CN202519628U - Inlet plugging device for temporary buried pipe in dense dam body - Google Patents

Inlet plugging device for temporary buried pipe in dense dam body Download PDF

Info

Publication number
CN202519628U
CN202519628U CN2012201356946U CN201220135694U CN202519628U CN 202519628 U CN202519628 U CN 202519628U CN 2012201356946 U CN2012201356946 U CN 2012201356946U CN 201220135694 U CN201220135694 U CN 201220135694U CN 202519628 U CN202519628 U CN 202519628U
Authority
CN
China
Prior art keywords
dam body
concrete
buried pipe
wedge
shaped slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201356946U
Other languages
Chinese (zh)
Inventor
任建国
余英
陈晓华
程志华
郑梓扬
杨军
陈宏�
彭国勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2012201356946U priority Critical patent/CN202519628U/en
Application granted granted Critical
Publication of CN202519628U publication Critical patent/CN202519628U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to an inlet plugging device for a temporary buried pipe in a dense dam body. The device comprises a buried pipe, wherein a concrete dam body is arranged at the outer side of the buried pipe, a wedge groove with a large outer opening and a small inner opening is arranged in the concrete dam body of the inlet of the buried pipe, two annular water stopping plates are arranged on the temporary buried pipe buried in the dam body, and the wedge groove is backfilled densely with concrete in the later period. According to the device, the construction is simple and convenient, the burying quality of the temporary buried pipe is guaranteed, the construction need of the dam body is satisfied, the concrete dam body quality is guaranteed at the same time, and external water can be effectively prevented from entering the dam body and leaking along a buried temporary pipeline.

Description

Interim pipe laying import plugging device in the closely knit dam body
Technical field
The utility model relates to a kind of dam body pipe laying inlet device, relates in particular to the interim pipe laying import plugging device in a kind of closely knit dam body.
Background technology
At water power building concrete dam dam body work progress; For making things convenient for the dam body construction drainage; Be everlasting and bury the interim construction drainage pipe that runs through dam body underground in the dam body, when the dam body construction of corresponding site finishes, the temporary drainage pipe must shutoff; For the gutter shutoff leakiness that prevents to bury underground in the dam body becomes penetrating passage of dam body temporarily, cause the dam body hidden danger of quality.
Summary of the invention
The technical problem that the utility model will solve provides a kind of simple in structure, and construction effect is good, prevents that secondary water from getting into the interim pipe laying import plugging device of dam body along the temporary pipeline seepage of burying underground.
The purpose of the utility model is achieved in that the interim pipe laying import plugging device in a kind of closely knit dam body; It comprises steel pipe; The steel pipe outside is a concrete dam body; On the concrete dam body of steel pipe import, be provided with wedge-shaped slot, the steel pipe outside of wedge-shaped slot rear end is provided with annular seal plate, and backfill has concrete in the wedge-shaped slot.The wedge-shaped slot collar extension is big, in young.Filled closely knit concrete in the described wedge-shaped slot.
Technique effect below the utility model has been obtained:
1, the utility model construction is simple and convenient, has guaranteed that interim pipe laying buries quality underground, satisfies dam body construction needs, has also guaranteed the concrete dam body quality simultaneously, can prevent effectively that secondary water from getting into dam body along the temporary pipeline seepage of burying underground.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the sketch map of the utility model.
Fig. 2 is the left view of Fig. 1.
The specific embodiment
Shown in Fig. 1-2; Interim pipe laying import plugging device in a kind of closely knit dam body; It comprises steel pipe 1, and the steel pipe outside is a concrete dam body, on the concrete dam body of steel pipe import, is provided with wedge-shaped slot 4; The steel pipe outside of wedge-shaped slot 4 rear ends is provided with annular seal plate 2,3, and backfill has concrete 5 in the wedge-shaped slot 4.Wedge-shaped slot 4 collar extensions are big, in young.Filled closely knit concrete in the described wedge-shaped slot 4.
The reservation wedge-shaped slot of the utility model is arranged on the gutter entrance location, and wedge-shaped slot collar extension imperial palace is young, and it is reserved about the general 100cm of degree of depth, the admission section size with make things convenient for preformed groove, pipe laying grouting with and backfill construction conveniently be as the criterion; The concrete of wedge-shaped slot and backfill thereof is after it receives external hydraulic action, and it is tightr that the concrete of backfill is combined with whole dam concrete as stopper, prevention secondary water entering dam body.Twice annular steel sealing is welded on the interim pipe laying of dam body, in pipe laying is embedded in concrete dam body, is used for preventing stoping infiltration to be extended to dam body inside along pipe laying just in case there is secondary water to leak into the pipe laying position, forms penetrating passage.Pipe laying in being embedded in dam body is finished using, and with mortar or cement paste pipe laying is poured into closely knitly, and the pipe laying section that will be exposed at wedge-shaped slot is then cut off, and is to wedge shape groove face hacking, clean out, with concrete that the wedge-shaped slot shutoff is closely knit.
The utility model construction utilizes process to implement according to following four steps:
1, makes the dam body pipe laying
Bury the water pipe plan according to dam body, carry out pipe arrangement, and weld twice steel plate water-stopping ring in dam body pipe laying import appropriate location.
2, the dam body pipe laying is installed
Treat that dam body is poured into design altitude,, the pipe laying layout is put in place, and the young wedge-shaped slot template of the collar extension imperial palace that will design and produce is in place according to dam body pipe laying plan.Treat that each operation delivery receiving acceptance finishes, build this storehouse concrete, will use piping laying in concrete temporarily.
3, the interim pipe laying grouting of dam body
Finish using when the interim pipe laying of dam body, pipe port is shut, and at shutoff plate upper shed welding grouting slurries turnover arm with steel plate, closely knit through the grouting arm then to the pipe laying perfusion of being in the milk.
4, reserve the wedge-shaped slot shutoff
After the interim pipe laying grouting of dam body is closely knit, remove being exposed at the pipe laying of reserving wedge-shaped slot, and will reserve wedge shape groove face hacking and clean out, behind the installation and design reinforcing bar formwork erection, the wedge-shaped slot backfill is closely knit with concrete.
This device is successful Application in Three Gorges Projects, and construction is simple, has guaranteed dam body pipe laying quality; Satisfied the functional requirement of dam body pipe laying; Effectively stoped along the penetrating passage of dam body pipe laying, guaranteed the dam concrete quality, practiced thrift construction cost; Satisfy whole dam body construction requirement, obtained good effect.

Claims (3)

1. the interim pipe laying import plugging device in the closely knit dam body; It comprises steel pipe (1); The steel pipe outside is a concrete dam body; It is characterized in that: on the concrete dam body of steel pipe import, be provided with wedge-shaped slot (4), the steel pipe outside of wedge-shaped slot (4) rear end is provided with annular seal plate (2,3), and the interior backfill of wedge-shaped slot (4) has concrete (5).
2. the interim pipe laying import plugging device in the closely knit dam body according to claim 1, it is characterized in that: wedge-shaped slot (4) collar extension is big, in young.
3. the interim pipe laying import plugging device in the closely knit dam body according to claim 1 and 2, it is characterized in that: described wedge-shaped slot has filled closely knit concrete in (4).
CN2012201356946U 2012-04-01 2012-04-01 Inlet plugging device for temporary buried pipe in dense dam body Expired - Fee Related CN202519628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201356946U CN202519628U (en) 2012-04-01 2012-04-01 Inlet plugging device for temporary buried pipe in dense dam body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201356946U CN202519628U (en) 2012-04-01 2012-04-01 Inlet plugging device for temporary buried pipe in dense dam body

Publications (1)

Publication Number Publication Date
CN202519628U true CN202519628U (en) 2012-11-07

Family

ID=47102583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201356946U Expired - Fee Related CN202519628U (en) 2012-04-01 2012-04-01 Inlet plugging device for temporary buried pipe in dense dam body

Country Status (1)

Country Link
CN (1) CN202519628U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291071A (en) * 2013-05-31 2013-09-11 中国葛洲坝集团股份有限公司 Concrete pipe-laying grooving template and method
CN104912034A (en) * 2015-04-14 2015-09-16 中铁四局集团第三建设有限公司 Plugging method and device for hydraulic structure tie rod hole
CN105650359A (en) * 2016-03-18 2016-06-08 中国海洋石油总公司 Systems used for enabling LNG pipelines to cross over dam and construction method of systems

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291071A (en) * 2013-05-31 2013-09-11 中国葛洲坝集团股份有限公司 Concrete pipe-laying grooving template and method
CN104912034A (en) * 2015-04-14 2015-09-16 中铁四局集团第三建设有限公司 Plugging method and device for hydraulic structure tie rod hole
CN105650359A (en) * 2016-03-18 2016-06-08 中国海洋石油总公司 Systems used for enabling LNG pipelines to cross over dam and construction method of systems
CN105650359B (en) * 2016-03-18 2018-04-06 中国海洋石油总公司 LNG pipelines cross dike system and its construction method

Similar Documents

Publication Publication Date Title
CN101429764B (en) Infiltration water detection and plugging renovation devices and methods for underground continuous wall groove segment seam
CN104005419B (en) The box culvert structure of sinking method construction and construction method
CN102061710B (en) Underground continuous wall joint and manufacturing method thereof
CN102535441A (en) Construction method of underground diaphragm wall
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN104099946B (en) Inspection-pit between a kind of Novel top pipeline section
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN102606168A (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN103215922A (en) High-pressure high-flow centralized leakage grouting leaking stoppage method
CN106013265A (en) Emergency basement anti-floating structure and construction method thereof
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN109853477B (en) Centralized leakage blocking structure and method for changing dynamic water into static water in gallery
CN202519628U (en) Inlet plugging device for temporary buried pipe in dense dam body
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN105220700A (en) Foundation pit waterproof curtain reinforcement
CN115012452A (en) Post-casting belt construction technology and basement drainage and pressure relief structure
CN214994121U (en) Advanced pre-embedding device for treating leakage water of underground structure
CN110374680A (en) The construction technology of rock crusher water burst tunnel waterwall
CN206495224U (en) A kind of foundation pit of elevator shaft dewatering process structure
CN217630349U (en) Sewage new and old pipe network connection system based on reverse construction method pipe jacking well
CN209603062U (en) Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery
CN104480905B (en) Upstream face structure of concrete panel dam for preventing panel from being hollow and construction method
CN204356738U (en) Concrete panel dam upstream surface structure for preventing panel from being empty
CN202559321U (en) Diversion tunnel plug concrete drainage pipe device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20170401