CN202164830U - 输电铁塔的加固装置 - Google Patents
输电铁塔的加固装置 Download PDFInfo
- Publication number
- CN202164830U CN202164830U CN2011202590005U CN201120259000U CN202164830U CN 202164830 U CN202164830 U CN 202164830U CN 2011202590005 U CN2011202590005 U CN 2011202590005U CN 201120259000 U CN201120259000 U CN 201120259000U CN 202164830 U CN202164830 U CN 202164830U
- Authority
- CN
- China
- Prior art keywords
- main material
- reinforcing
- bolt
- bolts
- original
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 42
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 26
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 21
- 230000005540 biological transmission Effects 0.000 title abstract 3
- 239000000463 material Substances 0.000 claims abstract description 65
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 230000002787 reinforcement Effects 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 239000003292 glue Substances 0.000 claims description 3
- 239000000853 adhesive Substances 0.000 abstract 1
- 230000001070 adhesive effect Effects 0.000 abstract 1
- 230000010354 integration Effects 0.000 abstract 1
- 230000000717 retained effect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型所要解决的技术问题是提供一种成本低廉、施工方便且加固性能高的输电铁塔的加固装置,由连接角钢(1)、加固主材(2)、螺栓A(3)、节点板(4)、螺栓B(5)、加劲槽钢(6)组成,其特征在于将需要加固的主材段上的所有螺栓B上安装新的螺栓A,将加固主材通过螺栓B固装于原有主材上,将加固主材上的加劲槽钢的一侧用户外结构胶与原有主材进行粘接,将加固主材的底端焊接在塔脚板上,即完成对铁塔的加固。此种设置可充分利用原有主材上的螺栓,在每个螺栓上安装一个螺栓A,再通过螺栓A将加固主材平行固装于原有主材上,这种加固装置无需在原有主材上打孔,也无需更换原有主材上的螺栓,最大限度的保留了原有结构的整体性,保证了输电铁塔的加固性能。
Description
技术领域
本实用新型涉及一种加固装置,特别涉及一种输电铁塔的加固装置。
背景技术
输电铁塔是电力传输工程中的重要设备,近年来由于对电能需求的显著提高,需要在铁塔上增加更多的绝缘子串及传感器,增大了铁塔要承受的荷载,又由于许多塔型是根据旧版规范设计制造的,其性能指标也已不能适应现在越来越恶劣的环境的需要。老的输电铁塔可以通过增加新的构件来强化,使其可以承受更大的荷载作用,从而花费较少的费用就可以实现对铁塔的加固升级,这比再建一个新的铁塔线路要节省很多成本,目前的加固方式主要有两种:一是通过在铁塔相应位置增加横隔装置,实现对铁塔的加固,该装置存在的问题是适用范围较窄,施工不便,尤其是对现行线路的铁塔进行加固时。第二种方法是通过在原有主材上附加新增主材装置,新增主材是通过连接角钢与原有主材进行连接的,此种装置适用性广,施工也比较方便,但其缺点是在加固过程中需要对螺栓B进行更换,亦不太适合对现行线路上的铁塔进行加固,尤其是对转角塔和终端塔。
发明内容
根据以上技术问题,本实用新型所要解决的技术问题是提供一种成本低廉、施工方便且加固性能高的输电铁塔的加固装置,由连接角钢(1)、加固主材(2)、螺栓A(3)、节点板(4)、螺栓B(5)、加劲槽钢(6)组成,其特征在于将需要加固的主材段上的所有螺栓B上安装新的螺栓A,将加固主材通过螺栓B固装于原有主材上,将加固主材上的加劲槽钢的一侧用户外结构胶与原有主材进行粘接,将加固主材的底端焊接在塔脚板上,即完成对铁塔的加固。
本实用新型的有益效果为:此种设置可充分利用原有主材上的螺栓,在每个螺栓上安装一个螺栓A,再通过螺栓A将加固主材平行固装于原有主材上,这种加固装置无需在原有主材上打孔,也无需更换原有主材上的螺栓,最大限度的保留了原有结构的整体性,保证了输电铁塔的加固性能。只需利用铁塔上原有螺栓安装加固角钢,其优点是成本较低廉,施工简单,工期短等优点,因为几乎无需对原有铁塔结构进行变动,故尤其适合应用于对已经运行的铁塔的加固,这也是本实用新型最为突出的优点。
附图说明
图1是局部剖视图;
图2是局部剖视图;
图3是连接角钢局部放大图;
图4是连接螺栓局部放大图。
具体实施方式
参见图1-4所示,以下结合附图对本加固装置实施例进行详述:本实用新型是对现有铁塔进行加固,尤其适合于对已有运行中铁塔进行加固,下面以35JGu33输电铁塔为例加以说明。现有铁塔由塔身、横担、塔角和基础组成,塔身是由四根主材与横材、斜材及辅助材所构成的塔式框架结构,在主材与横材、斜材交汇点所构成的多个节点处均安装有节点板(4),通过该节点板(4)将上述三者用螺栓B(5)固定安装到一起,每根主材均由多段连接角钢(1)构成并固装于连接板和节点板(4)内侧,主材与横材,主材与斜材之间的交点通过交点螺栓B(5)固装,塔身的底部通过螺栓B(5)固装于基础上的塔脚板上,塔身上部水平安装有横担。本加固方法主要是利用原有主材上的原有螺栓B(5),通过在其上固定安装螺栓A(3),再将新加加固主材(2)平行固定于原有主材上,具体实施方法是:在每个原有螺栓上固定安装一个螺栓A(3),然后将加固主材(2)再固定安装在螺栓A(3)上,最后将加固主材(2)通过焊接方式固定在塔脚板上,将加固主材上的加劲槽钢(6)的一侧用户外结构胶与原有主材进行粘接即完成对铁塔的加固。
以35JGu33型铁塔为例进行说明,在加固之前需要的准备工作:
首先根据铁塔需要加固部分的原有主材上的螺栓B(5)数量制造出同等数量的螺栓A(3),因为需要在每个原有螺栓B(5)上安装螺栓A(3),所以数量应该是相同的。然后制备出与原有主材相同材质,但规格要大的加固主材(2),每个连接角钢(1)两端及中部设有与原有主材相对应的安装孔,该加固主材(2)要求与原主材材质相同,规格要比原有主材适当提高,选择标准是加固后加固主材(2)肢边和原有主材的肢边对齐,这样才能最有效的保证加固性能。
Claims (1)
1.一种输电铁塔的加固装置,由连接角钢(1)、加固主材(2)、螺栓A(3)、节点板(4)、螺栓B(5)、加劲槽钢(6)组成,其特征在于:将需要加固的主材段上的所有螺栓B(5)上安装新的螺栓A(3),将加固主材(2)通过螺栓A(3)固装于原有主材上,将加固主材(2)上的加劲槽钢(6)的一侧用户外结构胶与原有主材进行粘接,将加固主材(2)的底端焊接在塔脚板上,即完成对铁塔的加固。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202590005U CN202164830U (zh) | 2011-07-21 | 2011-07-21 | 输电铁塔的加固装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202590005U CN202164830U (zh) | 2011-07-21 | 2011-07-21 | 输电铁塔的加固装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202164830U true CN202164830U (zh) | 2012-03-14 |
Family
ID=45800666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202590005U Expired - Lifetime CN202164830U (zh) | 2011-07-21 | 2011-07-21 | 输电铁塔的加固装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202164830U (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883154A (zh) * | 2014-03-14 | 2014-06-25 | 国家电网公司 | 输电线路角钢塔塔腿现场焊接加固方法 |
CN104153596A (zh) * | 2014-08-21 | 2014-11-19 | 中铁西北科学研究院有限公司 | 砖石古塔整体抗震加固方法 |
CN105735482A (zh) * | 2014-12-08 | 2016-07-06 | 国家电网公司 | 一种单双角钢过渡节点 |
CN106567599A (zh) * | 2016-11-10 | 2017-04-19 | 中国能源建设集团广东省电力设计研究院有限公司 | 输电塔加固用夹具、输电塔加固装置及其加固方法 |
CN107747424A (zh) * | 2017-11-27 | 2018-03-02 | 深圳带路科技有限公司 | 一种嵌套式加固铁塔 |
CN108374594A (zh) * | 2018-03-16 | 2018-08-07 | 广东电网有限责任公司江门供电局 | 一种用于内套塔的加固装置及方法 |
CN113027218A (zh) * | 2021-03-20 | 2021-06-25 | 中电建十一局工程有限公司 | 一种新型通信铁塔加固专用模具 |
CN113175234A (zh) * | 2021-05-08 | 2021-07-27 | 大连航天高科科技有限公司 | 一种粘接式角钢塔加固结构及加固方法 |
CN115126327A (zh) * | 2022-04-13 | 2022-09-30 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种输电铁塔角钢加固装置 |
-
2011
- 2011-07-21 CN CN2011202590005U patent/CN202164830U/zh not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883154A (zh) * | 2014-03-14 | 2014-06-25 | 国家电网公司 | 输电线路角钢塔塔腿现场焊接加固方法 |
CN103883154B (zh) * | 2014-03-14 | 2015-12-02 | 国家电网公司 | 输电线路角钢塔塔腿现场焊接加固方法 |
CN104153596A (zh) * | 2014-08-21 | 2014-11-19 | 中铁西北科学研究院有限公司 | 砖石古塔整体抗震加固方法 |
CN105735482A (zh) * | 2014-12-08 | 2016-07-06 | 国家电网公司 | 一种单双角钢过渡节点 |
CN105735482B (zh) * | 2014-12-08 | 2017-03-08 | 国家电网公司 | 一种单双角钢过渡节点 |
CN106567599A (zh) * | 2016-11-10 | 2017-04-19 | 中国能源建设集团广东省电力设计研究院有限公司 | 输电塔加固用夹具、输电塔加固装置及其加固方法 |
CN107747424A (zh) * | 2017-11-27 | 2018-03-02 | 深圳带路科技有限公司 | 一种嵌套式加固铁塔 |
CN108374594A (zh) * | 2018-03-16 | 2018-08-07 | 广东电网有限责任公司江门供电局 | 一种用于内套塔的加固装置及方法 |
CN113027218A (zh) * | 2021-03-20 | 2021-06-25 | 中电建十一局工程有限公司 | 一种新型通信铁塔加固专用模具 |
CN113175234A (zh) * | 2021-05-08 | 2021-07-27 | 大连航天高科科技有限公司 | 一种粘接式角钢塔加固结构及加固方法 |
CN115126327A (zh) * | 2022-04-13 | 2022-09-30 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种输电铁塔角钢加固装置 |
CN115126327B (zh) * | 2022-04-13 | 2023-10-20 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种输电铁塔角钢加固装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202164830U (zh) | 输电铁塔的加固装置 | |
CN101463667A (zh) | 输电铁塔的加固方法 | |
CN204326335U (zh) | 一种预制钢筋混凝土楼板与叠合梁一体装配连接结构 | |
CN203947616U (zh) | 一种连梁式抗震阻尼器 | |
CN202359830U (zh) | 新型输电铁塔的加固装置 | |
CN105064759B (zh) | 一种gfrp管钢筋混凝土组合构件多回路输电杆 | |
CN103670910A (zh) | 一种分段式风力机叶片的连接装置及连接方法 | |
CN106013832A (zh) | 一种通信管塔的加固改造方法 | |
CN205134791U (zh) | 一种装配式预制楼梯 | |
CN202064454U (zh) | 建筑用连接件及使用这种连接件的梁柱建筑结构体系 | |
CN110805141B (zh) | 一种建筑物顶升后钢管柱与隔震支座的连接装置及方法 | |
CN203669323U (zh) | 可伸缩拼装作业平台支架 | |
CN204041365U (zh) | 一种风力发电机专用塔架 | |
CN203741989U (zh) | 一种集成房屋轻钢结构 | |
CN210396223U (zh) | 一种光伏电站杆塔加固装置 | |
CN204225558U (zh) | 格构式钢管柱与输电塔架 | |
CN204024443U (zh) | 采用连接件搭接式竹制攀爬梯 | |
CN203890879U (zh) | 一种钢-混组合桥涵面板 | |
CN205039496U (zh) | 整体预制电缆支架 | |
CN204001330U (zh) | 一种钢结构楼板 | |
CN204356793U (zh) | 一种装配式中空钢筋混凝土独立基础 | |
CN203792514U (zh) | 一种预应力钢筋波纹管施工定位系统 | |
CN203412111U (zh) | 劲性型钢梁节点处的直螺纹套筒连接结构 | |
CN202000494U (zh) | 用于钢结构的拼接加强机构 | |
CN202450627U (zh) | 门柱柱脚预埋件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120314 |
|
CX01 | Expiry of patent term | ||
DD01 | Delivery of document by public notice |
Addressee: Patent of Tianjin Qiushi electric power planning and Design Co.,Ltd. The person in charge Document name: Notice of expiration and termination of patent right |
|
DD01 | Delivery of document by public notice |