Screw type grouting behind shaft or drift lining ground source heat can be changed the preformed pile device
Technical field
The utility model relates to ground source heat ability preformed pile technical field, relates to a kind of screw type grouting behind shaft or drift lining ground source heat specifically and can change the preformed pile device.
Background technology
Earth source heat pump can offer building with ground source heat, and this not only environmental protection but also energy-conservation mode just are widely used, still; Earth source heat pump is through " boring direct burial " method; Promptly through in advance in the underground mode of imbedding heat exchanger tube, underground heat energy is transformed on the ground, and the expense of prebored hole is very high; It is over half generally to account for gross investment, and the technology of in boring, imbedding heat exchanger tube is very complicated.This causes difficulty all for the development of ground source heat pump technology.Pile foundation is a building base form commonly used, and the stake diameter is from 0.5~2.0m usually, long ten meters of stakes, even reach hundred meters, be embedded in the deep soil.The inventor finds through research practice, with the carrier of the screw type preformed pile after improving as underground buried tube, and it carried out grouting behind shaft or drift lining, not only solved the defective of above-mentioned earth source heat pump pipe laying in early stage technology, also improved bearing capacity of pile foundation.
The utility model content
The purpose of the utility model provides a kind of screw type grouting behind shaft or drift lining ground source heat can change the preformed pile device; Make pile foundation construction and earth source heat pump pipe laying construction integrated; Not only can avoid digging on the ground the deep hole of many 20~100m; Reduce boring greatly and bury cost underground, practiced thrift land area, also improved efficiency of construction.
In order to address the above problem, the technical solution of the utility model is:
A kind of screw type grouting behind shaft or drift lining ground source heat can be changed the preformed pile device; Comprise several screw type prefabricated screw piles of imbedding respectively in the hole; Be embedded with vertical exchanger in each screw pile; The entrance point of each vertical exchanger and the port of export stretch out the screw pile open upper end respectively, respectively with cushion cap or bed course in horizontal feed liquor collector, horizontal fluid collector be connected, along the length direction of vertical exchanger every at a distance from 1-3m be provided with to medium-height trestle; Screw type grouting behind shaft or drift lining prefabricated screw pile comprises the hollow pile core; Stake core bottom is provided with conical pile crown, and stake 1-3m position, outer core bottom is provided with helical blade, the grouting and reinforcing layer that the cast back forms between stake outer core middle and upper part and the stake hole wall.
The screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device; Wherein said medium-height trestle is comprised plate body; The outside of plate body is provided with opening, and the number of opening is corresponding with the group number of the vertical heat exchanger tube of placement, and the somewhat larger in diameter of this open pore is in the external diameter of vertical heat exchanger tube; The center of plate body is provided with grout hole, and Grouting Pipe is placed in the grout hole.
The screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device, wherein saidly adopts steel, plastics or concrete to process to medium-height trestle.
The screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device; Horizontal feed liquor collector, horizontal fluid collector outside in wherein said cushion cap or the bed course is provided with feed liquor metal sleeve, the fluid metal sleeve of band clubfoot respectively, liquid inlet and outlet metal sleeve fill insulant material respectively and between the horizontal feed liquor collector, horizontal fluid collector.
The screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device, and wherein said vertical exchanger is the vertical heat exchanger tube of U type.
The screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device, and wherein said vertical heat exchanger tube is the heat exchanger tube of high-strength polyethylene or PVC or PPR material.
The utility model screw type grouting behind shaft or drift lining ground source heat can be changed the preformed pile device, comprises several screw type grouting behind shaft or drift lining prefabricated screw piles, is embedded with vertical exchanger in each screw pile and reaches medium-height trestle; Make pile foundation construction and earth source heat pump boring pipe laying construction integrated, avoided digging on the ground the deep hole of many 20~100m, greatly reduce cost; Practiced thrift land area, vertical exchanger has been embedded in the screw pile construction install convenience; Improved efficiency of construction, construction cost is low.The stake outer core bottom 1-3m position of screw pile is provided with helical blade, and screw pile is screwed in ground, has avoided the destruction of hammering construction to the stake end, avoided borehole construction backfill closely knit inadequately, influence heat conducting problem.Cast grouting behind shaft or drift lining back-up coat had both strengthened heat transfer area, and because the cement heat transfer property is better than soil, had also improved heat-conductive characteristic between stake outer core middle and upper part and the stake hole wall, had improved pile body bearing capacity simultaneously.The bearing capacity that this not only can improve pile foundation itself plays the purpose of carrying, retaining soil, ground stabilization, and can effectively enlarge the heat exchange contact area of heat exchanger tube and soil, improves heat exchanger effectiveness, conveniently carries out the closed circulation conversion of ground source heat ability.Therefore this screw type grouting behind shaft or drift lining ground source heat can be changed the preformed pile device and can transmit load for building, and the difference of source temperature and ambient temperature is carried out interchange of heat again capable of usingly, to reach the target of energy-conserving and environment-protective.
But the screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device; Length direction along vertical heat exchanger tube is provided with medium-height trestle; Can be separately to medium-height trestle with vertical heat exchanger tube; Avoid a plurality of heat exchanger tubes to abut in together, cause heat to reflux, also guaranteed accurately laying of the stake many vertical heat exchanger tubes of group of in-core simultaneously.
Description of drawings
Fig. 1 is the structural representation that the utility model screw type grouting behind shaft or drift lining ground source heat can be changed the preformed pile device.
Fig. 2 is the sectional view that the utility model screw type grouting behind shaft or drift lining ground source heat can be changed preformed pile;
Fig. 3 is the B-B sectional drawing of Fig. 2.
Fig. 4 can change the sectional view that preformed pile device king-pile in-core is filled backfill for the utility model screw type grouting behind shaft or drift lining ground source heat;
Fig. 5 is the A-A sectional drawing of Fig. 4.
Fig. 6 can change the structural representation that the preformed pile device is imbedded the stratum for the utility model screw type grouting behind shaft or drift lining ground source heat;
Fig. 7 is a C-C sectional drawing among Fig. 6.
The specific embodiment
As shown in Figure 1; The utility model screw type grouting behind shaft or drift lining ground source heat can be changed the preformed pile device; Comprise several screw type grouting behind shaft or drift lining prefabricated screw piles 1 of imbedding respectively in the hole, be embedded with vertical exchanger 2 in each screw pile 1, vertical exchanger 2 is the vertical heat exchanger tube of U type; The entrance point of each vertical heat exchanger tube and the port of export stretch out screw pile 1 open upper end respectively, are connected with horizontal feed liquor collector 3, horizontal fluid collector 4 respectively.
In conjunction with Fig. 2, shown in 3, screw type grouting behind shaft or drift lining prefabricated screw pile 1 comprises cylinder type hollow stake core 11, and stake core 11 bottoms are provided with conical pile crown 12, and stake 1-3m position, core 11 outer wall bottom is provided with helical blade 13.Screw type grouting behind shaft or drift lining prefabricated screw pile 1 can be whole also sectional connect, when connecting for segmentation, every segment length is preferably 3-6m, section with section between employing weld or flange connects.
Vertical heat exchanger tube can be the heat exchanger tube of high-strength polyethylene or PVC or PPR material.For preventing that short circuit from appearring in vertical heat exchanger tube; Be provided with one to medium-height trestle 5 along the length direction of vertical heat exchanger tube is every at a distance from 1-3m; Medium-height trestle 5 adopted by steel, plastics, concrete or other harmless material of vertical heat exchanger tube is processed, comprise plate body 51, the outside of plate body 51 is provided with opening 52; The number of opening 52 is corresponding with the group number of the vertical heat exchanger tube of placement, and the somewhat larger in diameter in these opening 52 holes is in the external diameter of vertical heat exchanger tube.The center of plate body 51 is provided with grout hole 53, places Grouting Pipe 6 in the grout hole 53.
Horizontal feed liquor collector 3, horizontal fluid collector 4 are arranged in ground bed course 7 or the cushion cap.Horizontal feed liquor collector 3, horizontal fluid collector 4 outsides are provided with feed liquor metal sleeve 31, the fluid metal sleeve 41 of band clubfoot respectively, liquid inlet and outlet metal sleeve 31,41 fill insulant material respectively and between the horizontal feed liquor collector 3, horizontal fluid collector 4.
In conjunction with Fig. 4, shown in 5, fill backfill 8 in the stake core 11, backfill 8 can be constructional materialss such as concrete, cement mortar, cement paste, rubble and clay.
In conjunction with Fig. 6, shown in 7, cast grouting behind shaft or drift lining back-up coat 30 between stake outer core middle and upper part and the stake hole wall.
The screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed in the preformed pile device, and vertical exchanger is a U type pipe, according to actual heating load needs and stake core stake footpath size, can settle one or more groups vertical exchanger at the stake in-core.
The screw type ground source heat of the utility model can be changed the method that the preformed pile device is imbedded the stratum, may further comprise the steps:
(1) drive 1 rotation of screw type grouting behind shaft or drift lining prefabricated screw pile by stake mechanomotive force head and pierce pile foundation 9 desired depths,
(2) after pile sinking finishes; According to actual heating load needs and stake core stake footpath size, in stake core 11, place one or more groups vertical exchanger 2, be provided with one to medium-height trestle 5 along the length direction of vertical exchanger 2 is every at a distance from 1-3m; In to the grout hole 53 of medium-height trestle 5, place Grouting Pipe 6
(3) carry out backfill operation in the stake, backfill 8 high pressure are enclosed from stake core 11 bottoms from bottom to top through Grouting Pipe 6 with grouting pump or slush pump, backfill 8 can be constructional materialss such as concrete, cement mortar, cement paste, rubble and clay,
(4) after backfill finishes in the stake, the back mud jacking is carried out in the space between stake outer core middle and upper part and the stake hole, form grouting behind shaft or drift lining back-up coat 30, reinforce pile peripheral earth, see Fig. 6,7.
(5) horizontal feed liquor collector 3, horizontal fluid collector 4 are set in cushion cap or bed course 7, the entrance point of pre-buried vertical exchanger 2 in preformed pile, the port of export are connected with horizontal feed liquor collector 3, horizontal fluid collector 4 respectively.
After the screw type grouting behind shaft or drift lining ground source heat of the utility model can be changed the preformed pile device and imbeds the stratum, as shown in Figure 1, horizontal feed liquor collector 3, horizontal fluid collector 4 are connected with condensate correcting-distribuing device 10 respectively, condensate correcting-distribuing device 10 is connected with earth source heat pump unit 20.Filling heat-exchange fluid 21 in the vertical exchanger 2, this fluid 21 adopts water, salt solution or various antifreezing agent solution usually, forms cryogenically heat energy circulating system of enclosed type.The extruding soil layer 23 between all grouting behind shaft or drift lining back-up coat of helical blade 13 through backfill 8, stake core 11, stake outer core in the replacement fluids 21 in the vertical exchanger 2, the stake, the stake on pile body top 30, all bottoms of the stake helical blade and the thermostat layer of shallow soil water system carry out the cycling hot exchange; And reach the purpose that energy transforms through the earth source heat pump unit; Play the effect of central air-conditioning, if auxiliary central hot water system institute calorific requirement then can be provided with devices such as central heaters.
The above embodiment describes the preferred implementation of the utility model; Be not that scope to the utility model limits; Under the prerequisite that does not break away from the utility model design spirit; Various distortion and improvement that the common engineers and technicians in this area make the technical scheme of the utility model all should fall in the protection domain that claims of the utility model confirm.