CN201554034U - 逆作施工后浇带水平嵌固支撑结构 - Google Patents
逆作施工后浇带水平嵌固支撑结构 Download PDFInfo
- Publication number
- CN201554034U CN201554034U CN2009202119700U CN200920211970U CN201554034U CN 201554034 U CN201554034 U CN 201554034U CN 2009202119700 U CN2009202119700 U CN 2009202119700U CN 200920211970 U CN200920211970 U CN 200920211970U CN 201554034 U CN201554034 U CN 201554034U
- Authority
- CN
- China
- Prior art keywords
- post
- sides
- pouring belt
- horizontal
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 238000005266 casting Methods 0.000 claims description 21
- 230000002411 adverse Effects 0.000 claims description 8
- 238000000034 method Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 5
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 210000002435 tendon Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板,其特征在于,还包括水平设置的预埋型钢,所述预埋型钢两端分别嵌入到两侧梁板内。本实用新型通过改变后浇带在逆作阶段的竖向支撑形式,利用后浇带两侧的梁板,在梁板内嵌入水平预埋型钢,从而将竖向支撑改为水平嵌固支撑,取消后浇带两侧的格构立柱,本实用新型水平嵌固支撑能够保证水平荷载传递的连续性,解决了逆作施工中后浇带换撑难的问题,使换撑施工工艺简化,施工成本降低。
Description
技术领域
本实用新型属于建筑地下工程技术领域,涉及一种逆作法施工水平支撑结构,具体地说是一种逆作施工后浇带水平嵌固支撑结构。
背景技术
逆作法施工由于受挖土及结构施工的流程限制,一旦进行下一层挖土排架就需拆除,因此后浇带部位在挖土阶段不能采用排架换撑。常规作法是在后浇带两侧预先打设格构立柱,用格构立柱来支撑后浇带两侧的竖向荷载。此外,为保持水平荷载传递的连续性,后浇位置还需要水平换撑。该施工工艺复杂,施工成本高。
发明内容
本实用新型所要解决的技术问题是提供一种施工工艺简单、施工成本低的逆作施工后浇带水平嵌固支撑结构,以克服现有技术存在的施工工艺复杂、施工成本高的缺陷。
一种逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板,其特征在于,还包括水平设置的预埋型钢,所述预埋型钢两端分别嵌入到两侧梁板内。
更进一步,所述预埋型钢两端分别嵌入两侧梁板结构内部的距离为80cm~120cm。
在后浇带两侧的梁板中预埋型钢,型钢嵌入结构内部1m,用其作为后浇带两侧结构的竖向支撑,同时该支撑能够保证水平荷载传递的连续性。
由以上公开的技术方案可知,本实用新型通过改变后浇带在逆作阶段的竖向支撑形式,利用后浇带两侧的梁板,在梁板内嵌入水平预埋型钢,从而将竖向支撑改为水平嵌固支撑,取消后浇带两侧的格构立柱,本实用新型水平嵌固支撑能够保证水平荷载传递的连续性,解决了逆作施工中后浇带换撑难的问题,使换撑施工工艺简化,施工成本降低。
附图说明
图1为本实用新型结构示意图。
附图标记如下:
1、梁板 2、预埋型钢
具体实施方式
下面结合附图及实施例对本实用新型作进一步详述。
如图1所述,本实用新型逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板1,还包括水平设置的预埋型钢2,所述预埋型钢2两端分别嵌入到两侧梁板1内。
所述预埋型钢2两端分别嵌入两侧梁板1结构内部的距离L为100cm。
本实用新型施工方法:
1、如图1所示,后浇带两侧结构浇捣垫层,搭设排架模板。
2、绑扎主、次梁主筋,水平嵌固预埋型钢2在箍筋绑扎完前放入。
3、待后浇带两侧结构混凝土设计强度80%拆除模板及底部排架,进行下一层结构逆作。
以上所述仅为本实用新型的较佳实施方式,并非用来限制本实用新型的保护范围,凡是依照本实用新型权利要求所做的同等变换,均在本实用新型的保护范围之内。
Claims (2)
1.一种逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板(1),其特征在于,还包括水平设置的预埋型钢(2),所述预埋型钢(2)两端分别嵌入到两侧梁板(1)内。
2.根据权利要求1所述的逆作施工后浇带水平嵌固支撑结构,其特征在于,所述预埋型钢(2)两端分别嵌入两侧梁板(1)结构内部的距离为80cm~120cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202119700U CN201554034U (zh) | 2009-11-06 | 2009-11-06 | 逆作施工后浇带水平嵌固支撑结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202119700U CN201554034U (zh) | 2009-11-06 | 2009-11-06 | 逆作施工后浇带水平嵌固支撑结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201554034U true CN201554034U (zh) | 2010-08-18 |
Family
ID=42613711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202119700U Expired - Fee Related CN201554034U (zh) | 2009-11-06 | 2009-11-06 | 逆作施工后浇带水平嵌固支撑结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201554034U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720201A (zh) * | 2012-07-02 | 2012-10-10 | 中建三局第二建设工程有限责任公司 | 一种利用建筑物主体结构换撑施工的建造方法 |
CN104452825A (zh) * | 2014-10-13 | 2015-03-25 | 华东交通大学 | 一种用于围护结构支撑拆除时的后浇带换撑结构 |
CN105003089A (zh) * | 2015-07-21 | 2015-10-28 | 上海建工七建集团有限公司 | 沉降后浇带提前拆除临时支撑的施工方法 |
CN105178330A (zh) * | 2015-08-27 | 2015-12-23 | 浙江绿城建筑设计有限公司 | 地下结构后浇带换撑方法 |
CN111173036A (zh) * | 2019-10-17 | 2020-05-19 | 浙江省建筑设计研究院 | 逆作基坑水平梁板支撑结构变形控制方法及装置 |
-
2009
- 2009-11-06 CN CN2009202119700U patent/CN201554034U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720201A (zh) * | 2012-07-02 | 2012-10-10 | 中建三局第二建设工程有限责任公司 | 一种利用建筑物主体结构换撑施工的建造方法 |
CN102720201B (zh) * | 2012-07-02 | 2014-10-29 | 中建三局第二建设工程有限责任公司 | 一种利用建筑物主体结构换撑施工的建造方法 |
CN104452825A (zh) * | 2014-10-13 | 2015-03-25 | 华东交通大学 | 一种用于围护结构支撑拆除时的后浇带换撑结构 |
CN105003089A (zh) * | 2015-07-21 | 2015-10-28 | 上海建工七建集团有限公司 | 沉降后浇带提前拆除临时支撑的施工方法 |
CN105178330A (zh) * | 2015-08-27 | 2015-12-23 | 浙江绿城建筑设计有限公司 | 地下结构后浇带换撑方法 |
CN111173036A (zh) * | 2019-10-17 | 2020-05-19 | 浙江省建筑设计研究院 | 逆作基坑水平梁板支撑结构变形控制方法及装置 |
CN111173036B (zh) * | 2019-10-17 | 2021-05-28 | 浙江省建筑设计研究院 | 逆作基坑水平梁板支撑结构变形控制方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480862B (zh) | 一种斜拉桥边跨钢桁梁的架设方法 | |
CN201554034U (zh) | 逆作施工后浇带水平嵌固支撑结构 | |
CN103911956B (zh) | 一种大跨度斜拉桥钢桁梁安装方法 | |
CN103437300A (zh) | 墩顶钢梁无墩旁托架架设双悬臂的施工方法 | |
CN104594201B (zh) | 一种利用单侧墩旁托架架设墩顶钢梁的方法 | |
CN103993745B (zh) | 一种转换梁整体吊装装置及其吊装方法 | |
CN102535849B (zh) | 构造柱柱顶混凝土浇筑方法 | |
CN205295963U (zh) | 大跨径钢箱梁顶推施工用横向纠偏支撑结构 | |
CN102535525B (zh) | 一种利用抗浮锚杆支撑地下筏板上排筏板钢筋架的方法 | |
CN104481166A (zh) | 老旧小区外加装配式阳台结构及其施工方法 | |
CN103469735A (zh) | 曲线超高型空心柱板式桥墩墩顶实心段模板的安装方法 | |
CN202689536U (zh) | 超高混凝土梁板结构支模体系 | |
CN201942994U (zh) | 一种桥梁支座垫块 | |
CN202788126U (zh) | 一种锚栓式柱脚人字形构架 | |
CN204000885U (zh) | 地铁深基坑混凝土支撑吊模模具 | |
CN203213137U (zh) | 一种钢结构屋盖安装用钢筏板基础 | |
CN104295089A (zh) | 一种现浇混凝土gbf蜂巢芯密肋楼盖的支撑系统 | |
CN204370831U (zh) | 老旧小区外加装配式阳台结构 | |
CN208235587U (zh) | 一种大跨度深基坑地下厂房网架拼装施工平台 | |
CN204266571U (zh) | 一种悬挑脚手架工字钢预埋装置 | |
CN105625732A (zh) | 超高悬挑钢结构桁架无支撑施工方法 | |
CN204238443U (zh) | 一种可拆卸柱脚固定装置 | |
CN211691720U (zh) | 一种用于建筑隔震工程的抗风装置结构 | |
CN201598652U (zh) | 双向同步施工转换结构 | |
CN202440851U (zh) | 支承地下室顶板上施工电梯基础的结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100818 Termination date: 20101106 |