Summary of the invention
The purpose of this utility model is to provide a kind of crude oil gas-liquid separation process integrated equipment, and it can realize the integrated functions such as the oily buffering of well group, Oil-gas Separation and associated gas separatory.
The concrete technical scheme of oil-gas-liquid separation process integrated equipment is as follows:
Heating furnace comes oil pipeline to connect the output pump pipeline through the bypass line gate valve, comes oily gate valve to connect airtight surge tank through well group simultaneously, and airtight surge tank connects the output pump pipeline through outer defeated gate valve.
Airtight surge tank connects air cooler through the three way cock I, and air cooler connects the associated gas knockout through the three way cock II, and the three way cock I connects the three way cock II that can be used as the use of bypass flow process simultaneously.After the associated gas knockout connects the knockout stop valve, one the tunnel through vent stop valve connection gas blow-down pipe, one the tunnel through stop valve or before flow meter stop valve, gas flowmeter and flow meter be connected stop valve and connect the gas external transport pipeline, the one tunnel connects the heating furnace burning line through gas shutoff valve.
Airtight surge tank is often opened stop valve I, safety valve and Chang Kai stop valve II and is connected the gas blow-down pipe.Airtight surge tank is provided with sand discharge gate valve and the blowoff gate valve that is connected blowdown pipeline.
Airtight surge tank connects hot water piping through the hot water stop valve, connects return piping through the backwater stop valve.
The utlity model has for well group and come the oily multinomial processing capacities such as buffering, Oil-gas Separation and associated gas separatory, can satisfy the needs of multiple production technology.The utility model technological process is simple, short construction period, use flexible operation, floor space are few, is fit to very much the demand of oil field development.
The specific embodiment
With reference to Fig. 1 embodiment of the present utility model is further specified:
Embodiment:
The syndeton of crude oil gas-liquid separation process integrated equipment is as follows:
Heating furnace comes oil pipeline A to connect output pump pipeline D through bypass line gate valve 1, comes oily gate valve 3 to connect airtight surge tank 7 through well group simultaneously, and airtight surge tank 7 connects output pump pipeline D through outer defeated gate valve 8.
Airtight surge tank 7 connects air cooler 20 through three way cock I 21, and air cooler 20 connects associated gas knockout 18 through three way cock II 19, and three way cock I 21 connects the three way cock II 19 that can be used as the use of bypass flow process simultaneously.After associated gas knockout 18 connects knockout stop valve 17, one the tunnel through vent stop valve 12 connection gas blow-down pipe H, one the tunnel through stop valve 14 or before flow meter stop valve 16, gas flowmeter and flow meter be connected stop valve 13 and connect gas external transport pipeline G, the one tunnel connects heating furnace burning line F through gas shutoff valve 15.
Airtight surge tank 7 is often opened stop valve I 9, safety valve 11 and Chang Kai stop valve II and is connected and connects gas blow-down pipe H.Airtight surge tank 7 is provided with sand discharge gate valve 6 and the blowoff gate valve 5 that is connected blowdown pipeline E.
Airtight surge tank 7 connects hot water piping B through hot water stop valve 2, connects return piping C through backwater stop valve 4.
The integrated approach of crude oil gas-liquid separation process is as follows:
The technological process of production one is used for realizing the normal closed gathering of crude oil:
Well group comes oily behind booster station internally heated oven heat temperature raising, come oily gate valve 3 to enter airtight surge tank 7 by well group, realize crude oil buffering and closed gathering, and by the variable frequency control of continuous level monitoring realization to output pump, crude oil is exported from output pump pipeline D through outer defeated gate valve 8.
The technological process of production two, when association tolerance is larger, use:
Well group comes oily behind booster station internally heated oven heat temperature raising, come oily gate valve 3 to enter airtight surge tank 7 by well group, realize crude oil buffering and closed gathering, and by the variable frequency control of continuous level monitoring realization to output pump, crude oil is exported from output pump pipeline D by outer defeated gate valve 8.Isolated associated gas to air cooler 20 coolings, enters associated gas knockout 18 through three way cock II 19 through three way cock I 21 again in airtight surge tank 7, and realization associated gas condensate liquid separates with gas.Isolated associated gas is by behind the knockout stop valve 17, one the tunnel discharges from gas blow-down pipe H through vent stop valve 12, one the tunnel through stop valve 14 or before flow meter behind stop valve 16, gas flowmeter and the flow meter stop valve 13 from gas external transport pipeline G metering output, the one tunnel through gas shutoff valve 15 from heating furnace burning line F to the heating furnace air feed.
The technological process of production three, hour use in association tolerance:
Well group comes oily behind booster station internally heated oven heat temperature raising, come oily gate valve 3 to enter airtight surge tank 7 by well group, realize crude oil buffering and closed gathering, and by the variable frequency control of continuous level monitoring realization to output pump, crude oil is exported from output pump pipeline D by outer defeated gate valve 8.Isolated associated gas directly enters associated gas knockout 18 through three way cock I 21 and three way cock II 19 in airtight surge tank 7, and realization associated gas condensate liquid separates with gas.Isolated associated gas is by behind the knockout stop valve 17, and one the tunnel discharges from gas blow-down pipe H through vent stop valve 12, the one tunnel through gas shutoff valve 15 from heating furnace burning line F to the heating furnace air feed.
The technological process of production four, when field, station accident purging or overhaul of the equipments, use:
Well group comes oily behind booster station internally heated oven heat temperature raising, and 1 outwards defeated pump line line D directly exports from the bypass line gate valve.
By three way cock I 21 and II 19 are set, the technological process of production two and three can be switched mutually.Can satisfy need of production if associated gas gathering and transferring process upstream and downstream arrange, air cooler can save need not.