CN202731272U - Suspended construction assisting trolley - Google Patents

Suspended construction assisting trolley Download PDF

Info

Publication number
CN202731272U
CN202731272U CN 201220354963 CN201220354963U CN202731272U CN 202731272 U CN202731272 U CN 202731272U CN 201220354963 CN201220354963 CN 201220354963 CN 201220354963 U CN201220354963 U CN 201220354963U CN 202731272 U CN202731272 U CN 202731272U
Authority
CN
China
Prior art keywords
support bar
connecting rod
guardrail
rod
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220354963
Other languages
Chinese (zh)
Inventor
赵书杰
陈忠伟
韩小亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN 201220354963 priority Critical patent/CN202731272U/en
Application granted granted Critical
Publication of CN202731272U publication Critical patent/CN202731272U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a suspended construction assisting trolley, comprising a supporting frame arranged above a dam crest guardrail, a reservoir guiderail or a parapet wall, wherein a bogie frame is arranged on the inner side of the dam crest guardrail, the reservoir guiderail or the parapet wall; a plurality of travelling wheels are arranged at the bottom of the bogie frame; one end of the supporting frame is arranged on the inner side of the dam crest guardrail, the reservoir guiderail or the parapet wall and connected with the bogie frame; the other end of the supporting frame bypasses the dam crest guardrail, the reservoir guiderail or the parapet wall and is suspended on the outer side of the dam crest guardrail, the reservoir guiderail or the parapet wall; and an operating platform connected with the supporting frame is arranged on the outer side of the dam crest guardrail, the reservoir guiderail or the parapet wall. The suspended construction assisting trolley can improve safety of construction and the construction efficiency, and has the advantages of simple structure, convenience for use and low production cost, so that the trolley is easy to popularize and apply.

Description

Chassis is assisted in a kind of unsettled construction
Technical field
The utility model relates to a kind of equipment of unsettled construction, particularly relates to the auxiliary chassis of a kind of unsettled construction.
Background technology
Usually, when dam dam crest guardrail, reservoir guardrail, the construction of high building parapet, Yi Bian be walking surface, another side then is unsettled, need to whitewash, decorate dam crest guardrail, reservoir guardrail, the unsettled face of parapet, usually way is to set up shelf, sets up full hall frame from the ground of unsettled side, perhaps hangs rope, the human rope is helped, hanging and constructing, using these methods to construct, construction cost is high, efficiency of construction is low, danger is high.
The utility model content
The purpose of this utility model is to overcome above-mentioned deficiency of the prior art, provides a kind of unsettled construction to assist chassis.The auxiliary chassis of this unsettled construction can improve the safety of construction, and has improved efficiency of construction, and it is simple in structure, easy to use, cost of production is low, is convenient to promote the use of.
For achieving the above object, the technical solution adopted in the utility model is: chassis is assisted in a kind of unsettled construction, it is characterized in that: comprise being arranged on the dam crest guardrail, the bracing frame of reservoir guardrail or parapet top, described dam crest guardrail, the inboard of reservoir guardrail or parapet is provided with bogie frame, the bottom of described bogie frame is provided with a plurality of road wheels, one end of support frame as described above is arranged on the dam crest guardrail, reservoir guardrail or parapet inboard and be connected with bogie frame, the other end of support frame as described above is walked around the dam crest guardrail, reservoir guardrail or parapet and the unsettled dam crest guardrail that is arranged on, the outside of reservoir guardrail or parapet, described dam crest guardrail, the arranged outside of reservoir guardrail or parapet has the operating platform that is connected with bracing frame.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: on the support frame as described above and the top that is positioned at bogie frame is provided with equilibrate counterweight.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: described operating platform is connected with the top of bracing frame by wire rope near an end of dam crest guardrail, reservoir guardrail or parapet.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: support frame as described above comprises for the medial cradle that is connected with bogie frame, is used for the outrigger and the level connection joint support that is used to be connected medial cradle and outrigger of fitting operation platform.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: described medial cradle comprises horizontally disposed support bar one and support bar two, described support bar one and support bar two be arranged in parallel mutually, the together side that described support bar one is connected with support bar connects by support bar three, described support bar one are connected with support bar another connect by support bar four with side, be provided with between described support bar one and the support bar two for the support bar five that balancing weight is installed, the bottom surface of described support bar one and support bar two is provided with supporting leg, the top of described support bar three is provided with the support bar seven that the support bar six that is connected with support bar 31 ends is connected with support bar three other ends, described support bar six vertically arranges, the upper end of described support bar seven is connected with the upper end of support bar six, the top of described support bar four is provided with the support bar eight that is connected with support bar 41 ends and the support bar nine that is connected with support bar four other ends, described support bar eight vertically arranges, the upper end of described support bar nine is connected with the upper end of support bar eight, and the upper end of the upper end of described support bar six and support bar eight is connected by support bar ten; Described level connection joint support comprises the connecting rod one that is parallel to each other and is inclined to set and connecting rod two and the connecting rod three that parallels with support bar ten, one end of described connecting rod one is connected with the upper end of support bar six, the other end of described connecting rod one is connected with an end of connecting rod three, one end of described connecting rod two is connected with the upper end of support bar eight, the other end of described connecting rod two is connected with the other end of connecting rod three, be horizontally disposed with under the described connecting rod one and be useful on the connecting rod four that connects support bar six and connecting rod three, be horizontally disposed with under the described connecting rod two and be useful on the connecting rod five that connects support bar eight and connecting rod three; Described outrigger comprises connecting rod six and the connecting rod seven of vertical setting, the upper end of described connecting rod six is connected with connecting rod four, the upper end of described connecting rod seven is connected with connecting rod five, described operating platform is connected with the lower end of connecting rod six and the lower end of connecting rod seven, be provided with suspension ring one on the described connecting rod four, described operating platform is provided with the suspension ring two corresponding with suspension ring one position near an end of dam crest guardrail, reservoir guardrail or parapet, and described suspension ring one are connected with suspension ring by wire rope one connection; Be provided with suspension ring three on the described connecting rod five, described operating platform is provided with the suspension ring four corresponding with suspension ring three positions near an end of dam crest guardrail, reservoir guardrail or parapet, and described suspension ring three are connected wire rope two connections with the suspension ring four-way.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: described connecting rod four bottom surfaces are connected with the hound one that is connected with support bar six and the hound two that is connected with connecting rod six; Described connecting rod five bottom surfaces are connected with the hound three that is connected with support bar eight and the hound four that is connected with connecting rod seven.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: be provided with protective guard on the described operating platform.
Chassis is assisted in above-mentioned a kind of unsettled construction, it is characterized in that: described protective guard comprises the fender rod one that is horizontally set on the operating platform top, fender rod two, fender rod three and fender rod four, one end of described fender rod one is connected with connecting rod six, the other end of described fender rod one is connected with connecting rod seven, described fender rod one, fender rod two, fender rod three and fender rod four head and the tail are connected to form framework in turn, one end of described fender rod three is connected with operating platform by fender rod five, the other end of described fender rod three is connected with operating platform by fender rod six, be provided with hound five between described fender rod five and the connecting rod six, be provided with hound six between described fender rod six and the connecting rod seven, be provided with interlaced hound seven between described fender rod one and the operating platform.
The utility model compared with prior art has the following advantages:
1, of the present utility model simple in structure, rationally novel in design, be easy to install.
When 2, the utility model used, operating personnel stood on the operating platform and construct, and drove the auxiliary chassis integrated moving of this unsettled construction by road wheel, used more conveniently, had improved the safety of constructing.
3, the utility model is simple for production, can carry out field fabrication according to the job site environment, and can be in conjunction with manned payload, by calculating and then select suitable counterweight, guarantee safety factor, can realize effect with low cost, safe and reliable, that work efficiency improves.
4, realization cost of the present utility model is low, and result of use is good, is convenient to promote the use of.
In sum, the utility model is simple in structure, and rationally novel in design, functional reliability is high, and long service life can improve the safety of construction, and has improved efficiency of construction, and it is easy to use, cost of production is low, is convenient to promote the use of.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model bracing frame.
Fig. 3 is the structural representation of the utility model protective guard.
Description of reference numerals:
1-dam crest guardrail, reservoir guardrail or parapet; 2-bracing frame;
2-1-medial cradle; 2-1-1-support bar one; 2-1-2-support bar two;
2-1-3-support bar three; 2-1-4-support bar four; 2-1-5-support bar five;
2-1-6-support bar six; 2-1-7-support bar seven; 2-1-8-support bar eight;
2-1-9-support bar nine; 2-1-10-support bar ten; 2-1-11-supporting leg;
2-2-level connection joint support; 2-2-1-connecting rod one; 2-2-2-connecting rod two;
2-2-3-connecting rod three; 2-2-4-connecting rod four; 2-2-5-connecting rod five;
2-2-6-hound one; 2-2-7-hound two; 2-2-8-hound three;
2-2-9-hound four; 2-3-outrigger; 2-3-1-connecting rod six;
2-3-2-connecting rod seven; 3-bogie frame; 4-road wheel;
5-operating platform; 6-suspension ring one; 7-suspension ring two;
8-wire rope one; 9-suspension ring three; 10-suspension ring four;
11-wire rope two; 12-protective guard; 12-1-fender rod one;
12-2-fender rod two; 12-3-fender rod three; 12-4-fender rod four;
12-5-fender rod five; 12-6-fender rod six; 12-7-hound five;
12-8-hound six; 12-9-hound seven; 13-equilibrate counterweight.
The specific embodiment
Chassis is assisted in a kind of unsettled construction as shown in Figure 1, comprise and be arranged on the dam crest guardrail, the bracing frame 2 of reservoir guardrail or parapet 1 top, described dam crest guardrail, the inboard of reservoir guardrail or parapet 1 is provided with bogie frame 3, the bottom of described bogie frame 3 is provided with a plurality of road wheels 4, one end of support frame as described above 2 is arranged on the dam crest guardrail, reservoir guardrail or parapet 1 inboard and be connected with bogie frame 3, the other end of support frame as described above 2 is walked around the dam crest guardrail, reservoir guardrail or parapet 1 and the unsettled dam crest guardrail that is arranged on, the outside of reservoir guardrail or parapet 1, described dam crest guardrail, the arranged outside of reservoir guardrail or parapet 1 has the operating platform 5 that is connected with bracing frame 2.
During use, the constructor stands on the operating platform 5, promote bogie frame 3, bogie frame 3 is realized operating platform 5 movement in the horizontal direction under the drive of road wheel 4, the auxiliary chassis of this unsettled construction has improved the safety of construction greatly, simultaneously also significantly improved efficiency of construction, easy to utilize.
As shown in Figure 1, on the support frame as described above 2 and top that is positioned at bogie frame 3 is provided with equilibrate counterweight 13.By equilibrate counterweight 13 is set, can guarantee the supporting ﹠ stablizing of bracing frame 2, can not produce inclination, use very safe.
As depicted in figs. 1 and 2, described operating platform 5 is connected by the top of wire rope with bracing frame 2 near an end of dam crest guardrail, reservoir guardrail or parapet 1.
In conjunction with Fig. 1 and Fig. 2, support frame as described above 2 comprises for the medial cradle 2-1 that is connected with bogie frame 3, is used for the outrigger 2-3 and the level connection joint support 2-2 that is used to be connected medial cradle 2-1 and outrigger 2-3 of fitting operation platform 5.Described medial cradle 2-1 comprises horizontally disposed support bar one 2-1-1 and support bar two 2-1-2, described support bar one 2-1-1 and support bar two 2-1-2 are arranged in parallel, described support bar one 2-1-1 is connected the together side of 2-1-2 and is connected by support bar three 2-1-3 with support bar, described support bar one 2-1-1 is connected another of 2-1-2 and is connected by support bar four 2-1-4 with side with support bar, be provided with between described support bar one 2-1-1 and support bar two 2-1-2 for support bar five 2-1-5 that balancing weight is installed, the bottom surface of described support bar one 2-1-1 and support bar two 2-1-2 is provided with supporting leg 2-1-11, the top of described support bar three 2-1-3 is provided with support bar seven 2-1-7 that support bar six 2-1-6 that are connected with support bar three 2-1-3 one end are connected with the support bar three 2-1-3 other ends, described support bar six 2-1-6 vertically arrange, the upper end of described support bar seven 2-1-7 is connected with the upper end of support bar six 2-1-6, the top of described support bar four 2-1-4 is provided with support bar eight 2-1-8 that are connected with support bar four 2-1-4 one end and support bar nine 2-1-9 that are connected with the support bar four 2-1-4 other ends, described support bar eight 2-1-8 vertically arrange, the upper end of described support bar nine 2-1-9 is connected with the upper end of support bar eight 2-1-8, and the upper end of the upper end of described support bar six 2-1-6 and support bar eight 2-1-8 is connected by support bar ten 2-1-10; Described level connection joint support 2-2 comprises connecting rod one 2-2-1 that is parallel to each other and is inclined to set and connecting rod two 2-2-2 and connecting rod three 2-2-3 that parallel with support bar ten 2-1-10, the end of described connecting rod one 2-2-1 is connected with the upper end of support bar six 2-1-6, the other end of described connecting rod one 2-2-1 is connected with the end of connecting rod three 2-2-3, the end of described connecting rod two 2-2-2 is connected with the upper end of support bar eight 2-1-8, the other end of described connecting rod two 2-2-2 is connected with the other end of connecting rod three 2-2-3, be horizontally disposed with under described connecting rod one 2-2-1 and be useful on connecting rod four 2-2-4 that connect support bar six 2-1-6 and connecting rod three 2-2-3, be horizontally disposed with under described connecting rod two 2-2-2 and be useful on connecting rod five 2-2-5 that connect support bar eight 2-1-8 and connecting rod three 2-2-3; Described outrigger 2-3 comprises connecting rod six 2-3-1 and connecting rod seven 2-3-2 of vertical setting, the upper end of described connecting rod six 2-3-1 is connected with connecting rod four 2-2-4, the upper end of described connecting rod seven 2-3-2 is connected with connecting rod five 2-2-5, described operating platform 5 is connected with the lower end of connecting rod six 2-3-1 and the lower end of connecting rod seven 2-3-2, be provided with suspension ring 1 on described connecting rod four 2-2-4, described operating platform 5 is near the dam crest guardrail, one end of reservoir guardrail or parapet 1 is provided with the suspension ring two 7 corresponding with suspension ring one 6 positions, and described suspension ring 1 are connected 7 by wire rope one 8 connections with suspension ring; Be provided with suspension ring 39 on described connecting rod five 2-2-5, described operating platform 5 is provided with the suspension ring four 10 corresponding with suspension ring 39 positions near an end of dam crest guardrail, reservoir guardrail or parapet 1, and described suspension ring 39 are connected 10 by wire rope 2 11 connections with suspension ring.
As shown in Figure 2, described connecting rod four 2-2-4 bottom surfaces are connected with hound one 2-2-6 that is connected with support bar six 2-1-6 and hound two 2-2-7 that are connected with connecting rod six 2-3-1; Described connecting rod five 2-2-5 bottom surfaces are connected with hound three 2-2-8 that are connected with support bar eight 2-1-8 and hound four 2-2-9 that are connected with connecting rod seven 2-3-2.By hound one 2-2-6, hound two 2-2-7, hound three 2-2-8 and hound four 2-2-9 are set, improved the intensity of bracing frame 2.
In conjunction with Fig. 1 and Fig. 3, be provided with on the described operating platform 5 for the protection of constructor's safety protective guard 12.Described protective guard 12 comprises fender rod one 12-1 that is horizontally set on operating platform 5 tops, fender rod two 12-2, fender rod three 12-3 and fender rod four 12-4, the end of described fender rod one 12-1 is connected with connecting rod six 2-3-1, the other end of described fender rod one 12-1 is connected with connecting rod seven 2-3-2, described fender rod one 12-1, fender rod two 12-2, fender rod three 12-3 and fender rod four 12-4 head and the tail are connected to form framework in turn, the end of described fender rod three 12-3 is connected with operating platform 5 by fender rod five 12-5, the other end of described fender rod three 12-3 is connected with operating platform 5 by fender rod six 12-6, be provided with hound five 12-7 between described fender rod five 12-5 and connecting rod six 2-3-1, be provided with hound six 12-8 between described fender rod six 12-6 and connecting rod seven 2-3-2, be provided with interlaced hound seven 12-9 between described fender rod one 12-1 and the operating platform 5.By hound five 12-7, hound six 12-8 and hound seven 12-9 are set, strengthened the protective action of protective guard 12.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every according to the utility model technical spirit to any simple modification, change and equivalent structure transformation that above embodiment does, all still belong in the protection domain of technical solutions of the utility model.

Claims (7)

1. chassis is assisted in a unsettled construction, it is characterized in that: comprise being arranged on the dam crest guardrail, the bracing frame (2) of reservoir guardrail or parapet (1) top, described dam crest guardrail, the inboard of reservoir guardrail or parapet (1) is provided with bogie frame (3), the bottom of described bogie frame (3) is provided with a plurality of road wheels (4), one end of support frame as described above (2) is arranged on the dam crest guardrail, reservoir guardrail or parapet (1) inboard and be connected with bogie frame (3), the other end of support frame as described above (2) is walked around the dam crest guardrail, reservoir guardrail or parapet (1) and the unsettled dam crest guardrail that is arranged on, the outside of reservoir guardrail or parapet (1), described dam crest guardrail, the arranged outside of reservoir guardrail or parapet (1) has the operating platform (5) that is connected with bracing frame (2).
2. the auxiliary chassis of a kind of unsettled construction according to claim 1 is characterized in that: support frame as described above (2) top upper and that be positioned at bogie frame (3) is provided with equilibrate counterweight (13).
3. the auxiliary chassis of a kind of unsettled construction according to claim 1 is characterized in that: support frame as described above (2) comprises for the medial cradle (2-1) that is connected with bogie frame (3), is used for the outrigger (2-3) and the level connection joint support (2-2) that is used to be connected medial cradle (2-1) and outrigger (2-3) of fitting operation platform (5).
4. chassis is assisted in a kind of unsettled construction according to claim 3, it is characterized in that: described medial cradle (2-1) comprises horizontally disposed support bar one (2-1-1) and support bar two (2-1-2), described support bar one (2-1-1) and support bar two (2-1-2) are arranged in parallel, described support bar one (2-1-1) is connected the together side of (2-1-2) and is connected by support bar three (2-1-3) with support bar, described support bar one (2-1-1) is connected another of (2-1-2) and is connected by support bar four (2-1-4) with side with support bar, be provided with between described support bar one (2-1-1) and the support bar two (2-1-2) for the support bar five (2-1-5) that balancing weight is installed, the bottom surface of described support bar one (2-1-1) and support bar two (2-1-2) is provided with supporting leg (2-1-11), the top of described support bar three (2-1-3) is provided with the support bar seven (2-1-7) that the support bar six (2-1-6) that is connected with support bar three (2-1-3) end is connected with support bar three (2-1-3) other end, described support bar six (2-1-6) vertically arranges, the upper end of described support bar seven (2-1-7) is connected with the upper end of support bar six (2-1-6), the top of described support bar four (2-1-4) is provided with the support bar eight (2-1-8) that is connected with support bar four (2-1-4) end and the support bar nine (2-1-9) that is connected with support bar four (2-1-4) other end, described support bar eight (2-1-8) vertically arranges, the upper end of described support bar nine (2-1-9) is connected with the upper end of support bar eight (2-1-8), and the upper end of the upper end of described support bar six (2-1-6) and support bar eight (2-1-8) is connected by support bar ten (2-1-10); Described level connection joint support (2-2) comprises the connecting rod one (2-2-1) that is parallel to each other and is inclined to set and connecting rod two (2-2-2) and the connecting rod three (2-2-3) that parallels with support bar ten (2-1-10), one end of described connecting rod one (2-2-1) is connected with the upper end of support bar six (2-1-6), the other end of described connecting rod one (2-2-1) is connected with an end of connecting rod three (2-2-3), one end of described connecting rod two (2-2-2) is connected with the upper end of support bar eight (2-1-8), the other end of described connecting rod two (2-2-2) is connected with the other end of connecting rod three (2-2-3), be horizontally disposed with under the described connecting rod one (2-2-1) and be useful on the connecting rod four (2-2-4) that connects support bar six (2-1-6) and connecting rod three (2-2-3), be horizontally disposed with under the described connecting rod two (2-2-2) and be useful on the connecting rod five (2-2-5) that connects support bar eight (2-1-8) and connecting rod three (2-2-3); Described outrigger (2-3) comprises connecting rod six (2-3-1) and the connecting rod seven (2-3-2) of vertical setting, the upper end of described connecting rod six (2-3-1) is connected with connecting rod four (2-2-4), the upper end of described connecting rod seven (2-3-2) is connected with connecting rod five (2-2-5), described operating platform (5) is connected with the lower end of connecting rod six (2-3-1) and the lower end of connecting rod seven (2-3-2), be provided with suspension ring one (6) on the described connecting rod four (2-2-4), described operating platform (5) is near the dam crest guardrail, one end of reservoir guardrail or parapet (1) is provided with the suspension ring two (7) corresponding with suspension ring one (6) position, described suspension ring one (6) are connected with suspension ring (7) connect by wire rope one (8); Be provided with suspension ring three (9) on the described connecting rod five (2-2-5), described operating platform (5) is provided with the suspension ring four (10) corresponding with suspension ring three (9) positions near an end of dam crest guardrail, reservoir guardrail or parapet (1), and described suspension ring three (9) are connected (10) by wire rope two (11) connections with suspension ring.
5. chassis is assisted in a kind of unsettled construction according to claim 4, and it is characterized in that: described connecting rod four (2-2-4) bottom surface is connected with the hound one (2-2-6) that is connected with support bar six (2-1-6) and the hound two (2-2-7) that is connected with connecting rod six (2-3-1); Described connecting rod five (2-2-5) bottom surface is connected with the hound three (2-2-8) that is connected with support bar eight (2-1-8) and the hound four (2-2-9) that is connected with connecting rod seven (2-3-2).
6. the auxiliary chassis of a kind of unsettled construction according to claim 4 is characterized in that: be provided with protective guard (12) on the described operating platform (5).
7. chassis is assisted in a kind of unsettled construction according to claim 5, it is characterized in that: described protective guard (12) comprises the fender rod one (12-1) that is horizontally set on operating platform (5) top, fender rod two (12-2), fender rod three (12-3) and fender rod four (12-4), one end of described fender rod one (12-1) is connected with connecting rod six (2-3-1), the other end of described fender rod one (12-1) is connected with connecting rod seven (2-3-2), described fender rod one (12-1), fender rod two (12-2), fender rod three (12-3) and fender rod four (12-4) head and the tail are connected to form framework in turn, one end of described fender rod three (12-3) is connected with operating platform (5) by fender rod five (12-5), the other end of described fender rod three (12-3) is connected with operating platform (5) by fender rod six (12-6), be provided with hound five (12-7) between described fender rod five (12-5) and the connecting rod six (2-3-1), be provided with hound six (12-8) between described fender rod six (12-6) and the connecting rod seven (2-3-2), be provided with interlaced hound seven (12-9) between described fender rod one (12-1) and the operating platform (5).
CN 201220354963 2012-07-22 2012-07-22 Suspended construction assisting trolley Expired - Lifetime CN202731272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220354963 CN202731272U (en) 2012-07-22 2012-07-22 Suspended construction assisting trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220354963 CN202731272U (en) 2012-07-22 2012-07-22 Suspended construction assisting trolley

Publications (1)

Publication Number Publication Date
CN202731272U true CN202731272U (en) 2013-02-13

Family

ID=47656984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220354963 Expired - Lifetime CN202731272U (en) 2012-07-22 2012-07-22 Suspended construction assisting trolley

Country Status (1)

Country Link
CN (1) CN202731272U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018657A (en) * 2014-05-30 2014-09-03 浙江省东阳第三建筑工程有限公司 Method for constructing high and large cornice through horizontal sliding platform
CN105781094A (en) * 2016-04-15 2016-07-20 安徽机电职业技术学院 Electric hanger for construction
CN106382001A (en) * 2016-08-31 2017-02-08 中建三局第建设工程有限责任公司 Parapet wall mold supporting frame capable of being moved and revolved
CN109610800A (en) * 2018-11-26 2019-04-12 中国十七冶集团有限公司 A kind of architectural engineering movable altitude faces side safety work device and application method
CN109763638A (en) * 2018-12-24 2019-05-17 中建三局集团有限公司 A kind of high-altitude overhanging facade special type working vehicle and its construction method
CN112554538A (en) * 2020-11-27 2021-03-26 宋广生 Lifting device for building outer wall painting

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018657A (en) * 2014-05-30 2014-09-03 浙江省东阳第三建筑工程有限公司 Method for constructing high and large cornice through horizontal sliding platform
CN105781094A (en) * 2016-04-15 2016-07-20 安徽机电职业技术学院 Electric hanger for construction
CN106382001A (en) * 2016-08-31 2017-02-08 中建三局第建设工程有限责任公司 Parapet wall mold supporting frame capable of being moved and revolved
CN109610800A (en) * 2018-11-26 2019-04-12 中国十七冶集团有限公司 A kind of architectural engineering movable altitude faces side safety work device and application method
CN109763638A (en) * 2018-12-24 2019-05-17 中建三局集团有限公司 A kind of high-altitude overhanging facade special type working vehicle and its construction method
CN112554538A (en) * 2020-11-27 2021-03-26 宋广生 Lifting device for building outer wall painting

Similar Documents

Publication Publication Date Title
CN202731272U (en) Suspended construction assisting trolley
CN201286669Y (en) Folding type window cleaning device
CN105735140B (en) A kind of bridge side platform device for high-altitude operation
CN104912367B (en) Nothing avoids storied 3-D parking apparatus ride board connecting structure
CN201665307U (en) CUG track type window cleaning machine
CN110485289A (en) A kind of inspection platform in extension type double plane cable stayed bridge king-post drag-line area
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN105752894B (en) Suspension bridge main cable self-climbing maintenance platform trolley
CN103352559A (en) Hanging type movable working platform for storage tank maintenance
CN103086276B (en) Construction method for hoisting bridge type crane in high-rise well tower type building
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN202882377U (en) Hanging scaffold for integral hanging construction of truss
CN202465099U (en) Single-girder partial hanging gantry crane
CN201174560Y (en) Elevated DC feeding power supplying apparatus
CN202271999U (en) Rescue trolley used on straddle type monorail rail tracks
CN202729645U (en) Tower crane with elevator
CN202390106U (en) Lifting hook portal crane easy to maintain
CN205893930U (en) Self -propelled hanging flower basket device
CN203499232U (en) Attached lifting scaffold
CN209618693U (en) A kind of encircling type single-beam operation trolley
CN202416890U (en) Welding slag leakage-proof device
CN203555689U (en) Electric hanging basket for vertical shaft
CN203452004U (en) Bottom width overhaul hanging basket of bridge
CN202294448U (en) Rubber-tyred hydraulic transfer truck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130213

CX01 Expiry of patent term