CN202164830U - 输电铁塔的加固装置 - Google Patents

输电铁塔的加固装置 Download PDF

Info

Publication number
CN202164830U
CN202164830U CN2011202590005U CN201120259000U CN202164830U CN 202164830 U CN202164830 U CN 202164830U CN 2011202590005 U CN2011202590005 U CN 2011202590005U CN 201120259000 U CN201120259000 U CN 201120259000U CN 202164830 U CN202164830 U CN 202164830U
Authority
CN
China
Prior art keywords
main material
reinforcing
bolt
bolts
original
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202590005U
Other languages
English (en)
Inventor
蒋靖
丁谦
任金来
于扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd
Original Assignee
TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd filed Critical TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd
Priority to CN2011202590005U priority Critical patent/CN202164830U/zh
Application granted granted Critical
Publication of CN202164830U publication Critical patent/CN202164830U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型所要解决的技术问题是提供一种成本低廉、施工方便且加固性能高的输电铁塔的加固装置,由连接角钢(1)、加固主材(2)、螺栓A(3)、节点板(4)、螺栓B(5)、加劲槽钢(6)组成,其特征在于将需要加固的主材段上的所有螺栓B上安装新的螺栓A,将加固主材通过螺栓B固装于原有主材上,将加固主材上的加劲槽钢的一侧用户外结构胶与原有主材进行粘接,将加固主材的底端焊接在塔脚板上,即完成对铁塔的加固。此种设置可充分利用原有主材上的螺栓,在每个螺栓上安装一个螺栓A,再通过螺栓A将加固主材平行固装于原有主材上,这种加固装置无需在原有主材上打孔,也无需更换原有主材上的螺栓,最大限度的保留了原有结构的整体性,保证了输电铁塔的加固性能。

Description

输电铁塔的加固装置
技术领域
本实用新型涉及一种加固装置,特别涉及一种输电铁塔的加固装置。
背景技术
输电铁塔是电力传输工程中的重要设备,近年来由于对电能需求的显著提高,需要在铁塔上增加更多的绝缘子串及传感器,增大了铁塔要承受的荷载,又由于许多塔型是根据旧版规范设计制造的,其性能指标也已不能适应现在越来越恶劣的环境的需要。老的输电铁塔可以通过增加新的构件来强化,使其可以承受更大的荷载作用,从而花费较少的费用就可以实现对铁塔的加固升级,这比再建一个新的铁塔线路要节省很多成本,目前的加固方式主要有两种:一是通过在铁塔相应位置增加横隔装置,实现对铁塔的加固,该装置存在的问题是适用范围较窄,施工不便,尤其是对现行线路的铁塔进行加固时。第二种方法是通过在原有主材上附加新增主材装置,新增主材是通过连接角钢与原有主材进行连接的,此种装置适用性广,施工也比较方便,但其缺点是在加固过程中需要对螺栓B进行更换,亦不太适合对现行线路上的铁塔进行加固,尤其是对转角塔和终端塔。
发明内容
根据以上技术问题,本实用新型所要解决的技术问题是提供一种成本低廉、施工方便且加固性能高的输电铁塔的加固装置,由连接角钢(1)、加固主材(2)、螺栓A(3)、节点板(4)、螺栓B(5)、加劲槽钢(6)组成,其特征在于将需要加固的主材段上的所有螺栓B上安装新的螺栓A,将加固主材通过螺栓B固装于原有主材上,将加固主材上的加劲槽钢的一侧用户外结构胶与原有主材进行粘接,将加固主材的底端焊接在塔脚板上,即完成对铁塔的加固。
本实用新型的有益效果为:此种设置可充分利用原有主材上的螺栓,在每个螺栓上安装一个螺栓A,再通过螺栓A将加固主材平行固装于原有主材上,这种加固装置无需在原有主材上打孔,也无需更换原有主材上的螺栓,最大限度的保留了原有结构的整体性,保证了输电铁塔的加固性能。只需利用铁塔上原有螺栓安装加固角钢,其优点是成本较低廉,施工简单,工期短等优点,因为几乎无需对原有铁塔结构进行变动,故尤其适合应用于对已经运行的铁塔的加固,这也是本实用新型最为突出的优点。
附图说明
图1是局部剖视图;
图2是局部剖视图;
图3是连接角钢局部放大图;
图4是连接螺栓局部放大图。
具体实施方式
参见图1-4所示,以下结合附图对本加固装置实施例进行详述:本实用新型是对现有铁塔进行加固,尤其适合于对已有运行中铁塔进行加固,下面以35JGu33输电铁塔为例加以说明。现有铁塔由塔身、横担、塔角和基础组成,塔身是由四根主材与横材、斜材及辅助材所构成的塔式框架结构,在主材与横材、斜材交汇点所构成的多个节点处均安装有节点板(4),通过该节点板(4)将上述三者用螺栓B(5)固定安装到一起,每根主材均由多段连接角钢(1)构成并固装于连接板和节点板(4)内侧,主材与横材,主材与斜材之间的交点通过交点螺栓B(5)固装,塔身的底部通过螺栓B(5)固装于基础上的塔脚板上,塔身上部水平安装有横担。本加固方法主要是利用原有主材上的原有螺栓B(5),通过在其上固定安装螺栓A(3),再将新加加固主材(2)平行固定于原有主材上,具体实施方法是:在每个原有螺栓上固定安装一个螺栓A(3),然后将加固主材(2)再固定安装在螺栓A(3)上,最后将加固主材(2)通过焊接方式固定在塔脚板上,将加固主材上的加劲槽钢(6)的一侧用户外结构胶与原有主材进行粘接即完成对铁塔的加固。
以35JGu33型铁塔为例进行说明,在加固之前需要的准备工作:
首先根据铁塔需要加固部分的原有主材上的螺栓B(5)数量制造出同等数量的螺栓A(3),因为需要在每个原有螺栓B(5)上安装螺栓A(3),所以数量应该是相同的。然后制备出与原有主材相同材质,但规格要大的加固主材(2),每个连接角钢(1)两端及中部设有与原有主材相对应的安装孔,该加固主材(2)要求与原主材材质相同,规格要比原有主材适当提高,选择标准是加固后加固主材(2)肢边和原有主材的肢边对齐,这样才能最有效的保证加固性能。

Claims (1)

1.一种输电铁塔的加固装置,由连接角钢(1)、加固主材(2)、螺栓A(3)、节点板(4)、螺栓B(5)、加劲槽钢(6)组成,其特征在于:将需要加固的主材段上的所有螺栓B(5)上安装新的螺栓A(3),将加固主材(2)通过螺栓A(3)固装于原有主材上,将加固主材(2)上的加劲槽钢(6)的一侧用户外结构胶与原有主材进行粘接,将加固主材(2)的底端焊接在塔脚板上,即完成对铁塔的加固。
CN2011202590005U 2011-07-21 2011-07-21 输电铁塔的加固装置 Expired - Lifetime CN202164830U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202590005U CN202164830U (zh) 2011-07-21 2011-07-21 输电铁塔的加固装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202590005U CN202164830U (zh) 2011-07-21 2011-07-21 输电铁塔的加固装置

Publications (1)

Publication Number Publication Date
CN202164830U true CN202164830U (zh) 2012-03-14

Family

ID=45800666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202590005U Expired - Lifetime CN202164830U (zh) 2011-07-21 2011-07-21 输电铁塔的加固装置

Country Status (1)

Country Link
CN (1) CN202164830U (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883154A (zh) * 2014-03-14 2014-06-25 国家电网公司 输电线路角钢塔塔腿现场焊接加固方法
CN104153596A (zh) * 2014-08-21 2014-11-19 中铁西北科学研究院有限公司 砖石古塔整体抗震加固方法
CN105735482A (zh) * 2014-12-08 2016-07-06 国家电网公司 一种单双角钢过渡节点
CN106567599A (zh) * 2016-11-10 2017-04-19 中国能源建设集团广东省电力设计研究院有限公司 输电塔加固用夹具、输电塔加固装置及其加固方法
CN107747424A (zh) * 2017-11-27 2018-03-02 深圳带路科技有限公司 一种嵌套式加固铁塔
CN108374594A (zh) * 2018-03-16 2018-08-07 广东电网有限责任公司江门供电局 一种用于内套塔的加固装置及方法
CN113027218A (zh) * 2021-03-20 2021-06-25 中电建十一局工程有限公司 一种新型通信铁塔加固专用模具
CN113175234A (zh) * 2021-05-08 2021-07-27 大连航天高科科技有限公司 一种粘接式角钢塔加固结构及加固方法
CN115126327A (zh) * 2022-04-13 2022-09-30 中国能源建设集团广东省电力设计研究院有限公司 一种输电铁塔角钢加固装置

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883154A (zh) * 2014-03-14 2014-06-25 国家电网公司 输电线路角钢塔塔腿现场焊接加固方法
CN103883154B (zh) * 2014-03-14 2015-12-02 国家电网公司 输电线路角钢塔塔腿现场焊接加固方法
CN104153596A (zh) * 2014-08-21 2014-11-19 中铁西北科学研究院有限公司 砖石古塔整体抗震加固方法
CN105735482A (zh) * 2014-12-08 2016-07-06 国家电网公司 一种单双角钢过渡节点
CN105735482B (zh) * 2014-12-08 2017-03-08 国家电网公司 一种单双角钢过渡节点
CN106567599A (zh) * 2016-11-10 2017-04-19 中国能源建设集团广东省电力设计研究院有限公司 输电塔加固用夹具、输电塔加固装置及其加固方法
CN107747424A (zh) * 2017-11-27 2018-03-02 深圳带路科技有限公司 一种嵌套式加固铁塔
CN108374594A (zh) * 2018-03-16 2018-08-07 广东电网有限责任公司江门供电局 一种用于内套塔的加固装置及方法
CN113027218A (zh) * 2021-03-20 2021-06-25 中电建十一局工程有限公司 一种新型通信铁塔加固专用模具
CN113175234A (zh) * 2021-05-08 2021-07-27 大连航天高科科技有限公司 一种粘接式角钢塔加固结构及加固方法
CN115126327A (zh) * 2022-04-13 2022-09-30 中国能源建设集团广东省电力设计研究院有限公司 一种输电铁塔角钢加固装置
CN115126327B (zh) * 2022-04-13 2023-10-20 中国能源建设集团广东省电力设计研究院有限公司 一种输电铁塔角钢加固装置

Similar Documents

Publication Publication Date Title
CN202164830U (zh) 输电铁塔的加固装置
CN101463667A (zh) 输电铁塔的加固方法
CN204326335U (zh) 一种预制钢筋混凝土楼板与叠合梁一体装配连接结构
CN203947616U (zh) 一种连梁式抗震阻尼器
CN202359830U (zh) 新型输电铁塔的加固装置
CN105064759B (zh) 一种gfrp管钢筋混凝土组合构件多回路输电杆
CN103670910A (zh) 一种分段式风力机叶片的连接装置及连接方法
CN106013832A (zh) 一种通信管塔的加固改造方法
CN205134791U (zh) 一种装配式预制楼梯
CN202064454U (zh) 建筑用连接件及使用这种连接件的梁柱建筑结构体系
CN110805141B (zh) 一种建筑物顶升后钢管柱与隔震支座的连接装置及方法
CN203669323U (zh) 可伸缩拼装作业平台支架
CN204041365U (zh) 一种风力发电机专用塔架
CN203741989U (zh) 一种集成房屋轻钢结构
CN210396223U (zh) 一种光伏电站杆塔加固装置
CN204225558U (zh) 格构式钢管柱与输电塔架
CN204024443U (zh) 采用连接件搭接式竹制攀爬梯
CN203890879U (zh) 一种钢-混组合桥涵面板
CN205039496U (zh) 整体预制电缆支架
CN204001330U (zh) 一种钢结构楼板
CN204356793U (zh) 一种装配式中空钢筋混凝土独立基础
CN203792514U (zh) 一种预应力钢筋波纹管施工定位系统
CN203412111U (zh) 劲性型钢梁节点处的直螺纹套筒连接结构
CN202000494U (zh) 用于钢结构的拼接加强机构
CN202450627U (zh) 门柱柱脚预埋件

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120314

CX01 Expiry of patent term
DD01 Delivery of document by public notice

Addressee: Patent of Tianjin Qiushi electric power planning and Design Co.,Ltd. The person in charge

Document name: Notice of expiration and termination of patent right

DD01 Delivery of document by public notice