CN202900060U - Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string - Google Patents
Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string Download PDFInfo
- Publication number
- CN202900060U CN202900060U CN 201220591947 CN201220591947U CN202900060U CN 202900060 U CN202900060 U CN 202900060U CN 201220591947 CN201220591947 CN 201220591947 CN 201220591947 U CN201220591947 U CN 201220591947U CN 202900060 U CN202900060 U CN 202900060U
- Authority
- CN
- China
- Prior art keywords
- fracturing
- coiled tubing
- perforation
- sleeve
- bridging plug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000012856 packing Methods 0.000 title claims abstract description 11
- 238000010276 construction Methods 0.000 abstract description 5
- 238000005553 drilling Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000004048 modification Effects 0.000 abstract 2
- 238000012986 modification Methods 0.000 abstract 2
- 230000008878 coupling Effects 0.000 abstract 1
- 238000010168 coupling process Methods 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 241001074085 Scophthalmus aquosus Species 0.000 description 5
- 239000012530 fluid Substances 0.000 description 4
- 238000003825 pressing Methods 0.000 description 3
- 238000005086 pumping Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000664 rectum Anatomy 0.000 description 1
- 238000005488 sandblasting Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a coiled tubing perforation, sleeve pipe fracturing and bridging plug packing technology tubular column are implemented and are designed for guaranteeing horizontal well clustering multistage fracturing safety high-efficiently, have connected gradually connector, hydraulic pressure on the coiled tubing horizontal segment promptly and have lost the hand, sleeve pipe coupling locator, sprayer and the sliding sleeve of connecting, centralizing sliding sleeve seat, hydraulic pressure seat seal instrument and bore the bridging plug soon. The process pipe column drives the quick drilling bridge plug to operate through the continuous oil pipe, is safe and efficient, is reliable in packing, and is not limited in the number of the modification sections; the coiled tubing is dragged under pressure, so that multi-cluster perforation and fracturing of the perforated light sleeve can be completed according to the requirement of volume fracturing, the friction of the tubing string is small, and the construction scale of fracturing is increased; after drilling and grinding are finished, the large drift diameter of the sleeve can be kept, and secondary modification operation in the later period of the oil-gas well is facilitated.
Description
Technical field
The utility model relates to a kind of coiled tubing perforation, casing fracturing and bridging plug packing process pipe string, belongs to the oil-gas field fracturing technical field.
Background technology
At present, the oil gas field staged fracturing of horizontal well mainly contains the techniques such as open hole packer, hydraulic sand blasting and waterpower bridging plug, but the waterpower bridging plug has the characteristics such as the reliable light casing fracturing of packing and staged fracturing progression is unrestricted, is the ideal chose of realizing sub-clustering multistage pressure break.The waterpower bridging plug mainly is by waterpower pumping or crawl device fast brill bridging plug and perforating gun connection that cable connects to be made drilling tool down to the precalculated position, setting and discharge bridging plug after, break away from perforating gun, on carry perforating gun to perforation position and carry out many showers hole by design, then drilling tool is carried to well head, adopted low sticking clear water or mixing water to carry out the construction of light casing fracturing, finish successively a plurality of interval operations from bottom to top, adopt at last the continuous tubing drill bridging plug, completion.It is high that crawl device is lowered to the bridging plug cost, and the waterpower pumping then easily is subject to the impact of well track, and the cycle of pumping electric cable bridge plug is longer in horizontal well.Adopt the cable multistep ignition to realize that many showers hole can be subject to the impact of cable load-bearing, multistep ignition perforation hop count can be restricted, in case and can not give up after bridging plug sets in the work progress, cable will be cut off, and causes down-hole accident.
Summary of the invention
The purpose of this utility model is to provide a kind of coiled tubing perforation, casing fracturing and bridging plug packing process pipe string, and it can guarantee that horizontal well sub-clustering multistage pressure break implements safely and efficiently.
Concrete technical scheme of the present utility model is as follows:
Be connected with sliding sleeve, righting type sleeve base, the hydraulic setting tool of connector, hydraulic releasing, casing collar locator (CCL), ejector and connection thereof in turn and bore soon bridging plug at the coiled tubing horizontal segment.
This process pipe string drives the fast bridging plug operation of boring by coiled tubing, and safety, efficient, packing is reliable and it is unrestricted to transform hop count.Coiled tubing is with pressure to be dragged, and can finish light casing fracturing behind many showers hole and the perforation according to " volume fracturing " demand, and string friction is little, is beneficial to the pressing crack construction scale that increases.After the brill mill is complete, can keep the large latus rectum of sleeve pipe, the later-stage secondary of being convenient to Oil/gas Well is transformed operation.
Description of drawings
Fig. 1 is coiled tubing perforation, casing fracturing and bridging plug packing process pipe string structural representation.
The specific embodiment
With reference to Fig. 1 embodiment of the present utility model is further specified:
Embodiment:
This process pipe string is by coiled tubing 1, connector 2, hydraulic releasing 3, casing collar locator (CCL) 4, ejector 5, sliding sleeve 6, righting type sleeve base 7, hydraulic setting tool 8 and bore soon bridging plug 9 and form:
Be connected with connector 2, hydraulic releasing 3, casing collar locator (CCL) 4, ejector 5 in turn and the sliding sleeve 6, righting type sleeve base 7, the hydraulic setting tool 8 that connect by pin and bore soon bridging plug 9 at coiled tubing 1 horizontal segment.
The course of work of coiled tubing perforation, casing fracturing and bridging plug packing process pipe string is as follows:
1, first through wash well operations is lowered to the utility model process pipe string, and by casing collar locator (CCL) 4 location, when fast brill bridging plug 9 arrived design attitude, the ball of throwing φ 15.88mm from ground was to hydraulic setting tool 8 ball seats, and coiled tubing 1 pressurization is finished and set, gives up.
First paragraph perforation, pressing crack construction:
Hydraulic perforation: hydraulic perforation: bridging plug pressure testing 40Mpa, behind the voltage stabilizing 5min, by casing collar locator (CCL) 4 location, on carry coiled tubing 1 to ejector 5 and aim at first bunch of design perforation position; Throw the ball of φ 19.05mm from ground, treat that ball drops on the sliding sleeve 6, the pin that connects ejector 5 and sliding sleeve 6 is sheared in coiled tubing 1 pressurization, and sliding sleeve 6 and steel ball are together fallen on the righting type sleeve base 7, the passage below the shutoff; Inject perforating fluid from coiled tubing 1, carry out the coiled tubing hydraulic perforating; When load fluid during to nozzle distance 200m, improve the discharge capacity abrasive perforating.During perforation, perforating fluid injects from coiled tubing 1, and the oil jacket annular space returns out.After shooting away first bunch, carry 1m on the coiled tubing, repeat the first shower hole step and finish the second shower hole, finish successively the perforation of all the other each bunches.
Light casing fracturing: after perforation is finished, carry to shaft mouth anti-blowout pipe on the coiled tubing 1, inject fracturing fluid from sleeve pipe and finish pressing crack construction.
2, the first paragraph operation complete after, repeating step 1 is finished all the other each section hydraulic jet perforation, light casing fracturing.
3, bridging plug bores the mill operation: be lowered to continuous tubing drill plug instrument, the disposable brill mill operation of finishing all bridging plugs.
4, completion: after the brill mill is finished, trip out continuous tubing drill plug tubing string, be lowered to flow string.
Claims (1)
1. a coiled tubing perforation, casing fracturing and bridging plug packing process pipe string is characterized in that:
Be connected with connector (2), hydraulic releasing (3), casing collar locator (CCL) (4), ejector (5) and the sliding sleeve (6) that connects thereof, righting type sleeve base (7), hydraulic setting tool (8) and the fast bridging plug (9) that bores in turn at coiled tubing (1) horizontal segment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220591947 CN202900060U (en) | 2012-11-12 | 2012-11-12 | Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220591947 CN202900060U (en) | 2012-11-12 | 2012-11-12 | Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202900060U true CN202900060U (en) | 2013-04-24 |
Family
ID=48120743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220591947 Expired - Fee Related CN202900060U (en) | 2012-11-12 | 2012-11-12 | Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202900060U (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470242A (en) * | 2013-09-14 | 2013-12-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Oilfield horizontal well volume fracturing method |
CN104141476A (en) * | 2013-10-12 | 2014-11-12 | 中国石油化工股份有限公司 | Perforation device and perforation method by using same |
CN104196464A (en) * | 2014-08-27 | 2014-12-10 | 杰瑞能源服务有限公司 | Tubular column string and bridge plug setting and sand blasting perforation combining method |
CN104213891A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Coiled tubing controllable packer process pipe column for old well repeated reconstruction |
CN104278979A (en) * | 2013-07-05 | 2015-01-14 | 中国石油天然气股份有限公司 | Coiled tubing perforation bridge plug packing fracturing method |
CN104564003A (en) * | 2014-12-23 | 2015-04-29 | 中国石油天然气股份有限公司 | Drilling plug-free pumping type hydraulic bridge plug staged fracturing method |
CN104563997A (en) * | 2013-10-29 | 2015-04-29 | 中国石油天然气股份有限公司 | Hydraulic jet and bridge plug combined process pipe column and working method thereof |
CN104632168A (en) * | 2013-11-15 | 2015-05-20 | 中国石油天然气股份有限公司 | Hydraulic sand-blasting perforation large-displacement fracturing process pipe column and method |
CN104695923A (en) * | 2013-12-05 | 2015-06-10 | 中国石油天然气股份有限公司 | Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls |
CN105201461A (en) * | 2015-09-02 | 2015-12-30 | 北京泰坦通源天然气资源技术有限公司 | Multistage sand jet perforation and fracture combined operation method adopting coiled tubing and bottom packer |
CN105525902A (en) * | 2016-01-21 | 2016-04-27 | 中国石油化工股份有限公司 | Horizontal well up-going fracturing method for screen pipe suspension well completion |
CN105822253A (en) * | 2015-01-06 | 2016-08-03 | 中国石油天然气股份有限公司 | Casing sliding sleeve and hydraulic bridge plug combined well completion pipe string and rapid fracturing method |
CN107476793A (en) * | 2016-06-08 | 2017-12-15 | 中国石油化工股份有限公司 | A kind of deep layer shale gas fracturing string and fracturing technology method |
CN108204228A (en) * | 2016-12-16 | 2018-06-26 | 中国石油化工股份有限公司 | A kind of composite fracturing process pipe string and its application method |
CN108868729A (en) * | 2018-06-12 | 2018-11-23 | 中国石油集团渤海钻探工程有限公司 | A kind of pressure break process method for well completion |
CN110130867A (en) * | 2019-04-16 | 2019-08-16 | 中国石油天然气股份有限公司 | Staged multi-cluster fracturing method for slim-hole sidetracking horizontal well |
CN111691844A (en) * | 2020-07-07 | 2020-09-22 | 中国石油天然气集团有限公司 | Double-sealing water and gas production string for plugging and use method |
CN111877999A (en) * | 2020-08-24 | 2020-11-03 | 中国石油化工股份有限公司 | Coiled tubing hydraulic sand blasting perforation setting bridge plug integrated tubular column and construction method |
-
2012
- 2012-11-12 CN CN 201220591947 patent/CN202900060U/en not_active Expired - Fee Related
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213891A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Coiled tubing controllable packer process pipe column for old well repeated reconstruction |
CN104278979A (en) * | 2013-07-05 | 2015-01-14 | 中国石油天然气股份有限公司 | Coiled tubing perforation bridge plug packing fracturing method |
CN103470242B (en) * | 2013-09-14 | 2015-08-19 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of oilfield horizontal well volume fracturing method |
CN103470242A (en) * | 2013-09-14 | 2013-12-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Oilfield horizontal well volume fracturing method |
CN104141476A (en) * | 2013-10-12 | 2014-11-12 | 中国石油化工股份有限公司 | Perforation device and perforation method by using same |
CN104141476B (en) * | 2013-10-12 | 2016-08-17 | 中国石油化工股份有限公司 | Perforating system and the method using its perforation |
CN104563997A (en) * | 2013-10-29 | 2015-04-29 | 中国石油天然气股份有限公司 | Hydraulic jet and bridge plug combined process pipe column and working method thereof |
CN104632168A (en) * | 2013-11-15 | 2015-05-20 | 中国石油天然气股份有限公司 | Hydraulic sand-blasting perforation large-displacement fracturing process pipe column and method |
CN104632168B (en) * | 2013-11-15 | 2017-10-17 | 中国石油天然气股份有限公司 | Hydraulic sand-blasting perforation large-displacement fracturing process pipe column and method |
CN104695923A (en) * | 2013-12-05 | 2015-06-10 | 中国石油天然气股份有限公司 | Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls |
CN104196464A (en) * | 2014-08-27 | 2014-12-10 | 杰瑞能源服务有限公司 | Tubular column string and bridge plug setting and sand blasting perforation combining method |
CN104196464B (en) * | 2014-08-27 | 2018-01-30 | 杰瑞能源服务有限公司 | Tubing string string and bridging plug set the method made with abrasive perforating connection |
CN104564003A (en) * | 2014-12-23 | 2015-04-29 | 中国石油天然气股份有限公司 | Drilling plug-free pumping type hydraulic bridge plug staged fracturing method |
CN105822253A (en) * | 2015-01-06 | 2016-08-03 | 中国石油天然气股份有限公司 | Casing sliding sleeve and hydraulic bridge plug combined well completion pipe string and rapid fracturing method |
CN105201461A (en) * | 2015-09-02 | 2015-12-30 | 北京泰坦通源天然气资源技术有限公司 | Multistage sand jet perforation and fracture combined operation method adopting coiled tubing and bottom packer |
CN105525902A (en) * | 2016-01-21 | 2016-04-27 | 中国石油化工股份有限公司 | Horizontal well up-going fracturing method for screen pipe suspension well completion |
CN105525902B (en) * | 2016-01-21 | 2019-01-22 | 中国石油化工股份有限公司 | Fracturing process is returned on a kind of complete well water horizontal well of suspension screen casing |
CN107476793A (en) * | 2016-06-08 | 2017-12-15 | 中国石油化工股份有限公司 | A kind of deep layer shale gas fracturing string and fracturing technology method |
CN107476793B (en) * | 2016-06-08 | 2020-02-21 | 中国石油化工股份有限公司 | Deep shale gas fracturing pipe column and fracturing process method |
CN108204228A (en) * | 2016-12-16 | 2018-06-26 | 中国石油化工股份有限公司 | A kind of composite fracturing process pipe string and its application method |
CN108868729A (en) * | 2018-06-12 | 2018-11-23 | 中国石油集团渤海钻探工程有限公司 | A kind of pressure break process method for well completion |
CN110130867A (en) * | 2019-04-16 | 2019-08-16 | 中国石油天然气股份有限公司 | Staged multi-cluster fracturing method for slim-hole sidetracking horizontal well |
CN110130867B (en) * | 2019-04-16 | 2021-08-31 | 中国石油天然气股份有限公司 | Staged multi-cluster fracturing method for slim-hole sidetracking horizontal well |
CN111691844A (en) * | 2020-07-07 | 2020-09-22 | 中国石油天然气集团有限公司 | Double-sealing water and gas production string for plugging and use method |
CN111691844B (en) * | 2020-07-07 | 2024-03-01 | 中国石油天然气集团有限公司 | Double-sealing water-plugging gas production pipe column and use method thereof |
CN111877999A (en) * | 2020-08-24 | 2020-11-03 | 中国石油化工股份有限公司 | Coiled tubing hydraulic sand blasting perforation setting bridge plug integrated tubular column and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202900060U (en) | Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string | |
CN204326983U (en) | Tubing string string | |
CN104278978B (en) | Soluble bridge plug fracturing process pipe column and fracturing method thereof | |
CN204098878U (en) | Device made by a kind of abrasive material perforation sandblasting pressure break connection | |
CN104278979A (en) | Coiled tubing perforation bridge plug packing fracturing method | |
CN104196464A (en) | Tubular column string and bridge plug setting and sand blasting perforation combining method | |
CN104695927B (en) | Coiled tubing and production tubing combined string fracturing and well completion integrated method | |
CN203394493U (en) | Soluble bridge plug fracturing technology pipe column | |
CN104213891B (en) | Coiled tubing controllable packer process pipe column for old well repeated reconstruction | |
CN101338663A (en) | Horizontal well mechanical staged fracturing blocking-proof process pipe column | |
CN104564003A (en) | Drilling plug-free pumping type hydraulic bridge plug staged fracturing method | |
CN103266873A (en) | Connecting structure of multilevel hydraulic spraying segmentation fracturing tubular column | |
CN203321476U (en) | Coiled tubing controllable packer process pipe column for old well repeated reconstruction | |
CN104213895A (en) | Hydraulic sand-blasting perforation fracturing and sand-filling combined process method | |
CN103967439A (en) | Continuous milling and salvage integrated tool and milling and salvage method thereof | |
CN104695923A (en) | Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls | |
CN109519136A (en) | A kind of automatic rotoblast cutting technique tubing string of coiled tubing and method | |
CN102562017A (en) | Sand blasting, perforating and fracturing method | |
CN201367892Y (en) | Pipe string structure of downhole hydraulic-jetting fracturing and acidizing tool of oil-gas well | |
CN104563997A (en) | Hydraulic jet and bridge plug combined process pipe column and working method thereof | |
CN106246144A (en) | Perforation and fracturing integrated process for coiled tubing bridge plug | |
CN101105121A (en) | Horizontal well machinery staged fracturing tool string | |
CN104632167A (en) | Hydraulic jet double-sealing single-clamping perforation and fracturing integrated process pipe column | |
CN103089196B (en) | Setting method and the device thereof joining work with abrasive perforating of bridging plug is carried out with oil pipe | |
CN103821490A (en) | Special ejector with multilevel hydraulic ejecting and staged fracturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130424 Termination date: 20211112 |