[go: up one dir, main page]

CN201615804U - A lead-acid battery pole group assembly pressure tester - Google Patents

A lead-acid battery pole group assembly pressure tester Download PDF

Info

Publication number
CN201615804U
CN201615804U CN2010200496216U CN201020049621U CN201615804U CN 201615804 U CN201615804 U CN 201615804U CN 2010200496216 U CN2010200496216 U CN 2010200496216U CN 201020049621 U CN201020049621 U CN 201020049621U CN 201615804 U CN201615804 U CN 201615804U
Authority
CN
China
Prior art keywords
pole group
lead
assembly pressure
test board
battery pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200496216U
Other languages
Chinese (zh)
Inventor
赵文超
余江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI CHAOWEI POWER CO., LTD.
Original Assignee
Chaowei Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chaowei Power Supply Co Ltd filed Critical Chaowei Power Supply Co Ltd
Priority to CN2010200496216U priority Critical patent/CN201615804U/en
Application granted granted Critical
Publication of CN201615804U publication Critical patent/CN201615804U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本实用新型提供一种铅酸蓄电池极群装配压力测试仪,包括底座、设在底座上的推进装置以及测量装置,所述底座上设有若干导向柱,所述推进装置与测量装置通过导向柱连接。能够准确地检测到极群装配压力,根据检测到的数据控制极群在实际装配过程中的压力,能够保证产品的寿命和性能。

Figure 201020049621

The utility model provides a lead-acid storage battery pole group assembly pressure tester, which comprises a base, a propulsion device and a measuring device arranged on the base. connect. It can accurately detect the assembly pressure of the pole group, and control the pressure of the pole group in the actual assembly process according to the detected data, so as to ensure the life and performance of the product.

Figure 201020049621

Description

一种铅酸蓄电池极群装配压力测试仪 A lead-acid battery pole group assembly pressure tester

技术领域technical field

本实用新型涉及铅酸蓄电池行业,具体涉及一种铅酸蓄电池极群装配压力测试仪。The utility model relates to the lead-acid storage battery industry, in particular to a lead-acid storage battery electrode group assembly pressure tester.

背景技术Background technique

现有的电动助力车用铅酸蓄电池因使用条件苛刻,电池一般保用时间在15月。要保证其寿命和性能,蓄电池内极群装配压力的控制非常重要,装配压力小,极群内正极板容易脱落失效;装配压力大,易导致电池内部载酸量降低,在蓄电池使用后期产生因缺酸而变形的问题,甚至在初期就会出现蓄电池外壳的直接鼓胀变形。实际上,蓄电池行业内对于极群控制合理装配压力都有一定的认识,但也仅仅局限于认识程度而已,对于控制在多少,应该如何依靠精确的检测来获得数据,以及制定极群装配压力工艺要求范围后,如何快速有效实施生产现场的持续监控,缺乏快速有效的检测器具来进行快速测定和控制。The existing lead-acid batteries for electric mopeds are generally guaranteed for 15 months due to harsh conditions of use. To ensure its service life and performance, it is very important to control the assembly pressure of the battery electrode group. If the assembly pressure is small, the positive plate in the electrode group will easily fall off and fail; The problem of deformation due to lack of acid, even in the initial stage, there will be direct swelling and deformation of the battery shell. In fact, the storage battery industry has a certain understanding of the reasonable assembly pressure of the extreme group control, but it is only limited to the degree of understanding. As for how much to control, how to rely on accurate testing to obtain data and formulate the assembly pressure process of the extreme group After the scope of requirements, how to quickly and effectively implement continuous monitoring of the production site, there is a lack of fast and effective detection equipment for rapid measurement and control.

发明内容Contents of the invention

本实用新型所要解决的技术问题在于提供一种铅酸蓄电池极群装配压力测试仪,能够准确地检测到极群装配压力。The technical problem to be solved by the utility model is to provide a lead-acid battery pole group assembly pressure tester, which can accurately detect the pole group assembly pressure.

为解决上述现有的技术问题,本实用新型采用如下方案:一种铅酸蓄电池极群装配压力测试仪,包括底座、设在底座上的推进装置以及测量装置,所述底座上设有若干导向柱,所述推进装置与测量装置通过导向柱连接。In order to solve the above-mentioned existing technical problems, the utility model adopts the following scheme: a lead-acid battery electrode group assembly pressure tester, including a base, a propulsion device and a measuring device arranged on the base, and several guiding devices are arranged on the base column, and the propulsion device is connected with the measuring device through a guide column.

作为优选,所述推进装置包括设在底座上的气缸、设在气缸的气缸顶针上的顶板,所述顶板活络穿接在导向柱上。利用气缸推动顶板向上运动,挤压装在顶板上的铅酸蓄电池极群。Preferably, the propulsion device includes an air cylinder arranged on the base, and a top plate arranged on the cylinder thimble of the air cylinder, and the top plate is flexibly connected to the guide post. Utilize the cylinder to push the top plate to move upwards, and squeeze the lead-acid battery pole group installed on the top plate.

作为优选,所述气缸上设有两块平行的固定板,所述固定板穿接在导向柱上。对气缸进行限位。Preferably, two parallel fixing plates are arranged on the cylinder, and the fixing plates are connected to the guide column. Limit the cylinder.

作为优选,所述测量装置包括平行固定在导向柱上的第一测试板和第二测试板、设在第一测试板与第二测试板之间的指针式推拉力计。Preferably, the measuring device includes a first test board and a second test board parallelly fixed on the guide column, and a pointer-type push-pull gauge arranged between the first test board and the second test board.

作为优选,所述指针式推拉力计包括表头和传感探头,所述表头设在第一测试板上,所述传感探头与第二测试板接触。测量的压力通过传感探头传到表头显示。Preferably, the pointer-type push-pull gauge includes a gauge head and a sensing probe, the gauge head is set on the first test board, and the sensing probe is in contact with the second test board. The measured pressure is transmitted to the meter display through the sensing probe.

作为优选,所述第一测试板与第二测试板之间设有固定螺杆,所述导向柱与第二测试板之间设有固定扣。使得第一测试板与第二测试板相对固定。Preferably, a fixing screw is provided between the first test board and the second test board, and a fixing buckle is provided between the guide column and the second test board. Make the first test board and the second test board relatively fixed.

有益效果:Beneficial effect:

本实用新型采用上述技术方案提供一种铅酸蓄电池极群装配压力测试仪,能够准确地检测到极群装配压力,根据检测到的数据控制极群在实际装配过程中的压力,保证了产品的寿命和性能。The utility model adopts the above-mentioned technical scheme to provide a lead-acid battery pole group assembly pressure tester, which can accurately detect the pole group assembly pressure, and control the pressure of the pole group in the actual assembly process according to the detected data, so as to ensure the safety of the product. longevity and performance.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

具体实施方式Detailed ways

如图1,一种铅酸蓄电池极群装配压力测试仪,包括底座1、设在底座1上的推进装置以及测量装置,所述底座上设有若干导向柱2,所述推进装置与测量装置通过导向柱2连接。所述推进装置包括设在底座1上的气缸3、设在气缸3的气缸顶针31上的顶板4,所述顶板4活络穿接在导向柱2上。所述气缸3上设有两块平行的固定板5,所述固定板5穿接在导向柱2上。所述测量装置包括平行固定在导向柱2上的第一测试板6和第二测试板7、设在第一测试板6与第二测试板7之间的指针式推拉力计8。所述指针式推拉力计8包括表头81和传感探头82,所述表头81设在第一测试板6上,所述传感探头82与第二测试板7接触。所述第一测试板6与第二测试板7之间设有固定螺杆9,所述导向柱2与第二测试板7之间设有固定扣10。As shown in Fig. 1, a kind of lead-acid battery pole group assembly pressure tester comprises base 1, propulsion device and measuring device that are located on base 1, and described base is provided with some guide posts 2, and described propulsion device and measuring device Connection via guide post 2. The propulsion device includes a cylinder 3 arranged on the base 1 , and a top plate 4 arranged on the cylinder thimble 31 of the cylinder 3 , and the top plate 4 is flexibly connected to the guide column 2 . The cylinder 3 is provided with two parallel fixing plates 5 , and the fixing plates 5 are connected to the guide column 2 . The measuring device includes a first test board 6 and a second test board 7 fixed on the guide column 2 in parallel, and a pointer type push-pull force gauge 8 arranged between the first test board 6 and the second test board 7 . The pointer push-pull gauge 8 includes a gauge head 81 and a sensing probe 82 , the gauge head 81 is set on the first test board 6 , and the sensing probe 82 is in contact with the second test board 7 . A fixing screw 9 is provided between the first test board 6 and the second test board 7 , and a fixing buckle 10 is provided between the guide column 2 and the second test board 7 .

测量时,首先将待测极群置于第二测试板7与顶板4之间形成的测试空间内,按照预定的压缩尺寸,将游标卡尺或高度尺调整至这一压缩值,之后选定气动速度,开启气动开关,利用气缸调节阀11控制输气管12进气,气缸顶针31将顶板4缓慢上推,直至极群被压缩至规定的压缩值,从指针式推拉力计8的表头81读取传感探头82传送的第二测试板7上的压力值,所述的压力值为压缩至规定值后的压力,然后,按P装配压力=103×N/S计算出极群装配压力,其中P装配压力为电池内极群装配压力(单位:千帕);N为压缩至规定值后的压力(单位:牛顿);S为极群表面积(单位:mm2)。根据检测到的数据控制极群在实际装配过程中的压力,保证了产品的寿命和性能。When measuring, first place the pole group to be tested in the test space formed between the second test board 7 and the top board 4, adjust the vernier caliper or height gauge to the compression value according to the predetermined compression size, and then select the pneumatic speed , turn on the pneumatic switch, use the cylinder regulating valve 11 to control the intake air of the air pipe 12, and the cylinder thimble 31 will slowly push up the top plate 4 until the pole group is compressed to the specified compression value, read from the meter head 81 of the pointer push-pull gauge 8 Take the pressure value on the second test board 7 transmitted by the sensor probe 82, which is the pressure after being compressed to a specified value, and then calculate the assembly pressure of the pole group according to P assembly pressure = 10 3 ×N/S , where P assembly pressure is the assembly pressure of the electrode group in the battery (unit: kPa); N is the pressure after compression to a specified value (unit: Newton); S is the surface area of the electrode group (unit: mm 2 ). According to the detected data, the pressure of the pole group in the actual assembly process is controlled to ensure the life and performance of the product.

Claims (6)

1.一种铅酸蓄电池极群装配压力测试仪,其特征在于:包括底座(1)、设在底座(1)上的推进装置以及测量装置,所述底座上设有若干导向柱(2),所述推进装置与测量装置通过导向柱(2)连接。1. A lead-acid storage battery pole group assembly pressure tester, it is characterized in that: comprise base (1), be located at the propelling device and the measuring device on the base (1), described base is provided with some guide columns (2) , the propelling device is connected with the measuring device through a guide column (2). 2.根据权利要求1所述的一种铅酸蓄电池极群装配压力测试仪,其特征在于:所述推进装置包括设在底座(1)上的气缸(3)、设在气缸(3)的气缸顶针(31)上的顶板(4),所述顶板(4)活络穿接在导向柱(2)上。2. A kind of lead-acid storage battery pole group assembly pressure tester according to claim 1, is characterized in that: described propelling device comprises the cylinder (3) that is located on the base (1), is located at the cylinder (3) The top plate (4) on the cylinder thimble (31), the said top plate (4) is flexibly connected on the guide column (2). 3.根据权利要求2所述的一种铅酸蓄电池极群装配压力测试仪,其特征在于:所述气缸(3)上设有两块平行的固定板(5),所述固定板(5)穿接在导向柱(2)上。3. A kind of lead-acid storage battery pole group assembly pressure tester according to claim 2, is characterized in that: described cylinder (3) is provided with two parallel fixed plates (5), and described fixed plate (5) ) through the guide column (2). 4.根据权利要求1所述的一种铅酸蓄电池极群装配压力测试仪,其特征在于:所述测量装置包括平行固定在导向柱(2)上的第一测试板(6)和第二测试板(7)、设在第一测试板(6)与第二测试板(7)之间的指针式推拉力计(8)。4. A kind of lead-acid battery pole group assembly pressure tester according to claim 1, is characterized in that: described measuring device comprises the first test plate (6) that is fixed on the guide column (2) in parallel and the second A test board (7), a pointer type push-pull gauge (8) arranged between the first test board (6) and the second test board (7). 5.根据权利要求4所述的一种铅酸蓄电池极群装配压力测试仪,其特征在于:所述指针式推拉力计(8)包括表头(81)和传感探头(82),所述表头(81)设在第一测试板(6)上,所述传感探头(82)与第二测试板(7)接触。5. A kind of lead-acid storage battery pole group assembly pressure tester according to claim 4, is characterized in that: described pointer type push-pull gauge (8) comprises meter head (81) and sensing probe (82), and the The meter head (81) is arranged on the first test board (6), and the sensing probe (82) is in contact with the second test board (7). 6.根据权利要求4所述的一种铅酸蓄电池极群装配压力测试仪,其特征在于:所述第一测试板(6)与第二测试板(7)之间设有固定螺杆(9),所述导向柱(2)与第二测试板(7)之间设有固定扣(10)。6. A kind of lead-acid battery pole group assembly pressure tester according to claim 4, is characterized in that: between described first test plate (6) and the second test plate (7), be provided with fixing screw (9) ), a fixing buckle (10) is provided between the guide column (2) and the second test board (7).
CN2010200496216U 2010-01-08 2010-01-08 A lead-acid battery pole group assembly pressure tester Expired - Fee Related CN201615804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200496216U CN201615804U (en) 2010-01-08 2010-01-08 A lead-acid battery pole group assembly pressure tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200496216U CN201615804U (en) 2010-01-08 2010-01-08 A lead-acid battery pole group assembly pressure tester

Publications (1)

Publication Number Publication Date
CN201615804U true CN201615804U (en) 2010-10-27

Family

ID=43002171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200496216U Expired - Fee Related CN201615804U (en) 2010-01-08 2010-01-08 A lead-acid battery pole group assembly pressure tester

Country Status (1)

Country Link
CN (1) CN201615804U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102095543A (en) * 2010-12-10 2011-06-15 浙江天能电池(江苏)有限公司 Automatic tester for pressure of accumulator polar group
CN102269633A (en) * 2011-05-04 2011-12-07 超威电源有限公司 Assembling pressure precise tester
CN102519650A (en) * 2011-12-31 2012-06-27 河南三丽电源股份有限公司 Full-automatic pressure tester for accumulator plate groups
CN103196661A (en) * 2013-03-14 2013-07-10 天津力神电池股份有限公司 Device and method for testing coordination situations between battery shell and battery cover
CN105334106A (en) * 2015-10-16 2016-02-17 辰星(天津)自动化设备有限公司 Extruder used for battery detection
CN105403332A (en) * 2015-12-02 2016-03-16 浙江德福精密驱动制造有限公司 Pressure detection apparatus for spline assembling

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102095543A (en) * 2010-12-10 2011-06-15 浙江天能电池(江苏)有限公司 Automatic tester for pressure of accumulator polar group
CN102095543B (en) * 2010-12-10 2012-03-28 浙江天能电池(江苏)有限公司 Battery pole group pressure automatic detector
CN102269633A (en) * 2011-05-04 2011-12-07 超威电源有限公司 Assembling pressure precise tester
CN102519650A (en) * 2011-12-31 2012-06-27 河南三丽电源股份有限公司 Full-automatic pressure tester for accumulator plate groups
CN103196661A (en) * 2013-03-14 2013-07-10 天津力神电池股份有限公司 Device and method for testing coordination situations between battery shell and battery cover
CN105334106A (en) * 2015-10-16 2016-02-17 辰星(天津)自动化设备有限公司 Extruder used for battery detection
CN105403332A (en) * 2015-12-02 2016-03-16 浙江德福精密驱动制造有限公司 Pressure detection apparatus for spline assembling
CN105403332B (en) * 2015-12-02 2018-07-03 浙江德福精密驱动制造有限公司 A kind of spline assembling pressure detection device

Similar Documents

Publication Publication Date Title
CN201615804U (en) A lead-acid battery pole group assembly pressure tester
CN201909739U (en) Arch structure test device
CN201637834U (en) Lead wire device for fuel cell stack cell voltage test
CN204326120U (en) A kind of device measuring horizontal bearing capacity of single pile
CN203455227U (en) Point load test instrument
CN204301905U (en) Nuclear fuel element screen work spring clamping force measuring apparatus
CN201828221U (en) Cylinder jacket length and spigot height checking fixture
CN101476862B (en) Strain Type Internal Displacement Tester for Measuring Internal Displacement of Geomechanical Models
CN203164052U (en) Novel compressive resilience modulus testing clamp
CN103983179A (en) Battery thickness change detecting device and battery safety detecting and judging method
CN103592060B (en) The stress-strain test system of Intelligent electric energy meter automation detecting device crimp type terminal
CN103278315A (en) Device and method for measuring contact rigidity of engine valve
CN206348251U (en) A kind of device for detecting lead accumulator with AGM dividing plates pressurization rate of liquid aspiration
CN204530353U (en) Track plates displacement is tested and prior-warning device automatically
CN209470684U (en) Power battery thickness measuring device
CN203100972U (en) A Calibration System of Pre-embedded Bolt Axial Force Sensor
CN202974770U (en) Young modulus measurer
CN103278409B (en) Detection device and detection method for elastic characteristic value of small-scale dish-shaped gasket
CN202693164U (en) Digital double-range standard dynamometer
CN206556568U (en) A kind of swing arm angle detection device
CN205317581U (en) Aggregate tensile strength and penetration resistance unite apparatus
CN205333737U (en) Surface resistance measuring device of antistatic coating
CN204666458U (en) Sour pick-up unit is inhaled in a kind of dividing plate pressurization
CN210665282U (en) An anchor pullout force detection device
CN203881328U (en) Similar simulation test tunnel bottom drum monitoring device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ANHUI CHILWEE POWER CO., LTD.

Free format text: FORMER OWNER: CHILWEE POWER CO., LTD.

Effective date: 20111216

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 313100 HUZHOU, ZHEJIANG PROVINCE TO: 242807 CHIZHOU, ANHUI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20111216

Address after: 242807 Yongping village, Ding Town, Qingyang County, Chizhou, Anhui

Patentee after: ANHUI CHAOWEI POWER CO., LTD.

Address before: 313100 new industrial park, pheasant Town, Zhejiang, Changxing County

Patentee before: Chilwee Power Supply Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101027

Termination date: 20150108

EXPY Termination of patent right or utility model