CN201546408U - Wall floor mounting and fixing device - Google Patents
Wall floor mounting and fixing device Download PDFInfo
- Publication number
- CN201546408U CN201546408U CN2009202196779U CN200920219677U CN201546408U CN 201546408 U CN201546408 U CN 201546408U CN 2009202196779 U CN2009202196779 U CN 2009202196779U CN 200920219677 U CN200920219677 U CN 200920219677U CN 201546408 U CN201546408 U CN 201546408U
- Authority
- CN
- China
- Prior art keywords
- wall
- cramp
- floor board
- groove
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
A wall floor mounting and fixing device comprises a girder keel for supporting the wall floor, a connecting fixed part is arranged on the girder keel to realize the fixed connection of the girder keel and the wall floor, the connecting fixed part comprises a spring buckling piece and a buckling piece slot, the spring buckling piece is arranged on the inner side of the wall floor, the bucking piece slot is correspondingly arranged on the girder keel, and the spring buckling piece is fixed in the buckling piece slot. The wall floor mounting and fixing device is used for mounting and dismounting the wall floor, is simple and convenient, has easy operation, is time and labor saving, and can improve the work efficiency.
Description
Technical field
The utility model belongs to constructional materials structural member field, the particularly fixing device for installing on building wall floor.
Background technology
Skin, indoor partition wall and ground often need be adopted has ornamental wallboard and floor, as stone material and ceramic wall and floor bricks with decorative pattern and color are used widely.Also need use cement masonry because the stone material of single material and ceramic wall and floor bricks be more thick and heavy, some surfaces adopt composite wall and floors of ultra-thin ceramic plate nexines employing lightweight metal materials such as aluminum honeycomb material to begin to be applied in recent years.For the combine way of this composite plate, generally be elder generation's fixing metal Beam bone on body of wall, and then composite plate is fixed on the metal Beam bone with body of wall or ground.About the combination of composite plate and metal Beam bone, generally be bolt to be given put in the composite plate, fix with nut with the Beam bone then, efficient was low when there was installation in this mode of installing and fixing, dismantled the problem of inconvenience in the time need changing the part wall and floor board again.
Summary of the invention
At above-mentioned composite plate and Beam bone with screw bolt and nut install when being connected the installation fee that produces, the inconvenient problem of dismounting, the utility model proposes and a kind ofly install and fix the method for composite wall and floor without screw bolt and nut, its concrete technical scheme is as follows:
A kind of wall and floor board fixing device for installing, comprise the Beam bone that is used for the knee wall floor, described Beam bone is provided with and is connected and fixed part, the Beam bone is fixedlyed connected with wall and floor board, the described part that is connected and fixed comprises spring cramp and cramp draw-in groove, described spring cramp is arranged on the wall and floor board inboard, and described cramp draw-in groove correspondence is arranged on the Beam bone, and the spring cramp is fixing in the cramp draw-in groove.
Particularly, on the cell wall of described cramp draw-in groove, raised line is set, the corresponding groove that is provided with raised line on the described spring cramp; The perhaps corresponding groove that is provided with on the cell wall of described cramp draw-in groove with raised line, the corresponding raised line that is provided with groove on the described spring cramp.
Described spring cramp is arranged on four jiaos or four limits of wall and floor board piece inboard, and it can be fixedlyed connected with screw with wall and floor board.
Further, described cramp draw-in groove and metal Beam bone section bar are wholely set.The cramp draw-in groove can be arranged on a side of Beam bone, in this side 1 or 2 cramp draw-in grooves is set; Also can be arranged on the both sides of Beam bone, 1 or 2 cramp draw-in grooves are set in every side.
The utility model beneficial effect is: the wall and floor board fixing device for installing is when carrying out the installation and removal of wall and floor board, and is simple and convenient, and easy operating is time saving and energy saving, has improved operating efficiency.
Description of drawings
Fig. 1 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 1;
Fig. 2 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 2;
Fig. 3 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 3;
Fig. 4 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 4;
Fig. 5 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 5;
Fig. 6 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 6;
Fig. 7 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 7.
The specific embodiment
Fig. 1 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 1.As seen from the figure, draw-in groove 2 is arranged on the side of Beam bone 1, is fixed together with Beam bone 1.Raised line 2.1 is set on the cell wall of cramp draw-in groove 2.Spring cramp 3 is arranged on the inboard of wall and floor board 5, and it is fixedlyed connected with wall and floor board 5 usefulness screws 4.The groove 3.1 that matches with raised line 2.1 is set on spring cramp 3.When wall and floor board was installed, only need be forced into spring cramp 3 aligning cramp draw-in grooves 2 and get final product; When the dismounting wall and floor board, only need be extracted wall and floor board with glass holder and get final product from the cramp draw-in groove.
Fig. 2 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 2.As seen from the figure, cramp draw-in groove 6 is arranged on the side of Beam bone 1, is fixed together with Beam bone 1.Groove 6.1 is set on the cell wall of cramp draw-in groove 6.Spring cramp 7 is arranged on the inboard of wall and floor board 5, and it is fixedlyed connected with wall and floor board 5 usefulness screws 4.The raised line 7.1 that matches with groove 6.1 is set on spring cramp 7.When wall and floor board was installed, only need be forced into spring cramp 7 aligning cramp draw-in grooves 6 and get final product; Equally, when the dismounting wall and floor board, only need be extracted wall and floor board with glass holder and get final product from the cramp draw-in groove.
Fig. 3 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 3.As seen from the figure, cramp draw-in groove 8.1 is that metal Beam bone section bar 8 is wholely set, and generally adopts the light-weight metal aluminium extruded sections as the Beam bone material.Article one, cramp draw-in groove 8.1 is arranged on a side of Beam bone 8.Spring cramp 3 reaches identical with embodiment 1 with being connected of wall and floor board 5 with the cooperation of cramp draw-in groove 8.1.This embodiment is adapted at the situation that Beam bone one side is installed wallboard, is particularly suited for the end of metope (facade).
Fig. 4 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 4.As seen from the figure, cramp draw-in groove 9.1 is that metal Beam bone section bar 9 is wholely set, and generally adopts the light-weight metal aluminium extruded sections as the Beam bone material.Article two, cramp draw-in groove 9.1 is arranged on a side of Beam bone 9.Spring cramp 3 reaches identical with embodiment 3 with being connected of wall and floor board 5 with the cooperation of cramp draw-in groove 8.1.This embodiment is adapted at the situation that wallboard is installed in Beam bone both sides, and the installation that is particularly suited for indoor partition wall is the end of metope (facade) particularly.Certainly, also can be used for only installing the situation of a framed side wallboard.
Fig. 5 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 5.As seen from the figure, cramp draw-in groove 10.1 is ingredients of metal Beam bone section bar 10, generally adopts the light-weight metal aluminium extruded sections as the Beam bone material.Article two, cramp draw-in groove 10.1 is separately positioned on the both sides of Beam bone 10.Spring cramp 3 reaches identical with embodiment 3 with being connected of wall and floor board 5 with the cooperation of cramp draw-in groove 10.1.This embodiment is adapted at the situation that Beam bone one side is installed wallboard, is particularly suited for the connection of two blocks of wallboards.
Fig. 6 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 6.As seen from the figure, cramp draw-in groove 11.1 is ingredients of metal Beam bone section bar 11, generally adopts the light-weight metal aluminium extruded sections as the Beam bone material.Article four, cramp draw-in groove 11.1 is separately positioned on the both sides of Beam bone 10.Spring cramp 3 reaches identical with embodiment 5 with being connected of wall and floor board 5 with the cooperation of cramp draw-in groove 11.1.This embodiment is adapted at the situation that wallboard is installed in Beam bone both sides, is particularly suited for the connection of two adjacent wall board of indoor partition wall.Certainly, also can be used for only installing the situation of a framed side wallboard.
Fig. 7 is the schematic diagram of the utility model wall and floor board fixing device for installing embodiment 7.This illustrates the installation situation that the combined wall board that an aluminum honeycomb material A and ceramic wafer B make is installed, and metallic aluminium section bar Beam bone 1 also adds some other structures 1.1 on the basis of each embodiment in front more as seen from the figure.
In a word, adopt wall and floor board fixing device for installing of the present utility model when carrying out the installation and removal of wall and floor board, simple and convenient, easy operating, time saving and energy saving, improved operating efficiency.
Claims (8)
1. wall and floor board fixing device for installing, comprise the Beam bone that is used for the knee wall floor, it is characterized in that, described Beam bone is provided with and is connected and fixed part, the Beam bone is fixedlyed connected with wall and floor board, and the described part that is connected and fixed comprises spring cramp and cramp draw-in groove, and described spring cramp is arranged on the wall and floor board inboard, described cramp draw-in groove correspondence is arranged on the Beam bone, and the spring cramp is fixing in the cramp draw-in groove.
2. wall and floor board fixing device for installing according to claim 1 is characterized in that, on the cell wall of described cramp draw-in groove raised line is set, the corresponding groove that is provided with raised line on the described spring cramp.
3. wall and floor board fixing device for installing according to claim 1 is characterized in that, on the cell wall of described cramp draw-in groove groove is set, the corresponding raised line that is provided with groove on the described spring cramp.
4. wall and floor board fixing device for installing according to claim 1 is characterized in that, described spring cramp is arranged on four jiaos or four limits of wall and floor board piece inboard.
5. according to claim 1 or 4 each described wall and floor board fixing device for installing, it is characterized in that described spring cramp is fixedlyed connected with screw with wall and floor board.
6. wall and floor board fixing device for installing according to claim 1 is characterized in that, described cramp draw-in groove and metal Beam bone section bar are wholely set.
7. according to claim 1 or 6 each described wall and floor board fixing device for installing, it is characterized in that described cramp draw-in groove is arranged on a side of Beam bone, 1 or 2 cramp draw-in grooves are set in this side.
8. according to claim 1 or 6 each described wall and floor board fixing device for installing, it is characterized in that described cramp draw-in groove is arranged on the both sides of Beam bone, 1 or 2 cramp draw-in grooves are set in every side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202196779U CN201546408U (en) | 2009-10-30 | 2009-10-30 | Wall floor mounting and fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202196779U CN201546408U (en) | 2009-10-30 | 2009-10-30 | Wall floor mounting and fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201546408U true CN201546408U (en) | 2010-08-11 |
Family
ID=42601582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202196779U Expired - Fee Related CN201546408U (en) | 2009-10-30 | 2009-10-30 | Wall floor mounting and fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201546408U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015746A (en) * | 2012-12-17 | 2013-04-03 | 佛山市利铭蜂窝复合材料有限公司 | Aluminum honeycomb prefabricated house |
CN105657875A (en) * | 2016-01-13 | 2016-06-08 | 肖玉化 | Method for installing heating module on basic plane |
CN109537937A (en) * | 2018-11-21 | 2019-03-29 | 江苏金陵体育器材股份有限公司 | Connection structure between the panel and crossbeam of swimming pool bottom bed course |
CN110295730A (en) * | 2019-07-22 | 2019-10-01 | 苏州美瑞德建筑装饰有限公司 | A kind of compound dry-laid structure of plastic uptake cellular board floor tile |
CN112524126A (en) * | 2019-09-19 | 2021-03-19 | 贾建国 | Spring card |
-
2009
- 2009-10-30 CN CN2009202196779U patent/CN201546408U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015746A (en) * | 2012-12-17 | 2013-04-03 | 佛山市利铭蜂窝复合材料有限公司 | Aluminum honeycomb prefabricated house |
CN105657875A (en) * | 2016-01-13 | 2016-06-08 | 肖玉化 | Method for installing heating module on basic plane |
CN109537937A (en) * | 2018-11-21 | 2019-03-29 | 江苏金陵体育器材股份有限公司 | Connection structure between the panel and crossbeam of swimming pool bottom bed course |
CN109537937B (en) * | 2018-11-21 | 2024-04-26 | 江苏金陵体育器材股份有限公司 | Connection structure between panel and crossbeam of swimming pool bottom cushion layer |
CN110295730A (en) * | 2019-07-22 | 2019-10-01 | 苏州美瑞德建筑装饰有限公司 | A kind of compound dry-laid structure of plastic uptake cellular board floor tile |
CN110295730B (en) * | 2019-07-22 | 2024-01-16 | 苏州美瑞德建筑装饰有限公司 | Plastic uptake honeycomb plate and floor tile composite dry paving structure |
CN112524126A (en) * | 2019-09-19 | 2021-03-19 | 贾建国 | Spring card |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201546408U (en) | Wall floor mounting and fixing device | |
CN210177784U (en) | Assembled adjustable large-block-plate suspended ceiling | |
CN202284352U (en) | Ceramic thin-plate curtain-wall node | |
CN205777066U (en) | A kind of wallboard being easily installed | |
CN2931631Y (en) | Honeycomb composite battenboard | |
CN202672420U (en) | Curtain wall structure | |
CN211313194U (en) | From taking integrated thermal insulation wall of veneer | |
CN203878804U (en) | Exterior wall structure of truss type house building | |
CN104005496A (en) | Fabricated environment-friendly external wall | |
CN203867001U (en) | Assemblable and environment-friendly outer wall | |
CN201546405U (en) | Wallboard mounting and fixing device | |
CN201180323Y (en) | Polyurethane support mold pouring heat preservation wall | |
CN213572788U (en) | Pendant is connected to decorative board | |
CN201801992U (en) | Reverse-support suspended ceiling for overlong suspended rod | |
CN2856248Y (en) | Dry hanging building decorative structure of movable fiber ceramic boards | |
CN201129020Y (en) | Construction bracket for building board | |
CN107178193B (en) | Mounting node of cladding board and assembly method thereof | |
CN202731205U (en) | Slate partial thickening and mounting structure for architectural ornament | |
CN221865412U (en) | Assembled type combined fast-assembling curtain box structure | |
CN201474227U (en) | Composite decorative plate with heat insulation function and built-in fixing connecting piece | |
CN215519656U (en) | Wallboard connecting piece, wallboard hanging tooth hanging structure and wall hanging plate back bolt connecting structure | |
CN215211673U (en) | External enclosure heat insulation and decoration integrated wallboard | |
CN216196189U (en) | Assembled honeycomb rock plate cylinder mounting structure | |
CN214884700U (en) | Engineering construction is with quick detach formula building curtain | |
CN211421692U (en) | Decorative wallboard for indoor design |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100811 Termination date: 20141030 |
|
EXPY | Termination of patent right or utility model |