The semi coke furnace dry quenching device
Technical field
The utility model belongs to coking industry, relates to a kind of semi coke furnace dry quenching device, is a kind of to the supporting dry coke quenching auxiliary of blue charcoal stove.
Technical background
In China, the quenching mode of the blue charcoal stove of blue charcoal processing enterprise all is wet quenching, has not only caused the significant wastage of the energy, and has seriously polluted environment.
The coke quenching device that present blue charcoal production is adopted is long 9 meters, wide 2.8 meters, high 1 meter hydrolock quenching groove, a supporting cover oven dry bed, quenching, oven dry, coke discharging.Scorching hot blue charcoal about about 550 ℃ in the burner hearth extinguishes and cool off and deliver to coke bin after dry by scraper conveyor drying bed the back in pushing machine pushes the quenching groove that fills with coke quenching water, transports behind the crushing and screening.
The problem that existing coke quenching device exists is;
1) quenching process is the direct quenching of water, consume a large amount of moisture, puts out one ton of blue charcoal and will consume about 0.2 ton of coke quenching water through measuring and calculating is whenever wet;
2) a large amount of steam of coke wet quenching generation directly enter atmosphere, and red Jiao's sensible heat is also along with the discharging of steam is wasted.The heat of 1 ton of blue charcoal consumption of every refining is about 2.21~2.35GJ, and wherein the heat of coke wet quenching waste is 1.05GJ, accounts for 45% of wastage in bulk or weight heat;
3) the blue charcoal of releasing from coking chamber, temperature is about 550 ℃, red blue charcoal sharply cooling in water during coke wet quenching, blue charcoal internal structure produces very big thermal stresses, and map cracking is more, and void content is very high, so its barrate strength is lower, and the fragile fritter that is cleaved into;
4) red blue charcoal cools off in water during coke wet quenching, and cooled wet blue charcoal needs heating, drying, has wasted a large amount of coal gas;
5) in the coke wet quenching process, red blue charcoal contacts with water and produces a large amount of objectionable impuritiess such as phenol, cyanogen compound and sulphur compound, and the steam that produces with quenching freely discharges heavy corrosion surrounding devices and atmosphere pollution.
Summary of the invention
The purpose of this utility model provides that a kind of investment is little, and effects of energy conservation and environmental protection is obvious, has guaranteed the semi coke furnace dry quenching device of blue carbonaceous amount simultaneously.
The technical solution of the utility model is: the semi coke furnace dry quenching device, it is characterized in that: comprise a box Heat Room at least, box Heat Room lies on original water sealed tank basis, the length direction horizontal fixed has high temperature resistant pushing machine in the box Heat Room, high temperature resistant pushing machine lower end is intervally distributed with the jacketed type dant holding plate, the box Heat Room horizontal direction in jacketed type dant holding plate lower edge is fixed high temperature resistant chain-type scraper plate machine, and the afterbody axle of the push rod of high temperature resistant pushing machine and high temperature resistant chain-type scraper plate machine has the steam seal cover with the place that box Heat Room sidewall is connected; Box Heat Room right-hand member along its length puts out the formula coke bin with two sections packing vapour and is connected; Two sections packing vapour put out the burnt coke bin of formula and connect the coal gas adjustable pipe, and the top that jacketed type is led Jiao Kou is connected with the coke discharge box of coke oven; The bottom that jacketed type is led Jiao Kou is connected with the top seal of box Heat Room.
Described box Heat Room is one long 17 meters, wide 2.8 meters, high 1.2 meters airtight rectangular parallelepiped, its top and the side water wall tube that distributing, and base plate is a water jacket.
Described high temperature resistant pushing machine and high temperature resistant chain-type scraper plate machine are at least 2.
The utility model has the advantages that; Adopt advanced technology, material, equipment and antifouling reduction of discharging measure, filled up the blank of China Shanxi, Shan, illiteracy, regional blue charcoal processing dry coke quenching technology such as peaceful, new, promote the blue charcoal complete processing in this area to move towards improvement.
Description of drawings
Below in conjunction with accompanying drawing structural principle of the present utility model and principle of work are described in detail.
Fig. 1 is an embodiment of the invention structural representation;
Fig. 2 is the horizontal cross-sectional schematic of box Heat Room of Fig. 1.
Among the figure: 1, jacketed type is led Jiao Kou; 2, box Heat Room; 3, two sections packing vapour put out the formula coke bin; 4, coal gas adjustable pipe; 5, jacketed type dant holding plate; 6, high temperature resistant pushing machine; 7, high temperature resistant chain-type scraper plate machine; 8, coke oven platform; 9, coke discharge box; 10, coke oven furnace stay; 11, longeron; 12, basis.
Embodiment
As depicted in figs. 1 and 2, the box Heat Room 2 that comprises an airtight rectangular parallelepiped, the length direction horizontal fixed has high temperature resistant pushing machine 6 in the box Heat Room 2, high temperature resistant pushing machine 6 lower ends are intervally distributed with jacketed type dant holding plate 5, box Heat Room 2 horizontal directions in jacketed type dant holding plate 5 lower edges are fixed high temperature resistant chain-type scraper plate machine 7, and the afterbody axle of the push rod of high temperature resistant pushing machine 6 and high temperature resistant chain-type scraper plate machine 7 has the steam seal cover with the place that box Heat Room 2 sidewalls are connected; High temperature resistant pushing machine 6 and high temperature resistant chain-type scraper plate machine 7 are at least 2.Box Heat Room 2 lies on original water sealed tank basis 12, and box Heat Room 2 right-hand member along its length puts out formula coke bin 3 with two sections packing vapour and is connected; Two sections packing vapour put out the burnt coke bin 3 of formula and connect coal gas adjustable pipe 4, and the top that jacketed type is led burnt mouthful 1 is connected with the original coke discharge box 9 of coke oven; Pass through fixedly coke oven platform 8 of longeron 11 on the coke discharge box 9, the bottom that jacketed type is led burnt mouthful 1 is connected with the top seal of box Heat Room 2.
Box Heat Room 2 is one long 17 meters, wide 2.8 meters, high 1.2 meters airtight rectangular parallelepiped, its top and the side water wall tube that distributing, and base plate is a water jacket.
As shown in Figure 2, box Heat Room 2 lies on original water sealed tank basis 12, is high temperature resistant pushing machine 6, jacketed type dant holding plate 5, high temperature resistant chain-type scraper plate machine 7 successively below the original coke oven furnace stay 10 of coke oven, box Heat Room 2, jacketed type are led burnt mouthful 1.
During work, high temperature resistant pushing machine 6 is being done the reciprocating sliding campaign on jacketed type dant holding plate 5 under the driving of step-down gear, scorching hot blue charcoal on the jacketed type dant holding plate 5 is falling on the base plate of box Heat Room 2 along jacketed type dant holding plate 5 both sides under the push-and-pull of high temperature resistant pushing machine 6, is delivered to two sections packing vapour through high temperature resistant chain-type scraper plate machine 7 again and puts out in the formula coke bin 3.When blue charcoal is transported to two sections packing vapour when putting out a section of formula coke bin 3, temperature is reduced to about 300 ℃ substantially, again with steam cooling to temperature required, enter packing vapour and put out two sections of formula coke bin, regularly discharge.Be furnished with coal gas adjustable pipe 4 at the top that two sections packing vapour put out formula coke bin 3, coal gas adjustable pipe 4 is connected the pressure of regulating coal gas in the box Heat Room 2 with gaspipe network, to guarantee ordinary production.
In the utility model, high temperature resistant pushing machine 6 and high temperature resistant chain-type scraper plate machine 7 are at least 2, are at least 1 and two sections packing vapour put out formula coke bin 3.
In the utility model, establish the steam seal cover at the push rod of high temperature resistant pushing machine 6 and the afterbody axle of high temperature resistant chain-type scraper plate machine 7 with the place that the sidewall of box Heat Room 2 is connected, guarantee that when operation vapor pressure is greater than box Heat Room 2 internal pressures in the seal cartridge, make coal gas and isolate from outer air in the box Heat Room 2, and guarantee that push rod and scraper plate tail axle rotate flexibly.