CN201786036U - Temporary protective railing for building construction - Google Patents

Temporary protective railing for building construction Download PDF

Info

Publication number
CN201786036U
CN201786036U CN2010202923456U CN201020292345U CN201786036U CN 201786036 U CN201786036 U CN 201786036U CN 2010202923456 U CN2010202923456 U CN 2010202923456U CN 201020292345 U CN201020292345 U CN 201020292345U CN 201786036 U CN201786036 U CN 201786036U
Authority
CN
China
Prior art keywords
screw
guard rail
fence unit
provisional
bed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202923456U
Other languages
Chinese (zh)
Inventor
郭连山
钟新林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch filed Critical China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Priority to CN2010202923456U priority Critical patent/CN201786036U/en
Application granted granted Critical
Publication of CN201786036U publication Critical patent/CN201786036U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

A temporary protective railing for building construction belongs to the field of safety protection facilities in building engineering. The edge protection rail in the prior art is inconvenient to carry, large in material loss, long in material lease period, high in cost and unattractive in overall image, and the connecting fastener needs regular maintenance. The utility model discloses a many stands and a plurality of guardrail unit, the tip welding has a bed plate under every stand, and the design has 2 ~ 4 mounting holes that supply the assembly inflation bolt to use on every bed plate, installs a guardrail unit through the screw between per two stands, and each guardrail unit comprises two vertical poles and 2 ~ 4 horizontal poles, and the both ends of every horizontal pole pass through screw horizontal connection with two vertical poles respectively and are in the same place. The utility model relates to a temporary protection railing of construction, its component size is suitable, and dismouting and transport are convenient, and the material loss volume is few, can manifold cycles utilize, and the cost is lower, and the material chooses for use the convenience, and is whole pleasing to the eye.

Description

The guard rail that a kind of building operations is provisional
Technical field
The utility model relates to a kind of security protection facility field in the building engineering construction process, particularly relates to the provisional guard rail of a kind of building operations of foundation ditch periphery, office premises or market floor periphery.
Background technology
Modern construction engineering all must be put safe construction in the first place, wherein faces the emphasis that the building safety construction was protected and was in frontier defense.Safety how to carry out construction work is faced frontier defense and is protected, and guarantees safe construction, and reduces safe construction measure expense and be one and be worth the practical problem discussed.
In order to ensure building engineering construction safety, face the frontier defense guard rail rod and generally adopt steel pipe to set up, three road horizon bars are set, the upper boom height is 1.0~1.2m, and the king-rod height is 0.5~0.6m, and the lower beam height is 0.2m; Vertical pole ' s span is not more than 1800mm, and horizon bar is connected with building, flooring, foundation ditch top with vertical rod, adopts embedded bar, expansion bolt firmly to be connected with the diagonal brace steel pipe, and the guard rail bottom is provided with 200mm height, the thick wood plywood of 18mm as foot guard plate.Adopting this weak point of facing the frontier defense guard rail rod is that the steel pipe length specification is longer, and carrying is inconvenient, faces frontier defense and protects and need cutting for short-range, and the spillage of material amount is big; Connection fastener needs periodic maintenance, and is time-consuming; Material is long tenancy duration, the cost height; Overall image is not attractive in appearance.For solving this difficult problem, people wish urgently to have that a kind of input cost is few, easy construction, the provisional guard rail appearance of building operations that image is attractive in appearance.
The utility model content
Technical problem to be solved in the utility model is, overcome prior art face that frontier defense guard rail rod carrying is inconvenient, the spillage of material amount is big, connection fastener needs periodic maintenance, time-consuming, material tenancy duration is long, cost is high, the inaesthetic defective of overall image, satisfy the market demand of the provisional guard rail of people's eager desire and building operations, provide a kind of building operations provisional guard rail, guard rail prefabricated member suitable size, dismounting and convenient in carrying that this building operations is provisional; The spillage of material amount is few, can recycled for multiple times, cost is lower; Convenient and the overall appearance of material selection.
The technical scheme that its technical problem that solves the utility model adopts is: the guard rail that a kind of building operations is provisional, comprise many root posts, be welded with a bed plate in every root post bottom, design has 2~4 for assembling the installing hole that expansion bolt is used on each bed plate, this guard rail also comprises a plurality of fence units, between per two root posts, a fence unit is installed by screw, described each fence unit is formed by two vertical bars and 2~4 horizon bars, and the two ends of every horizon bar link together by the screw level with two vertical bars respectively.
In technique scheme, in each fence unit front lower position design one foot guard plate is arranged, foot guard plate links together by screw and fence unit.
Making the material that described column selects for use is the square tube steel.
Making the material that described vertical bar selects for use is angle bar, and making the material that described horizon bar selects for use is the square tube steel.
The beneficial effects of the utility model are: the guard rail that the building operations of said structure is provisional, because the material that manufacturing column and horizon bar are selected for use is the square tube steel, making the material that vertical bar selects for use is angle bar, column is connected with office premises or market floor periphery by expansion bolt, horizon bar links together by the screw level with vertical bar, and column and fence unit link together by screw, therefore, 1, prefabricated member suitable size, demolition, installation and convenient in carrying; 2, spillage of material amount is few, the energy recycled for multiple times, and cost is lower; 3, material selection is convenient; 4, overall appearance.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is a front view of the present utility model;
Fig. 2 is a vertical view of the present utility model;
Fig. 3 is the rear elevation of a fence unit of the utility model;
Fig. 4 is the sectional view along A-A line among Fig. 1.
Among the figure, 1, horizon bar; 2, vertical bar; 3, foot guard plate; 4, column; 5, bed plate; 6, expansion bolt; 7, screw.
The specific embodiment
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the provisional guard rail of the described a kind of building operations of present embodiment, comprise many root posts 4, be welded with a bed plate 5 in every root post 4 bottoms, design has 4 installing holes for assembling expansion bolt 6 usefulness on each bed plate 5, this guard rail also comprises a plurality of fence units, between per two root posts 4, a fence unit is installed by screw 7, described each fence unit is formed by two vertical bars 2 and 3 horizon bars 1, and the two ends of every horizon bar 1 link together by screw 7 levels with two vertical bars 2 respectively.In each fence unit front lower position design one foot guard plate 3 is arranged, foot guard plate 3 links together by screw 7 and fence unit.Making the material that described column 4 selects for use is the square tube steel.Making the material that described vertical bar 2 selects for use is angle bar, and making the material that described horizon bar 1 selects for use is the square tube steel.
The concrete implementation step of present embodiment is as follows:
1, select material: select 50*70mm square tube, 30*40mm square tube, 40*40mm angle bar, M6*20 screw and φ 14 expansion bolts as the manufacturing materials of facing the frontier defense guard rail rod, selected materials is the GB material.
2, make member: making the material that described column 4 selects for use is the 50*70mm square tube, high 1.2m; Making the material that described bed plate 5 selects for use is the iron plate of 150*200mm, thick 6mm; Making the material that described horizon bar 1 selects for use is the 30*40mm square tube; Making the material that described vertical bar 2 selects for use is the 40*40mm angle bar; Each fence unit is formed by two vertical bars 2 and 3 horizon bars 1.
3, on-the-spot unwrapping wire: according to the standard specification of each fence unit with face the on-the-spot unwrapping wire of limit size, as do not meet modulus, make the not size of specification fence unit.
4, make not specification fence unit:, measure the not size of specification fence unit, special not specification fence unit according to location, scene unwrapping wire.
5, install: according to location, scene unwrapping wire, adopt 4 φ, 14 expansion bolts, 6 vertical columns 4, adopt M6*20 screw 7 to connect column 4 and each fence unit then.
6, brush caution paint: the horizon bar 1 of guard rail, column 4 and foot guard plate 3, all brushing spacing is 400mm caution paint red and white.
7, hang up safety net: safety net is hanged up in the guard rail inboard, hangs " Caution, drop down " safety signs at eye-catching place.
The above only is a preferred embodiment of the present utility model; be not to be used for limiting the utility model; under the prerequisite that does not break away from the utility model structural principle; all its similar structures; for example; design has 2~4 installing holes that supply the assembling expansion bolt to use on each bed plate, and described each fence unit is by two vertical bars and 2~4 horizon bar compositions etc., and these features all should be covered by the protection domain of the utility model patent.

Claims (4)

1. guard rail that building operations is provisional, comprise many root posts, be welded with a bed plate in every root post bottom, design has 2~4 for assembling the installing hole that expansion bolt is used on each bed plate, it is characterized in that: also comprise a plurality of fence units, between per two root posts, a fence unit is installed by screw, described each fence unit is formed by two vertical bars and 2~4 horizon bars, and the two ends of every horizon bar link together by the screw level with two vertical bars respectively.
2. the provisional guard rail of a kind of building operations according to claim 1 is characterized in that: in each fence unit front lower position design one foot guard plate is arranged, foot guard plate links together by screw and fence unit.
3. the provisional guard rail of a kind of building operations according to claim 1 is characterized in that: making the material that described column selects for use is the square tube steel.
4. the provisional guard rail of a kind of building operations according to claim 1 is characterized in that: making the material that described vertical bar selects for use is angle bar, and making the material that described horizon bar selects for use is the square tube steel.
CN2010202923456U 2010-08-13 2010-08-13 Temporary protective railing for building construction Expired - Fee Related CN201786036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202923456U CN201786036U (en) 2010-08-13 2010-08-13 Temporary protective railing for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202923456U CN201786036U (en) 2010-08-13 2010-08-13 Temporary protective railing for building construction

Publications (1)

Publication Number Publication Date
CN201786036U true CN201786036U (en) 2011-04-06

Family

ID=43818006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202923456U Expired - Fee Related CN201786036U (en) 2010-08-13 2010-08-13 Temporary protective railing for building construction

Country Status (1)

Country Link
CN (1) CN201786036U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296766A (en) * 2011-06-17 2011-12-28 江苏省建筑工程集团有限公司 Assembled staircase temporary protective railing
CN102367126A (en) * 2011-06-29 2012-03-07 苏州新达电扶梯部件有限公司 Guardrail food board for elevator
CN102768864A (en) * 2012-08-02 2012-11-07 中广核检测技术有限公司 CPR nuclear power unit reactor core guardrail
CN104005598A (en) * 2014-06-11 2014-08-27 中建一局华江建设有限公司 Multipurpose protective support capable of being turned over
CN104179362A (en) * 2014-08-27 2014-12-03 中国建筑第五工程局有限公司东莞分公司 Quick-release protective railings for construction sites
CN106121262A (en) * 2016-08-25 2016-11-16 贵州中航电梯有限公司 A kind of safety protection fence

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296766A (en) * 2011-06-17 2011-12-28 江苏省建筑工程集团有限公司 Assembled staircase temporary protective railing
CN102367126A (en) * 2011-06-29 2012-03-07 苏州新达电扶梯部件有限公司 Guardrail food board for elevator
CN102768864A (en) * 2012-08-02 2012-11-07 中广核检测技术有限公司 CPR nuclear power unit reactor core guardrail
CN102768864B (en) * 2012-08-02 2015-03-18 中广核检测技术有限公司 CPR nuclear power unit reactor core guardrail
CN104005598A (en) * 2014-06-11 2014-08-27 中建一局华江建设有限公司 Multipurpose protective support capable of being turned over
CN104005598B (en) * 2014-06-11 2016-05-04 中建一局华江建设有限公司 Multipurpose protective support capable of being turned over
CN104179362A (en) * 2014-08-27 2014-12-03 中国建筑第五工程局有限公司东莞分公司 Quick-release protective railings for construction sites
CN106121262A (en) * 2016-08-25 2016-11-16 贵州中航电梯有限公司 A kind of safety protection fence

Similar Documents

Publication Publication Date Title
CN201786036U (en) Temporary protective railing for building construction
KR200459322Y1 (en) Assembly safety fence
CN201786037U (en) A kind of temporary safety protection door for elevator hole in building construction
CN202866311U (en) Construction stair protective barrier and veering connecting device
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
CN104179362A (en) Quick-release protective railings for construction sites
CN207829505U (en) A kind of pin-connected panel floor edge protective fence
CN204849600U (en) Public road bridge face assembled removable barricade
CN201148726Y (en) Independent hanging scaffold super large operating platform
CN206279783U (en) Assembled construction safety channel
CN213328818U (en) Steel guardrail
CN210530504U (en) Multifunctional protective railing for construction site
CN205189291U (en) Railing assembly structure
CN204645572U (en) A kind of Rotary Scaffold
CN204326565U (en) Face frontier defense guardrail
CN203808539U (en) Protective barrier
CN201649003U (en) Active powder concrete column and steel pipe combination rail structure
CN203729852U (en) Assembled building site gate
CN204311718U (en) A kind of outer overhanging type steel scaffold with horizontal protective function
CN211286559U (en) Scaffold for building construction
CN219196671U (en) Modularized silo construction stair
CN203129617U (en) Quick-disassembling protective fence
CN220620961U (en) Building construction has building construction frame of anti falling structure
CN104818859A (en) Method for installing construction platform of rail transit elevated station
CN220815204U (en) Protective rescue railing at bottom of groove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20160813