CN202936102U CN 201220612009 CN201220612009U CN202936102U CN 202936102 U CN202936102 U CN 202936102U CN 201220612009 CN201220612009 CN 201220612009 CN 201220612009 U CN201220612009 U CN 201220612009U CN 202936102 U CN202936102 U CN 202936102U
Authority
CN
China
Prior art keywords
guide rail
beam column
fixed
bridge crane
adapter plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220612009
Other languages
Chinese (zh)
Inventor
李建明
马林锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CHANGJIANG STEEL HEAVY INDUSTRY Co Ltd
Original Assignee
JIANGSU CHANGJIANG STEEL HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CHANGJIANG STEEL HEAVY INDUSTRY Co Ltd filed Critical JIANGSU CHANGJIANG STEEL HEAVY INDUSTRY Co Ltd
Priority to CN 201220612009 priority Critical patent/CN202936102U/en
Application granted granted Critical
Publication of CN202936102U publication Critical patent/CN202936102U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The utility model discloses a bridge crane guide rail in the field of cranes. The bridge crane guide rail comprises a corbel fixed on an I-shaped steel beam column, wherein a guide rail is arranged on the corbel, an L-shaped fixing plate is arranged on one side wall of the I-shaped steel beam column above the corbel in a fixed manner, one end of the L-shaped fixing plate is fixed on one side wall of the steel beam column, the other end thereof is connected with the guide rail through a connection plate, one end of the connection plate is connected with the fixing plate in a fixed manner through a bolt, and the other end thereof. As the guide rail is connected with the steel beam column directly through the bolt after the guide rail is placed on the corbel, the reliability and the stability of installation of the guide rail are enhanced. Therefore, the onsite potential safety hazards are eliminated, and the onsite safety is improved. The bridge crane guide rail can be used in a steel-structure plant.

Description

A kind of crane in bridge type guide rail
Technical field
The utility model relates to a kind of hoisting crane, particularly a kind of crane in bridge type.
Background technology
Steel-structure factory building is compared with reinforced concrete structure, the general strong point of steel structure is high-strength light, it is loaded down with trivial details to construct, installation rate is fast, the workshop level is high, the node ease of connection is reliable, ductility large, the fight better function, high-strength light can increase the weight of the main building deadweight, the steel-structure factory building deadweight is about 25% of concrete structure, the suspension column internal force of steel structure is approximately under the contrary condition of 85%(of concrete structure), therefore can dwindle ground and solve and basic expense, this engineering poor to foundation condition has obvious economic effects.
Along with popularizing of steel-structure factory building, crane in bridge type also more and more uses in steel-structure factory building, for lifting the mechanical devices that some weight are larger, when crane in bridge type of the prior art is installed, it is general by the crossbeam of crane in bridge type is supposed on the guide rail at factory building two ends, guide rail generally is arranged on the bracket of beam column of steel structure, in the actual build process of factory building, first on the bracket of each beam column, place guide rail, after treating in whole factory building that the guide rail on all brackets is all placed, the welder is weldingly fixed on it on each bracket by lift car more one by one, its weak point is, guide rail directly is placed on bracket and is not fixed, running into some natural causes such as strong wind easily drops, just there is certain potential safety hazard in this, even threaten the life security of field worker, if guide rail of the every placement of welder just welds one, this has just increased operator's work capacity greatly, wasted resource.
The utility model content
The purpose of this utility model is to provide a kind of crane in bridge type guide rail, makes hoisting crane install while setting up more safe and reliable, eliminates the potential safety hazard of engineering site, has improved on-the-spot safety.
The purpose of this utility model is achieved in that a kind of crane in bridge type guide rail, comprise the bracket be fixed on the I-beam section beam column, be provided with guide rail on described bracket, be fixedly installed the L-type adapter plate on the beam column sidewall of described bracket top, the one side of described adapter plate is fixed on the beam column sidewall, the other end of described adapter plate is connected with guide rail through connecting panel, and one section of described connecting panel is fixed together through bolt and adapter plate, and the other end of described connecting panel is fixed together through bolt.
Crane in bridge type, in installation process, directly couples together guide rail and beam column by bolt after being placed on bracket by guide rail, makes guide rail more stable on bracket.Compared with prior art, the beneficial effects of the utility model are, the utility model directly couples together by bolt and beam column after guide rail is placed on to bracket, has strengthened reliability and the stability of guide rails assembling, thereby eliminated on-the-spot potential safety hazard, improved on-the-spot safety.The utility model can be used in steel-structure factory building.
As further improvement of the utility model, described connecting panel is arranged on the upper surface of adapter plate and guide rail.Make connecting panel convenient with being fixedly connected with of adapter plate, guide rail.
The accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is A place enlarged drawing in Fig. 1.
Wherein, 1 beam column, 2 brackets, 3 adapter plates, 4 connecting panels, 5 bolts, 6 guide rails.
The specific embodiment
A kind of crane in bridge type guide rail as shown in Figure 1-2, comprise the bracket 2 be fixed on I-beam section beam column 1, be provided with guide rail 6 on bracket 2, be fixedly installed L-type adapter plate 3 on beam column 1 sidewall of bracket 2 tops, the one side of adapter plate 3 is fixed on beam column 1 sidewall, the other end of adapter plate 3 is connected with guide rail 6 through connecting panel 4, one section of connecting panel 4 is fixed together through bolt 5 and adapter plate 3, the other end of connecting panel 4 is fixed together through bolt 5, and connecting panel 4 is arranged on the upper surface of adapter plate 3 and guide rail 6.
The utility model is not limited to above-described embodiment; on the basis of the disclosed technical scheme of the utility model; those skilled in the art is according to disclosed technology contents; do not need performing creative labour just can make some replacements and distortion to some technical characterictics wherein, these replacements and distortion are all in protection domain of the present utility model.

Claims (2)

1. a crane in bridge type guide rail, comprise the bracket be fixed on the I-beam section beam column, be provided with guide rail on described bracket, be fixedly installed the L-type adapter plate on the beam column sidewall of described bracket top, the one side of described adapter plate is fixed on the beam column sidewall, and the other end of described adapter plate is connected with guide rail through connecting panel, it is characterized in that, one section of described connecting panel is fixed together through bolt and adapter plate, and the other end of described connecting panel is fixed together through bolt.
2. a kind of crane in bridge type guide rail according to claim 1, is characterized in that, described connecting panel is arranged on the upper surface of adapter plate and guide rail.
CN 201220612009 2012-11-19 2012-11-19 Bridge crane guide rail Expired - Fee Related CN202936102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220612009 CN202936102U (en) 2012-11-19 2012-11-19 Bridge crane guide rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220612009 CN202936102U (en) 2012-11-19 2012-11-19 Bridge crane guide rail

Publications (1)

Publication Number Publication Date
CN202936102U true CN202936102U (en) 2013-05-15

Family

ID=48320354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220612009 Expired - Fee Related CN202936102U (en) 2012-11-19 2012-11-19 Bridge crane guide rail

Country Status (1)

Country Link
CN (1) CN202936102U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115095019A (en) * 2022-07-21 2022-09-23 北京市市政六建设工程有限公司 Impact-resistant portal steel frame structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115095019A (en) * 2022-07-21 2022-09-23 北京市市政六建设工程有限公司 Impact-resistant portal steel frame structure
CN115095019B (en) * 2022-07-21 2024-05-28 北京市市政六建设工程有限公司 Impact-resistant portal steel frame structure

Similar Documents

Publication Publication Date Title
CN201089696Y (en) Spar boom of explosion-proof suspension crane
CN103437563B (en) Mounting method for steel skeleton of large steel structure factory building
CN204185120U (en) Mobile unit dolly in place
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN201458583U (en) Liftable and detachable lifting platform
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN201737616U (en) Double-lifting pole
CN201506692U (en) Roofing steel structure simple lifting device and installation structure thereof
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN104018680A (en) Lifting method of large-span solid-web type arc beam
CN202936102U (en) Bridge crane guide rail
CN201825672U (en) Lifting device for generator stator
CN202214125U (en) Crane girder combined hoisting device with auxiliary truss
CN205294673U (en) Change basic connection structure
CN203701622U (en) Sliding construction device for garbage storage span roof trusses of large-scale garbage incineration power plant
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN201722937U (en) Sliding platform for installation of net rack
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN214495499U (en) Specially-made underframe for tower crane
CN201411926Y (en) Arc beam hoisting structure
CN204238443U (en) A kind of detachable suspension column fastening devices
CN202401386U (en) Cable bridge for frame bridge
CN104278848A (en) Bailey beam disassembly trailer
CN204803758U (en) A sideslip system for making up installation of heavier steel web member of longeron

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20151119

EXPY Termination of patent right or utility model