CN202260192U - Derrick mast with adjustable height - Google Patents
Derrick mast with adjustable height Download PDFInfo
- Publication number
- CN202260192U CN202260192U CN201120397251XU CN201120397251U CN202260192U CN 202260192 U CN202260192 U CN 202260192U CN 201120397251X U CN201120397251X U CN 201120397251XU CN 201120397251 U CN201120397251 U CN 201120397251U CN 202260192 U CN202260192 U CN 202260192U
- Authority
- CN
- China
- Prior art keywords
- upper column
- column
- height
- steel plate
- lower column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 239000000725 suspension Substances 0.000 claims abstract description 6
- 238000003032 molecular docking Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 9
- 238000009434 installation Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 230000006698 induction Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 229910052573 porcelain Inorganic materials 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种高度可调式扒杆,包括:横梁,在所述横梁的一端部设置有方形钢板,另一端设置有吊环;上立柱,所述上立柱的顶端设置有能与所述方形钢板对接的法兰盘;下立柱,所述下立柱的底端设置有基座钢板;所述上立柱及下立柱上均设置有高度调节孔,所述上立柱、下立柱对接并通过插入所述高度调节孔内的钢销锁紧。本实用新型采用的工器具外形结构简单,在施工现场安装、拆卸方便,解决了超长的木制独立扒杆运输和存放保管方面存在的问题。
The utility model discloses a height-adjustable grilling pole, which comprises: a beam, a square steel plate is arranged at one end of the beam, and a suspension ring is arranged at the other end; an upper column, the top of the upper column is provided with a A flange plate butted with square steel plates; a lower column, the bottom of which is provided with a base plate; the upper column and the lower column are provided with height adjustment holes, and the upper column and the lower column are butted and inserted The steel pin in the height adjustment hole is locked. The tools and utensils adopted by the utility model have a simple appearance and structure, are convenient to install and disassemble at the construction site, and solve the problems existing in the transportation and storage of the super-long wooden independent grilling pole.
Description
技术领域: Technical field:
本实用新型涉及一种高度可调式扒杆。The utility model relates to a height-adjustable grilling pole.
背景技术: Background technique:
随着社会经济的发展,变(配)电站新建、扩建工程越来越多,而城市建设的发展,使得部分所处地势相对变低的变(配)电站需要搬迁或升高改造,因此,隔离开关、避雷器等电力设备安装任务也越来越多,但以往传统安装方法有以下缺点:With the development of society and economy, there are more and more construction and expansion projects of substation (distribution) substations, and the development of urban construction makes some substations (distribution) substations with relatively lower terrain need to be relocated or upgraded. Therefore, There are more and more installation tasks for electrical equipment such as isolating switches and lightning arresters, but the traditional installation methods in the past have the following disadvantages:
隔离开关或绝缘支柱、避雷器等独立瓷件安装或更换的工作,若采用吊车吊装,用车费用高昂,且在新建变电站,需要有足够的场地空间以满足吊臂伸展回旋需求;在已运行的变电站进行间隔扩建或改造工作,还需要确保吊臂、钢丝绳、吊物、辅具等与架空导线及带电体的安全距离(35kV≥4.0米,110kV≥5.0米),吊装时常常要求相邻间隔陪伴停电,甚至需要母线停止运行,造成经济损失;若采用自备的木制独立扒杆吊装,为满足交通法规对超长物品运输规定,需耗时办理特别通行证,若租用加长货车运输,则成本付出较多,而且占用保管室空间较大。For the installation or replacement of independent ceramic parts such as isolating switches, insulating pillars, and lightning arresters, if cranes are used for hoisting, the cost of using vehicles is high, and in new substations, there must be enough site space to meet the needs of boom extension and maneuvering; For substation expansion or reconstruction work, it is also necessary to ensure a safe distance between the boom, wire rope, hoisting objects, auxiliary equipment, etc. Accompanied by a power outage, it may even require the busbar to stop running, causing economic losses; if the self-provided wooden independent pick-up pole is used for hoisting, in order to meet the traffic regulations on the transportation of super-long items, it will take time to apply for a special pass. If you rent an extended truck for transportation, then The cost is more paid, and it takes up a lot of space in the storage room.
发明内容: Invention content:
为克服现有技术的缺陷,本实用新型的目的在于提供一种高度可调式扒杆,采用此扒杆能满足大部分变电安装工程需求,缩短了工期,大幅度降低了车辆使用率和对施工道路的占有率,其外形结构简单、安装(拆卸)方便,便于存放保管和运输,不受空间、地形条件限制,不受作业点附近有无线路和设备等问题的影响,大大减轻了作业人员的劳动强度,保证了人身和设备的安全性,创造了经济效益,因此具有较强的现实推广意义。In order to overcome the defects of the prior art, the purpose of this utility model is to provide a height-adjustable pole, which can meet the needs of most substation installation projects, shorten the construction period, greatly reduce the utilization rate of vehicles and the Occupancy of the construction road, its appearance is simple, easy to install (disassemble), easy to store, keep and transport, not limited by space and terrain conditions, not affected by problems such as whether there are wireless lines and equipment near the operating point, which greatly reduces the operating cost. The labor intensity of personnel ensures the safety of personal and equipment, and creates economic benefits, so it has strong practical promotion significance.
本实用新型解决技术问题采用如下技术方案:The utility model solves the technical problem and adopts the following technical solutions:
一种高度可调式扒杆,包括:A height adjustable grill comprising:
横梁,在所述横梁的一端部设置有方形钢板,另一端设置有吊环;A crossbeam, a square steel plate is arranged at one end of the crossbeam, and a suspension ring is arranged at the other end;
上立柱,所述上立柱的顶端设置有能与所述方形钢板对接的法兰盘;An upper column, the top of the upper column is provided with a flange capable of docking with the square steel plate;
下立柱,所述下立柱的底端设置有基座钢板;A lower column, the bottom end of which is provided with a base steel plate;
所述上立柱及下立柱上均设置有高度调节孔,所述上立柱、下立柱对接并通过插入所述高度调节孔内的钢销锁紧。Both the upper column and the lower column are provided with height adjustment holes, and the upper column and the lower column are butted and locked by a steel pin inserted into the height adjustment hole.
本实用新型的结构特点也在于:Structural features of the present utility model also are:
所述上立柱及横梁上均设置有连接钢板,斜拉支撑的两端分别连接在上立柱的连接钢板和横梁的连接钢板上。Both the upper column and the crossbeam are provided with connecting steel plates, and the two ends of the cable-stayed support are respectively connected to the connecting steel plates of the upper column and the connecting steel plates of the crossbeam.
与已有技术相比,本实用新型的有益效果体现在:Compared with the prior art, the beneficial effects of the utility model are reflected in:
1、本实用新型采用的工器具外形结构简单,在施工现场安装、拆卸方便,解决了超长的木制独立扒杆运输和存放保管方面存在的问题。1. The utility model adopts a simple appearance and structure, and is easy to install and disassemble at the construction site, which solves the problems existing in the transportation and storage of the super-long wooden independent pole.
2、本实用新型避免了吊车使用率及其对施工道路的占有率,且能根据需要灵活改变吊装地点,因此,节约车辆使用成本,缩短了工期。2. The utility model avoids the utilization rate of the crane and its occupancy of the construction road, and can flexibly change the hoisting location according to the needs, thus saving the cost of the vehicle and shortening the construction period.
3、本实用新型有效解决了采用吊车所需要的驻车场地和吊臂回旋安全距离的空间问题,保证了施工的安全性,避免了吊车吊装时常常要求相邻间隔陪伴停电、甚至需要母线停止运行的弊端,大幅度降低了停电带来的经济损失,创造了经济效益和社会效益。3. The utility model effectively solves the space problem of the parking space and the safety distance of the boom swing required by the crane, ensures the safety of the construction, and avoids the need for adjacent intervals to be accompanied by power failures and even bus stop when the crane is hoisting. The disadvantages of operation have greatly reduced the economic losses caused by power outages and created economic and social benefits.
4、本实用新型由于不受室内外空间、地形条件限制等问题的影响,不受作业点附近有无线路和设备等问题的影响,能满足大部分变电安装工程需求,因此适用范围广,具有较强的现实推广意义。4. Since the utility model is not affected by problems such as indoor and outdoor space and terrain conditions, and is not affected by problems such as wireless lines and equipment near the operating point, it can meet the needs of most substation installation projects, so it has a wide range of applications. It has strong practical promotion significance.
附图说明: Description of drawings:
图1为本实用新型扒杆的总装结构图;图2A、2B、2C分别为横梁的主视图、左视图及仰视图;图3为上立柱的结构图;图4为下立柱的结构图。Fig. 1 is the general assembly structural diagram of the utility model grill bar; Fig. 2A, 2B, 2C are the front view, the left side view and the bottom view of crossbeam respectively; Fig. 3 is the structural diagram of upper column; Fig. 4 is the structural diagram of lower column.
图中标号:1横梁,11方形钢板,12吊环,2上立柱,21法兰盘,3下立柱,31基座钢板,4高度调节孔,5钢销,6斜拉支撑,7连接钢板。Symbols in the figure: 1 beam, 11 square steel plate, 12 suspension ring, 2 upper column, 21 flange plate, 3 lower column, 31 base steel plate, 4 height adjustment hole, 5 steel pin, 6 cable-stayed support, 7 connecting steel plate.
以下通过具体实施方式,并结合附图对本实用新型作进一步说明。The utility model will be further described below through specific embodiments in conjunction with the accompanying drawings.
具体实施方式: Detailed ways:
实施例:参见图1-4,本实施例的高度可调式扒杆,包括:Embodiment: Referring to Fig. 1-4, the height-adjustable grilling pole of this embodiment includes:
一根横梁1,在横梁的一端部设置有方形钢板11,另一端设置有吊环12,吊环用于安装吊葫芦,上立柱2的顶端设置有法兰盘21,其能与横梁的方形钢板11对接并用螺栓锁定,下立柱3与上立柱2对接,并在下立柱的底端设置有基座钢板31,防止扒杆陷入泥地,有感应电时下立柱的基座钢板可作接地端子使用。A
为了实现高度可调,上立柱2及下立柱3上均设置有高度调节孔4,当上立柱、下立柱对接时,通过插入高度调节孔内的钢销5锁紧。In order to realize the height adjustment, the upper column 2 and the
为了提高横梁的承重力及稳固性,在上立柱2及横梁1上均设置有连接钢板7,斜拉支撑6的两端分别连接在上立柱的连接钢板和横梁的连接钢板上,形成三角支撑。In order to improve the load-bearing capacity and stability of the beam, connecting
采用本实用新型的高度可调式扒杆作业方法,按如下步骤操作:Adopt the height-adjustable grilling pole operation method of the utility model, operate according to the following steps:
1、根据待安装隔离开关及独立瓷件等设备的尺寸和需要提升的高度,通过上下立柱的调节孔调整立柱高度并固定钢销,组装立柱与横梁;1. According to the size and height of the equipment to be installed, such as isolating switches and independent porcelain parts, adjust the height of the columns through the adjustment holes of the upper and lower columns and fix the steel pins, and assemble the columns and beams;
2、组装上立柱与横梁之间的斜拉支撑,即成为高度可调式扒杆;2. Assemble the cable-stayed support between the upper column and the beam to become a height-adjustable pole;
3、将扒杆竖起并紧靠等径杆或钢构架,绑扎牢固;3. Stand up the pole and close to the equal-diameter pole or steel frame, and tie it firmly;
4、在横梁上安装吊葫芦,有感应电时应在下立柱的基座钢板接入接地线。4. Install the hoist on the beam, and connect the grounding wire to the base steel plate of the lower column when there is induction electricity.
5、对扒杆进行全面安全检查;5. Carry out a comprehensive safety inspection on the grill;
6、起吊物底部距离地面约50~100mm时停止起吊,对扒杆再次检查无误,即可提升继续完成安装。6. Stop hoisting when the bottom of the lifting object is about 50-100mm from the ground, and check the pole again, then you can lift it and continue to complete the installation.
7、拆解时,先拆除吊葫芦,轻轻放倒扒杆,按组装相反步骤拆解。7. When dismantling, first remove the hoist, gently put down the pole, and disassemble according to the reverse steps of assembly.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120397251XU CN202260192U (en) | 2011-10-18 | 2011-10-18 | Derrick mast with adjustable height |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120397251XU CN202260192U (en) | 2011-10-18 | 2011-10-18 | Derrick mast with adjustable height |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202260192U true CN202260192U (en) | 2012-05-30 |
Family
ID=46121378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120397251XU Expired - Fee Related CN202260192U (en) | 2011-10-18 | 2011-10-18 | Derrick mast with adjustable height |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202260192U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103318745A (en) * | 2013-06-06 | 2013-09-25 | 国家电网公司 | Lightweight special-purposed spreader and mounting method thereof |
CN103904575A (en) * | 2014-04-18 | 2014-07-02 | 国家电网公司 | Single tower crane for replacing disconnecting links |
CN105133858A (en) * | 2015-09-30 | 2015-12-09 | 兰州兰石重型装备股份有限公司 | Adjustable ladder stand for safety construction |
CN105417422A (en) * | 2015-11-27 | 2016-03-23 | 中建钢构有限公司 | Movable independent derrick mast hoisting device and hoisting method thereof |
CN106703178A (en) * | 2016-12-27 | 2017-05-24 | 上海都市绿色工程有限公司 | Greenhouse foundation for adjusting elevation of steel upright post and adjusting method |
CN108792982A (en) * | 2018-07-05 | 2018-11-13 | 上海市机械施工集团有限公司 | Hanging apparatus and hanging method |
-
2011
- 2011-10-18 CN CN201120397251XU patent/CN202260192U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103318745A (en) * | 2013-06-06 | 2013-09-25 | 国家电网公司 | Lightweight special-purposed spreader and mounting method thereof |
CN103904575A (en) * | 2014-04-18 | 2014-07-02 | 国家电网公司 | Single tower crane for replacing disconnecting links |
CN105133858A (en) * | 2015-09-30 | 2015-12-09 | 兰州兰石重型装备股份有限公司 | Adjustable ladder stand for safety construction |
CN105417422A (en) * | 2015-11-27 | 2016-03-23 | 中建钢构有限公司 | Movable independent derrick mast hoisting device and hoisting method thereof |
CN105417422B (en) * | 2015-11-27 | 2019-01-11 | 中建钢构有限公司 | Movable independent derrick mast hoisting device and hoisting method thereof |
CN106703178A (en) * | 2016-12-27 | 2017-05-24 | 上海都市绿色工程有限公司 | Greenhouse foundation for adjusting elevation of steel upright post and adjusting method |
CN108792982A (en) * | 2018-07-05 | 2018-11-13 | 上海市机械施工集团有限公司 | Hanging apparatus and hanging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202260192U (en) | Derrick mast with adjustable height | |
CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN102359302B (en) | UHV long-span iron tower assembly method | |
CN201671391U (en) | Light Line Repair Tower | |
CN202322008U (en) | Movable and adjustable multi-functional hoisting frame | |
CN105003090A (en) | Temporary support frame for mounting assembly type steel structure | |
CN201458583U (en) | Liftable and detachable lifting platform | |
CN101618835A (en) | Hoisting platform capable of being lifted and disassembled and application method thereof | |
CN204538469U (en) | Diagonal-bracing type line lever switch support | |
CN201737616U (en) | Double-lifting pole | |
CN203284128U (en) | Hoisting tool of main mechanism of switch blade | |
CN203487767U (en) | Cross plate scaffold | |
CN202785387U (en) | Indoor cantilever crane | |
CN201918653U (en) | High-voltage isolating switch maintenance protection bracket | |
CN204876631U (en) | Assembled steel structure installation uses interim support frame | |
CN206767452U (en) | A kind of lifting framework for GIS device Disintegration overhaul | |
CN105366559A (en) | Small hoisting machine fixed on channel steel framework | |
CN216190654U (en) | Line-straight-down type station room finite space large-span steel structure lifting tool | |
CN103896153A (en) | Zig-zag derrick for replacing disconnecting link | |
CN204802886U (en) | Instrument formula tower crane anchorage device's installation operation and half space | |
CN206053825U (en) | A kind of upper font combines insulation elevator | |
CN212085657U (en) | Vehicle-mounted power transmission line emergency mobile tower | |
CN203402848U (en) | Anti-tilting device of lifting machine for portable transformer | |
CN205076724U (en) | Multi -functional haulage equipment of transformer substation that frame lockable, adoption lifting hook lifted by crane | |
CN102570325B (en) | A kind of light hoisting device for converting station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20171018 |