[go: up one dir, main page]

CN201475503U - Wall-penetrating sealing structural part with telescopic function - Google Patents

Wall-penetrating sealing structural part with telescopic function Download PDF

Info

Publication number
CN201475503U
CN201475503U CN2009203062080U CN200920306208U CN201475503U CN 201475503 U CN201475503 U CN 201475503U CN 2009203062080 U CN2009203062080 U CN 2009203062080U CN 200920306208 U CN200920306208 U CN 200920306208U CN 201475503 U CN201475503 U CN 201475503U
Authority
CN
China
Prior art keywords
flange plate
flange
conduit
insulation layer
thermal insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203062080U
Other languages
Chinese (zh)
Inventor
陈海渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huanai Lining Material Co Ltd
Original Assignee
Jiangsu Huanai Lining Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huanai Lining Material Co Ltd filed Critical Jiangsu Huanai Lining Material Co Ltd
Priority to CN2009203062080U priority Critical patent/CN201475503U/en
Application granted granted Critical
Publication of CN201475503U publication Critical patent/CN201475503U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Thermal Insulation (AREA)
  • Joints Allowing Movement (AREA)

Abstract

The utility model discloses a wall-penetrating sealing structural part with a telescopic function. The wall-penetrating sealing structural part mainly comprises a thermal pipeline, a heat-preserving layer, a pre-embedding sleeve, a first flange joint, a corrugated pipe, a second flange joint and a necked flange. The pre-embedding sleeve is fixedly arranged on a pipeline through hole of the wall body. The thermal pipeline coated with the thermal layer penetrates through the pre-embedding sleeve. The first flange joint comprises a first flange piece fixed at the right end of the pre-embedding sleeve and a first guide pipe fixed at the right end of the first flange. The necked flange is fixed on the thermal pipeline and is arranged at the right part of the first flange joint. The second flange joint comprises a second flange piece fixed at the left end of the necked flange and a second guide pipe fixed at the left end of the second flange piece. The second guide pipe is coated at the external side of the heat-preserving layer; the first guide pipe is coated at the external side of the second guide pipe; and the first guide pipe and the second guide pipe are connected with each other in the axial direction in a sliding way. The corrugated pipe is elastically connected between the first flange piece and the second flange piece. The wall-penetrating sealing structural part has good sealing performance.

Description

A kind of seal structural part through walls with Telescopic
Technical field
The utility model relates to the structural member through walls that is used for transmission medium in the industries such as a kind of petrochemical industry, electric power.
Background technique
In industries such as petrochemical industry, electric power, steam, liquid and other medium all need to transmit by pipeline, when pipeline when passing place such as poisonous, harmful, radiation, in (or block body) through walls process, be difficult to accomplish seal.Especially the heat distribution pipeline of nuclear power plant, when through walls because pipeline constantly is heated the thermal expansion distortion can take place in transmission medium (200-800 ℃ steam) process, also can vibrate because of the vibration of medium, make and to produce certain slit between pipeline and the body of wall, if do not take the effective seal measure, will cause the nuclear ray to penetrate by the slit between body of wall and the pipeline; In chemical industry, these pipelines are by poisonous, harmful, inflammable, explosive place the time, and its position through walls equally also can be caused the leakage of harmful matter (gas, dust etc.) because of poor sealing, cause the generation of danger.
Chinese patent literature CN201032144Y discloses a kind of wall-passing pipe of dry coke quenching residual heat boiler and the sealing configuration of membrane wall, it comprises superheater, the wall-passing pipe of vaporizer, membrane wall, backplate, corrugated expansion joint, sealing plate and collection case, its wall-passing pipe passes membrane wall fixedlys connected with the collection case, backplate, corrugated expansion joint and sealing plate are coated on membrane wall and the wall-passing pipe of collection between the case, wherein the inner encapsulation of backplate is connected on the wall-passing pipe external wall that touches peripheral membrane wall through walls, the backplate outer end is connected with corrugated expansion joint one end, the corrugated expansion joint the other end is connected with sealing plate is inner, and the sealing plate outer end is connected with the encapsulation of collection case.This sealing configuration can only guarantee sealing when wall-passing pipe generation axial deformation, and does not have heat insulation effect, can not guarantee sealing when wall-passing pipe generation radial deformation.
The model utility content
Technical problem to be solved in the utility model provides a kind of thermal distortion that can overcome because of pipeline through walls and causes the sealed type structural member through walls that produces the leakage crack between pipeline and body of wall.
The technological scheme that realizes the utility model purpose is: a kind of seal structural part through walls with Telescopic is provided, comprises heat distribution pipeline, thermal insulation layer, service sleeve, first flanged joint, bellows, second flanged joint and hubbed flange.
Service sleeve is the sleeve pipe that is fixedly installed on the pipeline via hole of body of wall, comprises the body of annulus cylindricality, and the axial length of body is greater than the thickness of body of wall.
Thermal insulation layer is a tubular thermal insulation layer, and its internal diameter is identical with the external diameter of heat distribution pipeline, and external diameter is identical with the internal diameter of body.Thermal insulation layer closely is coated on the outside of heat distribution pipeline, and it is provided with a circular groove around its periphery setting on right-hand part of body of wall.
The heat distribution pipeline that is coated with thermal insulation layer passes from service sleeve, thereby passes body of wall.
First flanged joint comprises first flange plate, and first flanged joint is by the airtight right-hand member that is fixed on service sleeve of first flange plate.Hubbed flange is fixed on the heat distribution pipeline by its neck is airtight, and is positioned at the right part of the circular groove of thermal insulation layer.Second flanged joint comprises second flange plate, and second flanged joint is by the airtight left end that is fixed on hubbed flange of second flange plate, and second flange plate is positioned at the left part of the circular groove of thermal insulation layer.Bellows is enclosed within outside the thermal insulation layer, and the left end of bellows is fixedly installed on first flange plate from the airtight welding in right side, the right-hand member of bellows is fixedly installed on second flange plate from the airtight welding in left side, makes bellows elasticity be connected between first flange plate and second flange plate.
Above-mentioned service sleeve also comprises left end flange plate that is weldingly fixed on body outside left end and the right-hand member flange plate that is weldingly fixed on body outside right-hand member.The major part of body is sealed in body of wall by concrete, and the left surface of body of wall is close on the right side of left end flange plate.The right-hand member flange plate is provided with an axial 4-8 attachment hole, and all attachment holes are centrosymmetric along the circumferential equal angles setting of disk body.
Above-mentioned seal structural part through walls with Telescopic also comprises 4-8 first connecting bolt and 4-8 second connecting bolt.
First flanged joint also comprises first conduit.First flange plate is a slip-on-welding plate flange, its ring footpath is identical with the ring footpath of the right-hand member flange plate of service sleeve, be provided with the tapped hole identical on first flange plate vertically, and the position of the attachment hole on the position of each tapped hole and the right-hand member flange plate is corresponding with the attachment hole quantity of right-hand member flange plate.First conduit is the body of an annulus cylindricality, and its internal diameter is slightly larger than the external diameter of thermal insulation layer.First conduit is fixed on first flange plate, and is positioned at the right side of first flange plate.
Each first connecting bolt screws in the tapped hole of first flange plate after passing attachment hole on the right-hand member flange plate of service sleeve respectively from left to right.
Second flanged joint also comprises second conduit.Second flange plate is a slip-on-welding plate flange, and its internal diameter is slightly larger than the external diameter of heat distribution pipeline, is provided with 4-8 tapped hole on second flange plate vertically, and all tapped holes are centrosymmetric along the circumferential equal angles setting of disk body.Second conduit is the body of an annulus cylindricality, and its internal diameter is identical with the external diameter of thermal insulation layer, and external diameter is identical with the internal diameter of first conduit.Second conduit is fixed on second flange plate, and is positioned at the left side of second flange plate.
Second conduit closely is coated on the outside of thermal insulation layer, and the left part of second conduit just in time inserts in the gap between first conduit and the thermal insulation layer, and second conduit and first conduit are slidingly connected in the axial direction, and bellows is enclosed within outside second conduit and first conduit.
Hubbed flange comprises neck and is connected the flange plate of neck left end.The airtight outside left end that is weldingly fixed on neck of flange plate.The internal diameter of neck is identical with the external diameter of heat distribution pipeline.The neck of hubbed flange is around periphery setting, airtight being weldingly fixed on the heat distribution pipeline of heat distribution pipeline.The external diameter of flange plate is identical with the external diameter of second flange plate, is provided with the identical attachment hole of quantity with the tapped hole of second flange plate on the flange plate vertically, and the position of the tapped hole on the position of each attachment hole and second flange plate is corresponding.
Each second connecting bolt screws in the tapped hole of second flange plate after passing attachment hole on the flange plate respectively from right to left.
The utlity model has positive effect: the structural member through walls with Telescopic of the present utility model has fundamentally solved wall-passing pipe and has produced a difficult problem of revealing the crack because of thermal distortion causes between pipeline and body of wall, make good seal between wall-passing pipe and the body of wall, prevent to examine the leakage of ray and all kinds of poisonous, harmful, flammable and explosive substance effectively, and simple in structure, it is convenient to implement.
Description of drawings
Fig. 1 is a kind of cross-sectional view of the present utility model.
Mark in the above-mentioned accompanying drawing is as follows:
Heat distribution pipeline 1,
Thermal insulation layer 2,
Service sleeve 3, left end flange plate 3-1, body 3-2, right-hand member flange plate 3-3,
First flanged joint, 4, the first flange plate 4-1, the first conduit 4-2,
Bellows 5,
Second flanged joint, 6, the second flange plate 6-1, the second conduit 6-2,
Hubbed flange 7, neck 7-1, flange plate 7-2,
The first connecting bolt 8-1, the second connecting bolt 8-2,
Body of wall 9.
Embodiment
(embodiment 1)
See Fig. 1, the structural member through walls with Telescopic of present embodiment comprises heat distribution pipeline 1, thermal insulation layer 2, service sleeve 3, first flanged joint 4, bellows 5, second flanged joint 6,7,8 first connecting bolt 8-1 of hubbed flange and 8 second connecting bolt 8-2.
Still see Fig. 1, service sleeve 3 is the sleeve pipe on the pipeline via hole that is fixedly installed on body of wall 9, comprise the annulus cylindricality body 3-2, be weldingly fixed on the left end flange plate 3-1 of body 3-2 outside left end and be weldingly fixed on the right-hand member flange plate 3-3 of body 3-2 outside right-hand member.And the axial length of body 3-2 is slightly larger than the thickness of body of wall 9.The major part of body 3-2 is sealed in body of wall 9 by concrete, and the right side of left end flange plate 3-1 is close to the left surface of body of wall 9, so between the right flank of the left side of right-hand member flange plate 3-3 and body of wall 9 certain distance is arranged.Right-hand member flange plate 3-3 is provided with 8 axial attachment holes, and all attachment holes are centrosymmetric along the circumferential equal angles setting of disk body.
Still see Fig. 1, heat distribution pipeline 1 is a kind of high temperature resistant pipeline of transmission steam, liquid and other medium, and its pipe thickness is 3 to 20 millimeters, has the physical property of expanding with heat and contract with cold.
Thermal insulation layer 2 is that its internal diameter is identical with the external diameter of heat distribution pipeline 1 by the formed tubular thermal insulation layer of the stainless steel outer packed skin of aluminosilicate fiber cotton, and thickness is 15 centimetres.Aluminum silicate fiber has good thermostability and thermal shock resistance, and the heating do not expand, toughness is good, so thermal insulation layer 2 possesses good insulating power and toughness.
Thermal insulation layer 2 closely is coated on the outside of heat distribution pipeline 1, and it is provided with a circular groove around its periphery setting on right-hand part of body of wall 9.
The heat distribution pipeline 1 that is coated with thermal insulation layer 2 passes from service sleeve 3, thereby passes body of wall 9.
First flanged joint 4 comprises the first flange plate 4-1 and the first conduit 4-2.The first flange plate 4-1 is a slip-on-welding plate flange, its ring footpath is identical with the ring footpath of the right-hand member flange plate 3-3 of service sleeve 3, be provided with the identical tapped hole of attachment hole quantity with right-hand member flange plate 3-3 on the first flange plate 4-1 vertically, and the position of the attachment hole on the position of each tapped hole and the right-hand member flange plate 3-3 is corresponding.
Screw in the tapped hole of the first flange plate 4-1 pass the attachment hole on the right-hand member flange plate 3-3 of service sleeve 3 respectively from left to right by 8 first connecting bolt 8-1 after, thereby first flanged joint 4 is fixed on the right-hand member of service sleeve 3.
The first conduit 4-2 is the body of an annulus cylindricality, and its internal diameter is slightly larger than the external diameter of thermal insulation layer 2.The first conduit 4-2 is fixed on the first flange plate 4-1, and is positioned at the right side of the first flange plate 4-1, has the certain thickness annular space of one deck between conduit 4-2 and the thermal insulation layer 2 thereby make to win.
Second flanged joint 6 comprises the second flange plate 6-1 and the second conduit 6-2.The second flange plate 6-1 is a slip-on-welding plate flange, and its internal diameter is slightly larger than the external diameter of heat distribution pipeline 1, is provided with 8 tapped holes on the second flange plate 6-1 vertically, and all tapped holes are centrosymmetric along the circumferential equal angles setting of disk body.
The second conduit 6-2 is the body of an annulus cylindricality, and its internal diameter is identical with the external diameter of thermal insulation layer 2, and external diameter is identical with the internal diameter of the first conduit 4-2.The second conduit 6-2 is fixed on the second flange plate 6-1, and is positioned at the left side of the second flange plate 6-1.
The second flange plate 6-1 of second flanged joint 6 is positioned at the left part of the circular groove of thermal insulation layer 2.The second conduit 6-2 closely is coated on the outside of thermal insulation layer 2, and the left part of the second conduit 6-2 just in time inserts in the gap between the first conduit 4-2 and the thermal insulation layer 2, and the second conduit 6-2 and the first conduit 4-2 are slidingly connected in the axial direction.
Hubbed flange 7 comprises neck 7-1 and is connected the flange plate 7-2 of neck 7-1 left end.The airtight outside left end that is weldingly fixed on neck 7-1 of flange plate 7-2; The internal diameter of the neck 7-1 all external diameter with heat distribution pipeline 1 is identical.The external diameter of flange plate 7-2 is identical with the external diameter of the second flange plate 6-1, be provided with the identical attachment hole of quantity with the tapped hole of the second flange plate 6-1 on the flange plate 7-2 vertically, and the position of the tapped hole on the position of each attachment hole and the second flange plate 6-1 is corresponding.
The neck 7-1 of hubbed flange 7 centers on periphery setting, airtight being weldingly fixed on the heat distribution pipeline 1 of heat distribution pipeline 1, and is positioned at the right part of the circular groove of thermal insulation layer 2.
Screw in the tapped hole of the second flange plate 6-1 after passing attachment hole on the flange plate 7-2 respectively from right to left by 8 second connecting bolt 8-2, thereby second flanged joint 6 is fixed on the left end of hubbed flange 7.
Bellows 5 is enclosed within outside the first conduit 4-1 and the second conduit 4-2, the left end of bellows 5 is fixedly installed on the first flange plate 4-1 from the airtight welding in right side, the right-hand member of bellows 5 is fixedly installed on the second flange plate 6-1 from the airtight welding in left side, makes bellows 5 elasticity be connected between the first flange plate 4-1 and the second flange plate 6-1.
Heat distribution pipeline 1 is used to transmit 200-800 ℃ media such as steam, the steam of high temperature can constantly collide the inwall of heat distribution pipeline 1 in the process of transmission, vibration can cause the thermal distortion and the displacement of heat distribution pipeline 1, and because principle of expanding with heat and contracting with cold, the phenomenon of thermal expansion also can take place in heat distribution pipeline 1, cause heat distribution pipeline 1 to take place axially and distortion radially, equally, after stopping transmission medium, because the temperature of heat distribution pipeline 1 descends thereupon, again the shrinkage phenomenon can take place, cause heat distribution pipeline 1 also to take place axially and recovery radially.When heat distribution pipeline 1 diametrically deformation took place, the thermal insulation layer 2 with excellent toughness had played elastic telescopic, has absorbed oscillating action, and the sealing of the seal structural part of present embodiment is not had any harmful effect.When axial deformation takes place in heat distribution pipeline 1, heat distribution pipeline 1 drives hubbed flange 7, axial displacement takes place second flanged joint 6, the second conduit 6-2 to the first fixing conduit 4-2 near or away from slip, yet indentation or expansion thereupon of bellows 5 simultaneously do not have any harmful effect to the sealing of the seal structural part of present embodiment yet.

Claims (3)

1. the seal structural part through walls with Telescopic comprises heat distribution pipeline (1) and bellows (5), it is characterized in that: also comprise thermal insulation layer (2), service sleeve (3), first flanged joint (4), second flanged joint (6) and hubbed flange (7);
Service sleeve (3) is the sleeve pipe on the pipeline via hole that is fixedly installed on body of wall (9), comprises the body (3-2) of annulus cylindricality, and the axial length of body (3-2) is greater than the thickness of body of wall (9);
Thermal insulation layer (2) is a tubular thermal insulation layer, and its internal diameter is identical with the external diameter of heat distribution pipeline (1), and external diameter is identical with the internal diameter of body (3-2); Thermal insulation layer (2) closely is coated on the outside of heat distribution pipeline (1), and it is provided with a circular groove around its periphery setting on right-hand part of body of wall (9);
The heat distribution pipeline (1) that is coated with thermal insulation layer (2) passes from service sleeve (3), thereby passes body of wall (9);
First flanged joint (4) comprises first flange plate (4-1), and first flanged joint (4) is by the airtight right-hand member that is fixed on service sleeve (3) of first flange plate (4-1); Hubbed flange (7) is fixed on the heat distribution pipeline (1) by its neck is airtight, and is positioned at the right part of the circular groove of thermal insulation layer (2); Second flanged joint (6) comprises second flange plate (6-1), and second flanged joint (6) is by the airtight left end that is fixed on hubbed flange (7) of second flange plate (6-1), and second flange plate (6-1) is positioned at the left part of the circular groove of thermal insulation layer (2); Bellows (5) is enclosed within outside the thermal insulation layer (2), and the left end of bellows (5) is fixedly installed on first flange plate (4-1) from the airtight welding in right side, the right-hand member of bellows (5) is fixedly installed on second flange plate (6-1) from the airtight welding in left side, makes bellows (5) elasticity be connected between first flange plate (4-1) and second flange plate (6-1).
2. a kind of seal structural part through walls with Telescopic according to claim 1 is characterized in that: described service sleeve (3) also comprises left end flange plate (3-1) that is weldingly fixed on body (3-2) outside left end and the right-hand member flange plate (3-3) that is weldingly fixed on body (3-2) outside right-hand member; The major part of body (3-2) is sealed in body of wall (9) by concrete, and the left surface of body of wall (9) is close on the right side of left end flange plate (3-1); Right-hand member flange plate (3-3) is provided with an axial 4-8 attachment hole, and all attachment holes are centrosymmetric along the circumferential equal angles setting of disk body.
3. a kind of seal structural part through walls with Telescopic according to claim 1 and 2 is characterized in that: also comprise 4-8 first connecting bolt (8-1) and 4-8 second connecting bolt (8-2);
First flanged joint (4) also comprises first conduit (4-2); First flange plate (4-1) is a slip-on-welding plate flange, its ring footpath is identical with the ring footpath of the right-hand member flange plate (3-3) of service sleeve (3), be provided with the identical tapped hole of attachment hole quantity with right-hand member flange plate (3-3) on first flange plate (4-1) vertically, and the position of the attachment hole on the position of each tapped hole and the right-hand member flange plate (3-3) is corresponding; First conduit (4-2) is the body of an annulus cylindricality, and its internal diameter is slightly larger than the external diameter of thermal insulation layer (2); First conduit (4-2) is fixed on first flange plate (4-1), and is positioned at the right side of first flange plate (4-1);
Each first connecting bolt (8-1) screws in the tapped hole of first flange plate (4-1) after passing attachment hole on the right-hand member flange plate (3-3) of service sleeve (3) respectively from left to right;
Second flanged joint (6) also comprises second conduit (6-2); Second flange plate (6-1) is a slip-on-welding plate flange, and its internal diameter is slightly larger than the external diameter of heat distribution pipeline (1), is provided with 4-8 tapped hole on second flange plate (6-1) vertically, and all tapped holes are centrosymmetric along the circumferential equal angles setting of disk body; Second conduit (6-2) is the body of an annulus cylindricality, and its internal diameter is identical with the external diameter of thermal insulation layer (2), and external diameter is identical with the internal diameter of first conduit (4-2); Second conduit (6-2) is fixed on second flange plate (6-1), and is positioned at the left side of second flange plate (6-1);
Second conduit (6-2) closely is coated on the outside of thermal insulation layer (2), and the left part of second conduit (6-2) just in time inserts in the gap between first conduit (4-2) and the thermal insulation layer (2), second conduit (6-2) is slidingly connected in the axial direction with first conduit (4-2), and bellows (5) is enclosed within outside second conduit (6-2) and first conduit (4-2);
Hubbed flange (7) comprises neck (7-1) and is connected the flange plate (7-2) of neck (7-1) left end; The airtight outside left end that is weldingly fixed on neck (7-1) of flange plate (7-2); The internal diameter of neck (7-1) is identical with the external diameter of heat distribution pipeline (1); The neck (7-1) of hubbed flange (7) is around periphery setting, airtight being weldingly fixed on the heat distribution pipeline (1) of heat distribution pipeline (1); The external diameter of flange plate (7-2) is identical with the external diameter of second flange plate (6-1), be provided with the identical attachment hole of quantity with the tapped hole of second flange plate (6-1) on the flange plate (7-2) vertically, and the position of the tapped hole on the position of each attachment hole and second flange plate (6-1) is corresponding;
Each second connecting bolt (8-2) screws in the tapped hole of second flange plate (6-1) after passing attachment hole on the flange plate (7-2) respectively from right to left.
CN2009203062080U 2009-07-15 2009-07-15 Wall-penetrating sealing structural part with telescopic function Expired - Fee Related CN201475503U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203062080U CN201475503U (en) 2009-07-15 2009-07-15 Wall-penetrating sealing structural part with telescopic function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203062080U CN201475503U (en) 2009-07-15 2009-07-15 Wall-penetrating sealing structural part with telescopic function

Publications (1)

Publication Number Publication Date
CN201475503U true CN201475503U (en) 2010-05-19

Family

ID=42411753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203062080U Expired - Fee Related CN201475503U (en) 2009-07-15 2009-07-15 Wall-penetrating sealing structural part with telescopic function

Country Status (1)

Country Link
CN (1) CN201475503U (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102980170A (en) * 2012-12-19 2013-03-20 中国船舶重工集团公司第七�三研究所 Wall-through sealing structure of supercharged boiler
CN104405979A (en) * 2014-11-07 2015-03-11 马钢(集团)控股有限公司 Wear-resistant high-temperature-resistant connection buffering device for dry quenching conveying pipeline
CN104455755A (en) * 2014-12-03 2015-03-25 浙江省火电建设公司 Waterproof sealing device of underground thrust wall feed-through sleeve
CN106195275A (en) * 2016-08-31 2016-12-07 南京慧淳环保科技有限公司 A kind of Z-type sealing ring
CN106286997A (en) * 2016-10-10 2017-01-04 无锡华光锅炉股份有限公司 A kind of vertical exhaust-heat boiler wall pipe sealing device
CN107651979A (en) * 2017-10-25 2018-02-02 张家港市华孚实业有限公司 Expanded perlite manufacture expansion furnace
CN108204480A (en) * 2016-12-20 2018-06-26 核工业西南物理研究院 A mechanical penetration assembly for piping systems
CN108591999A (en) * 2018-05-08 2018-09-28 阜阳安固锅炉压力容器制造有限公司 a kind of boiler header structure arrangement
CN109253319A (en) * 2017-07-13 2019-01-22 中国石油天然气集团公司 It is a kind of for the Pipeline Crossing Program device of fire wall and application
CN109323073A (en) * 2018-12-07 2019-02-12 徐州华阳饲料有限公司 A kind of pipeline flexible threeway and installation method
CN110425623A (en) * 2019-07-16 2019-11-08 上海一建安装工程有限公司 A kind of installation method of indoor heating hot water pipeline
CN110966464A (en) * 2019-10-31 2020-04-07 吉林省热力工程设计研究有限责任公司 Special composite sleeve device for heating power
CN111336323A (en) * 2020-03-11 2020-06-26 龙净科杰环保技术(上海)有限公司 Vertical exhaust-heat boiler denitration technology pipeline through-wall sealing device
CN111577996A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine pressure sleeve type double-bridge vibration isolation through cabin connecting pipe
CN111577998A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine floating raft one-level vibration isolation through cabin connecting pipe
CN111577999A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine external pressure second grade vibration isolation leads to cabin and takes over
CN111577997A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine inner sleeve type single-stage vibration isolation through cabin connecting pipe
WO2020180228A1 (en) * 2019-03-01 2020-09-10 Roxtec Ab Transit for a pipe
CN111928229A (en) * 2020-08-11 2020-11-13 哈尔滨哈锅锅炉容器工程有限责任公司 Sealing structure of boiler header through-wall expander
CN112728225A (en) * 2021-01-12 2021-04-30 中国海洋石油集团有限公司 Pump line column watertight fittings
CN113280192A (en) * 2021-06-25 2021-08-20 西安热工研究院有限公司 Structure and method for preventing water from permeating into heat supply inspection well chamber
CN113309905A (en) * 2021-06-22 2021-08-27 中国核动力研究设计院 Heat preservation penetration device for hot chamber
CN113357467A (en) * 2021-06-15 2021-09-07 沈阳明科控制腐蚀技术有限公司 Pouring sealing waterproof structure of pipeline expansion joint and construction method

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102980170A (en) * 2012-12-19 2013-03-20 中国船舶重工集团公司第七�三研究所 Wall-through sealing structure of supercharged boiler
CN104405979A (en) * 2014-11-07 2015-03-11 马钢(集团)控股有限公司 Wear-resistant high-temperature-resistant connection buffering device for dry quenching conveying pipeline
CN104405979B (en) * 2014-11-07 2016-08-31 马钢(集团)控股有限公司 Dry coke quenching conveyance conduit Wear-resistant, high-temperature resistant connects buffer unit
CN104455755A (en) * 2014-12-03 2015-03-25 浙江省火电建设公司 Waterproof sealing device of underground thrust wall feed-through sleeve
CN106195275A (en) * 2016-08-31 2016-12-07 南京慧淳环保科技有限公司 A kind of Z-type sealing ring
CN106286997A (en) * 2016-10-10 2017-01-04 无锡华光锅炉股份有限公司 A kind of vertical exhaust-heat boiler wall pipe sealing device
CN108204480B (en) * 2016-12-20 2024-02-09 核工业西南物理研究院 A mechanical penetration assembly for duct systems
CN108204480A (en) * 2016-12-20 2018-06-26 核工业西南物理研究院 A mechanical penetration assembly for piping systems
CN109253319A (en) * 2017-07-13 2019-01-22 中国石油天然气集团公司 It is a kind of for the Pipeline Crossing Program device of fire wall and application
CN107651979A (en) * 2017-10-25 2018-02-02 张家港市华孚实业有限公司 Expanded perlite manufacture expansion furnace
CN108591999A (en) * 2018-05-08 2018-09-28 阜阳安固锅炉压力容器制造有限公司 a kind of boiler header structure arrangement
CN109323073A (en) * 2018-12-07 2019-02-12 徐州华阳饲料有限公司 A kind of pipeline flexible threeway and installation method
WO2020180228A1 (en) * 2019-03-01 2020-09-10 Roxtec Ab Transit for a pipe
CN110425623B (en) * 2019-07-16 2021-06-15 上海一建安装工程有限公司 Installation method of hot water pipeline for indoor heating
CN110425623A (en) * 2019-07-16 2019-11-08 上海一建安装工程有限公司 A kind of installation method of indoor heating hot water pipeline
CN110966464A (en) * 2019-10-31 2020-04-07 吉林省热力工程设计研究有限责任公司 Special composite sleeve device for heating power
CN111336323A (en) * 2020-03-11 2020-06-26 龙净科杰环保技术(上海)有限公司 Vertical exhaust-heat boiler denitration technology pipeline through-wall sealing device
CN111577998A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine floating raft one-level vibration isolation through cabin connecting pipe
CN111577999A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine external pressure second grade vibration isolation leads to cabin and takes over
CN111577997A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine inner sleeve type single-stage vibration isolation through cabin connecting pipe
CN111577996A (en) * 2020-06-12 2020-08-25 武汉麦康德设备有限公司 Marine pressure sleeve type double-bridge vibration isolation through cabin connecting pipe
CN111928229A (en) * 2020-08-11 2020-11-13 哈尔滨哈锅锅炉容器工程有限责任公司 Sealing structure of boiler header through-wall expander
CN112728225A (en) * 2021-01-12 2021-04-30 中国海洋石油集团有限公司 Pump line column watertight fittings
CN113357467A (en) * 2021-06-15 2021-09-07 沈阳明科控制腐蚀技术有限公司 Pouring sealing waterproof structure of pipeline expansion joint and construction method
CN113357467B (en) * 2021-06-15 2022-10-04 沈阳明科控制腐蚀技术有限公司 Pouring sealing waterproof structure of pipeline expansion joint and construction method
CN113309905A (en) * 2021-06-22 2021-08-27 中国核动力研究设计院 Heat preservation penetration device for hot chamber
CN113309905B (en) * 2021-06-22 2022-03-01 中国核动力研究设计院 Heat preservation penetration device for hot chamber
CN113280192A (en) * 2021-06-25 2021-08-20 西安热工研究院有限公司 Structure and method for preventing water from permeating into heat supply inspection well chamber

Similar Documents

Publication Publication Date Title
CN201475503U (en) Wall-penetrating sealing structural part with telescopic function
CN205227273U (en) A sealing device for exhaust -heat boiler through -wall pipe
CN205784735U (en) A kind of environment-friendly high-efficiency tubular heat exchanger
CN106247065B (en) Low temperature pipeline temperature stress compensation structure in vacuum chamber
CN201934843U (en) Vacuum compensator for low-temperature conveying pipeline
CN205061967U (en) Coke oven tedge heat transfer device
CN203585689U (en) Expansion joint
CN105135138A (en) Expansion joint
CN202733245U (en) Novel high temperature resistance electric-insulation flange device
CN211398966U (en) Pipeline compensator with damper
CN201723919U (en) a vacuum tube
CN203836241U (en) Full sealed butterfly-shaped isolation door with high temperature resistance
CN205534628U (en) Combustion engine exhaust -heat boiler wall pipe high temperature expansion festival
CN206583337U (en) A kind of big footpath take-over type plate cooler for vessel
CN204253873U (en) A kind of vapour compression machine mechanical seal
CN203348759U (en) Medium conveying pipe with heat tracing function
CN204164592U (en) The corrosion-resistant steam jacket thermal insulation pipe of Molten sulphur conveying
CN104315292A (en) Novel rotary compensator
CN108204480B (en) A mechanical penetration assembly for duct systems
CN204986184U (en) Expansion joint
CN202955410U (en) Steam direct buried pipe compensator leakage remedy device
CN205956633U (en) High temperature resistant rectangle expansion joint
CN202852275U (en) Expansion joint
CN221824798U (en) A heating pipe compensator
CN104214453A (en) Dual-channel rotary joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20140715

EXPY Termination of patent right or utility model