CN202755355U - Overhaul drainage structure of through-flow hydropower station - Google Patents

Overhaul drainage structure of through-flow hydropower station Download PDF

Info

Publication number
CN202755355U
CN202755355U CN2012204250888U CN201220425088U CN202755355U CN 202755355 U CN202755355 U CN 202755355U CN 2012204250888 U CN2012204250888 U CN 2012204250888U CN 201220425088 U CN201220425088 U CN 201220425088U CN 202755355 U CN202755355 U CN 202755355U
Authority
CN
China
Prior art keywords
upstream
pipe
downstream
drainage
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012204250888U
Other languages
Chinese (zh)
Inventor
时铁城
王浩
包冀邢
蒋志勇
王立成
岳丽霞
庞书聪
朱伟君
任智锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN2012204250888U priority Critical patent/CN202755355U/en
Application granted granted Critical
Publication of CN202755355U publication Critical patent/CN202755355U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

本实用新型公开了一种贯流式水电站检修排水结构,包括排水廊道、集水井以及分别与流道上、下游最低处和排水廊道连通的排水管,上、下游排水管分别设置放水阀,上、下游管放水阀分别布置在上、下游排水管进口。本实用新型主要用于多泥沙河流上的贯流式水电站,结构简单、安全性高,可以及时、可控、方便的排除流道积水,提高工作效率和安全性,缩短检修时间,增加电站发电效益。

Figure 201220425088

The utility model discloses a maintenance drainage structure of a tubular hydropower station, which comprises a drainage corridor, a water collection well and drainage pipes respectively connected with the upper and lower reaches of the flow channel and the drainage corridor, and the upper and lower drainage pipes are respectively provided with drain valves. The drain valves of the upstream and downstream pipes are respectively arranged at the inlets of the upstream and downstream drain pipes. The utility model is mainly used for the tubular hydropower station on the silt-rich river. It has simple structure and high safety. The power generation efficiency of the power station.

Figure 201220425088

Description

A kind of drainage for overhaul structure of tubular power station
Technical field
The utility model relates to the drainage for overhaul structure in power station, particularly a kind of drainage for overhaul structure that is mainly used in the tubular power station on the fully-loaded stream.
Background technology
The drainage for overhaul structure in power station is the common facility in the hydroelectric station design, as shown in Figure 1, according to the characteristics of tubular unit runner, for satisfying the unit maintenance drainage requirement, need respectively arrange in the runner upstream and downstream gutter in the prior art.Upstream row water pipe 1 ' drains into collector drain 6 ' to runner upstream ponding from 5 ' bottom, generator vertical support basis, downstream row water pipe 2 ' drains into collector drain 6 ' to downstream ponding from draft tube 7 ' lowest part, ponding converges to collecting well through collector drain, then drained by water pump, the upstream row water pipe vertically arranges upstream tube discharging valve 4 ' generator bottom enter hole 3 ' or water wheels motor-pumped well 8 ' upstream side, and the downstream row water pipe vertically arranges downstream tube discharging valve 14 ' in water wheels motor-pumped well 8 ' downstream.Upstream tube discharging valve 4 ' and downstream tube discharging valve 14 ' are separately positioned on the middle part of upstream row water pipe 1 ' and downstream row water pipe 2 ', and 13 ' is the runner upstream.
But when the drainage for overhaul structure in the tubular power station of said structure was used for tubular power station on the fully-loaded stream, gutter can not in time be got rid of runner ponding easily by the silt silting, and the unit maintenance time lengthening has been lost the power station power benefit.
The utility model content
The technical problems to be solved in the utility model is that a kind of simple in structure, safe tubular power station drainage for overhaul structure is provided.
The technical solution adopted in the utility model is: a kind of drainage for overhaul structure of tubular power station, comprise collector drain, collecting well, generator bottom enter hole, generator vertical support, the upstream row water pipe that is communicated with runner upstream and collector drain respectively, the downstream row water pipe that is communicated with draft tube and collector drain respectively, be arranged on the upstream tube discharging valve on the upstream row water pipe and be arranged on downstream discharging valve on the downstream row water pipe, described upstream tube discharging valve is arranged in the water inlet of upstream row water pipe, and the downstream tube discharging valve is arranged in the water inlet of downstream row water pipe.
Described generator bottom enter hole upstream extends to below, generator vertical support bottom, form installing space, described gutter water inlet is arranged on side, generator vertical support rear, the upstream tube discharging valve is arranged in the installing space of generator bottom enter hole formation below generator vertical support bottom, connect the water inlet that generator vertical support base plate stretches to the upstream row water pipe, at draft tube lower space setting operation gallery, operating gallery extends to downstream drainage water inlet tube mouth below, the downstream tube discharging valve is arranged on the end of operating gallery, connects the water inlet that the operating gallery top board stretches to the downstream row water pipe.
Described upstream tube discharging valve and downstream tube discharging valve adopt lower operated disc type valve.
Be respectively arranged with trashrack at the water inlet of described upstream row water pipe and the water inlet of downstream row water pipe.
The beneficial effects of the utility model are: the water inlet of offering the upstream row water pipe in side, tubular hydropower generator vertical support rear, generator bottom enter hole upstream extends the installation discharging valve, utilize the draft tube lower space to establish an operating gallery, operating gallery extends to downstream row water pipe import below, at the operating gallery end discharging valve is set, gutter can be by silt and dirt silting, can be timely during unit maintenance, get rid of easily the runner internal water accumulation, realize the controlled discharging of drainage for overhaul safety, efficient and the safety of fully-loaded stream tubular power station service work have greatly been improved, effectively shorten the repair time, increased the power benefit in power station.
Description of drawings
Fig. 1 is the sectional drawing of drainage for overhaul structural configuration mode in the tubular power station of prior art.
Fig. 2 is the plan view of the drainage for overhaul structure in tubular power station of the present utility model.
Fig. 3 is that A-A of Fig. 2 is to sectional drawing.
Fig. 4 is that B-B of Fig. 2 is to sectional drawing.
Fig. 5 is that C-C of Fig. 2 is to sectional drawing.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail:
Shown in Fig. 2-5, the drainage for overhaul structure in tubular power station of the present utility model, comprise collector drain 6, collecting well 12, generator bottom enter hole 3, generator vertical support 5, the upstream row water pipe 1 that is communicated with runner upstream 13 and collector drain 6 respectively, the downstream row water pipe 2 that is communicated with draft tube 7 and collector drain 6 respectively, be arranged on upstream tube discharging valve 4 and the downstream discharging valve 14 that is arranged on the downstream row water pipe 2 on the upstream row water pipe 1, described upstream tube discharging valve 4 is arranged in the water inlet 10 of upstream row water pipe, and downstream tube discharging valve 14 is arranged in the water inlet 15 of downstream row water pipe.
Described generator bottom enter hole 3 upstream extends to below, generator vertical support 5 bottoms, form installing space, described gutter water inlet 10 is arranged on side, generator vertical support 5 rear, upstream tube discharging valve 4 is arranged in the installing space that generator bottom enter hole 3 forms below generator vertical support 5 bottoms, connect the water inlet 10 that generator vertical support 5 base plates stretch to the upstream row water pipe, at draft tube 7 lower space setting operation gallerys 9, operating gallery 9 extends to downstream row water pipe 2 water inlets below, downstream tube discharging valve 14 is arranged on the end of operating gallery 9, connects the water inlet 15 that operating gallery 9 top boards stretch to the downstream row water pipe.
Described upstream tube discharging valve 4 and downstream tube discharging valve 14 adopt lower operated disc type valve.
Be respectively arranged with trashrack 11 at the water inlet 10 of described upstream row water pipe and the water inlet 15 of downstream row water pipe.
Present embodiment comprises three groups of separate upstream row water pipes 1 and downstream row water pipe 2, every group of corresponding factory building unit of gutter, upstream row water pipe 1 is communicated with runner upstream 13 and collector drain 6 collecting wells 12, downstream row water pipe 2 is communicated with draft tube 7 and collector drain 6 collecting wells 12, every gutter is all installed a discharging valve 4,14, and discharging valve is arranged in the gutter import, prevents that gutter is by the silt silting.
Present embodiment middle and upper reaches gutter 1 is offered water inlet 10 in side, generator vertical support 5 rear, and generator bottom enter hole 3 upstream extends installation discharging valve 4; Downstream row water pipe 2 utilizes draft tube 7 lower space to establish an operating gallery 9, and operating gallery 9 extends to downstream row water pipe 2 water inlets below from water wheels motor-pumped well 8 downstream sidewalls, at the operating gallery 9 terminal discharging valves 14 of installing; For preventing that foreign material silt gutter up, the trashrack 11 of steel work processing is set at the gutter water inlet.
For guaranteeing Power station structure safety, generator bottom enter hole 3 upstream extension need strengthen arrangement of reinforcement, gutter water inlet 10 will be avoided generator vertical support embedded part and downstream will guarantee to leave enough concrete structure thickness (should greater than 500mm), guarantee to leave enough concrete structure thickness (should greater than 1500mm) between draft tube 7 and the operating gallery 9, collector drain 6 can suitably reduce and guarantees to leave enough concrete structure thickness (should greater than 500mm) between elevation and the operating gallery 9.
Above-described embodiment only is used for illustrating technological thought of the present utility model and characteristics, its purpose is to make those skilled in the art can understand content of the present utility model and implements according to this, can not only limit claim of the present utility model with present embodiment, be equal variation or the modification that spirit that all the utility model disclose is done, still drop in the claim of the present utility model.

Claims (4)

1.一种贯流式水电站的检修排水结构,包括排水廊道(6)、集水井(12)、发电机下部进人孔(3)、发电机垂直支撑(5)、分别与流道上游(13)和排水廊道(6)连通的上游排水管(1)、分别与尾水管(7)和排水廊道(6)连通的下游排水管(2)、设置在上游排水管(1)上的上游管放水阀(4)和设置在下游排水管(2)上的下游放水阀(14),其特征在于:所述上游管放水阀(4)布置在上游排水管的进水口(10),下游管放水阀(14)布置在下游排水管的进水口(15)。1. A maintenance and drainage structure for a tubular hydropower station, including a drainage corridor (6), a water collection well (12), a manhole at the lower part of the generator (3), a vertical support for the generator (5), and the upstream of the flow channel respectively. (13) The upstream drainage pipe (1) connected to the drainage gallery (6), the downstream drainage pipe (2) respectively connected to the draft pipe (7) and the drainage gallery (6), and the upstream drainage pipe (1) The upstream pipe drain valve (4) on the top and the downstream drain valve (14) arranged on the downstream drain pipe (2), characterized in that: the upstream pipe drain valve (4) is arranged at the water inlet (10) of the upstream drain pipe ), the downstream pipe drain valve (14) is arranged at the water inlet (15) of the downstream drain pipe. 2.根据权利要求1所述的贯流式水电站的检修排水结构,其特征在于:所述发电机下部进人孔(3)向上游延伸到发电机垂直支撑(5)底部下方,形成安装空间,所述排水管进水口(10)设置在发电机垂直支撑(5)后方侧面,上游管放水阀(4)设置在发电机下部进人孔(3)在发电机垂直支撑(5)底部下方形成的安装空间中,贯通发电机垂直支撑(5)底板伸向上游排水管的进水口(10),在尾水管(7)下部空间设置操作廊道(9),操作廊道(9)延伸至下游排水管(2)进水口下方,下游管放水阀(14)设置在操作廊道(9)的末端,贯通操作廊道(9)顶板伸向下游排水管的进水口(15)。2. The maintenance and drainage structure of the tubular hydropower station according to claim 1, characterized in that: the manhole (3) at the lower part of the generator extends upstream to the bottom of the vertical support (5) of the generator, forming an installation space , the drain pipe water inlet (10) is set on the rear side of the generator vertical support (5), and the upstream pipe drain valve (4) is set on the manhole (3) at the lower part of the generator below the bottom of the generator vertical support (5) In the formed installation space, the vertical support (5) bottom plate of the penetrating generator extends to the water inlet (10) of the upstream drain pipe, and an operation corridor (9) is set in the space below the draft tube (7), and the operation corridor (9) extends Below the water inlet of the downstream drain pipe (2), the downstream pipe discharge valve (14) is arranged at the end of the operation corridor (9), and runs through the top plate of the operation corridor (9) to the water inlet (15) of the downstream drain pipe. 3.根据权利要求2所述的贯流式水电站的检修排水结构,其特征在于:所述上游管放水阀(4)和下游管放水阀(14)采用下操作式盘型阀。3. The inspection and drainage structure of the tubular hydropower station according to claim 2, characterized in that: the upstream pipe water discharge valve (4) and the downstream pipe water discharge valve (14) adopt a down-operated disc valve. 4.根据权利要求1、2或3所述的贯流式水电站的检修排水结构,其特征在于:在所述上游排水管的进水口(10)和下游排水管的进水口(15)分别设置有拦污栅(11)。4. The maintenance and drainage structure of the tubular hydropower station according to claim 1, 2 or 3, characterized in that: the water inlet (10) of the upstream drainage pipe and the water inlet (15) of the downstream drainage pipe are respectively set There are trash racks (11).
CN2012204250888U 2012-08-24 2012-08-24 Overhaul drainage structure of through-flow hydropower station Withdrawn - After Issue CN202755355U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204250888U CN202755355U (en) 2012-08-24 2012-08-24 Overhaul drainage structure of through-flow hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204250888U CN202755355U (en) 2012-08-24 2012-08-24 Overhaul drainage structure of through-flow hydropower station

Publications (1)

Publication Number Publication Date
CN202755355U true CN202755355U (en) 2013-02-27

Family

ID=47734544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204250888U Withdrawn - After Issue CN202755355U (en) 2012-08-24 2012-08-24 Overhaul drainage structure of through-flow hydropower station

Country Status (1)

Country Link
CN (1) CN202755355U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808399A (en) * 2012-08-24 2012-12-05 中水北方勘测设计研究有限责任公司 Service drainage structure of through flow hydropower station
CN104120693A (en) * 2014-08-12 2014-10-29 广东梅雁吉祥水电股份有限公司 Energy-saving drainage system for bulb through-flow generator units

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808399A (en) * 2012-08-24 2012-12-05 中水北方勘测设计研究有限责任公司 Service drainage structure of through flow hydropower station
CN104120693A (en) * 2014-08-12 2014-10-29 广东梅雁吉祥水电股份有限公司 Energy-saving drainage system for bulb through-flow generator units
CN104120693B (en) * 2014-08-12 2016-01-20 广东梅雁吉祥水电股份有限公司 The energy-saving drainage system of a kind of bulb type generator set

Similar Documents

Publication Publication Date Title
JP6873444B2 (en) A system that uses the energy storage pipes of multiple high-rise buildings to generate electricity
CN202181543U (en) A flood discharge tunnel structure
CN102936920B (en) Vacuum rainwater drainage system and method
CN202416168U (en) Viaduct rainwater collection system
CN102400452B (en) Dirt preventing facility and construction method thereof
CN202755355U (en) Overhaul drainage structure of through-flow hydropower station
CN104452685B (en) A kind of classification buoyancy lift type checkdam
CN201404718Y (en) Gravity-type valveless filter
CN102269181A (en) Butt matching low-hump-type bidirectional water-outlet flow channel
CN202588003U (en) Simple multi-hole hose surge flow irrigation system
CN106514846A (en) Novel pipe piece water maintenance pool
CN104278739A (en) Prefabricated pump station system
CN204237620U (en) A kind of water distribution uniform anaerobic reactor whirlwind-type water distributor
CN204311415U (en) A kind of classification buoyancy lift type checkdam
CN102808399B (en) Service drainage structure of through flow hydropower station
CN207646698U (en) Training for sediment structure with suspended sediment collecting function
CN202865974U (en) Vacuum rainwater drainage system
CN205444086U (en) A water intaking structure for pump station river course
CN205935150U (en) Rain water pipe assembly
CN203716279U (en) Sewage lifting pump station
CN203334419U (en) Pump station system
CN204107115U (en) Sewage valveless filtering pool
CN201713934U (en) Overflow and siphon automatic blowdown apparatus
CN209620172U (en) Novel inverted siphon water pipeline mud discharging and emptying structure
CN206667363U (en) A kind of submergence type culvert water inlet structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130227

Effective date of abandoning: 20150114

AV01 Patent right actively abandoned

Granted publication date: 20130227

Effective date of abandoning: 20150114

RGAV Abandon patent right to avoid regrant