[go: up one dir, main page]

CN201762664U - Bracket for mounting guardrail templates in bridge building - Google Patents

Bracket for mounting guardrail templates in bridge building Download PDF

Info

Publication number
CN201762664U
CN201762664U CN2010205155792U CN201020515579U CN201762664U CN 201762664 U CN201762664 U CN 201762664U CN 2010205155792 U CN2010205155792 U CN 2010205155792U CN 201020515579 U CN201020515579 U CN 201020515579U CN 201762664 U CN201762664 U CN 201762664U
Authority
CN
China
Prior art keywords
fixed
suspension rod
support bar
bridge
outer suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205155792U
Other languages
Chinese (zh)
Inventor
邢军
罗维成
崔炳乾
高光辉
朱甲学
张强
程剑兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 2 Co Ltd
Original Assignee
Sinohydro Bureau 2 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 2 Co Ltd filed Critical Sinohydro Bureau 2 Co Ltd
Priority to CN2010205155792U priority Critical patent/CN201762664U/en
Application granted granted Critical
Publication of CN201762664U publication Critical patent/CN201762664U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a bracket for mounting guardrail templates in bridge building, which comprises a supporting device, a suspension platform device and a cantilever device. One end of the cantilever device is connected with the supporting device, and the other end is connected with the suspension platform device. The bracket for mounting guardrail templates in bridge building according to the utility model has the following characteristics: simple structure, easy construction, convenient and flexible movement, small space occupation in construction, high construction efficiency, remarkable benefit, etc. The bracket can be widely used for the following fields: hydraulic dam crest rail mounting, template mounting, concrete pouring and bridge concrete construction. The bracket is a tool in mounting high-altitude concrete anticollision guardrail template, and can simultaneously be used for facade decoration construction of high-altitude building.

Description

The carriage that the guardrail template that is used to build a bridge is installed
Technical field
The utility model relates to the installation of water conservancy project dam crest railing, template construction, concreting, bridge concrete construction field, the carriage that particularly a kind of guardrail template that is used to build a bridge is installed.
Background technology
Access bridge concrete anticollision barrier on the dam of Hydraulic and Hydro-Power Engineering dam, the Guttr board of concrete anticollision barrier and elevated highway bridge and anticollision barrier thereof are when concrete construction on the bridge of overhead railway bridge, need at first branching standing template, side form and outer side form in template is divided, for inner side template, the workman can stand in safely and carry out formwork on the bridge floor, and for outboard template, then be unsettled, the platform that the workman does not stand and operates, for allow the workman can safety formwork, past normally begins to set up scaffold gets on from ground, and the workman stands in and carries out formwork work on the scaffolding platform then.
Generally speaking, it is more that the scaffolding platform difficulty is set up in work high above the ground, and time-consuming, high material consumption, and construction cost is higher.And, be river, zanjon, ramp, weak soil layer in case run under the bridge, or need frequently to be open to traffic under the bridge of somewhere, or need frequently current heavy duty equipment under the bridge that it is bigger then to set up the scaffold difficulty, even does not have safety guarantee.
The utility model content
The purpose of this utility model, provide a kind of simple in structure, construction safety, conveniently moving, flexibly, floor space is little during construction, efficiency of construction height, the benefit carriage that the guardrail template is installed that significantly is used to build a bridge.
In order to achieve the above object, technical scheme provided by the utility model is: the carriage that a kind of guardrail template that is used to build a bridge is installed, it comprises bracing or strutting arrangement, cantilever arrangement and cape device, and an end of cantilever arrangement is fixed with bracing or strutting arrangement, and the other end is fixed with the cape device;
Described bracing or strutting arrangement is a right-angled triangle, it comprises connecting rod, support bar, skew back pull bar and counterweight platform, connecting rod is fixed between the support bar, one end of support bar is fixed in an end of skew back pull bar, its other end vertically is fixed in a side of counterweight platform, the other end of skew back pull bar is fixed in another side of counterweight platform, is installed with pole between counterweight platform and the support bar;
The cape device comprises operating platform, outer suspension rod and interior suspension rod, operating platform is a rectangular configuration, lay scaffold floor on it, one side of operating platform vertically is fixed in the bottom of outer suspension rod, the bottom of suspension rod in another side is fixed in, be installed with pole between the side of outer suspension rod and operating platform, be connected with connecting rod between the outer suspension rod;
Cantilever arrangement comprises chooses armed lever and last diagonal member, choose the top of the vertical affixed outer suspension rod of armed lever one end, the other end vertically is fixed on the support bar, last diagonal member one end is fixed in the top of outer suspension rod, the other end is fixed in the top of support bar, the top of interior suspension rod vertically is fixed in chooses on the armed lever, and outer suspension rod and choose and be installed with pole between the armed lever is chosen between armed lever and the support bar and is installed with pole.
Further, choose and be connected with connecting rod between the armed lever.
Further, counterweight platform bottom is provided with roller.
Further, outer suspension rod and operating platform outside are provided with protective screening.
The utility model is used to build a bridge carriage that the guardrail template installs by outwards lean out certain operating space on bridge floor, guarantee that by applying mass the center of gravity of template installation bracket is on bridge floor, and carriage keeps stable, promptly guaranteed the safety of high-altitude construction, saved a large amount of scaffold support systems again, save substantial contribution, have simple in structure, construction safety, conveniently moving, flexibly, floor space is little during construction, the efficiency of construction height, characteristics such as benefit is obvious can be widely used in water conservancy project dam crest railing and install, template construction, concreting, the bridge concrete construction field, be the instrument that high-altitude concrete anticollision barrier template is installed, also can be used for high-altitude facade decoration construction simultaneously.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the structural representation of the utility model embodiment two;
Fig. 4 is the right view of Fig. 3;
Fig. 5 the utility model be used to build a bridge working state figure of the carriage that the guardrail template installs.
Wherein: 1 operating platform, 2 outer suspension rods, suspension rods in 3,4 scaffold floors, 5 connecting rods, 6 support bars, 7 skew back pull bars, 8 counterweight platforms, 9 choose armed lever, diagonal member on 10,11 poles, 12 rollers, 13 protective screenings, 14 mass, 15 bracing or strutting arrangements, 16 cantilever arrangement, 17 cape devices.
The specific embodiment
Below in conjunction with the description of drawings specific embodiment of the present utility model.
Embodiment one: as illustrated in fig. 1 and 2, the carriage that a kind of guardrail template that is used to build a bridge is installed, it comprises bracing or strutting arrangement 15, cape device 17 and cantilever arrangement 16, one end of cantilever arrangement 16 connects bracing or strutting arrangement 15, the other end connects cape device 17, cape device 17 comprises operating platform 1, outer suspension rod 2 and interior suspension rod 3, operating platform 1 is the rectangle steel shelf structure, lay wooden scaffold floor 4 on it, the two ends of a frame of operating platform 1 vertically are fixed in the bottom of two outer suspension rods 2, the two ends of its opposite side frame are fixed in the bottom of two interior suspension rods 3 respectively, article two, be connected with connecting rod 5 between the outer suspension rod 2, the steel tube fastener of connecting rod 5 usefulness standards is connected with short steel pipes on the outer suspension rod 2, play the crosswise fixed effect, bracing or strutting arrangement 15 comprises support bar 6, skew back pull bar 7 and counterweight platform 8, counterweight platform 8 is a rectangle, be shelved with mass 14 on it, the bottom of vertical affixed two support bars 6 in the frame two ends, one side of counterweight platform 8, one end of its affixed two diagonal members 7 in opposite side frame two ends, the other end of skew back pull bar 7 is fixed in the top of respective support bar 6 respectively, be connected with connecting rod 5 between two support bars 6, cantilever arrangement 16 comprises chooses armed lever 9 and last diagonal member 10, choose that armed lever 9 and outer suspension rod 2 are corresponding to be provided with two, two vertical affixed corresponding outer suspension rod 2 tops of an end of choosing armed lever 9, the other end vertically is fixed on the corresponding support bar 6, last diagonal member 10 1 ends are fixed in the top of corresponding outer suspension rod 2, the other end is fixed in the top of corresponding support bar 6, the top of interior suspension rod 3 vertically is fixed in chooses on the armed lever 9 accordingly, choose for two and be connected with connecting rod 5 between the armed lever 9, contact has pole 11 between the frame of outer suspension rod 2 and operating platform 1, outer suspension rod 2 and choose accordingly that contact has pole 11 between the armed lever 9, support bar 6 and choose accordingly that contact has pole 11 between the armed lever 9, contact has pole 11 between the frame of support bar 6 and counterweight platform 8, counterweight platform 8 bottoms are provided with roller 12, and outer suspension rod 2 and operating platform 1 outside are provided with protective screening 13.
Embodiment two: shown in Fig. 3 and 4, the carriage that a kind of guardrail template that is used to build a bridge is installed, it comprises bracing or strutting arrangement 15, cape device 17 and cantilever arrangement 16, one end of cantilever arrangement 16 connects bracing or strutting arrangement 15, the other end connects cape device 17, cape device 17 comprises operating platform 1, outer suspension rod 2 and interior suspension rod 3, operating platform 1 is the rectangle steel shelf structure, lay wooden scaffold floor 4 on it, the vertical bottom that is fixed in three outer suspension rods 2, the two ends of a frame of operating platform 1 with the middle part, the two ends of its opposite side frame are fixed in the bottom of three interior suspension rods 3 respectively, article three, be connected with connecting rod 5 between the outer suspension rod 2, the steel tube fastener of connecting rod 5 usefulness standards is connected with short steel pipes on the outer suspension rod 2, play the crosswise fixed effect, bracing or strutting arrangement 15 comprises support bar 6, skew back pull bar 7 and counterweight platform 8, counterweight platform 8 is a rectangle, be shelved with mass 14 on it, the bottom of vertical affixed three support bars 6 in frame two ends, one side of counterweight platform 8 with the middle part, one end of its affixed skew back pull bar 7 in opposite side frame two ends, the other end of skew back pull bar 7 is fixed in the top of corresponding three support bars 6, be connected with connecting rod 5 between three support bars 6, cantilever arrangement 16 comprises chooses armed lever 9 and last diagonal member 10, choose that armed lever 9 and outer suspension rod 2 are corresponding to be provided with three, three tops of choosing the vertical affixed outer suspension rod 2 of an end of armed lever 9, the other end vertically is fixed on the corresponding support bar 6, last diagonal member 10 1 ends are fixed in the top of three outer suspension rods 2 respectively, the other end is fixed in the top of corresponding support bar 6, the top of interior suspension rod 3 vertically is fixed in chooses on the armed lever 9 accordingly, choose for three and be connected with connecting rod 5 between the armed lever 9, contact has pole 11 between the frame of outer suspension rod 2 and operating platform 1, outer suspension rod 2 and choose accordingly that contact has pole 11 between the armed lever 9, support bar 6 and choose accordingly that contact has pole 11 between the armed lever 9, contact has pole 11 between the frame of support bar 6 and counterweight platform 8, counterweight platform 8 bottoms are provided with roller 12, and outer suspension rod 2 and operating platform 1 outside are provided with protective screening 13.
The utility model carriage that the guardrail template is installed that is used to build a bridge, the keel of the keel of operating platform 1, outer suspension rod 2, the bar 9 of encorbelmenting, support bar 6 and counterweight platform 8 all adopt channel-section steel to make, interior suspension rod 3, skew back pull bar 7 and last diagonal member 10 all adopt Φ 20mm round steel to make, and connecting rod 5 adopts the steel pipe manufacturing of Φ 48 * 3.5mmmm.
During construction, the installation procedure that the anticollision barrier template is installed builder's jack is: 1) cleaning ground; 2) support bar 6 is installed; 3) counterweight platform 8 is installed; 4) the skew back pull bar 7 between installation counterweight platform 8 and the support bar 6; 5) support bar 6 and counterweight platform 8 are connected into an integral body by connecting rod 5 steel pipes and steel tube fastener; 6) on counterweight platform 8 stands, place mass 14; 7) the last diagonal member of choosing between armed lever 9 and the support bar 6 10 is installed; 8) outer suspension rod 2 is installed; 9) the fitting operation platform 1; 7) interior suspension rod 3 is installed; 11) carriage that the guardrail template installs that promotes to be used to build a bridge is in place.
As shown in Figure 5, the utility model is used to build a bridge carriage that the guardrail template installs in use, operating platform 1 and outer suspension rod 2 expose outside the body of wall, operating platform 1 provides a unsettled platform of standing and working for the workman, the load of operating platform 1 mainly passes to by outer suspension rod 2 and chooses armed lever 9, pass to support bar 6 by choosing armed lever 9 again, by support bar 6 working load is passed to roller 12 at last, interior suspension rod 3,7 balanced actions of last diagonal member 10 and skew back pull bar, roller 12 is a standard component, it can guarantee that carriage promotes by manpower or the tractor traction realizes advancing, action such as retreat and stop, the mass of shelving on the counterweight platform 8 14 carriage that the guardrail template installs that can prevent to be used to build a bridge is overturned under the working load effect, guarantees construction safety.
The embodiment of the above is a preferred case study on implementation of the present utility model; be not to limit practical range of the present utility model with this; so the equivalence that all shapes according to the utility model, structure and principle are done changes, and all should be encompassed in the protection domain of the present utility model.

Claims (4)

1. carriage that the guardrail template that is used to build a bridge is installed, it is characterized in that: it comprises bracing or strutting arrangement (15), cantilever arrangement (16) and cape device (17), one end of described cantilever arrangement (16) is fixed with bracing or strutting arrangement (15), and the other end is fixed with cape device (17);
Described bracing or strutting arrangement (15) is a right-angled triangle, it comprises connecting rod (5), support bar (6), skew back pull bar (7) and counterweight platform (8), described connecting rod (5) is fixed between the support bar (6), one end of described support bar (6) is fixed in an end of skew back pull bar (7), its other end vertically is fixed in a side of counterweight platform (8), the other end of skew back pull bar (7) is fixed in another side of counterweight platform (8), is installed with pole (11) between described counterweight platform (8) and the support bar (6);
Described cape device (17) comprises operating platform (1), outer suspension rod (2) and interior suspension rod (3), described operating platform (1) is a rectangular configuration, lay scaffold floor (4) on it, one side of described operating platform (1) vertically is fixed in the bottom of outer suspension rod (2), another side is fixed in the bottom of interior suspension rod (3), be installed with pole (11) between the side of described outer suspension rod (2) and operating platform (1), be connected with connecting rod (5) between the described outer suspension rod (2);
Described cantilever arrangement (16) comprises chooses armed lever (9) and last diagonal member (10), a described end of choosing armed lever (9) vertically is fixed in the top of outer suspension rod (2), the other end vertically is fixed on the support bar (6), described upward diagonal member (10) one ends are fixed in the top of outer suspension rod (2), the other end is fixed in the top of support bar (6), the top of suspension rod (3) vertically is fixed in and chooses on the armed lever (9) in described, described outer suspension rod (2) and choose and be installed with pole (11) between the armed lever (9), described choosing between armed lever (9) and the support bar (6) is installed with pole (11).
2. the carriage that the guardrail template that is used to build a bridge as claimed in claim 1 is installed, it is characterized in that: described choosing is connected with connecting rod (5) between the armed lever (9).
3. the carriage that the guardrail template that is used to build a bridge as claimed in claim 1 is installed is characterized in that: described counterweight platform (8) bottom is provided with roller (12).
4. the carriage that the guardrail template that is used to build a bridge as claimed in claim 1 is installed, it is characterized in that: described outer suspension rod (2) and operating platform (1) outside are provided with protective screening (13).
CN2010205155792U 2010-09-02 2010-09-02 Bracket for mounting guardrail templates in bridge building Expired - Fee Related CN201762664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205155792U CN201762664U (en) 2010-09-02 2010-09-02 Bracket for mounting guardrail templates in bridge building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205155792U CN201762664U (en) 2010-09-02 2010-09-02 Bracket for mounting guardrail templates in bridge building

Publications (1)

Publication Number Publication Date
CN201762664U true CN201762664U (en) 2011-03-16

Family

ID=43715275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205155792U Expired - Fee Related CN201762664U (en) 2010-09-02 2010-09-02 Bracket for mounting guardrail templates in bridge building

Country Status (1)

Country Link
CN (1) CN201762664U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493346A (en) * 2011-12-02 2012-06-13 中建三局第三建设工程有限责任公司 Upper air anti-collision guardrail module transfer hanging bracket and construction method
CN103882818A (en) * 2013-12-26 2014-06-25 浙江金筑交通建设有限公司 Construction method for SS (standard specification) level guard bar and guard bar reserved concrete platform
CN116044166A (en) * 2023-03-02 2023-05-02 中交一公局集团有限公司 Self-processing template trolley for anti-collision guardrail

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493346A (en) * 2011-12-02 2012-06-13 中建三局第三建设工程有限责任公司 Upper air anti-collision guardrail module transfer hanging bracket and construction method
CN103882818A (en) * 2013-12-26 2014-06-25 浙江金筑交通建设有限公司 Construction method for SS (standard specification) level guard bar and guard bar reserved concrete platform
CN103882818B (en) * 2013-12-26 2015-11-11 浙江金筑交通建设有限公司 The method that concrete platform constructs is reserved to SS level guardrail and guardrail
CN116044166A (en) * 2023-03-02 2023-05-02 中交一公局集团有限公司 Self-processing template trolley for anti-collision guardrail

Similar Documents

Publication Publication Date Title
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN201826525U (en) Climbing shuttering system device for buildings
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN101575890A (en) Girder and profiled steel sheet concrete combined floor construction method without support of hack lever
CN201762664U (en) Bracket for mounting guardrail templates in bridge building
CN216240384U (en) Operation platform assembly with ladder stand suitable for steel structure high altitude installation
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN204876577U (en) Building construction system
CN205116749U (en) A track strutting arrangement that is used for large -span steel construction wholly to slide
CN206769343U (en) It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN205976396U (en) Portable operation platform that indoor construction and installation used
CN201722937U (en) Sliding platform for installation of net rack
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN205688778U (en) A kind of elevating scaffold special over sling structure
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN211228141U (en) A New Type of T-beam Diaphragm Construction Platform Cross Bracing
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame
CN202658868U (en) Operating platform for super-high elevator shaft
CN204238220U (en) The concrete construction passage that vertically puts in storage
CN205976403U (en) Removal operation platform that indoor long corridor was used

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20160902