[go: up one dir, main page]

CN201554034U - 逆作施工后浇带水平嵌固支撑结构 - Google Patents

逆作施工后浇带水平嵌固支撑结构 Download PDF

Info

Publication number
CN201554034U
CN201554034U CN2009202119700U CN200920211970U CN201554034U CN 201554034 U CN201554034 U CN 201554034U CN 2009202119700 U CN2009202119700 U CN 2009202119700U CN 200920211970 U CN200920211970 U CN 200920211970U CN 201554034 U CN201554034 U CN 201554034U
Authority
CN
China
Prior art keywords
post
sides
pouring belt
horizontal
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202119700U
Other languages
English (en)
Inventor
朱毅敏
宋晓星
彭韬
于成杰
张海荣
周涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai First Construction Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CN2009202119700U priority Critical patent/CN201554034U/zh
Application granted granted Critical
Publication of CN201554034U publication Critical patent/CN201554034U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板,其特征在于,还包括水平设置的预埋型钢,所述预埋型钢两端分别嵌入到两侧梁板内。本实用新型通过改变后浇带在逆作阶段的竖向支撑形式,利用后浇带两侧的梁板,在梁板内嵌入水平预埋型钢,从而将竖向支撑改为水平嵌固支撑,取消后浇带两侧的格构立柱,本实用新型水平嵌固支撑能够保证水平荷载传递的连续性,解决了逆作施工中后浇带换撑难的问题,使换撑施工工艺简化,施工成本降低。

Description

逆作施工后浇带水平嵌固支撑结构
技术领域
本实用新型属于建筑地下工程技术领域,涉及一种逆作法施工水平支撑结构,具体地说是一种逆作施工后浇带水平嵌固支撑结构。
背景技术
逆作法施工由于受挖土及结构施工的流程限制,一旦进行下一层挖土排架就需拆除,因此后浇带部位在挖土阶段不能采用排架换撑。常规作法是在后浇带两侧预先打设格构立柱,用格构立柱来支撑后浇带两侧的竖向荷载。此外,为保持水平荷载传递的连续性,后浇位置还需要水平换撑。该施工工艺复杂,施工成本高。
发明内容
本实用新型所要解决的技术问题是提供一种施工工艺简单、施工成本低的逆作施工后浇带水平嵌固支撑结构,以克服现有技术存在的施工工艺复杂、施工成本高的缺陷。
一种逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板,其特征在于,还包括水平设置的预埋型钢,所述预埋型钢两端分别嵌入到两侧梁板内。
更进一步,所述预埋型钢两端分别嵌入两侧梁板结构内部的距离为80cm~120cm。
在后浇带两侧的梁板中预埋型钢,型钢嵌入结构内部1m,用其作为后浇带两侧结构的竖向支撑,同时该支撑能够保证水平荷载传递的连续性。
由以上公开的技术方案可知,本实用新型通过改变后浇带在逆作阶段的竖向支撑形式,利用后浇带两侧的梁板,在梁板内嵌入水平预埋型钢,从而将竖向支撑改为水平嵌固支撑,取消后浇带两侧的格构立柱,本实用新型水平嵌固支撑能够保证水平荷载传递的连续性,解决了逆作施工中后浇带换撑难的问题,使换撑施工工艺简化,施工成本降低。
附图说明
图1为本实用新型结构示意图。
附图标记如下:
1、梁板  2、预埋型钢
具体实施方式
下面结合附图及实施例对本实用新型作进一步详述。
如图1所述,本实用新型逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板1,还包括水平设置的预埋型钢2,所述预埋型钢2两端分别嵌入到两侧梁板1内。
所述预埋型钢2两端分别嵌入两侧梁板1结构内部的距离L为100cm。
本实用新型施工方法:
1、如图1所示,后浇带两侧结构浇捣垫层,搭设排架模板。
2、绑扎主、次梁主筋,水平嵌固预埋型钢2在箍筋绑扎完前放入。
3、待后浇带两侧结构混凝土设计强度80%拆除模板及底部排架,进行下一层结构逆作。
以上所述仅为本实用新型的较佳实施方式,并非用来限制本实用新型的保护范围,凡是依照本实用新型权利要求所做的同等变换,均在本实用新型的保护范围之内。

Claims (2)

1.一种逆作施工后浇带水平嵌固支撑结构,包括设置在后浇带两侧的梁板(1),其特征在于,还包括水平设置的预埋型钢(2),所述预埋型钢(2)两端分别嵌入到两侧梁板(1)内。
2.根据权利要求1所述的逆作施工后浇带水平嵌固支撑结构,其特征在于,所述预埋型钢(2)两端分别嵌入两侧梁板(1)结构内部的距离为80cm~120cm。
CN2009202119700U 2009-11-06 2009-11-06 逆作施工后浇带水平嵌固支撑结构 Expired - Fee Related CN201554034U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202119700U CN201554034U (zh) 2009-11-06 2009-11-06 逆作施工后浇带水平嵌固支撑结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202119700U CN201554034U (zh) 2009-11-06 2009-11-06 逆作施工后浇带水平嵌固支撑结构

Publications (1)

Publication Number Publication Date
CN201554034U true CN201554034U (zh) 2010-08-18

Family

ID=42613711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202119700U Expired - Fee Related CN201554034U (zh) 2009-11-06 2009-11-06 逆作施工后浇带水平嵌固支撑结构

Country Status (1)

Country Link
CN (1) CN201554034U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720201A (zh) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 一种利用建筑物主体结构换撑施工的建造方法
CN104452825A (zh) * 2014-10-13 2015-03-25 华东交通大学 一种用于围护结构支撑拆除时的后浇带换撑结构
CN105003089A (zh) * 2015-07-21 2015-10-28 上海建工七建集团有限公司 沉降后浇带提前拆除临时支撑的施工方法
CN105178330A (zh) * 2015-08-27 2015-12-23 浙江绿城建筑设计有限公司 地下结构后浇带换撑方法
CN111173036A (zh) * 2019-10-17 2020-05-19 浙江省建筑设计研究院 逆作基坑水平梁板支撑结构变形控制方法及装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720201A (zh) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 一种利用建筑物主体结构换撑施工的建造方法
CN102720201B (zh) * 2012-07-02 2014-10-29 中建三局第二建设工程有限责任公司 一种利用建筑物主体结构换撑施工的建造方法
CN104452825A (zh) * 2014-10-13 2015-03-25 华东交通大学 一种用于围护结构支撑拆除时的后浇带换撑结构
CN105003089A (zh) * 2015-07-21 2015-10-28 上海建工七建集团有限公司 沉降后浇带提前拆除临时支撑的施工方法
CN105178330A (zh) * 2015-08-27 2015-12-23 浙江绿城建筑设计有限公司 地下结构后浇带换撑方法
CN111173036A (zh) * 2019-10-17 2020-05-19 浙江省建筑设计研究院 逆作基坑水平梁板支撑结构变形控制方法及装置
CN111173036B (zh) * 2019-10-17 2021-05-28 浙江省建筑设计研究院 逆作基坑水平梁板支撑结构变形控制方法及装置

Similar Documents

Publication Publication Date Title
CN104480862B (zh) 一种斜拉桥边跨钢桁梁的架设方法
CN201554034U (zh) 逆作施工后浇带水平嵌固支撑结构
CN103911956B (zh) 一种大跨度斜拉桥钢桁梁安装方法
CN103437300A (zh) 墩顶钢梁无墩旁托架架设双悬臂的施工方法
CN104594201B (zh) 一种利用单侧墩旁托架架设墩顶钢梁的方法
CN103993745B (zh) 一种转换梁整体吊装装置及其吊装方法
CN102535849B (zh) 构造柱柱顶混凝土浇筑方法
CN205295963U (zh) 大跨径钢箱梁顶推施工用横向纠偏支撑结构
CN102535525B (zh) 一种利用抗浮锚杆支撑地下筏板上排筏板钢筋架的方法
CN104481166A (zh) 老旧小区外加装配式阳台结构及其施工方法
CN103469735A (zh) 曲线超高型空心柱板式桥墩墩顶实心段模板的安装方法
CN202689536U (zh) 超高混凝土梁板结构支模体系
CN201942994U (zh) 一种桥梁支座垫块
CN202788126U (zh) 一种锚栓式柱脚人字形构架
CN204000885U (zh) 地铁深基坑混凝土支撑吊模模具
CN203213137U (zh) 一种钢结构屋盖安装用钢筏板基础
CN104295089A (zh) 一种现浇混凝土gbf蜂巢芯密肋楼盖的支撑系统
CN204370831U (zh) 老旧小区外加装配式阳台结构
CN208235587U (zh) 一种大跨度深基坑地下厂房网架拼装施工平台
CN204266571U (zh) 一种悬挑脚手架工字钢预埋装置
CN105625732A (zh) 超高悬挑钢结构桁架无支撑施工方法
CN204238443U (zh) 一种可拆卸柱脚固定装置
CN211691720U (zh) 一种用于建筑隔震工程的抗风装置结构
CN201598652U (zh) 双向同步施工转换结构
CN202440851U (zh) 支承地下室顶板上施工电梯基础的结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20101106