CN202550338U - Mobile insulation track platform for live-line operation on transformer - Google Patents
Mobile insulation track platform for live-line operation on transformer Download PDFInfo
- Publication number
- CN202550338U CN202550338U CN2012201092933U CN201220109293U CN202550338U CN 202550338 U CN202550338 U CN 202550338U CN 2012201092933 U CN2012201092933 U CN 2012201092933U CN 201220109293 U CN201220109293 U CN 201220109293U CN 202550338 U CN202550338 U CN 202550338U
- Authority
- CN
- China
- Prior art keywords
- track
- platform
- insulating
- supporting
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
本实用新型公开了一种变电设备带电作业移动绝缘轨道平台,包括轨道、支撑底座、4架以上的绝缘梯、绝缘平台,支撑底座支撑在轨道上并能沿着轨道滑动,4架以上的绝缘梯分别支撑在支撑底座上,在绝缘梯的上部设置绝缘平台,轨道、支撑底座、4架以上的绝缘梯及绝缘平台之间采用可拆卸的活动连接。本实用新型的变电设备带电作业移动绝缘轨道平台整体拼装方便,安装时间约20分钟,采用轨道式的移动设计,可适应在不平整的场地内平稳转移电位或选择最佳作业位置;采用梯形结构的平台支架及支撑拉杆,使绝缘平台稳定性能及移动性能更加平稳安全;通过轨道式的绝缘平台移动,有效解决了组合距离不足的问题,确保了作业人员进出电场的安全。
The utility model discloses a mobile insulating track platform for live work of substation equipment, which comprises a track, a supporting base, more than four insulating ladders, and an insulating platform. The supporting base is supported on the track and can slide along the track. The insulating ladders are respectively supported on the supporting bases, and an insulating platform is set on the upper part of the insulating ladders, and detachable movable connections are adopted between the rails, the supporting bases, more than 4 insulating ladders and the insulating platforms. The mobile insulated track platform of the substation equipment for live work of the utility model is easy to assemble as a whole, and the installation time is about 20 minutes. It adopts a track-type mobile design, which can adapt to the stable transfer of potential or choose the best working position in an uneven site; it adopts a trapezoidal shape. The structural platform bracket and support rods make the insulation platform stable and mobile performance more stable and safe; the rail-type insulation platform moves effectively solves the problem of insufficient combination distance and ensures the safety of operators entering and exiting the electric field.
Description
技术领域 technical field
本实用新型涉及一种带电作业绝缘平台,特别是一种适用于变电设备等电位带电作业的可移动式绝缘轨道平台。 The utility model relates to an insulating platform for live work, in particular to a movable insulating track platform suitable for equipotential live work of substation equipment.
背景技术 Background technique
近年来,随着我省海西经济区建设步伐的加快,区域经济发展及规模经济建设的快速增长,各地用电负荷猛增,电网超负荷运行时有出现,给电网安全运行、特别是重载变电站的安全运行带来一定隐患,站内设备连接线的接点因超负荷运行过热现象时有发生。因此,及时运用带电作业手段检查紧固设备连接点的工作尤为重要,但目前变电站的带电作业主要手段是以绝缘软梯或普通绝缘平台进行等电位作业,由于变电站的母线及设备错综复杂,使用绝缘软梯因受安全距离和组合距离的制约,大多数作业点工作人员无法进入电场,特别是CT、PT、刀闸或支柱引线接点松脱、过热等缺陷无法得到及时有效地处理,从而影响变电设备的带电作业率及可靠性。 In recent years, with the acceleration of the construction of Haixi Economic Zone in our province, the rapid growth of regional economic development and scale economy construction, the power consumption load in various places has increased sharply, and the overload operation of the power grid has appeared from time to time, which poses a threat to the safe operation of the power grid, especially for heavy-duty The safe operation of the load substation brings certain hidden dangers, and the overheating phenomenon of the connection line of the equipment in the station occurs from time to time due to overload operation. Therefore, it is particularly important to use live work methods to check the connection points of fastening equipment in a timely manner. However, the main means of live work in substations is to perform equipotential work with insulating ladders or ordinary insulating platforms. Due to the restriction of safety distance and combined distance, most of the workers in the operating point cannot enter the electric field, especially defects such as CT, PT, knife switch or pillar lead contact loosening, overheating, etc. cannot be dealt with in a timely and effective manner, thus affecting the substation equipment The live working rate and reliability.
实用新型内容 Utility model content
本实用新型的目的在于克服现有技术的不足之处,而提供一种通过绝缘轨道平台转移等电位作业人员进出电场的路径, 从而实现110~220kV变电站多数设备组合距离虽然不足但仍能进行等电位作业的变电设备带电作业移动绝缘轨道平台。 The purpose of this utility model is to overcome the deficiencies of the prior art, and provide a path for transferring equipotential operators through the insulating track platform to enter and exit the electric field, so as to realize the combination distance of most equipment in 110-220kV substations. Potential work substation equipment live work mobile insulating track platform.
一种变电设备带电作业移动绝缘轨道平台,其结构要点在于:包括轨道、支撑底座、4架以上的绝缘梯、绝缘平台,支撑底座支撑在轨道上并能沿着轨道滑动,4架以上的绝缘梯分别支撑在支撑底座上,在绝缘梯的上部设置绝缘平台,轨道、支撑底座、4架以上的绝缘梯及绝缘平台之间采用可拆卸的活动连接。 A mobile insulating track platform for live work of substation equipment, the key points of its structure are: including a track, a support base, more than 4 insulating ladders, and an insulating platform, the support base is supported on the track and can slide along the track, and more than 4 supports The insulating ladders are respectively supported on the supporting bases, and an insulating platform is set on the upper part of the insulating ladders, and detachable movable connections are adopted between the rails, the supporting bases, more than 4 insulating ladders and the insulating platforms.
这种结构的变电设备带电作业移动绝缘轨道平台,在使用时,将轨道安装在待检修设备下方,而后依次装好支撑底座、4架以上的绝缘梯、绝缘平台,等电位作业人员沿绝缘梯到达绝缘平台,通过移动支撑底座,使等电位作业人员进入电场作业。 The mobile insulating track platform for live work of substation equipment with this structure, when in use, install the track under the equipment to be overhauled, and then install the supporting base, more than 4 insulating ladders, and insulating platforms in sequence, and equipotential operators along the insulating The ladder reaches the insulating platform, and by moving the support base, the equipotential workers can enter the electric field to work.
支撑底座在轨道上的滑动为在支撑底座的下部设置有沿着轨道滚动的滚轮。 The sliding of the support base on the track is that the lower part of the support base is provided with rollers rolling along the track.
在轨道的两端部设置有限制支撑底座滑出轨道的限位装置。 The two ends of the track are provided with limiting devices that limit the support base from sliding out of the track.
所述的限位装置或在轨道上支撑底座的运行方向上设置挡块,或者限位条。 The said limiting device is provided with a stopper or a limiting bar in the running direction of the supporting base on the track.
在支撑底座的下部设置有防止支撑底座脱离轨道的闭锁装置。 The lower part of the support base is provided with a locking device to prevent the support base from deviating from the track.
所述的闭锁装置或为在支撑底座的下方设置有向下延伸的并列设置的两定位条,两定位条分别卡在轨道的内外侧。 The locking device may be provided with two positioning strips extending downwards and arranged side by side under the supporting base, and the two positioning strips are respectively clamped on the inner and outer sides of the track.
所述的闭锁装置或为支撑底座的下方设置有向下延伸的定位条,将定位条用连接件可相对轨道滑动的固定于轨道上。 The locking device may be provided with a downwardly extending positioning bar under the support base, and the positioning bar is fixed on the track with a connecting piece that can slide relative to the track.
所述的连接件或为螺纹连接件,或为插销。 The connecting piece is either a threaded connecting piece or a bolt.
所述的轨道为由开口朝向侧面的槽形钢构成。 The track is made of channel-shaped steel with the opening facing the side.
在支撑底座的上表面在用于支撑绝缘梯的外侧设置有向上延伸的可防止绝缘梯滑出的护栏。 On the upper surface of the support base, an upwardly extending guardrail that can prevent the insulating ladder from sliding out is provided on the outer side for supporting the insulating ladder.
所述的两两排列对称排列的绝缘梯采用“人”字形的形式排列在一起,两相对排列的绝缘梯采用连接杆连接在一起,连接杆与两绝缘梯之间为可拆卸式的活动连接。 The insulating ladders arranged symmetrically in pairs are arranged together in the form of "herringbone", and the two oppositely arranged insulating ladders are connected together by connecting rods, and the connecting rods and the two insulating ladders are detachably connected. .
上述各部件之间的可拆卸活动连接为采用紧固关节件进行连接。 The detachable movable connection between the above-mentioned components is connected by fastening joints.
所述的绝缘梯的各部件之间为可拆卸式的活动连接。 The components of the insulation ladder are detachable and movable connections.
可拆卸式的活动连接绝缘梯的两立柱为由多节管材构成,两两相邻的管材之间采用插入到两管材内腔的销轴将两管材连接到一起,连接好的管材再采用连接件将其定位。 The two columns of the detachable movable connection insulation ladder are composed of multi-section pipes, and the pins inserted into the inner chambers of the two pipes are used to connect the two adjacent pipes together, and the connected pipes are then connected. to position it.
绝缘梯的横杆与立柱之间则采用关节连接件进行连接。 The cross bar and the column of the insulating ladder are connected by joint connectors.
所述的变电设备带电作业移动绝缘轨道平台还包括枕木,所述的枕木铺设在轨道的下方用于支撑轨道。 The live working mobile insulating track platform of the substation equipment further includes sleepers, and the sleepers are laid under the track to support the track.
枕木与轨道之间采用可调固定夹板设计,该可调固定夹板包括有可调螺母丝杆调节装置,固定夹板固定在螺母上,在丝杆的下端设置有撑脚,轨道安装于固定夹板上。 The adjustable fixed splint design is adopted between the sleeper and the track. The adjustable fixed splint includes an adjustable nut screw adjustment device. The fixed splint is fixed on the nut. There is a support foot at the lower end of the screw rod, and the track is installed on the fixed splint. .
所述的轨道亦为拼接式的轨道。 The track is also a spliced track.
轨道采用可拼接式,具有运输装卸方便、安装操作灵活。 The track adopts splicing type, which is convenient for transportation and loading and unloading, and flexible for installation and operation.
在绝缘平台的外周设置有防护栏。 A protective fence is arranged on the outer periphery of the insulating platform.
所述的变电设备带电作业移动绝缘轨道平台还包括有悬挂式辅助绝缘梯。 The mobile insulating track platform for live working of substation equipment also includes a suspended auxiliary insulating ladder.
所述的悬挂式辅助绝缘梯,是对平台作业高度的有效补充,可满足不同结构、不同高度的变电设备带电检修作业,特别是变电站复杂的设备接线情况下,作业人员在绝缘平台上可通过绝缘辅助梯转移作业位置或高度,以提高有效作业范围。 The suspended auxiliary insulating ladder is an effective supplement to the working height of the platform, and can meet the live maintenance operations of substation equipment with different structures and heights. Especially in the case of complicated equipment wiring in substations, operators can The working position or height is shifted through the insulating auxiliary ladder to improve the effective working range.
综上所述的,本实用新型相比现有技术如下优点: In summary, the utility model has the following advantages compared with the prior art:
本实用新型的变电设备带电作业移动绝缘轨道平台整体拼装方便,安装时间约20分钟,采用轨道式的移动设计,可适应在不平整的场地内平稳转移电位或选择最佳作业位置;采用梯形结构的平台支架及支撑拉杆,使绝缘平台稳定性能及移动性能更加平稳安全;通过轨道式的绝缘平台移动,有效解决了组合距离不足的问题,确保了作业人员进出电场的安全。 The mobile insulated track platform of the substation equipment for live work of the utility model is easy to assemble as a whole, and the installation time is about 20 minutes. It adopts a track-type mobile design, which can adapt to the stable transfer of potential or choose the best working position in an uneven site; it adopts a trapezoidal shape. The structural platform bracket and support rods make the insulation platform stable and mobile performance more stable and safe; the rail-type insulation platform moves effectively solves the problem of insufficient combination distance and ensures the safety of operators entering and exiting the electric field.
附图说明 Description of drawings
图1是本实用新型的实施例的变电设备带电作业移动绝缘轨道平台结构示意图。 Figure 1 is a schematic diagram of the structure of the mobile insulating track platform for live work of substation equipment according to an embodiment of the utility model.
图2是支撑底座与轨道配合的示意图。 Figure 2 is a schematic diagram of the cooperation between the support base and the track.
图3是两绝缘梯之间用连接杆将其固定的结构示意图。 Figure 3 is a schematic diagram of the structure of two insulating ladders fixed by connecting rods.
图4是绝缘梯立柱之间的各管材之间的连接结构示意图。 Figure 4 is a schematic diagram of the connection structure between the pipes between the columns of the insulation ladder.
标号说明1轨道11限位装置2支撑底座21滚轮22闭锁装置23支撑底座表面的护栏3绝缘梯31连接杆4绝缘平台5紧固关节件6枕木7防护栏。
DESCRIPTION OF
具体实施方式 Detailed ways
下面结合实施例对本实用新型进行更详细的描述。 Below in conjunction with embodiment the utility model is described in more detail.
实施例1 Example 1
一种如图1-4所示的变电设备带电作业移动绝缘轨道平台,包括轨道1、支撑底座2、4架以上的绝缘梯3、绝缘平台4,支撑底座支撑在轨道上并能沿着轨道滑动,4架的绝缘梯分别支撑在支撑底座上,在绝缘梯的上部设置绝缘平台,轨道、支撑底座、4架的绝缘梯及绝缘平台之间采用可拆卸的活动连接。支撑底座在轨道上的滑动为在支撑底座的下部设置有沿着轨道滚动的滚轮21。在轨道的两端部设置有限制支撑底座滑出轨道的限位装置11。所述的限位装置或在轨道上支撑底座的运行方向上设置挡块。在支撑底座的下部设置有防止支撑底座脱离轨道的闭锁装置22。所述的闭锁装置为支撑底座的下方设置有向下延伸的定位条,将定位条用连接件可相对轨道滑动的固定于轨道上。所述的轨道为由槽形钢构成。在支撑底座的上表面在用于支撑绝缘梯的外侧设置有向上延伸的可防止绝缘梯滑出的护栏23。所述的两两排列对称排列的绝缘梯采用“人”字形的形式排列在一起,两相对排列的绝缘梯采用连接杆31连接在一起,连接杆与两绝缘梯之间为可拆卸式的活动连接。上述各部件之间的可拆卸活动连接为采用紧固关节件5进行连接。所述的绝缘梯的各部件之间为可拆卸式的活动连接。可拆卸式的活动连接绝缘梯的两立柱为由多节管材构成,两两相邻的管材之间采用插入到两管材内腔的销轴将两管材连接到一起,连接好的管材再采用连接件将其定位。绝缘梯的横杆与立柱之间则采用关节连接件进行连接。所述的变电设备带电作业移动绝缘轨道平台还包括枕木6枕木,所述的枕木铺设在轨道的下方用于支撑轨道。枕木与轨道之间采用可调固定夹板设计,该可调固定夹板包括有可调螺母丝杆调节装置,固定夹板固定在螺母上,在丝杆的下端设置有撑脚,轨道安装于固定夹板上。所述的轨道亦为拼接式的轨道。在绝缘平台的外周设置有防护栏7。所述的变电设备带电作业移动绝缘轨道平台还包括有悬挂式辅助绝缘梯。
A mobile insulated track platform for live work of substation equipment as shown in Figure 1-4, including a
本实施例未述部分与现有技术相同。 The parts not described in this embodiment are the same as the prior art.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201092933U CN202550338U (en) | 2012-03-21 | 2012-03-21 | Mobile insulation track platform for live-line operation on transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201092933U CN202550338U (en) | 2012-03-21 | 2012-03-21 | Mobile insulation track platform for live-line operation on transformer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202550338U true CN202550338U (en) | 2012-11-21 |
Family
ID=47170907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201092933U Expired - Fee Related CN202550338U (en) | 2012-03-21 | 2012-03-21 | Mobile insulation track platform for live-line operation on transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202550338U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103633572A (en) * | 2013-12-05 | 2014-03-12 | 国家电网公司 | Mobile protector for substation maintenance |
CN107064765A (en) * | 2017-06-08 | 2017-08-18 | 国网山西省电力公司阳泉供电公司 | Deformable gas-insulating and fully-enclosed combined electrical apparatus partial-discharge test platform |
CN110405714A (en) * | 2019-08-21 | 2019-11-05 | 云南锡业股份有限公司铜业分公司 | A kind of self-baking electrode operation insulated platform |
-
2012
- 2012-03-21 CN CN2012201092933U patent/CN202550338U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103633572A (en) * | 2013-12-05 | 2014-03-12 | 国家电网公司 | Mobile protector for substation maintenance |
CN107064765A (en) * | 2017-06-08 | 2017-08-18 | 国网山西省电力公司阳泉供电公司 | Deformable gas-insulating and fully-enclosed combined electrical apparatus partial-discharge test platform |
CN107064765B (en) * | 2017-06-08 | 2023-06-16 | 国网山西省电力公司阳泉供电公司 | Partial discharge test platform of deformable gas-insulated fully-enclosed combined electrical apparatus |
CN110405714A (en) * | 2019-08-21 | 2019-11-05 | 云南锡业股份有限公司铜业分公司 | A kind of self-baking electrode operation insulated platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912004A (en) | Hold rail-type track transportation bridge evacuation maintenance platform | |
CN204552050U (en) | A kind of anchor ear bearing frame and scaffolding platform assembly | |
CN202550338U (en) | Mobile insulation track platform for live-line operation on transformer | |
CN104499742A (en) | Fixed maintenance platform with safety protector | |
CN106044576A (en) | Rail-mounted and wheel-mounted combined type tunnel track-laying crane and construction method thereof | |
CN204125829U (en) | Half high-rise unsettled insulation maintenance gap bridge | |
CN203654690U (en) | Movable disassembly and assembly type overhaul platform | |
CN206828042U (en) | A kind of inspection platform of power station main building rack illuminator | |
CN207536671U (en) | A kind of novel piping lane pallet | |
CN206887784U (en) | Sliding roof formula protecting canopy frame | |
CN103277112A (en) | Tunnel engineering train type rapid lifting and folding working platform | |
CN201881134U (en) | Special device for dismounting and mounting metro vehicle brake cylinder | |
CN203321529U (en) | Train type rapid lifting and folding work platform for tunnel engineering | |
CN103101861B (en) | A kind of street lamp apparatus for examination and repair that quickly can move along rail | |
CN202543812U (en) | Measure bracket for hanging ceilings on roofs of platform layers of rail traffic elevated station | |
CN205444739U (en) | Fixed railing structure of detachable | |
CN206917597U (en) | A kind of contact net power equipment maintaining step ladder | |
CN105239515A (en) | Device and method for bracket installation of railway protective scaffolding in combined highway and railway bridge | |
CN204472598U (en) | A kind of foot of ladder retractor device for electrification railway contact net tool car ladder | |
CN103437260B (en) | Cover plate structure of flangeway for reinforced concrete paved crossing | |
CN204728225U (en) | A kind of rail rail traffic bridge of embracing evacuates inspection platform | |
CN204447275U (en) | A kind of roller-coaster promotes highest point deliverance apparatus | |
CN202508112U (en) | Protecting device car stop fence of inclined drifts race car | |
CN205369946U (en) | Self -propelled modularization subway station roofing steel structure installation support frame | |
CN205153661U (en) | Safety device of modified transmission line framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: SANMING POWER SUPPLY CO., LTD. TATE GRID FUJIAN ELECTRIC POWER COMPANY Effective date: 20140325 Owner name: STATE GRID FUJIAN ELECTRIC POWER CO., LTD. SANMING Effective date: 20140325 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C56 | Change in the name or address of the patentee |
Owner name: SANMING POWER SUPPLY CO., LTD. TATE GRID FUJIAN E Free format text: FORMER NAME: FUJIAN PROVINCE ELETRIC POWER CO., LTD. SANMING POWER SUPPLY BUREAU |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 365000 SANMING, FUJIAN PROVINCE TO: 100031 XICHENG, BEIJING |
|
CP01 | Change in the name or title of a patent holder |
Address after: Fujian 365000 Sanming City province Meliet District listed Street No. 1032 Patentee after: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd. Address before: Fujian 365000 Sanming City province Meliet District listed Street No. 1032 Patentee before: SANMING ELECTRICITY BUREAU OF FUJIAN ELECTRIC POWER Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140325 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Patentee after: State Grid Corporation of China Patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd. Patentee after: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd. Address before: Fujian 365000 Sanming City province Meliet District listed Street No. 1032 Patentee before: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20190321 |