[go: up one dir, main page]

CN202886584U - Novel integrated error checking device of high-voltage energy measurement device - Google Patents

Novel integrated error checking device of high-voltage energy measurement device Download PDF

Info

Publication number
CN202886584U
CN202886584U CN 201220468770 CN201220468770U CN202886584U CN 202886584 U CN202886584 U CN 202886584U CN 201220468770 CN201220468770 CN 201220468770 CN 201220468770 U CN201220468770 U CN 201220468770U CN 202886584 U CN202886584 U CN 202886584U
Authority
CN
China
Prior art keywords
output end
electric energy
standard
booster
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220468770
Other languages
Chinese (zh)
Inventor
邱嘉文
张振旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Sichuan Electric Power Co Ltd
Original Assignee
ZHUHAI WEIHAN TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI WEIHAN TECHNOLOGY DEVELOPMENT Co Ltd filed Critical ZHUHAI WEIHAN TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN 201220468770 priority Critical patent/CN202886584U/en
Application granted granted Critical
Publication of CN202886584U publication Critical patent/CN202886584U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Measurement Of Current Or Voltage (AREA)

Abstract

本实用新型提供一种新型高压电能计量装置整体误差校检装置,其包括低功率信号源、与该低功率信号源的电流输出信号连接的升流器、与该低功率信号源的电压输出信号连接的升压器、并联连接于该升流器的输出端的标准电流互感器、新型电压互感器和新型电流互感器、与该升压器的输出端的正极连接的标准电压互感器、与该标准电压互感器的输出端和该标准电流互感器的输出端连接的标准电能表、与该新型电流互感器的输出端和新型电压互感器的输出端连接的新型电能表、与该标准电能表和新型电能表连接的电能表校验台,该升流器的输出端与该升压器的输出端的正极连接。本实用新型无需提供大功率的转换电路和大体积的转换装置,减少耗能、体积和制造成本。

Figure 201220468770

The utility model provides a novel overall error checking device of a high-voltage electric energy metering device, which includes a low-power signal source, a current booster connected with the current output signal of the low-power signal source, and a voltage output signal of the low-power signal source A booster connected, a standard current transformer connected in parallel to the output of the booster, a new voltage transformer and a new current transformer, a standard voltage transformer connected to the positive pole of the output of the booster, and the standard The standard electric energy meter connected to the output end of the voltage transformer and the output end of the standard current transformer, the new electric energy meter connected to the output end of the new current transformer and the output end of the new voltage transformer, and the standard electric energy meter and the output end of the new voltage transformer In the electric energy meter calibration platform connected with the novel electric energy meter, the output end of the current booster is connected with the positive pole of the output end of the booster. The utility model does not need to provide a high-power conversion circuit and a large-volume conversion device, thereby reducing energy consumption, volume and manufacturing cost.

Figure 201220468770

Description

A kind of novel high-pressure electric power meter global error school checking device
Technical field
The utility model relates to the school inspection technology of electric power metering device, is specifically related to a kind of novel high-pressure electric power meter global error school checking device.
Background technology
Traditional method for the high-voltage electric-energy meter verification is the various piece to device, comprise that voltage transformer (VT), current transformer, multifunctional electric energy meter and secondary line voltage drop of voltage mutual inductor detect respectively, obtain the error of various piece, then control the accuracy of measuring by the comprehensive error computation method.Like this by the theoretical result who calculates can not marking meter the global error precision, the measuring accuracy of high-voltage electric-energy meter integral body does not have direct detection method to determine.
In recent years, a kind of global error of high voltage energy metering installation calibration equipment has appearred, its cardinal principle is: with the little current power signal source of low pressure through synchronous boost and up-flow or be converted into high pressure (10KV) and large electric current (200A) experiment power supply, one benchmark electric energy measurement unit obtains the high-voltage great-current signal, and the standard of generation energy value, simultaneously, the verification object is to produce detection energy value after high-voltage electric-energy meter obtains the high-voltage great-current signal, then on the same group detection energy value and standard energy value are compared, obtain meritorious and reactive energy measurement error.The defective of this device is, for the little current power signal source of low pressure through boosting and up-flow or be converted into the high-voltage great-current signal, the up-flow device that boosts that need provide bulky, power consumption is huge makes that whole device power consumption is large, volume is large, cost is high.
The utility model content
In view of this, be necessary the problem mentioned for background technology, a kind of novel high-pressure electric power meter global error school checking device that reduces volume, reduces energy consumption is provided.
The technical solution of the utility model is specific as follows:
A kind of novel high-pressure electric power meter global error school checking device, it is characterized in that: it comprises the low-power signal source, the current lifting device that is connected with the current output signal in described low-power signal source, the stepup transformer that is connected with the Voltage-output signal in described low-power signal source, be connected in parallel in the standard current transformer of the output terminal of described current lifting device, novel voltage mutual inductor and novel current transformer, the standard potential transformer that is connected with the positive pole of the output terminal of described stepup transformer, with the output terminal of described standard potential transformer be connected the standard electric energy meter that the output terminal of standard current transformer is connected, be connected the electric energy meter that output terminal is connected with novel voltage mutual inductor with the output terminal of described novel current transformer, the calibration console for electric energy meter that is connected with electric energy meter with described standard electric energy meter, the output terminal of described current lifting device is connected with the positive pole of the output terminal of described stepup transformer, the negative pole of output end ground connection of described stepup transformer.
Compared to prior art, the utility model has the advantage of: with the voltage signal in low-power signal source and current signal respectively through boost and up-flow after be communicated with, for high-voltage electric-energy meter to be measured and benchmark electric energy measurement unit provide high-voltage signal and large current signal, need not to provide powerful change-over circuit, reduce power consumption, and need not to provide the conversion equipment of large volume, reduce volume and manufacturing cost.
Description of drawings
Fig. 1 is the utility model modular structure synoptic diagram.
Embodiment
As shown in Figure 1, present embodiment provides a kind of novel high-pressure electric power meter global error school checking device, it comprises the low-power signal source, the current lifting device that is connected with the current output signal in described low-power signal source, the stepup transformer that is connected with the Voltage-output signal in described low-power signal source, be connected in parallel in the standard current transformer of the output terminal of described current lifting device, novel voltage mutual inductor and novel current transformer, the standard potential transformer that is connected with the positive pole of the output terminal of described stepup transformer, with the output terminal of described standard potential transformer be connected the standard electric energy meter that the output terminal of standard current transformer is connected, be connected the electric energy meter that output terminal is connected with novel voltage mutual inductor with the output terminal of described novel current transformer, the calibration console for electric energy meter that is connected with electric energy meter with described standard electric energy meter, the output terminal of described current lifting device is connected with the positive pole of the output terminal of described stepup transformer, the negative pole of output end ground connection of described stepup transformer.Concrete, the meritorious pulse of the output terminal of described standard electric energy meter and electric energy meter and idle pulse are connected to respectively two groups of meritorious pulses of described calibration console for electric energy meter, idle pulse input end, for described calibration console for electric energy meter two groups of signals are compared, thereby take standard electric energy meter as standard electric energy meter is carried out verification.
The current signal in low-power signal source is converted into large current signal behind current lifting device, because power is constant, this signal voltage is very low; And the voltage signal in low-power signal source is converted into high voltage signal behind stepup transformer, because power is constant, this marking current value is very little.The large current signal of current lifting device output and the large voltage signal of stepup transformer output are overlapped, the small voltage value of large current signal can not affect the magnitude of voltage of large voltage signal, the little current value of large voltage signal can not affect the current value of large current signal, can satisfy the required large voltage of standard potential transformer of standard electric energy meter periphery, the large electric current that the standard electric energy mutual-inductor is required, can satisfy again the required large voltage of novel voltage mutual inductor of electric energy meter periphery, the large electric current that novel current transformer is required, need not to provide powerful change-over circuit, reduce power consumption, and need not to provide the conversion equipment of large volume, reduce volume and manufacturing cost.

Claims (1)

1.一种新型高压电能计量装置整体误差校检装置,其特征在于:其包括低功率信号源、与所述低功率信号源的电流输出信号连接的升流器、与所述低功率信号源的电压输出信号连接的升压器、并联连接于所述升流器的输出端的标准电流互感器、新型电压互感器和新型电流互感器、与所述升压器的输出端的正极连接的标准电压互感器、与所述标准电压互感器的输出端和所述标准电流互感器的输出端连接的标准电能表、与所述新型电流互感器的输出端和新型电压互感器的输出端连接的新型电能表、与所述标准电能表和新型电能表连接的电能表校验台,所述升流器的输出端与所述升压器的输出端的正极连接,所述升压器的输出端负极接地。 1. A new type of high-voltage electric energy metering device overall error checking device is characterized in that: it includes a low-power signal source, a current booster connected to the current output signal of the low-power signal source, and the low-power signal source The booster connected to the voltage output signal of the booster, the standard current transformer connected in parallel to the output end of the booster, the new voltage transformer and the new current transformer, and the standard voltage connected to the positive pole of the output end of the booster transformer, a standard energy meter connected to the output end of the standard voltage transformer and the output end of the standard current transformer, a new type of electric energy meter connected to the output end of the new type current transformer and the output end of the new type voltage transformer An electric energy meter, an electric energy meter verification platform connected with the standard electric energy meter and the new electric energy meter, the output end of the current booster is connected with the positive pole of the output end of the booster, and the negative pole of the output end of the booster is grounded.
CN 201220468770 2012-09-14 2012-09-14 Novel integrated error checking device of high-voltage energy measurement device Expired - Fee Related CN202886584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220468770 CN202886584U (en) 2012-09-14 2012-09-14 Novel integrated error checking device of high-voltage energy measurement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220468770 CN202886584U (en) 2012-09-14 2012-09-14 Novel integrated error checking device of high-voltage energy measurement device

Publications (1)

Publication Number Publication Date
CN202886584U true CN202886584U (en) 2013-04-17

Family

ID=48077995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220468770 Expired - Fee Related CN202886584U (en) 2012-09-14 2012-09-14 Novel integrated error checking device of high-voltage energy measurement device

Country Status (1)

Country Link
CN (1) CN202886584U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472433A (en) * 2013-09-12 2013-12-25 国家电网公司 Intelligent substation electric energy measuring secondary system virtual load error detection device and method
CN104267368A (en) * 2014-10-14 2015-01-07 国家电网公司 Fault monitoring method for secondary circuit of metering current transformer
CN104502882A (en) * 2014-12-08 2015-04-08 国网四川省电力公司电力科学研究院 Standard device for tracing 10kV-35kV high voltage electric energy value
CN105203984A (en) * 2014-06-12 2015-12-30 国网山西省电力公司电力科学研究院 Intelligent substation 3/2 wiring bus reactive power calibrator based on conventional instrument transformers
CN104111438B (en) * 2014-07-18 2017-03-29 河北省电力建设调整试验所 Primary large-current loop monitoring method in current transformer error test
CN107219492A (en) * 2017-04-24 2017-09-29 国网浙江省电力公司电力科学研究院 Medium voltage network electric energy metrical high pressure integration semi-physical simulation device
CN107748348A (en) * 2017-11-30 2018-03-02 国网安徽省电力公司淮南供电公司 The high-voltage electric energy meter calibrating installation that can integrally trace to the source

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472433A (en) * 2013-09-12 2013-12-25 国家电网公司 Intelligent substation electric energy measuring secondary system virtual load error detection device and method
CN105203984A (en) * 2014-06-12 2015-12-30 国网山西省电力公司电力科学研究院 Intelligent substation 3/2 wiring bus reactive power calibrator based on conventional instrument transformers
CN105203984B (en) * 2014-06-12 2017-07-18 国网山西省电力公司电力科学研究院 The wiring bus reactive power rate tester of intelligent station 3/2 based on traditional transformer
CN104111438B (en) * 2014-07-18 2017-03-29 河北省电力建设调整试验所 Primary large-current loop monitoring method in current transformer error test
CN104267368A (en) * 2014-10-14 2015-01-07 国家电网公司 Fault monitoring method for secondary circuit of metering current transformer
CN104502882A (en) * 2014-12-08 2015-04-08 国网四川省电力公司电力科学研究院 Standard device for tracing 10kV-35kV high voltage electric energy value
CN107219492A (en) * 2017-04-24 2017-09-29 国网浙江省电力公司电力科学研究院 Medium voltage network electric energy metrical high pressure integration semi-physical simulation device
CN107748348A (en) * 2017-11-30 2018-03-02 国网安徽省电力公司淮南供电公司 The high-voltage electric energy meter calibrating installation that can integrally trace to the source

Similar Documents

Publication Publication Date Title
CN202886584U (en) Novel integrated error checking device of high-voltage energy measurement device
CN200962142Y (en) High-voltage power meter correction device
CN202974544U (en) Portable digital barometer
CN203275641U (en) Automatic error check device of high-voltage electric energy meter
CN202583449U (en) Whole detection device of intelligent transformer station electric energy metering device
CN101251585A (en) Method and apparatus for checking global error of high voltage energy metering installation
CN205157761U (en) Detection device for direct current electric energy meter
CN103630871A (en) Testing device for dynamic characteristics of electronic energy meter
CN203658570U (en) Portable calibrating device for digital electric energy metering device
CN101650389A (en) Method and instrument for measuring shock ground resistance of transmission line tower
CN202309498U (en) High-precision intelligent ripple-superposed DC output circuit
CN104931914A (en) Analog field high voltage energy meter calibration system
CN105676141A (en) Battery capacity on-line measuring system and measuring method based on damped oscillation
CN206074714U (en) A kind of virtual load assay device for the detection of charging pile metering performance
CN102879760B (en) Method and device for checking errors of direct current electric energy meter by using standard alternating current electric energy meter
CN203011496U (en) Vortex street flow detection experiment device
CN204241579U (en) Portable type current transformer on-site calibrator
CN204283625U (en) Gas turbine rotary speed conditioning module
CN202421385U (en) Portable transformer tester
CN204649838U (en) Charging pile charge metering verifying attachment
CN203759067U (en) High stability alternating current standard voltage boosting system
CN103134979A (en) Checking circuit for energy storage device terminal voltage
CN205862264U (en) Portable multifunctional voltage x current source
CN204705706U (en) A kind of new electric energy measuring apparatus tester
CN203606483U (en) Three-phase voltage current simulation power supply used for on-site metering device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DEYANG POWER SUPPLY COMPANY, STATE GRID SICHUAN EL

Free format text: FORMER OWNER: WEIHAN SCIENCE AND TECHNOLOGY DEVELOPMENT CO., LTD., ZHUHAI

Effective date: 20150217

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liao Xuejing

Inventor after: Tang Zhongwei

Inventor after: Cai Hua

Inventor after: Zhang Bo

Inventor before: Qiu Jiawen

Inventor before: Zhang Zhenqi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: QIU JIAWEN ZHANG ZHENQI TO: LIAO XUEJING TANG ZHONGWEI CAI HUA ZHANG BO

Free format text: CORRECT: ADDRESS; FROM: 519000 ZHUHAI, GUANGDONG PROVINCE TO: 618000 DEYANG, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150217

Address after: 618000 Zijin Mountain street, Sichuan, Deyang, No. 4

Patentee after: Deyang Power Supply Company, State Grid Sichuan Electric Power Corporation

Address before: 519000 No. 117 Warwick Road, Guangdong, Zhuhai

Patentee before: Zhuhai Weihan Technology Development Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20170914

CF01 Termination of patent right due to non-payment of annual fee