Power distribution network transformer running state graphical supervision system Download PDFInfo
- Publication number
- CN202172306U CN202172306U CN201120198696.5U CN201120198696U CN202172306U CN 202172306 U CN202172306 U CN 202172306U CN 201120198696 U CN201120198696 U CN 201120198696U CN 202172306 U CN202172306 U CN 202172306U
- Authority
- CN
- China
- Prior art keywords
- distribution
- load
- distribution transformer
- central control
- control computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 17
- 238000013480 data collection Methods 0.000 claims description 2
- 238000004364 calculation method Methods 0.000 abstract description 4
- 230000009471 action Effects 0.000 abstract description 3
- 239000003086 colorant Substances 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 description 9
- 230000008859 change Effects 0.000 description 6
- 238000011835 investigation Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000009466 transformation Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000036541 health Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本实用新型公开了一种配电网变压器运行状态图形化监视系统,由对计量终端设备进行数据采集的采集器、接收数据并以图像显示方式显示数据情况的中央控制计算机和连接线组成,中央控制计算机内安装有控制计量终端设备动作的软件控制系统,中央控制计算设置有显示屏幕,中央控制计算机的显示屏幕展现的WEB窗口页面是以图形方式展示的图形信息;所述的图形信息由展示配电变压器所在位置的地理图形和以显示配电变压器当前状况的不同色块组成,不同色块的颜色显示不同配电变压器的负载率高低程度指数;根据各配电变压器的负载率高低程度指数及对应状态颜色,软件控制系统和中央控制计算机对各配电变压器进行分类、分级安排处理。
The utility model discloses a graphical monitoring system for the operation state of a distribution network transformer, which is composed of a collector for collecting data from metering terminal equipment, a central control computer for receiving data and displaying the data in an image display mode, and a connecting line. A software control system is installed in the control computer to control the action of the metering terminal equipment. The central control calculation is equipped with a display screen. The WEB window page displayed on the display screen of the central control computer is graphical information displayed in a graphical manner; the graphical information is provided by the display The geographical figure of the location of the distribution transformer is composed of different color blocks to show the current status of the distribution transformer. The colors of different color blocks show the level index of the load rate of different distribution transformers; according to the level index of the load rate of each distribution transformer And the corresponding status color, the software control system and the central control computer classify and arrange the distribution transformers in different levels.
Description
技术领域 technical field
本实用新型涉及一种配电网变压器运行状态图形化监视系统 ,尤其涉及一种利用多维信息展示模块把配电网变压器运行状态于WEB窗口以图形化显示、对配电变压器状况进行监视的系统。 The utility model relates to a graphical monitoring system for the operation state of distribution network transformers, in particular to a system which utilizes a multi-dimensional information display module to graphically display the operation state of distribution network transformers in a WEB window and monitors the state of distribution transformers . the
背景技术 Background technique
供电企业是国民经济的重要部门之一,随着国民经济的快速发展和人民生活水平的不断提高,我国对电力的需求量也在不断增大。近年来,在电力系统中,变电站、高压输电线路等主网设备的远程监视控制技术从开始的PTU设备、SCADA(实时数据采集)系统到目前的综合自动化系统、EMS(能量管理),设备质量及系统功能已相当成熟。而在低压配电网络方面,由于低压配电线路、配电设备、负荷设备等数量远比主网庞大,结构更加错综复杂,目前仍没有技术较成熟、性能较稳定的配网监视控制系统可供广泛使用,还是局限于局部的试点应用。尤其是对于配电网变压器运行状态的监视技术不完全成熟,现有对于配电网变压器运行状态负载情况检查主要是通过人工定期现场进行负荷测定发现,由于配网变压器数量多,不可能全天候进行数据监测记录;而且一台配电变压器只采集一天的数据,参考价值低,准确率差,很难及时发现设备存在隐患或发生了隐患,还要耗费大量的人力资源在现场执行监测工作,并容易受到天气的影响。现有的监视方法,只能通过定期报表的形式获得各市、各乡镇、各供电所的负荷总容量、用电量信息,却无法实时直观的了解某区域内当前负荷集中情况、哪里的用电负荷高,需要派出人员到现场经过长时间的调查摸底然后提供初步的评估报告,费时而且数据不够精确。 Power supply enterprises are one of the important sectors of the national economy. With the rapid development of the national economy and the continuous improvement of people's living standards, the demand for electricity in our country is also increasing. In recent years, in the power system, the remote monitoring and control technology of substations, high-voltage transmission lines and other main network equipment has changed from the initial PTU equipment, SCADA (real-time data acquisition) system to the current integrated automation system, EMS (energy management), equipment quality And system functions are quite mature. In terms of low-voltage distribution network, because the number of low-voltage distribution lines, distribution equipment, load equipment, etc. is much larger than that of the main network, and the structure is more intricate, there is still no distribution network monitoring and control system with mature technology and stable performance. Widely used, or limited to local pilot applications. In particular, the monitoring technology for the operating status of distribution network transformers is not fully mature. The current inspection of the operating status of distribution network transformers is mainly through manual and regular on-site load measurement. Due to the large number of distribution network transformers, it is impossible to carry out all-weather inspections. Data monitoring records; and a distribution transformer only collects data for one day, which has low reference value and poor accuracy. Vulnerable to weather. The existing monitoring method can only obtain the total load capacity and power consumption information of each city, township, and power supply station through regular reports, but it cannot understand the current load concentration in a certain area intuitively in real time, where the power consumption is The load is high, and it is necessary to send personnel to the site to conduct a long-term investigation and then provide a preliminary assessment report, which is time-consuming and the data is not accurate enough. the
针对上述的情况,本申请人致力于如何把配电网变压器运行状态实时地展示出来,对该配电变压器的情况进行监视,以便准确、快速、实时地了解某一区域的配电变压器的用电负荷情况,对该区域的用电进行分类、分级处理。 In view of the above situation, the applicant is committed to how to display the operating status of the distribution network transformer in real time, and monitor the distribution transformer, so as to accurately, quickly and real-time understand the usage of the distribution transformer in a certain area. According to the electricity load situation, the electricity consumption in the area is classified and graded. the
发明内容 Contents of the invention
本实用新型的目的在于克服现有技术的不足,提供一种使用方便、显示直接直观、快速准确显示用电情况的配电网变压器运行状态监视系统。 The purpose of the utility model is to overcome the deficiencies of the prior art, and provide a distribution network transformer operating state monitoring system that is easy to use, directly and intuitively displayed, and can quickly and accurately display power consumption conditions. the
本实用新型解决现有技术的技术方案是:配电网变压器运行状态图形化监视系统,由对计量终端设备进行数据采集的采集器、接收数据并以图像显示方式显示数据情况的中央控制计算机和连接线组成,中央控制计算机内安装有控制计量终端设备动作的软件控制系统,中央控制计算机设置有显示屏幕,中央控制计算机的显示屏幕展现的WEB窗口页面是以图形方式展示的图形信息;所述的图形信息由展示配电变压器所在位置的地理图形和以显示配电变压器当前状况的不同色块组成,不同色块的颜色显示不同配电变压器的负载率高低程度指数;根据各配电变压器的负载率高低程度指数及对应状态颜色,软件控制系统和中央控制计算机对各配电变压器进行分类、分级安排处理。 The technical solution of the utility model to solve the prior art is: a graphical monitoring system for the operation status of the distribution network transformer, which is composed of a collector for data collection of metering terminal equipment, a central control computer for receiving data and displaying data in an image display mode, and Composed of connection lines, the central control computer is installed with a software control system to control the action of the metering terminal equipment, the central control computer is provided with a display screen, and the WEB window page displayed on the display screen of the central control computer is graphical information displayed in a graphical manner; The graphical information of the distribution transformer is composed of geographic graphics showing the location of the distribution transformer and different color blocks to show the current status of the distribution transformer. The colors of different color blocks show the load rate index of different distribution transformers; Load rate level index and corresponding state color, software control system and central control computer classify and classify distribution transformers. the
作为对前述技术方案的进一步设计:中央控制计算机的显示屏幕的WEB窗口所展示的不同色块由蓝色、绿色、黄色、红色和黑色的至少一种组成;所述的蓝色代表配电变压器的负荷指标为负载率≤40%,表示没有任何负荷接入限制,此时配电变压器尚未达到经济运行状态,欢迎用户报装用电,鼓励用户用电;绿色代表配电变压器的负荷指标为40<负载率≤60%,表示配电变压器正处于经济运行范围内,没有负荷接入限制,继续欢迎用户报装用电;黄色代表配电变压器的负荷指标为60%<负载率≤80%,表示配电变压器仍处于经济运行状范围内,但需注意要适当控制接入负荷容量,用户可继续报装用电;红色代表配电变压器的负荷指标为80%<负载率≤100%,表示配电电压器处于高负载水平,必须严格控制负荷接入容量,并注意控制用电;黑色代表配电变压器的负荷指标为负载率>100%,表示配电变压器已超负荷运行,不允许再接入负荷,必须严格控制用电,不能长时间超负荷运行,要尽快进行增容改造或转移负荷,降低配电变压器负载率到安全值,避免设备损坏。 As a further design of the aforementioned technical scheme: the different color blocks shown in the WEB window of the display screen of the central control computer are composed of at least one of blue, green, yellow, red and black; the blue represents the distribution transformer The load index is load rate ≤ 40%, which means that there is no load access restriction. At this time, the distribution transformer has not yet reached the economical operation state. Users are welcome to report for installation and use of electricity, and users are encouraged to use electricity; green means that the load index of the distribution transformer is 40 < load rate ≤ 60%, it means that the distribution transformer is in the economical operation range, there is no load access restriction, and users are still welcome to apply for power consumption; yellow means that the load index of the distribution transformer is 60% < load rate ≤ 80% , indicating that the distribution transformer is still in the range of economical operation, but attention should be paid to properly controlling the access load capacity, and users can continue to report for installation and power consumption; red indicates that the load index of the distribution transformer is 80% < load rate ≤ 100%, It means that the distribution transformer is at a high load level, and the load access capacity must be strictly controlled, and attention must be paid to controlling power consumption; black means that the load index of the distribution transformer is the load rate > 100%, which means that the distribution transformer has been overloaded and is not allowed When re-connected to the load, the power consumption must be strictly controlled, and the overload operation cannot be performed for a long time. It is necessary to increase the capacity or transfer the load as soon as possible, reduce the load rate of the distribution transformer to a safe value, and avoid equipment damage. the
负载率是配电变压器最大负荷与额定负荷的比值,它是配电变压器运行的健康指标及负荷接入限度指标,用于反映配电变压器是否接近极限运,其数值越高 ,表明配电变压器负载量越大,甚至超负荷运行,会导致配电变压器损坏。而本实用新型利用不同的色块直观地显现了各配电变压器的负载率指标数据含义,简称“4681法则”,利用该法则进行配网变压器运行状态进行实时监视,大大节省了现场勘察、测定负荷的工作量,及时准确的发现设备运行存在的隐患,及早安排改造计划,提高了设备运维水平。 The load rate is the ratio of the maximum load to the rated load of the distribution transformer. It is the health index of the distribution transformer operation and the load access limit index. It is used to reflect whether the distribution transformer is close to the limit operation. The higher the value, the distribution transformer The greater the load, or even overloaded operation, will cause damage to the distribution transformer. The utility model uses different color blocks to visually display the meaning of the load rate index data of each distribution transformer, referred to as "4681 rule", and uses this rule to monitor the operation status of the distribution network transformer in real time, which greatly saves on-site investigation and measurement. The workload of the load, the timely and accurate discovery of hidden dangers in the operation of the equipment, the early arrangement of the transformation plan, and the improvement of the level of equipment operation and maintenance. the
作为对前述技术方案的更进一步设计:中央控制计算机的显示屏幕的WEB窗口可展示出一列表,列表表示各配电变压器在某一区域内的额定负载容量、最大负荷值及其出现时间、负载率;并可在显示屏幕的WEB窗口上查询具体用户的配电变压器的实时负载率,具体用户的日负载率变化数据列表记录、负载率变化曲线。上述功能能够展示电网供电电量、用户用电电量明细数据记录,描绘某区域或某用户的各类电力参数变化曲线,对各类数据进行统计分析计算并以列表的方式展示结果,其数据的专业性强。 As a further design of the aforementioned technical solution: the WEB window of the display screen of the central control computer can display a list, which shows the rated load capacity, maximum load value and its appearance time, load and load capacity of each distribution transformer in a certain area. rate; and the real-time load rate of the distribution transformer of a specific user can be queried on the WEB window of the display screen, the daily load rate change data list record of the specific user, and the load rate change curve. The above functions can display detailed data records of grid power supply and user electricity consumption, depict various power parameter change curves of a certain area or a certain user, perform statistical analysis and calculation of various data and display the results in a list. The professionalism of the data Strong. the
作为对前述技术方案的更进一步设计:中央控制计算机的显示屏幕展现的WEB窗口页面展示的地理图形是采用矢量图和影像图混合叠加显示出来,配电变压器的色块是以点对象分布密度着色展示,依据密度分布的情况,进行色彩深度叠加显示,把点发布信息转为面区域着色显示。 As a further design of the aforementioned technical solution: the geographic graphics displayed on the WEB window page displayed on the display screen of the central control computer are displayed by mixing and superimposing vector graphics and image images, and the color blocks of the distribution transformer are colored by the distribution density of point objects For display, according to the density distribution, the color depth is superimposed and displayed, and the point release information is converted into a colored display of the surface area. the
本实用新型的配电网变压器运行状态图形化监视系统以不同色块显示了配电变压器的状况,根据色块的颜色显示直观地反映出对应配电变压器的负载率指数;根据各配电变压器的负载率状况,对各配电变压器分类、分级安排处理。尤其是对于某区域内负荷点是分散分布还是高度集中分布,集中在供电线路的某一段还是整段线路都较平均,线路供电负荷覆盖范围有多大,用户是处于山上、公路旁还是靠近河流等分布特性信息,本监视方法能够很好的对这些数据进行宏观展现,有效减轻专业分析计算数据的筛选排查、来源定位等工作量,提高分析效率和准确性。 The graphical monitoring system for the operation state of distribution network transformers of the utility model displays the status of distribution transformers with different color blocks, and intuitively reflects the load rate index of the corresponding distribution transformers according to the color display of the color blocks; Classify and classify distribution transformers according to the load rate status. In particular, whether the load points in a certain area are distributed or highly concentrated, whether they are concentrated in a certain section of the power supply line or the entire line is relatively average, how large is the load coverage of the line power supply, and whether the users are on the mountain, beside the road or near the river, etc. Distribution characteristic information, this monitoring method can well display these data macroscopically, effectively reduce the workload of professional analysis and calculation data screening and investigation, source location, etc., and improve analysis efficiency and accuracy. the
附图说明 Description of drawings
图1是本实用新型的监视系统的框架图; Fig. 1 is the frame diagram of monitoring system of the present utility model;
图2是本实用新型监视系统的在显示屏幕中显示不同色块表示配电变压器状况的示意图; Fig. 2 is a schematic diagram showing different color blocks in the display screen of the monitoring system of the present invention to represent the status of the distribution transformer;
图3是本实用新型的监视系统在显示屏幕中显示配电变压器日负载率的曲线图的示意图。 Fig. 3 is a schematic diagram of a graph showing the daily load rate of distribution transformers on the display screen of the monitoring system of the present invention.
具体实施方式 Detailed ways
下面结合附图给出本实用新型的一个最佳实施例。 Provide a best embodiment of the present utility model below in conjunction with accompanying drawing. the
实施例1 Example 1
本实施例涉及配电网变压器运行状态图形化监视系统,如图1所示,由对计量终端设备进行数据采集的采集器1、接收数据并以图像显示方式显示数据情况的中央控制计算机2和连接线组成,中央控制计算机内安装有控制计量终端设备动作的软件控制系统,中央控制计算设置有显示屏幕3,中央控制计算机的显示屏幕展现的WEB窗口页面是以图形方式展示的图形信息;所述的图形信息由展示配电变压器所在位置的地理图形和以显示配电变压器当前状况的不同色块组成,不同色块的颜色显示不同配电变压器的负载率高低程度指数;根据各配电变压器的负载率高低程度指数及对应状态颜色,软件控制系统和中央控制计算机对各配电变压器进行分类、分级安排处理。
This embodiment relates to a graphical monitoring system for the operation status of distribution network transformers. As shown in FIG. The central control computer is equipped with a software control system to control the action of the metering terminal equipment. The central control computer is provided with a
如图2所示,中央控制计算机的显示屏幕的WEB窗口所展示的不同色块由蓝色、绿色、黄色、红色和黑色的至少一种组成;所述的蓝色代表配电变压器的负荷指标为负载率≤40%,表示没有任何负荷接入限制,此时配电变压器尚未达到经济运行状态,欢迎用户报装用电,鼓励用户用电;绿色代表配电变压器的负荷指标为40<负载率≤60%,表示配电变压器正处于经济运行范围内,没有负荷接入限制,继续欢迎用户报装用电;黄色代表配电变压器的负荷指标为60%<负载率≤80%,表示配电变压器仍处于经济运行状范围内,但需注意要适当控制接入负荷容量,用户可继续报装用电;红色代表配电变压器的负荷指标为80%<负载率≤100%,表示配电电压器处于高负载水平,必须严格控制负荷接入容量,并注意控制用电;黑色代表配电变压器的负荷指标为负载率>100%,表示配电变压器已超负荷运行,不允许再接入负荷,必须严格控制用电,不能长时间超负荷运行,要尽快进行增容改造或转移负荷,降低配电变压器负载率到安全值,避免设备损坏。 As shown in Figure 2, the different color blocks shown in the WEB window of the display screen of the central control computer are composed of at least one of blue, green, yellow, red and black; the blue represents the load index of the distribution transformer It means that the load rate is ≤40%, which means that there is no load access restriction. At this time, the distribution transformer has not yet reached the economical operation state. Users are welcome to report for installation and use of electricity, and users are encouraged to use electricity; green means that the load index of the distribution transformer is 40<load If the ratio is ≤60%, it means that the distribution transformer is in the economic operation range, and there is no load access restriction, and users are welcome to apply for installation and power consumption; yellow means that the load index of the distribution transformer is 60%<load ratio≤80%, which means that the distribution transformer The power transformer is still in the range of economic operation, but attention should be paid to properly controlling the access load capacity, and users can continue to apply for power consumption; red means that the load index of the distribution transformer is 80% < load rate ≤ 100%, indicating that the power distribution The voltage transformer is at a high load level, and the load access capacity must be strictly controlled, and attention must be paid to the control of power consumption; black means that the load index of the distribution transformer is the load rate > 100%, indicating that the distribution transformer has been overloaded and is not allowed to be connected again The load must be strictly controlled, and it cannot be overloaded for a long time. It is necessary to increase the capacity or transfer the load as soon as possible, reduce the load rate of the distribution transformer to a safe value, and avoid equipment damage. the
负载率是配电变压器最大负荷与额定负荷的比值,它是配电变压器运行的健康指标及负荷接入限度指标,用于反映配电变压器是否接近极限运,其数值越高 ,表明配电变压器负载量越大,甚至超负荷运行,会导致配电变压器损坏。而本实用新型利用不同的色块直观地显现了各配电变压器的负载率指标数据含义,简称“4681法则”,利用该法则进行配网变压器运行状态进行实时监视,大大节省了现场勘察、测定负荷的工作量,及时准确的发现设备运行存在的隐患,及早安排改造计划,提高了设备运维水平。 The load rate is the ratio of the maximum load to the rated load of the distribution transformer. It is the health index of the distribution transformer operation and the load access limit index. It is used to reflect whether the distribution transformer is close to the limit operation. The higher the value, the distribution transformer The greater the load, or even overloaded operation, will cause damage to the distribution transformer. The utility model uses different color blocks to visually display the meaning of the load rate index data of each distribution transformer, referred to as "4681 rule", and uses this rule to monitor the operation status of the distribution network transformer in real time, which greatly saves on-site investigation and measurement. The workload of the load, the timely and accurate discovery of hidden dangers in the operation of the equipment, the early arrangement of the transformation plan, and the improvement of the level of equipment operation and maintenance. the
如图3所示,中央控制计算机的显示屏幕的WEB窗口可展示出一列表,列表表示各配电变压器在某一区域内的额定负载容量、最大负荷值及其出现时间、负载率;并可在显示屏幕的WEB窗口上查询具体用户的配电变压器的实时负载率,具体用户的日负载率变化数据列表记录、负载率变化曲线。上述功能能够展示电网供电电量、用户用电电量明细数据记录,描绘某区域或某用户的各类电力参数变化曲线,对各类数据进行统计分析计算并以列表的方式展示结果,其数据的专业性强。 As shown in Figure 3, the WEB window of the display screen of the central control computer can display a list, which shows the rated load capacity, maximum load value, time of occurrence, and load rate of each distribution transformer in a certain area; On the WEB window of the display screen, query the real-time load rate of the distribution transformer of the specific user, the list record of the daily load rate change data of the specific user, and the load rate change curve. The above functions can display detailed data records of grid power supply and user electricity consumption, depict various power parameter change curves of a certain area or a certain user, perform statistical analysis and calculation of various data and display the results in a list. The professionalism of the data Strong. the
中央控制计算机的显示屏幕展现的WEB窗口页面展示的地理图形是采用矢量图和影像图混合叠加显示出来,配电变压器的色块是以点对象分布密度着色展示,依据密度分布的情况,进行色彩深度叠加显示,把点发布信息转为面区域着色显示。 The geographical graphics displayed on the WEB window page displayed on the display screen of the central control computer are displayed by mixing and superimposing vector graphics and image images. The color blocks of distribution transformers are displayed in color with the distribution density of point objects, and the color is adjusted according to the density distribution. Depth overlay display, convert point release information into surface area color display. the
如图1所示,该不同的色块直观地显现了各配电变压器的负载率指标数据含义,简称“4681法则”,利用该法则进行配网变压器运行状态进行实时监视,大大节省了现场勘察、测定负荷的工作量,及时准确的发现设备运行存在的隐患,及早安排改造计划,提高了设备运维水平。 As shown in Figure 1, the different color blocks intuitively show the meaning of the load rate index data of each distribution transformer, referred to as the "4681 rule", which is used to monitor the operating status of the distribution network transformer in real time, which greatly saves on-site investigation , Measure the workload of the load, timely and accurately discover hidden dangers in the operation of the equipment, arrange the transformation plan early, and improve the level of equipment operation and maintenance. the
除以上技术方案的实施例外,凡是与本实用新型技术方案相似的配电网变压器运行状态图形化监视方法也同样落入本实用新型的保护范围之内。 In addition to the implementation of the above technical solutions, any graphical monitoring method for the operation status of distribution network transformers similar to the technical solutions of the present utility model also falls within the scope of protection of the present utility model. the
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120198696.5U CN202172306U (en) | 2011-06-14 | 2011-06-14 | Power distribution network transformer running state graphical supervision system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120198696.5U CN202172306U (en) | 2011-06-14 | 2011-06-14 | Power distribution network transformer running state graphical supervision system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202172306U true CN202172306U (en) | 2012-03-21 |
Family
ID=45830492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120198696.5U Expired - Lifetime CN202172306U (en) | 2011-06-14 | 2011-06-14 | Power distribution network transformer running state graphical supervision system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202172306U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106199248A (en) * | 2016-06-28 | 2016-12-07 | 国网山东省电力公司昌邑市供电公司 | Network load the Visual Implementation method and device |
CN106288191A (en) * | 2012-03-29 | 2017-01-04 | 谷歌公司 | Process and report the use information connecting thermostat controlled HVAC system for network |
CN108054832A (en) * | 2017-12-08 | 2018-05-18 | 江苏省苏核辐射科技有限责任公司 | Project of transmitting and converting electricity environmental monitoring early warning integrated system |
US10443879B2 (en) | 2010-12-31 | 2019-10-15 | Google Llc | HVAC control system encouraging energy efficient user behaviors in plural interactive contexts |
US10606724B2 (en) | 2010-11-19 | 2020-03-31 | Google Llc | Attributing causation for energy usage and setpoint changes with a network-connected thermostat |
US11781770B2 (en) | 2012-03-29 | 2023-10-10 | Google Llc | User interfaces for schedule display and modification on smartphone or other space-limited touchscreen device |
-
2011
- 2011-06-14 CN CN201120198696.5U patent/CN202172306U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10606724B2 (en) | 2010-11-19 | 2020-03-31 | Google Llc | Attributing causation for energy usage and setpoint changes with a network-connected thermostat |
US10443879B2 (en) | 2010-12-31 | 2019-10-15 | Google Llc | HVAC control system encouraging energy efficient user behaviors in plural interactive contexts |
CN106288191A (en) * | 2012-03-29 | 2017-01-04 | 谷歌公司 | Process and report the use information connecting thermostat controlled HVAC system for network |
US10443877B2 (en) | 2012-03-29 | 2019-10-15 | Google Llc | Processing and reporting usage information for an HVAC system controlled by a network-connected thermostat |
CN106288191B (en) * | 2012-03-29 | 2020-08-25 | 谷歌有限责任公司 | Processing and reporting usage information for a network-connected thermostat-controlled HVAC system |
US11781770B2 (en) | 2012-03-29 | 2023-10-10 | Google Llc | User interfaces for schedule display and modification on smartphone or other space-limited touchscreen device |
CN106199248A (en) * | 2016-06-28 | 2016-12-07 | 国网山东省电力公司昌邑市供电公司 | Network load the Visual Implementation method and device |
CN108054832A (en) * | 2017-12-08 | 2018-05-18 | 江苏省苏核辐射科技有限责任公司 | Project of transmitting and converting electricity environmental monitoring early warning integrated system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205544597U (en) | Multi -functional three -phase power monitoring device | |
CN202172306U (en) | Power distribution network transformer running state graphical supervision system | |
CN103715767B (en) | Intelligent grid information integerated and display platform | |
CN106990328B (en) | Distribution network emergency repair abnormal data analysis, fault location system and method | |
CN102055244A (en) | Method for graphically monitoring running state of transformer of distribution network | |
CN104574217A (en) | Intelligent power distribution network online risk assessment method | |
CN105634138A (en) | Multifunctional three-phase electric power monitoring apparatus | |
CN112034287A (en) | Electric power safety monitoring system based on big data | |
CN101286643A (en) | Wind farm energy management system with grid access control function | |
CN110048413B (en) | A carbon emission reduction calculation method and system for regional new energy power generation | |
CN105429304A (en) | Power grid harmonic wave monitoring method | |
CN103986227A (en) | A method and system for monitoring and operating power distribution network based on GIS platform | |
CN105572512B (en) | The Index grading display methods of harbour distribution network electric energy quality monitoring system | |
CN104407260A (en) | Latent fault pre-warning method and device for distribution transformer | |
CN108037343A (en) | A kind of voltage monitoring Management System Data deepens analysis method | |
CN111337744A (en) | Transformer operation energy efficiency and/or loss monitoring device | |
CN108629520A (en) | A kind of ultra-high-tension power transmission line operating status appraisal procedure under microclimate environment | |
CN204330917U (en) | A kind of substation transformer incipient fault prior-warning device | |
CN105354613A (en) | Distributed photovoltaic operation and maintenance mode selection system | |
CN203479855U (en) | Photovoltaic generating electric energy metering system for low-voltage users | |
CN201893813U (en) | Power quality monitoring system for regional power grid | |
CN118378954A (en) | Dynamic monitoring system and method based on energy efficiency balance of rail transit enterprises | |
CN205485522U (en) | Energy efficiency management system | |
CN219421048U (en) | Industrial equipment dynamic monitoring system based on cloud platform | |
CN102053835A (en) | Method for displaying power supply range of power distribution line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120321 |