CN202055262U - Prefabricated assembling joint pipe trench - Google Patents
Prefabricated assembling joint pipe trench Download PDFInfo
- Publication number
- CN202055262U CN202055262U CN2011201104955U CN201120110495U CN202055262U CN 202055262 U CN202055262 U CN 202055262U CN 2011201104955 U CN2011201104955 U CN 2011201104955U CN 201120110495 U CN201120110495 U CN 201120110495U CN 202055262 U CN202055262 U CN 202055262U
- Authority
- CN
- China
- Prior art keywords
- trench
- section
- segment
- prefabricated
- partition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Road Paving Structures (AREA)
Abstract
本实用新型公开了一种预制拼装共同管沟,包括相互配合的顶盖节段和底座节段组成的管沟节段,所述顶盖节段和底座节段通过预应力筋和锚具进行连接,所述管沟节段内还设有隔板,所述隔板与管沟节段的横截面垂直,将管沟节段内部分隔成互不相通的隔腔,相邻管沟节段之间也通过预应力筋和锚具进行连接,在各个拼装接缝处均设有膨胀止水带进行密封。本实用新型采用预制的拼装结构,从而有效地提高了建筑质量、加快了建设速度、降低了建设成本和放宽了基坑维护要求,且具有良好的结构性能,管沟内设有隔板,可以将不同的管线安装在不同的隔腔,避免干扰。
The utility model discloses a prefabricated and assembled common pipe ditch, which comprises a pipe ditch segment composed of a top cover segment and a base segment that cooperate with each other, and the top cover segment and the base connected, the section of the trench is also provided with a partition, the partition is perpendicular to the cross section of the section of the trench, and divides the interior of the section of the trench into compartments that do not communicate with each other, and the adjacent sections of the trench They are also connected by prestressed tendons and anchors, and expansion waterstops are installed at each assembled joint for sealing. The utility model adopts a prefabricated assembly structure, thereby effectively improving the construction quality, speeding up the construction speed, reducing the construction cost and relaxing the maintenance requirements of the foundation pit, and has good structural performance. Install different lines in different compartments to avoid interference.
Description
技术领域 technical field
本实用新型涉及一种用于管线安装的管沟,尤其涉及一种预制拼装共同管沟。 The utility model relates to a pipe ditch used for pipeline installation, in particular to a prefabricated and assembled common pipe ditch.
背景技术 Background technique
目前,随着城市基础设施建设的快速发展,地下管线已经进入不断改造和更新的时期,人们直观上看到的道路上原始直埋管线的频繁开挖会导致的诸如交通堵塞、环境破换等问题。共同管沟作为一种集约型、可持续化的管线敷设方式,为上述矛盾提供了一种可行的解决方案。它一方面方便了管线的维护更新,避免了城市道路的反复开挖以及由此带来的各种问题,另一方面也改善了管线的使用寿命,避免了土壤中各种化学成分的侵蚀作用产生的耐久性问题。目前,国内共同管沟的建设均为明开挖与现浇混凝土方式,由此带来的建设周期过长、建设质量不易控制、建设成本过高和建设期间基坑维护要求高等问题,在一定程度上限制了共同管沟在国内的进一步推广应用。 At present, with the rapid development of urban infrastructure construction, underground pipelines have entered a period of continuous transformation and renewal. People intuitively see that the frequent excavation of the original direct buried pipelines on the road will cause traffic jams, environmental damage, etc. question. As an intensive and sustainable pipeline laying method, the common trench provides a feasible solution to the above contradictions. On the one hand, it facilitates the maintenance and renewal of the pipeline, avoids repeated excavation of urban roads and various problems caused by it, on the other hand, it also improves the service life of the pipeline and avoids the erosion of various chemical components in the soil resulting durability issues. At present, the construction of common pipe trenches in China is open excavation and cast-in-place concrete, which brings problems such as long construction period, difficult control of construction quality, high construction cost and high maintenance requirements for foundation pits during construction. To a certain extent, the further popularization and application of the common pipe trench in the country is limited.
发明内容 Contents of the invention
针对上述现有技术存在的问题,本实用新型目的在于提供一种预制拼装共同管沟,能有效地提高建筑质量、加快建设速度、降低建设成本和放宽基坑维护要求,且具有良好的结构性能。 Aiming at the problems existing in the above-mentioned prior art, the purpose of this utility model is to provide a prefabricated and assembled common pipe trench, which can effectively improve the construction quality, speed up the construction speed, reduce the construction cost and relax the maintenance requirements of the foundation pit, and has good structural performance .
本实用新型的技术方案是:一种预制拼装共同管沟,包括相互配合的顶盖节段和底座节段组成的管沟节段,所述顶盖节段和底座节段通过预应力筋和锚具进行连接,所述管沟节段内还设有隔板,所述隔板与管沟节段的横截面垂直,将管沟节段内部分隔成互不相通的隔腔,相邻管沟节段之间也通过预应力筋和锚具进行连接,在各个拼装接缝处均设有膨胀止水带进行密封。 The technical scheme of the utility model is: a prefabricated and assembled common pipe ditch, including a pipe ditch segment composed of a top cover segment and a base segment that cooperate with each other, and the top cover segment and the base segment are passed through prestressed ribs and The anchorage is connected, and there is also a partition in the section of the trench. The partition is perpendicular to the cross section of the section of the trench, and divides the interior of the section of the trench into compartments that do not communicate with each other. Adjacent pipes The ditch segments are also connected by prestressed tendons and anchors, and expansion waterstops are installed at each assembled joint for sealing.
作为优选,所述顶盖节段顶部还设有吊装孔。 Preferably, a hoisting hole is also provided at the top of the roof segment.
作为优选,所述膨胀止水带采用吸水膨胀高分子材料制成。 Preferably, the swelling waterstop is made of water-absorbing swelling polymer material.
作为优选,所述吸水膨胀高分子材料为聚醚型聚氨酯膨胀材料。 Preferably, the water-absorbing swellable polymer material is a polyether polyurethane swellable material.
本实用新型的有益效果是:采用预制的拼装结构,从而有效地提高了建筑质量、加快了建设速度、降低了建设成本和放宽了基坑维护要求,且具有良好的结构性能,管沟内设有隔板,可以将不同的管线安装在不同的隔腔,避免干扰;顶盖节段的吊装孔,方便安装和拆卸时进行吊装;拼装接缝处的膨胀止水带采用形状记忆高分子材料制成,可以保证良好的使用性能。 The beneficial effects of the utility model are: adopting the prefabricated assembled structure, thereby effectively improving the building quality, speeding up the construction speed, reducing the construction cost and relaxing the maintenance requirements of the foundation pit, and having good structural performance. With partitions, different pipelines can be installed in different compartments to avoid interference; the hoisting holes in the top cover section are convenient for hoisting during installation and disassembly; the expansion waterstop at the assembly joint is made of shape memory polymer material Made to ensure good performance.
附图说明 Description of drawings
图1为本实用新型的管沟节段的结构示意图; Fig. 1 is the structural representation of the trench section of the utility model;
图2为本实用新型的拼装结构示意图。 Fig. 2 is a schematic diagram of the assembly structure of the present invention.
图中:1、顶盖节段;2、底座节段;3、吊装孔;4、隔板;5、膨胀止水带。 In the figure: 1. Top cover segment; 2. Base segment; 3. Hoisting hole; 4. Partition plate; 5. Expansion waterstop.
具体实施方式 Detailed ways
作为本实用新型的一种实施方式,如图1和图2所示,一种预制拼装共同管沟,包括相互配合的顶盖节段1和底座节段2组成的管沟节段,所述顶盖节段1和底座节段2通过预应力筋和锚具进行连接,所述顶盖节段1顶部设有吊装孔3,所述管沟节段内还设有隔板4,所述隔板4与管沟节段的横截面垂直,将管沟节段内部分隔成互不相通的隔腔,在本实施方式中,隔板4分成上下两部分并分别与顶盖节段1和底座节段2连接成一体,隔板4的上下两部分通过预应力筋和锚具进行连接在一起,相邻管沟节段之间也通过预应力筋和锚具进行连接,在各个拼装接缝处均设有膨胀止水带5进行密封,所述膨胀止水带5由吸水膨胀高分子材料制成。作为优选,所述吸水膨胀高分子材料为聚醚型聚氨酯膨胀材料。 As an embodiment of the present utility model, as shown in Figure 1 and Figure 2, a prefabricated and assembled common pipe ditch includes a pipe ditch segment composed of a top cover segment 1 and a base segment 2 that cooperate with each other, the The top cover segment 1 and the base segment 2 are connected by prestressed tendons and anchors, the top of the top cover segment 1 is provided with a hoisting hole 3, and a partition 4 is also provided in the pipe trench segment. The partition plate 4 is perpendicular to the cross-section of the pipe ditch segment, and separates the interior of the pipe ditch segment into compartments that are not connected to each other. In this embodiment, the partition plate 4 is divided into upper and lower parts and connected to the top cover segment 1 and The base segment 2 is connected into one body, the upper and lower parts of the partition 4 are connected together by prestressed tendons and anchors, and the adjacent trench segments are also connected by prestressed tendons and anchors. Seams are provided with expansion waterstops 5 for sealing, and the expansion waterstops 5 are made of water-absorbing swelling polymer materials. Preferably, the water-absorbing swellable polymer material is a polyether polyurethane swellable material.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201104955U CN202055262U (en) | 2011-04-15 | 2011-04-15 | Prefabricated assembling joint pipe trench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201104955U CN202055262U (en) | 2011-04-15 | 2011-04-15 | Prefabricated assembling joint pipe trench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202055262U true CN202055262U (en) | 2011-11-30 |
Family
ID=45015239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201104955U Expired - Fee Related CN202055262U (en) | 2011-04-15 | 2011-04-15 | Prefabricated assembling joint pipe trench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202055262U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103683163A (en) * | 2013-11-20 | 2014-03-26 | 北京四方如钢混凝土制品有限公司 | Duct unit and cable duct |
CN105239599A (en) * | 2015-10-24 | 2016-01-13 | 陈培军 | Steel-structure-polyurethane-material underground pipe gallery or working well |
CN105887924A (en) * | 2016-04-25 | 2016-08-24 | 安徽砼宇特构科技有限公司 | Underground comprehensive pipe gallery |
CN106836231A (en) * | 2017-02-17 | 2017-06-13 | 上海市城市建设设计研究总院(集团)有限公司 | The assembling constructing method of big cross section precast construction in the deep big foundation pit of soft clay area |
-
2011
- 2011-04-15 CN CN2011201104955U patent/CN202055262U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103683163A (en) * | 2013-11-20 | 2014-03-26 | 北京四方如钢混凝土制品有限公司 | Duct unit and cable duct |
CN105239599A (en) * | 2015-10-24 | 2016-01-13 | 陈培军 | Steel-structure-polyurethane-material underground pipe gallery or working well |
CN105887924A (en) * | 2016-04-25 | 2016-08-24 | 安徽砼宇特构科技有限公司 | Underground comprehensive pipe gallery |
CN106836231A (en) * | 2017-02-17 | 2017-06-13 | 上海市城市建设设计研究总院(集团)有限公司 | The assembling constructing method of big cross section precast construction in the deep big foundation pit of soft clay area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104674847B (en) | A kind of city integrated piping lane of prefabricated concrete | |
CN202170515U (en) | Prefabricated assembling composite pipe line with U-shaped section | |
CN202559384U (en) | Prefabricated assembled pipe-jacking working well | |
CN100443672C (en) | Underpinning Method of Pile Foundation | |
CN206693363U (en) | Assembled plastics municipal drainage inspection shaft | |
CN104088298A (en) | Municipal road prefabricated concrete inspection well and construction method thereof | |
CN202055262U (en) | Prefabricated assembling joint pipe trench | |
CN105064400A (en) | Urban comprehensive pipe rack of steel corrugated plate structure | |
CN111305267A (en) | Structure and construction method of UHPC prefabricated and assembled integrated pipe gallery with flat curve connection segment | |
CN104410031B (en) | A kind of pre-fabricated electric cables comb | |
CN103696443B (en) | Prefabricated assembled inspection well | |
CN207268009U (en) | A drainage system of underground comprehensive pipe gallery based on the existing sewage channel | |
CN201933514U (en) | Leakage-prevention structure for 500KV underground substation | |
CN105240023B (en) | A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station | |
CN208380578U (en) | Precast construction in a kind of roads and tunnels | |
CN107355234B (en) | Anti-seepage, anti-corrosion, durable confluence regulation and storage type deep tunnel | |
CN206873491U (en) | A kind of assembled piping lane | |
CN102864833A (en) | Application of finished plastic inspection well in outdoor drainage system | |
CN211447035U (en) | Piping lane lateral wall movement joint waterproof construction | |
CN202324155U (en) | Adjustable corrugated prestress anti-pollution drainage culvert | |
CN202247719U (en) | Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN102677660B (en) | Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method | |
CN2839379Y (en) | Prestress prefabricated assembly joint pipe duct | |
CN204941552U (en) | A kind of subway station of parallel shield method enlarging construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111130 Termination date: 20130415 |