China
Prior art keywords
drilling platform
unit
signal detection
programmable logic
field programmable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201847671U
Other languages
Chinese (zh)
Inventor
侯文利
朱毅
丁开生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongyuan Electronic Technology Co Ltd
Original Assignee
Shaanxi Zhongyuan Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zhongyuan Electronic Technology Co Ltd filed Critical Shaanxi Zhongyuan Electronic Technology Co Ltd
Priority to CN2010201847671U priority Critical patent/CN201673387U/en
Application granted granted Critical
Publication of CN201673387U publication Critical patent/CN201673387U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Programmable Controllers (AREA)

Abstract

本实用新型公开了一种石油钻井平台防喷报警控制系统,包括对钻井平台井下工作时的相关工作参数以及钻井平台相关环境载荷参数进行实时采集的信号检测单元、告警单元、对信号检测单元所采集参数进行分析处理并相应对告警单元进行控制的主控单元、与主控单元进行双向通信的地面监控机、大容量掉电保护记忆体和对信号检测单元所采集参数与主控单元的分析处理结果进行同步循环存储记录的固态存储器,主控单元由DSP控制器和FPGA组成;信号检测单元、告警单元、地面监控机、固态存储器和大容量掉电保护记忆体均与FPGA相接。本实用新型设计新颖、合理且使用操作方便,所记录的参数种类全、数据幸存率高且系统本身的可靠性和寿命指标均较高。

Figure 201020184767

The utility model discloses a blowout prevention alarm control system for an oil drilling platform, which comprises a signal detection unit for real-time collection of relevant working parameters of the drilling platform and relevant environmental load parameters of the drilling platform, an alarm unit, and a control unit for the signal detection unit. The main control unit that collects parameters for analysis and processing and controls the alarm unit accordingly, the ground monitoring machine that conducts two-way communication with the main control unit, the large-capacity power-down protection memory, and the analysis of the parameters collected by the signal detection unit and the main control unit The processing results are stored and recorded in a solid-state memory in a synchronous cycle. The main control unit is composed of a DSP controller and FPGA; the signal detection unit, alarm unit, ground monitoring machine, solid-state memory and large-capacity power-down protection memory are all connected to the FPGA. The utility model is novel in design, reasonable in use and convenient in operation, has complete types of recorded parameters, high survival rate of data, and high reliability and service life indexes of the system itself.

Figure 201020184767

Description

Oil drilling platform blowout prevention alarm control system
Technical field
The utility model relates to a kind of alarm control system, especially relates to a kind of oil drilling platform blowout prevention alarm control system.
Background technology
At present, in oil drilling platform work engineering, gas blowout accident remains one of more serious industrial accident.Nowadays, pre-well blowout preventing still relies on traditional experience to carry out basically, does not have a kind of data refer of science.In the reality production run, because the staff is few to the down-hole situation awareness, the down-hole state is not clear, thereby might cause the blowout misjudgment phenomenon, can not give warning in advance to accident.And behind the generation gas blowout accident, can not reappear incident state at that time, thereby to finding out culprit, distinguishing responsibility etc. and cause difficulty.
The utility model content
Technical problem to be solved in the utility model is at above-mentioned deficiency of the prior art, a kind of oil drilling platform blowout prevention alarm control system is provided, its modern design, rationally and use easy to operately, the parameter kind that is write down is complete, the reliability and the index of aging of data survival rate height and system itself are all higher.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of oil drilling platform blowout prevention alarm control system, it is characterized in that: comprise the related work parameter and the detecting signal unit gathered in real time of the relevant environment load parameter of described drilling platform of drilling platform when the underground work, Alarm Unit, the main control unit that detecting signal unit institute acquisition parameter is carried out analyzing and processing and according to result Alarm Unit controlled, the ground monitoring machine that carries out two-way communication and rest on the ground with main control unit, high capacity power down protection memory body and the solid-state memory that the analysis processing result of detecting signal unit institute's acquisition parameter and main control unit is carried out the synchronous circulation stored record, described main control unit is formed by dsp controller with field programmable logic device FPGA that dsp controller joins; Described detecting signal unit, Alarm Unit, ground monitoring machine, solid-state memory and high capacity power down protection memory body all join with field programmable logic device FPGA.
Described detecting signal unit comprises temperature detecting module that the environment temperature to described drilling platform zone of living in detects in real time and voltage acquisition module and the electric current loop acquisition module that the related work voltage and current ring signal of described drilling platform is gathered, described temperature detecting module, voltage acquisition module and electric current loop acquisition module all join with field programmable logic device FPGA, are connected to the A/D modular converter between voltage acquisition module and electric current loop acquisition module and field programmable logic device FPGA.
Carry out two-way communication by the RS422 interface between described field programmable logic device FPGA and ground monitoring machine, and the RS422 interface joins with field programmable logic device FPGA and ground monitoring machine respectively.
Also comprise the SDRAM storer and the FLASH storer that join with dsp controller.
Also comprise the clock circuit and the multi-path digital I/O interface circuit that join with field programmable logic device FPGA.
Described Alarm Unit is an acoustic-optic alarm.
The utility model compared with prior art has the following advantages:
1, novel in design, reasonable, use operation and easy to maintenance, intelligent degree height, and power is little, can need not powered operation 4 hours in the down-hole.
2, the parameter kind that is write down is complete, and the parameter area that is write down has covered the various data in the drilling platform, for daily servicing and crash analysis provide abundant material.
3, data survival rate height, the utility model is provided with the solid-state memory that the data that master controller is sent here are carried out the synchronous circulation record, thereby recorded data can survive under special environment conditions such as certain baked wheaten cake, sewage immersion, deep-well pressure, impact, as the foundation of platform crash analysis; And black box be provided with under given conditions it is cast aside the workspace cast device (for example solid-state memory was burnt the back through 40 minutes and triggered impelling automatically) automatically aside, further increased recorded probability of survival; In addition, solid-state memory has localizer beacon under water, is convenient to seek in hydrolocation.System reliability, index of aging height: system adopts military industrial technology, can work reliably and with long-term under rigor condition.
4, perfect in shape and function, data-interface is many, easy-to-connect, the utility model is for having 16 tunnel ± 10V aanalogvoltage acquisition function, 4 tunnel 4~20mA electric current loop acquisition functions, plate carries the big empty amount storer (NAND FALSH) of 2GByte, black box read-write interface function, temperature collection function on the plate, (dual power supply also can be provided with year to the real-time clock function, month, day, the time, divide, second parameter), two-way full duplex RS422 communication interface, two-way warning I/O output, 8 way word I/O input functions, plate carries the SDRAM storer of 64Bit and the FLASH storer of 1MByte is made program and data-carrier store, dsp chip is made the Comprehensive Control disposal system of functional modules such as operation processing unit and fpga chip control timing generation circuit.
5, the level of integrated system height is low in energy consumption, takes into full account system radiating, and the data storage black box has positioning function under water simultaneously, is convenient to seek in hydrolocation, can be used for oil drilling platform down-hole displacement measurement simultaneously.
In sum, the utility model modern design, rationally and use easy to operately, the parameter kind that is write down is complete, the reliability and the index of aging of data survival rate height and system itself are all higher.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is a circuit block diagram of the present utility model.
Description of reference numerals:
The 1-1-temperature detecting module; The 1-2-voltage acquisition module; 1-3-electric current loop acquisition module;
The 2-Alarm Unit; The 3-main control unit; The 3-1-DSP controller;
3-2-field programmable logic device 4-ground monitoring machine; The 5-solid-state memory;
Part FPGA;
6-high capacity power down protection memory 7-SDRAM storer; The 8-FLASH storer;
Body;
The 9-A/D modular converter; The 10-RS422 interface; The 11-clock circuit;
12-numeral I/O interface circuit.
Embodiment
As shown in Figure 1; the utility model comprises related work parameter and the relevant environment load parameter of the described drilling platform detecting signal unit in real time gathered of drilling platform when the underground work; Alarm Unit 2; the main control unit 3 that detecting signal unit institute acquisition parameter is carried out analyzing and processing and according to result Alarm Unit 2 controlled; the ground monitoring machine 4 that carries out two-way communication and rest on the ground with main control unit 3; high capacity power down protection memory body 6 and the solid-state memory 5 that the analysis processing result of detecting signal unit institute's acquisition parameter and main control unit 3 is carried out the synchronous circulation stored record, described main control unit 3 is formed by dsp controller 3-1 with field programmable logic device FPGA3-2 that dsp controller 3-1 joins.Described detecting signal unit, Alarm Unit 2, ground monitoring machine 4, solid-state memory 5 and high capacity power down protection memory body 6 all join with field programmable logic device FPGA3-2.
In the present embodiment, described detecting signal unit comprises temperature detecting module 1-1 that the environment temperature to described drilling platform zone of living in detects in real time and voltage acquisition module 1-2 and the electric current loop acquisition module 1-3 that the related work voltage and current ring signal of described drilling platform is gathered, described temperature detecting module 1-1, voltage acquisition module 1-2 and electric current loop acquisition module 1-3 all join with field programmable logic device FPGA3-2, are connected to A/D modular converter 9 between voltage acquisition module 1-2 and electric current loop acquisition module 1-3 and field programmable logic device FPGA3-2.Described Alarm Unit 2 is an acoustic-optic alarm.
4 in described field programmable logic device FPGA3-2 and ground monitoring machine carry out two-way communication by RS422 interface 10, and RS422 interface 10 joins with field programmable logic device FPGA3-2 and ground monitoring machine 4 respectively.Simultaneously, the utility model also comprises SDRAM storer 7 and the FLASH storer 8 that joins with dsp controller 3-1, and comprises clock circuit 11 and the multi-path digital I/O interface circuit 12 that joins with field programmable logic device FPGA3-2.
In the actual use, the utility model adopts detecting signal unit mainly the every running parameter and the drilling platform relevant environment load parameter (comprising parameters such as displacement, well pressure and well temperature) of drilling platform down-hole to be detected in real time, and institute's detection signal synchronous driving to main control unit 3 carried out analyzing and processing, meanwhile, solid-state memory 5 (being equivalent to black box) carries out the synchronous circulation stored record to signal and main control unit 3 analysis processing result that described detecting signal unit detected; And main control unit 3 carries out real time bidirectional by RS422 interface 10 with ground monitoring machine 4 and communicates by letter; show in real time by the testing result of 4 pairs of detecting signal units of ground monitoring machine and the analysis processing result of main control unit 3; the utility model is provided with the high capacity power down protection memory body 6 that joins with main control unit 3 simultaneously, has power-down protection.Thereby the utility model can creep into that platform underground equipment various data are in process of production stored in real time effectively to oil, analysis and data hold function, and the utlity model has the hold function of drilling platform operational data under extreme case by land, this hold function is mainly based on aviation black box technology.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; everyly any simple modification that above embodiment did, change and equivalent structure are changed, all still belong in the protection domain of technical solutions of the utility model according to the utility model technical spirit.

Claims (6)

1.一种石油钻井平台防喷报警控制系统,其特征在于:包括对钻井平台在井下工作时的相关工作参数以及所述钻井平台的相关环境载荷参数进行实时采集的信号检测单元、告警单元(2)、对信号检测单元所采集参数进行分析处理并根据处理结果对告警单元(2)进行控制的主控单元(3)、与主控单元(3)进行双向通信且位于地面上的地面监控机(4)、大容量掉电保护记忆体(6)和对信号检测单元所采集参数与主控单元(3)的分析处理结果进行同步循环存储记录的固态存储器(5),所述主控单元(3)由DSP控制器(3-1)和与DSP控制器(3-1)相接的现场可编程逻辑器件FPGA(3-2)组成;所述信号检测单元、告警单元(2)、地面监控机(4)、固态存储器(5)和大容量掉电保护记忆体(6)均与现场可编程逻辑器件FPGA(3-2)相接。1. a kind of oil drilling platform blowout prevention alarm control system, it is characterized in that: comprise the signal detection unit, alarm unit ( 2), the main control unit (3) that analyzes and processes the parameters collected by the signal detection unit and controls the alarm unit (2) according to the processing results, and the ground monitoring unit (3) that performs two-way communication with the main control unit (3) and is located on the ground machine (4), large-capacity power-down protection memory (6) and a solid-state memory (5) that performs synchronous cycle storage and recording of the parameters collected by the signal detection unit and the analysis and processing results of the main control unit (3). The unit (3) is made up of a DSP controller (3-1) and a field programmable logic device FPGA (3-2) connected with the DSP controller (3-1); the signal detection unit, the alarm unit (2) , a ground monitoring machine (4), a solid-state memory (5) and a large-capacity power-failure protection memory (6) are all connected to a field programmable logic device FPGA (3-2). 2.按照权利要求1所述的石油钻井平台防喷报警控制系统,其特征在于:所述信号检测单元包括对所述钻井平台所处区域的环境温度进行实时检测的温度检测模块(1-1)以及对所述钻井平台的相关工作电压和电流环信号进行采集的电压采集模块(1-2)和电流环采集模块(1-3),所述温度检测模块(1-1)、电压采集模块(1-2)和电流环采集模块(1-3)均与现场可编程逻辑器件FPGA(3-2)相接,电压采集模块(1-2)和电流环采集模块(1-3)与现场可编程逻辑器件FPGA(3-2)间接有A/D转换模块(9)。2. according to the oil drilling platform blowout prevention alarm control system according to claim 1, it is characterized in that: the signal detection unit includes a temperature detection module (1-1) that detects in real time the ambient temperature in the area where the drilling platform is located ) and a voltage acquisition module (1-2) and a current loop acquisition module (1-3) that collect relevant operating voltages and current loop signals of the drilling platform, the temperature detection module (1-1), voltage acquisition Both the module (1-2) and the current loop acquisition module (1-3) are connected with the field programmable logic device FPGA (3-2), and the voltage acquisition module (1-2) and the current loop acquisition module (1-3) There is an A/D conversion module (9) indirectly with the field programmable logic device FPGA (3-2). 3.按照权利要求1或2所述的石油钻井平台防喷报警控制系统,其特征在于:所述现场可编程逻辑器件FPGA(3-2)与地面监控机(4)间通过RS 422接口(10)进行双向通信,且RS 422接口(10)分别与现场可编程逻辑器件FPGA(3-2)和地面监控机(4)相接。3. according to claim 1 or 2 described oil drilling platform blowout prevention alarm control system, it is characterized in that: between described Field Programmable Logic Device FPGA (3-2) and ground monitoring machine (4) by RS 422 interface ( 10) Two-way communication is carried out, and the RS 422 interface (10) is connected with the field programmable logic device FPGA (3-2) and the ground monitoring machine (4) respectively. 4.按照权利要求1或2所述的石油钻井平台防喷报警控制系统,其特征在于:还包括与DSP控制器(3-1)相接的SDRAM存储器(7)和FLASH存储器(8)。4. according to claim 1 or 2 described oil drilling platform blowout prevention alarm control system, it is characterized in that: also comprise SDRAM memory (7) and FLASH memory (8) that are connected with DSP controller (3-1). 5.按照权利要求1或2所述的石油钻井平台防喷报警控制系统,其特征在于:还包括与现场可编程逻辑器件FPGA(3-2)相接的时钟电路(11)和多路数字I/O接口电路(12)。5. according to claim 1 or 2 described oil drilling platform blowout prevention alarm control system, it is characterized in that: also comprise the clock circuit (11) that joins with Field Programmable Logic Device FPGA (3-2) and multi-channel digital I/O interface circuit (12). 6.按照权利要求1或2所述的石油钻井平台防喷报警控制系统,其特征在于:所述告警单元(2)为声光报警装置。6. The oil drilling platform blowout prevention alarm control system according to claim 1 or 2, characterized in that: the alarm unit (2) is an audible and visual alarm device.
CN2010201847671U 2010-05-10 2010-05-10 Blowout Prevention Alarm Control System for Oil Drilling Platform Expired - Fee Related CN201673387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201847671U CN201673387U (en) 2010-05-10 2010-05-10 Blowout Prevention Alarm Control System for Oil Drilling Platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201847671U CN201673387U (en) 2010-05-10 2010-05-10 Blowout Prevention Alarm Control System for Oil Drilling Platform

Publications (1)

Publication Number Publication Date
CN201673387U true CN201673387U (en) 2010-12-15

Family

ID=43330798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201847671U Expired - Fee Related CN201673387U (en) 2010-05-10 2010-05-10 Blowout Prevention Alarm Control System for Oil Drilling Platform

Country Status (1)

Country Link
CN (1) CN201673387U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104104434A (en) * 2014-07-24 2014-10-15 北京华环电子股份有限公司 Power failure alarm implementation method capable of rapidly inserting alarm frame
CN105156899A (en) * 2015-08-07 2015-12-16 成都国光电子仪表有限责任公司 Metering module structure used in natural gas extraction process
CN105156900A (en) * 2015-08-07 2015-12-16 成都国光电子仪表有限责任公司 Natural gas remote-metering measurement unit
CN105179947A (en) * 2015-08-12 2015-12-23 成都国光电子仪表有限责任公司 Metering method of flow computer for natural gas pipeline
CN110130849A (en) * 2019-05-08 2019-08-16 任丘市高登石油机械有限公司 A kind of control system of preventer based on Internet of Things
CN116073914A (en) * 2022-12-12 2023-05-05 深圳市太控科技有限公司 Pulse control device and control method based on DSP and FPGA

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104104434A (en) * 2014-07-24 2014-10-15 北京华环电子股份有限公司 Power failure alarm implementation method capable of rapidly inserting alarm frame
CN105156899A (en) * 2015-08-07 2015-12-16 成都国光电子仪表有限责任公司 Metering module structure used in natural gas extraction process
CN105156900A (en) * 2015-08-07 2015-12-16 成都国光电子仪表有限责任公司 Natural gas remote-metering measurement unit
CN105179947A (en) * 2015-08-12 2015-12-23 成都国光电子仪表有限责任公司 Metering method of flow computer for natural gas pipeline
CN110130849A (en) * 2019-05-08 2019-08-16 任丘市高登石油机械有限公司 A kind of control system of preventer based on Internet of Things
CN110130849B (en) * 2019-05-08 2023-12-19 北京石油机械有限公司 Blowout preventer control system based on Internet of things
CN116073914A (en) * 2022-12-12 2023-05-05 深圳市太控科技有限公司 Pulse control device and control method based on DSP and FPGA

Similar Documents

Publication Publication Date Title
CN201673387U (en) Blowout Prevention Alarm Control System for Oil Drilling Platform
CN104635571A (en) Remote gate control system and remote gate control method
CN202002689U (en) Flow rate detection instrument capable of controlling flow rate
CN103149904A (en) Intelligent device and intelligent method for early warning and monitoring of power plant geological disasters based on Internet of Things technology
CN201242452Y (en) Multi-parameter on-line monitoring instrument
CN203798818U (en) Wind speed wind direction acquisition device based on single-chip microcomputer
CN103257375A (en) Rain condition remote-measuring system and rain condition remote-measuring method
CN202632420U (en) IC card intelligent gas meter system
CN203178766U (en) Intelligent power station geological disaster early warning monitoring device based on IOT technology
CN205787003U (en) A kind of PCB intelligent detection device
CN105303799A (en) Wireless data collector
CN205679966U (en) Hydraulic parameter cloud acquisition terminal
CN204405146U (en) A kind of intelligent water reservoir level prior-warning device
CN201540471U (en) Pumping station automatic monitoring system
CN205175551U (en) Wind generating set vibration detection system based on DSP
CN203452850U (en) Alarm system based on gas monitoring
CN203643554U (en) Intelligent circuit fault indicator
CN202533145U (en) Liquid level alarm circuit
CN207164962U (en) A kind of hydrogen sulfide warning system
CN206321263U (en) A kind of detection means applied to demand Side Management platform
CN110686751A (en) Intelligent waterlogging prevention early warning device
CN205091903U (en) Wireless data transmission device
CN202975369U (en) Novel rainfall alarm
CN204630655U (en) A kind of green construction dust noise real-time monitoring device
CN103469723A (en) Highway quality detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215