CN202381894U - Rapid butt joint device - Google Patents
Rapid butt joint device Download PDFInfo
- Publication number
- CN202381894U CN202381894U CN2011204168484U CN201120416848U CN202381894U CN 202381894 U CN202381894 U CN 202381894U CN 2011204168484 U CN2011204168484 U CN 2011204168484U CN 201120416848 U CN201120416848 U CN 201120416848U CN 202381894 U CN202381894 U CN 202381894U
- Authority
- CN
- China
- Prior art keywords
- seal ring
- accumulation
- pipeline
- butt joint
- joint device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000001503 joint Anatomy 0.000 title abstract description 16
- 239000002184 metal Substances 0.000 claims abstract description 7
- 229910001220 stainless steel Inorganic materials 0.000 claims abstract description 4
- 239000010935 stainless steel Substances 0.000 claims abstract description 4
- 238000009825 accumulation Methods 0.000 claims description 31
- 239000000463 material Substances 0.000 claims description 12
- 230000007704 transition Effects 0.000 claims description 3
- 239000007769 metal material Substances 0.000 claims description 2
- 238000007789 sealing Methods 0.000 abstract description 21
- 238000009413 insulation Methods 0.000 abstract description 8
- 239000012530 fluid Substances 0.000 abstract description 3
- 238000004146 energy storage Methods 0.000 abstract 2
- 238000004321 preservation Methods 0.000 abstract 1
- 238000005086 pumping Methods 0.000 abstract 1
- 238000003032 molecular docking Methods 0.000 description 11
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 4
- 239000003570 air Substances 0.000 description 4
- 239000000446 fuel Substances 0.000 description 4
- 239000007789 gas Substances 0.000 description 4
- 239000007788 liquid Substances 0.000 description 3
- 230000008602 contraction Effects 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229910052757 nitrogen Inorganic materials 0.000 description 2
- 230000037361 pathway Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000009834 vaporization Methods 0.000 description 2
- 230000008016 vaporization Effects 0.000 description 2
- MYMOFIZGZYHOMD-UHFFFAOYSA-N Dioxygen Chemical compound O=O MYMOFIZGZYHOMD-UHFFFAOYSA-N 0.000 description 1
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 239000012080 ambient air Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The utility model discloses a rapid butt joint device which is provided with a pipeline. Pipeline ends are provided with butt joint faces; the pipeline is a double layer concentric pipe, the inner layer is a low temperature fluid conveying pipe, the outer layer is a vacuum pipe, and seal pumping vacuum is arranged between the inner layer and the outer layer; the position nearby the connection portion of the butt joint faces and the pipeline are transited through stainless steel metal bellows with thin walls; and two contact ends of the butt joint faces are close to the low temperature fluid conveying pipe, an end face energy storage seal ring is used, a radial energy storage seal ring is arranged on the position close to the vacuum pipe, an exhaust pipe is arranged in sealed space between the end face seal ring of the butt joint face and the radial seal ring, one end of the exhaust pipe is connected with the sealed space, and the other end is connected with a one-way valve. The rapid butt joint device can conduct heat preservation and heat insulation well in operating state, the position of a butt flange dose not freeze, sealing of the two pipe butt joint seal faces is reliable in normal temperature and low temperature state, and rapid releasing of the butt flange is achieved after work.
Description
Technical field
The utility model relates to space flight, military industry field guided missile, rocket cryogenic liquide fueling system, relates in particular to a kind of rapid abutting joint device of the cryogenic liquide fuel conduit of annotating.
Background technique
The rapid abutting joint device is the vitals of rocket low temp fuel loading system, and loading system can be-183 ° low temp fuel to the rocket temperature of annotating after rapid abutting joint device butt joint.Loading system needs to separate fast in low temp fuel filling finishing back.
The rapid abutting joint device should possess following function:
1. two pipeline Butt sealing face reliable sealings under normal temperature and low-temperature condition;
2 good insulations in working order are adiabatic, and the abutted flange place can not freeze;
Abutted flange is realized throwing off fast behind 3 end-of-jobs.
Three functions of rapid abutting joint device do not reach requirement if any one, will influence the proper functioning of whole system.
The situation of the rapid abutting joint device of existing technology:
1, sealing
Rapid abutting joint device Butt sealing circle adopts rubber material, and the minimum serviceability temperature of rubber material is about-40 °, and the temperature of liquid oxygen, liquid nitrogen, liquid hydrogen is much lower; When rubber is in liquid nitrogen temperature, it will become fragile, and not have elasticity and lose sealing; Original connector adopts a kind of rubber seal of special material; Though cryogenic property is better, also have only one its working life to secondary, can not meet the demands.
2, heat insulating construction
Original rapid abutting joint device is wrapped up thermal insulating material outside cryotronl, thermal insulation property is relatively poor, and at the loading system running hours, the interface place freezes very serious, and is not easily separated after filling finishes, and influences rocket launching.
Summary of the invention
The utility model main purpose is: overcome the deficiency of existing docking adapter technology, thereby develop a kind of Butt sealing face reliable sealing, insulation good in the working state is adiabatic, realizes the rapid abutting joint device of throwing off fast behind the end-of-job.
The above-mentioned technical problem of the utility model mainly is able to solve through following technical proposals: a kind of rapid abutting joint device, have pipeline, and there is interface the pipeline end; Adopt cylinder clamping mechanism between two interfaces; It is characterized in that: said pipeline is a bimetallic tube, and internal layer is the cryogen delivery pipe, and skin is a vacuum tube; Between the inside and outside layer is vacuum layer, makes vacuum insulation; Near interface and pipeline joint,, adopt the relatively poor stainless steel thin-wall wavy metal tube transitions of thermal conductivity for reducing conduction cooling between vacuum tube and the cryogen delivery pipe.This structure can reduce heat-conducting area, the lengthening thermally conductive pathways, is that the cold contraction of cryogen delivery pipe compensates simultaneously; Two interface contact jaws are provided with end face accumulation of energy seal ring near cryogen delivery pipe place, near the vacuum tube place, radially accumulation of energy seal ring are set; Said end face accumulation of energy seal ring or radially the accumulation of energy seal ring have the springback compensation ability, be convenient to butt joint, can not produce simultaneously and interfere with the internal end surface sealing, guarantee that inside and outside two seal rings can both reliable sealing.
The technological scheme of the utility model can also be further perfect:
As preferably, after the docking adapter butt joint, between interface place vacuum tube and cryogen delivery pipe, form a seal space, there is radially accumulation of energy seal ring in this outside, space, and there is end face accumulation of energy seal ring the inboard.If the end-face seal ring on the cryogen delivery pipe damages; Cryogen gets in this space, after vaporization, can produce a large amount of gases, and pressure raises; Too high pressure can destroy the docking adapter structure; For this reason the end face accumulation of energy seal ring of interface and radially the seal space between the accumulation of energy seal ring be provided with outlet pipe, outlet pipe one end links to each other with seal space, one-way valve of another termination.In normal working, peripheral air can not get in the docking adapter from one-way valve, in case the interface seal ring damages, the seal space internal pressure raises, and when pressure surpasses the one-way valve setting, the seal space pressurized gas discharge at once, play the safety protection effect.
As preferably, said end face accumulation of energy seal ring or radially the accumulation of energy seal ring be the low temperature resistant engineering material of cirque structure, innerly embed low temperature resistant metal material spring.After the docking adapter butt joint, the seal ring bi-side are compressed by external force, and its contained spring produces a spot of resiliently deformable, and the elastic force of spring flicks the seal ring both sides, makes two interface reliable sealings.
Radially the accumulation of energy seal ring is used for the sealing at vacuum tube place, prevents that outside air from getting into.
As preferably, said interface is a flanged surface.
As preferably, said bimetallic tube is a concentric tube.
The utility model beneficial effect is:
1, good insulation is adiabatic in working order, and the abutted flange place does not freeze;
2, two pipeline Butt sealing face reliable sealings under normal temperature and low-temperature condition;
3, abutted flange is realized throwing off fast behind the end-of-job.
Description of drawings
Accompanying drawing 1 is a kind of vacuum insulation structural representation of the utility model;
Accompanying drawing 2 is a kind of combined sealing structure schematic representation of the utility model;
Accompanying drawing 3 is a kind of safe exhaust structure schematic representation of the utility model;
Accompanying drawing 4 is end face accumulation of energy seal ring sectional views;
Accompanying drawing 5 is accumulation of energy seal ring sectional views radially.
Description of reference numerals: 1, cryogen delivery pipe, 11, end face accumulation of energy seal ring, 111, spring one, 112, low temperature resistant engineering material one; 2, vacuum tube, 21, accumulation of energy seal ring radially, 211, spring two; 212, low temperature resistant engineering material two, 3, metal bellows, 4, seal space; 5, outlet pipe, 6, one-way valve, ¢, diameter.
Embodiment
Pass through embodiment below, and combine accompanying drawing, do further bright specifically the technological scheme of the utility model.
Embodiment:
Like Fig. 1,2, the rapid abutting joint device shown in 3, have pipeline, there is the abutted flange face pipeline end; Adopt cylinder clamping mechanism between two abutted flange faces; Said pipeline is a concentric double tubes, and internal layer is a cryogen delivery pipe 1, and skin is a vacuum tube 2; Be that sealing vacuumizes between the inside and outside layer, make vacuum insulation.Near abutted flange face and pipeline joint,, adopt relatively poor stainless steel thin-wall metal bellows 3 transition of thermal conductivity for reducing conduction cooling between vacuum tube and the cryogen delivery pipe.This structure can reduce heat-conducting area, the lengthening thermally conductive pathways, is that the cold contraction of cryogen delivery pipe compensates simultaneously.
Two abutted flange face contact jaws adopt the end face accumulation of energy seal ring 11 with compensation ability near cryogen delivery pipe 1 place; In continuous duty, inner cryogenic FLUID TRANSPORTATION tube wall temperature is very low, and surrounding atmosphere is met cold build-uping ice; The a large amount of ice of interface can influence coming off of docking adapter, also increases heat conduction, at vacuum tube 2 places radially accumulation of energy seal ring 21 is set for this reason; Stop ambient air to get into; Be convenient to butt joint, can not produce simultaneously and interfere, guarantee that inside and outside two seal rings can both reliable sealing with the internal end surface sealing.
End face accumulation of energy seal ring 11 is a cirque structure, the inner spring that embeds, and the seal ring cross section is as shown in Figure 4; The material of end face accumulation of energy seal ring 11 is a kind of low temperature resistant engineering materials 1, can be used for-250 ℃ of low temperature environments, and contained spring 1 is processed by low temperature resistant metal; After the docking adapter butt joint, the seal ring bi-side are compressed by external force, and its contained spring one produces a spot of resiliently deformable; The elastic force of spring one flicks the seal ring both sides; Make two interface reliable sealings, this seal ring has compensation ability, and is reusable.
Radially accumulation of energy seal ring 21 is used for the sealing at vacuum tube place, prevents that outside air from getting into, and seal ring is a cirque structure; The inner spring 2 211 that embeds, the seal ring cross section is as shown in Figure 5, and radially the material of accumulation of energy seal ring 21 is a kind of low temperature resistant engineering materials 2 212; Can be used for-50 ℃ of low temperature environments, contained spring 2 211 is made of metal, after the docking adapter butt joint; The seal ring bi-side are compressed by external force, and its contained spring two produces a spot of resiliently deformable, and the elastic force of spring two flicks the seal ring both sides; Make two interface reliable sealings, this seal ring has compensation ability, and is reusable.
After the docking adapter butt joint, between interface place vacuum tube and cryogen delivery pipe, form a seal space, there is radially accumulation of energy seal ring 21 in this outside, space, and there is end face accumulation of energy seal ring 11 inboard.If the end-face seal ring on the cryogen delivery pipe damages, cryogen gets in this space, after vaporization, can produce a large amount of gases; Pressure raises, and too high pressure can destroy the docking adapter structure, on this space, is provided with an outlet pipe 5 for this reason; Outlet pipe one end links to each other with seal space 4, and one-way valve 6 of another termination is in normal working; Peripheral air can not get in the docking adapter from one-way valve, in case the interface seal ring damages, the seal space internal pressure raises; When pressure surpasses the one-way valve setting, the seal space pressurized gas discharge at once, play the safety protection effect.
Claims (5)
1. a rapid abutting joint device has pipeline, and there is interface the pipeline end, adopts cylinder clamping mechanism between two interfaces, and it is characterized in that: said pipeline is a bimetallic tube, and internal layer is the cryogen delivery pipe, and skin is a vacuum tube, is vacuum layer between the inside and outside layer; Near interface and pipeline joint, adopting with the stainless steel is the thin-wall metal bellows transition of material; Two interface contact jaws are provided with end face accumulation of energy seal ring near cryogen delivery pipe place, near the vacuum tube place, radially accumulation of energy seal ring are set; Said end face accumulation of energy seal ring or radially the accumulation of energy seal ring have the springback compensation ability.
2. rapid abutting joint device according to claim 1 is characterized in that: the end face accumulation of energy seal ring of interface and radially the seal space between the accumulation of energy seal ring be provided with outlet pipe, outlet pipe one end links to each other with seal space, the other end connects an one-way valve.
3. rapid abutting joint device according to claim 1 and 2 is characterized in that: said end face accumulation of energy seal ring or radially the accumulation of energy seal ring be the low temperature resistant engineering material of cirque structure, inner embed low temperature resistant metal material spring.
4. rapid abutting joint device according to claim 1 and 2 is characterized in that: said interface is a flanged surface.
5. rapid abutting joint device according to claim 1 and 2 is characterized in that: said bimetallic tube is a concentric tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204168484U CN202381894U (en) | 2011-10-28 | 2011-10-28 | Rapid butt joint device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204168484U CN202381894U (en) | 2011-10-28 | 2011-10-28 | Rapid butt joint device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202381894U true CN202381894U (en) | 2012-08-15 |
Family
ID=46630397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204168484U Expired - Fee Related CN202381894U (en) | 2011-10-28 | 2011-10-28 | Rapid butt joint device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202381894U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418823A (en) * | 2011-10-28 | 2012-04-18 | 杭州杭氧环保成套设备有限公司 | Quick butt-joint device |
CN108150761A (en) * | 2017-12-07 | 2018-06-12 | 浙江海洋大学 | A kind of defeated long-distance transport pipes of liquefied gas Low Temperature Liquid |
CN109163157A (en) * | 2018-11-09 | 2019-01-08 | 上海爱乐石油设备制造有限公司 | A kind of rapid abutting joint is of coupled connections device |
CN111692343A (en) * | 2020-06-18 | 2020-09-22 | 中国人民解放军63796部队 | Super-hydrophobic anti-icing cover of low-temperature connector |
-
2011
- 2011-10-28 CN CN2011204168484U patent/CN202381894U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418823A (en) * | 2011-10-28 | 2012-04-18 | 杭州杭氧环保成套设备有限公司 | Quick butt-joint device |
CN108150761A (en) * | 2017-12-07 | 2018-06-12 | 浙江海洋大学 | A kind of defeated long-distance transport pipes of liquefied gas Low Temperature Liquid |
CN109163157A (en) * | 2018-11-09 | 2019-01-08 | 上海爱乐石油设备制造有限公司 | A kind of rapid abutting joint is of coupled connections device |
CN109163157B (en) * | 2018-11-09 | 2024-03-19 | 浙江爱乐石油设备制造有限公司 | Quick butt-joint coupling connector |
CN111692343A (en) * | 2020-06-18 | 2020-09-22 | 中国人民解放军63796部队 | Super-hydrophobic anti-icing cover of low-temperature connector |
CN111692343B (en) * | 2020-06-18 | 2022-04-15 | 中国人民解放军63796部队 | Super-hydrophobic anti-icing cover of low-temperature connector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9464763B2 (en) | Safety valve for cryogenic insulated gas cylinder | |
CN202381894U (en) | Rapid butt joint device | |
CN107735355B (en) | Fluid handling device for liquid hydrogen | |
WO2018147189A1 (en) | Emergency release mechanism for fluid loading devices | |
US20090261578A1 (en) | Plug-In Coupling for Cryogenic Lines | |
CN102418823A (en) | Quick butt-joint device | |
JP2022521370A (en) | Liquefied natural gas transport pipe for fuel supply of marine engines | |
CN101738055A (en) | Interface Design of Liquid Helium Pipeline and Heat Sink | |
CN201599492U (en) | Through-wall structure of low-temperature cold box pipeline | |
CN103148311A (en) | Spherical-shell-type universal angle expansion joint | |
CN215215176U (en) | Low-temperature joint | |
US20140246167A1 (en) | Systems and Methods for Processing Geothermal Liquid Natural Gas (LNG) | |
CN203384636U (en) | Cryogenic fluid loading and unloading equipment | |
CN106641548B (en) | A kind of cryogenic coupler | |
US20190186481A1 (en) | Cryogenic pump flange | |
CN216692499U (en) | High vacuum type integral adsorption type heat insulation double-wall pipe | |
CN203131304U (en) | Spherical shell type universal angle expansion joint | |
CN104075043A (en) | Cold-resistant heat preservation conveying pipe | |
CN204164592U (en) | The corrosion-resistant steam jacket thermal insulation pipe of Molten sulphur conveying | |
CN115388250A (en) | A low temperature joint | |
CN210978986U (en) | Polyurethane prefabricated direct-buried insulating pipe | |
CN118953593B (en) | Liquefied gas leakage flow guiding device suitable for liquefied gas ship and liquefied gas ship | |
CN113819316A (en) | High vacuum type integral adsorption heat insulating double wall tube | |
CN220667691U (en) | A kind of cryogenic rocket auxiliary power system and liquid rocket | |
CN219692492U (en) | Supporting structure of vacuum heat insulation double-wall pipe and double-wall pipe for LNG fuel tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120815 Termination date: 20151028 |
|
EXPY | Termination of patent right or utility model |