01-15 天津大学 Method for preventing blocking and water gushing in recharge well
CN103741671A (en) * 2014-01-22 2014-04-23 上海长凯岩土工程有限公司 Groundwater recharge system structure for foundation pit dewatering
CN104831751A (en) * 2015-04-15 2015-08-12 中国建筑第八工程局有限公司 Base plate layered pouring method for reducing gushing risk confined water under high confined water head
CN104831742A (en) * 2015-04-15 2015-08-12 中国建筑第八工程局有限公司 Foundation pit dewatering method with two adjacent micro confined aquifers not separated by water-proof layer
CN105155564A (en) * 2015-08-07 2015-12-16 中建三局第二建设工程有限责任公司 Anti-inrushing construction method for weak water-resisting layer of deep foundation pit
CN105525633A (en) * 2015-11-25 2016-04-27 同济大学 Pumping-irrigating self-circulation control system for floating resistance of basement
CN106193076A (en) * 2016-08-10 2016-12-07 上海广联环境岩土工程股份有限公司 Deep basal pit is combined the Groundwater Control method of water-bearing structure
CN107245994A (en) * 2017-06-27 2017-10-13 中铁第四勘察设计院集团有限公司 It is a kind of based on pre-judging method of the deep foundation pit precipitation to high ferro roadbed safety effects
CN108661064A (en) * 2018-05-28 2018-10-16 郑林 A kind of local curtain water stop method in foundation pit
CN115305901A (en) * 2022-08-16 2022-11-08 中交第四公路工程局有限公司 Directional recharge and emergency pumping well

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510501A (en) * 2013-10-23 2014-01-15 天津大学 Method for preventing blocking and water gushing in recharge well
CN103510501B (en) * 2013-10-23 2015-04-29 天津大学 Method for preventing blocking and water gushing in recharge well
CN103741671A (en) * 2014-01-22 2014-04-23 上海长凯岩土工程有限公司 Groundwater recharge system structure for foundation pit dewatering
CN104831751A (en) * 2015-04-15 2015-08-12 中国建筑第八工程局有限公司 Base plate layered pouring method for reducing gushing risk confined water under high confined water head
CN104831742A (en) * 2015-04-15 2015-08-12 中国建筑第八工程局有限公司 Foundation pit dewatering method with two adjacent micro confined aquifers not separated by water-proof layer
CN105155564A (en) * 2015-08-07 2015-12-16 中建三局第二建设工程有限责任公司 Anti-inrushing construction method for weak water-resisting layer of deep foundation pit
CN105525633A (en) * 2015-11-25 2016-04-27 同济大学 Pumping-irrigating self-circulation control system for floating resistance of basement
CN106193076A (en) * 2016-08-10 2016-12-07 上海广联环境岩土工程股份有限公司 Deep basal pit is combined the Groundwater Control method of water-bearing structure
CN107245994A (en) * 2017-06-27 2017-10-13 中铁第四勘察设计院集团有限公司 It is a kind of based on pre-judging method of the deep foundation pit precipitation to high ferro roadbed safety effects
CN107245994B (en) * 2017-06-27 2019-07-09 中铁第四勘察设计院集团有限公司 It is a kind of based on deep foundation pit precipitation to the pre-judging method of high-speed rail roadbed safety effects
CN108661064A (en) * 2018-05-28 2018-10-16 郑林 A kind of local curtain water stop method in foundation pit
CN115305901A (en) * 2022-08-16 2022-11-08 中交第四公路工程局有限公司 Directional recharge and emergency pumping well
CN115305901B (en) * 2022-08-16 2024-05-28 中交第四公路工程局有限公司 Directional recharging and emergency pumping well

Similar Documents

Publication Publication Date Title
CN202936799U (en) Foundation pit dewatering bracing structure based on environment control purpose
CN103741671A (en) Groundwater recharge system structure for foundation pit dewatering
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN205063005U (en) Can carry out novel rainwater well that compensates to groundwater
CN107119691A (en) One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method
CN103225306B (en) Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN104404974A (en) High-pressure-bearing water and thick sand and pebble formation deep foundation pit grouting bottom-sealing structure and construction technology thereof
CN102926392A (en) Foundation pit dewatering system and construction method thereof
CN203238649U (en) Combined type waterproof curtain
CN202202335U (en) Flow guiding and water draining structure in deep foundation pit
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN102787606B (en) Guard method to surrounding environment in a kind of excavation of foundation pit Precipitation Process
CN104074234B (en) The interior river intake structure of electric power plant circulating water system and construction method thereof
CN205035821U (en) Combined type gravity retaining wall
CN203684243U (en) Twin-well combined recharge type settlement control system
CN204098050U (en) A kind of control artesian water precipitation system
CN204418195U (en) There is sealing and the open caisson subtracting heavy function
CN204510351U (en) A kind of recharge well structure
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN202881962U (en) Foundation pit dewatering structure
CN103790150B (en) Settlement control method based on twin-well combined type recharge
CN103866779B (en) A kind of construction method of sealing space enclosing structure of soft foundation building foundation pit
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN102787611A (en) Precipitation method for excavation of foundation pit at collapsible loess region

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130515