CN201459953U - A double-layer steel plate thermal insulation combined shear wall - Google Patents
A double-layer steel plate thermal insulation combined shear wall Download PDFInfo
- Publication number
- CN201459953U CN201459953U CN200920073457XU CN200920073457U CN201459953U CN 201459953 U CN201459953 U CN 201459953U CN 200920073457X U CN200920073457X U CN 200920073457XU CN 200920073457 U CN200920073457 U CN 200920073457U CN 201459953 U CN201459953 U CN 201459953U
- Authority
- CN
- China
- Prior art keywords
- layer
- thermal insulation
- steel plate
- double
- shear wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 67
- 239000010959 steel Substances 0.000 title claims abstract description 67
- 238000009413 insulation Methods 0.000 title claims abstract description 49
- 239000004567 concrete Substances 0.000 claims abstract description 28
- 239000003351 stiffener Substances 0.000 claims abstract description 16
- 239000002131 composite material Substances 0.000 claims abstract description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 238000004321 preservation Methods 0.000 abstract description 3
- 230000002787 reinforcement Effects 0.000 abstract description 3
- 239000012774 insulation material Substances 0.000 abstract description 2
- 239000004793 Polystyrene Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 229920002223 polystyrene Polymers 0.000 description 4
- 238000005336 cracking Methods 0.000 description 2
- 239000011494 foam glass Substances 0.000 description 2
- 239000011490 mineral wool Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/90—Passive houses; Double facade technology
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本实用新型涉及一种双层钢板保温组合剪力墙,属于建筑领域,它包括钢板、竖向加劲肋、保温层、内侧混凝土层、外侧混凝土层、抗剪栓钉、定位件、水平分布钢筋和竖向分布钢筋。钢板之间通过竖向加劲肋连成整体,竖向加劲肋上焊接定位件,保温层固定在定位件之间,保温层和钢板之间浇注内侧混凝土层,钢板的外侧焊接抗剪栓钉,绑扎水平分布钢筋和竖向分布钢筋,浇筑外侧混凝土层。本实用新型用于对抗震设防和承重墙保温有较高要求的高层和超高层结构中。本实用新型构造简单,施工方便,对保温材料要求低,解决了高层和超高层结构剪力墙的保温问题,相比传统的外墙外保温和外墙内保温体系优点突出。
The utility model relates to a double-layer steel plate thermal insulation composite shear wall, which belongs to the construction field, and comprises steel plates, vertical stiffening ribs, thermal insulation layers, inner concrete layers, outer concrete layers, shear studs, positioning pieces, and horizontally distributed steel bars and vertical distribution of reinforcement. The steel plates are connected as a whole by vertical stiffeners, the positioning parts are welded on the vertical stiffeners, the insulation layer is fixed between the positioning parts, the inner concrete layer is poured between the insulation layer and the steel plates, and the outer side of the steel plates is welded with shear studs. Bind the horizontally distributed steel bars and vertically distributed steel bars, and pour the outer concrete layer. The utility model is used in high-rise and super-high-rise structures that have higher requirements for anti-seismic fortification and load-bearing wall heat preservation. The utility model has the advantages of simple structure, convenient construction, low requirements on thermal insulation materials, solves the thermal insulation problem of high-rise and super high-rise structure shear walls, and has outstanding advantages compared with traditional external wall thermal insulation and external wall internal thermal insulation systems.
Description
技术领域technical field
本实用新型属于建筑领域,涉及高层和超高层结构剪力墙的保温技术。The utility model belongs to the field of construction and relates to the thermal insulation technology of high-rise and super high-rise structure shear walls.
背景技术Background technique
由于目前广泛使用的外墙外保温技术具有使用寿命短、施工麻烦和易于开裂等缺点,所以外墙夹芯保温技术具有保温层和结构同寿命,对保温层要求低,不易开裂等优点。但如何解决高层和超高层剪力墙的夹芯保温技术是一个难点,目前使用较多的是在钢筋混凝土剪力墙中间内嵌保温层,这种做法用于层数较低的结构中尚可,用于高层或超高层结构可能抗震性能不能满足要求。Since the widely used external wall insulation technology has the disadvantages of short service life, troublesome construction and easy cracking, the external wall sandwich insulation technology has the advantages of the same life span as the insulation layer and the structure, low requirements for the insulation layer, and not easy to crack. But how to solve the sandwich insulation technology of high-rise and super high-rise shear walls is a difficult point. At present, it is more used to embed the insulation layer in the middle of the reinforced concrete shear wall. Yes, if used in high-rise or super high-rise structures, the seismic performance may not meet the requirements.
组合钢板剪力墙是一种新的结构体系,它具有如下优点:减轻了结构的墙厚,即增大了结构的使用面积;减轻了结构自重,同时减小了基础荷载和地震作用;结构的延性好,可以经受很大的变形;抗震性能好,经受住了实际地震的考验并且表现良好。The combined steel plate shear wall is a new structural system, which has the following advantages: the wall thickness of the structure is reduced, that is, the usable area of the structure is increased; the self-weight of the structure is reduced, and the foundation load and earthquake action are reduced at the same time; It has good ductility and can withstand large deformations; it has good seismic performance and has withstood the test of actual earthquakes and performed well.
发明内容Contents of the invention
为了较好的解决高层和超高层结构剪力墙的保温问题,本实用新型提供一种双层钢板保温组合剪力墙,该双层钢板保温组合剪力墙不仅保温性能好,对保温材料要求低,而且抗震性能好,能够满足高层或超高层结构的抗震设防要求。In order to better solve the thermal insulation problem of high-rise and super high-rise structure shear walls, the utility model provides a double-layer steel plate thermal insulation combined shear wall. The double-layer steel thermal insulation composite shear wall not only has good thermal insulation performance, but also requires Low and good seismic performance, it can meet the seismic fortification requirements of high-rise or super high-rise structures.
本实用新型解决其技术问题所采用的技术方案是:一种双层钢板保温组合剪力墙,它包括钢板、竖向加劲肋、保温层、内侧混凝土层、外侧混凝土层、抗剪栓钉、定位件、水平分布钢筋和竖向分布钢筋,钢板之间通过竖向加劲肋连成整体,竖向加劲肋上焊接定位件,保温层固定在定位件之间,保温层和钢板之间浇注内侧混凝土层,钢板的外侧焊接抗剪栓钉,绑扎水平分布钢筋和竖向分布钢筋,浇筑外侧混凝土层。The technical solution adopted by the utility model to solve the technical problem is: a double-layer steel plate thermal insulation composite shear wall, which includes steel plates, vertical stiffeners, thermal insulation layers, inner concrete layers, outer concrete layers, shear studs, Positioning parts, horizontally distributed steel bars and vertically distributed steel bars, the steel plates are connected as a whole by vertical stiffeners, the vertical stiffeners are welded with positioning parts, the insulation layer is fixed between the positioning parts, and the inner side is poured between the insulation layer and the steel plates For the concrete layer, the outer side of the steel plate is welded with shear studs, the horizontally distributed steel bars and the vertically distributed steel bars are bound, and the outer concrete layer is poured.
所述的钢板的厚度为5~50mm。The thickness of the steel plate is 5-50mm.
所述的竖向加劲肋是一块长方形钢板,其高度与该双层钢板保温组合剪力墙相同。The vertical stiffener is a rectangular steel plate whose height is the same as that of the double-layer steel plate insulation combined shear wall.
所述的定位件是一块与该双层钢板保温组合剪力墙高度相同的长方形钢板,其宽度为50mm~300mm。The positioning part is a rectangular steel plate with the same height as the double-layer steel plate thermal insulation composite shear wall, and its width is 50mm-300mm.
所述的保温层可以是自熄型聚苯乙烯板,挤塑聚苯板,泡沫玻璃和半硬质矿棉板。The insulation layer can be self-extinguishing polystyrene board, extruded polystyrene board, foam glass and semi-rigid mineral wool board.
由于采用了以上技术方案,本实用新型具有以下有益效果:Due to the adoption of the above technical solutions, the utility model has the following beneficial effects:
1.双层钢板组合剪力墙抗震性能好,增大结构使用面积,减轻结构自重,技术人员在应用时容易理解和掌握,便于操作。1. The double-layer steel plate composite shear wall has good seismic performance, increases the use area of the structure, reduces the self-weight of the structure, and is easy for technicians to understand and master when applying it, and is easy to operate.
2.钢板两边均有现浇混凝土层,可以很好的约束钢板,防止钢板屈曲,而且钢板外侧不用设防火层,实现了钢板与混凝土的优势组合。2. There are cast-in-place concrete layers on both sides of the steel plate, which can well restrain the steel plate and prevent the steel plate from buckling, and there is no need to set a fireproof layer on the outside of the steel plate, realizing the advantageous combination of steel plate and concrete.
3.钢板之间内嵌保温层,能够保护保温层,对保温材料要求低,避免了保温层的开裂,免维护。3. The insulation layer is embedded between the steel plates, which can protect the insulation layer, has low requirements for insulation materials, avoids cracking of the insulation layer, and is maintenance-free.
4.工厂预制化程度高,施工方便、传力可靠,实现了高层和超高层剪力墙的抗震与保温一体化设计.4. The factory has a high degree of prefabrication, convenient construction and reliable force transmission, realizing the integrated design of earthquake resistance and thermal insulation of high-rise and super high-rise shear walls.
附图说明Description of drawings
附图为本实用新型实施例的结构示意图。Accompanying drawing is the structural representation of the utility model embodiment.
附图标记:1-钢板;2-竖向加劲肋;3-保温层;4-内侧混凝土层;5-外侧混凝土层;6-抗剪栓钉;7-定位件;8-水平分布钢筋;9-竖向分布钢筋Reference signs: 1-steel plate; 2-vertical stiffener; 3-insulation layer; 4-inner concrete layer; 5-outer concrete layer; 6-shear studs; 9- Vertical distribution of reinforcement
具体实施方式Detailed ways
以下结合附图所示实施例对本实用新型作进一步的说明:The utility model will be further described below in conjunction with the embodiment shown in the accompanying drawings:
如附图所示,本实用新型包括钢板1,竖向加劲肋2,保温层3,内侧混凝土层4,外侧混凝土层5,抗剪栓钉6,定位件7,水平分布钢筋8和竖向分布钢筋9。As shown in the drawings, the utility model includes a
所述的钢板1之间通过竖向加劲肋2连成整体,竖向加劲肋2上焊接定位件7,保温层3固定在定位件7之间,保温层3和钢板1之间浇注内侧混凝土层4,钢板1的外侧焊接抗剪栓钉6,绑扎水平分布钢筋8和竖向分布钢筋9,浇筑外侧混凝土层5。The
所述的钢板1的厚度为5mm~50mm。The thickness of the
所述的竖向加劲肋2是一块长方形钢板,其高度与该双层钢板保温组合剪力墙相同,其厚度为5mm~30mm,其主要作用是把钢板1连成整体。The
所述的定位件7是一块与该双层钢板保温组合剪力墙高度相同的长方形钢板,其宽度为50mm~300mm,目的是把保温层3固定在定位件7之间,便于保温层3和钢板1之间浇筑内侧混凝土层4。The
所述的保温层3可以是自熄型聚苯乙烯板,挤塑聚苯板,泡沫玻璃和半硬质矿棉板。The
所述的内侧混凝土层4和外侧混凝土层5均为现浇混凝土层。Both the
所述的抗剪栓钉6为建筑上普遍使用的圆柱形栓钉,其一头与钢板1焊接在一起,另外一头与外侧混凝土层5现浇在一起。The
所述的水平分布钢筋8和竖向分布钢筋9绑扎成钢筋网,最后与外侧混凝土层5现浇在一起。The horizontally distributed
施工时,钢板1、竖向加劲肋2、保温层3、抗剪栓钉6和定位件7都可以在工厂预制装配好,装配好的体积大小以便于运输和施工为原则,然后运到现场吊装安装,绑扎水平分布钢筋8和竖向分布钢筋9,支模板,最后浇筑内侧混凝土层4和外侧混凝土层5。During construction,
本实用新型主要用来解决高层或超高层结构剪力墙的保温问题,实现了剪力墙优良的抗震能力和保温能力的一体化设计。The utility model is mainly used to solve the heat preservation problem of the high-rise or super high-rise structure shear wall, and realizes the integrated design of the shear wall's excellent anti-seismic ability and heat preservation ability.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920073457XU CN201459953U (en) | 2009-06-05 | 2009-06-05 | A double-layer steel plate thermal insulation combined shear wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920073457XU CN201459953U (en) | 2009-06-05 | 2009-06-05 | A double-layer steel plate thermal insulation combined shear wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201459953U true CN201459953U (en) | 2010-05-12 |
Family
ID=42387306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920073457XU Expired - Fee Related CN201459953U (en) | 2009-06-05 | 2009-06-05 | A double-layer steel plate thermal insulation combined shear wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201459953U (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296728A (en) * | 2011-06-20 | 2011-12-28 | 南通建筑工程总承包有限公司 | Double-steel plate structure shear wall and construction method thereof |
CN102808462A (en) * | 2012-09-04 | 2012-12-05 | 吴方伯 | Cast-in-place heat preserving shear wall, column and beam |
CN102877559A (en) * | 2012-06-15 | 2013-01-16 | 吴方伯 | Cast-in-situ heat preservation and heat isolation beam, column or shear wall and construction method thereof |
CN105484354A (en) * | 2015-12-15 | 2016-04-13 | 宝钢建筑系统集成有限公司 | Assembled steel structure building system and construction method thereof |
CN106592821A (en) * | 2016-12-30 | 2017-04-26 | 上海建工四建集团有限公司 | Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric |
CN106639046A (en) * | 2016-12-30 | 2017-05-10 | 上海建工四建集团有限公司 | Entirely prefabricated monolayer steel plate-concrete composite shear wall and assembly method thereof |
CN106894544A (en) * | 2016-12-30 | 2017-06-27 | 上海建工四建集团有限公司 | Embedded individual layer steel plate concrete combined shear wall and its construction method |
CN106968365A (en) * | 2017-05-12 | 2017-07-21 | 哈尔滨工业大学深圳研究生院 | A kind of anti-buckling steel plate shear force wall of assembled for taking into account load and power consumption |
CN107989238A (en) * | 2017-12-13 | 2018-05-04 | 刘家宇 | A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method |
CN109610685A (en) * | 2018-12-07 | 2019-04-12 | 青岛理工大学 | Double-steel-plate combined shear wall with externally-wrapped pressure-bearing non-tensioned concrete and embedded damping interlayer |
CN109736588A (en) * | 2018-12-28 | 2019-05-10 | 上海二十冶建设有限公司 | Continuous casting host area double steel plate shear wall construction method under restricted clearance |
CN109944349A (en) * | 2019-04-04 | 2019-06-28 | 河南绿建建筑科技有限公司 | Sandwich heat preservation steel concrete compound tube structure and its processing method |
CN109944357A (en) * | 2019-04-04 | 2019-06-28 | 河南绿建建筑科技有限公司 | Sandwich heat preservation steel concrete compound shear wall fabricated construction system |
CN110748042A (en) * | 2019-10-24 | 2020-02-04 | 中国十七冶集团有限公司 | Sound insulation type steel plate concrete shear wall for high-rise building |
-
2009
- 2009-06-05 CN CN200920073457XU patent/CN201459953U/en not_active Expired - Fee Related
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296728A (en) * | 2011-06-20 | 2011-12-28 | 南通建筑工程总承包有限公司 | Double-steel plate structure shear wall and construction method thereof |
CN102877559A (en) * | 2012-06-15 | 2013-01-16 | 吴方伯 | Cast-in-situ heat preservation and heat isolation beam, column or shear wall and construction method thereof |
CN102808462A (en) * | 2012-09-04 | 2012-12-05 | 吴方伯 | Cast-in-place heat preserving shear wall, column and beam |
CN102808462B (en) * | 2012-09-04 | 2016-01-20 | 吴方伯 | A kind of cast-in-situ heat preservation shear wall, post, beam |
CN105484354A (en) * | 2015-12-15 | 2016-04-13 | 宝钢建筑系统集成有限公司 | Assembled steel structure building system and construction method thereof |
CN106894544B (en) * | 2016-12-30 | 2023-03-31 | 上海建工四建集团有限公司 | Embedded single-layer steel plate-concrete combined shear wall and construction method thereof |
CN106592821A (en) * | 2016-12-30 | 2017-04-26 | 上海建工四建集团有限公司 | Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric |
CN106639046A (en) * | 2016-12-30 | 2017-05-10 | 上海建工四建集团有限公司 | Entirely prefabricated monolayer steel plate-concrete composite shear wall and assembly method thereof |
CN106894544A (en) * | 2016-12-30 | 2017-06-27 | 上海建工四建集团有限公司 | Embedded individual layer steel plate concrete combined shear wall and its construction method |
CN106968365A (en) * | 2017-05-12 | 2017-07-21 | 哈尔滨工业大学深圳研究生院 | A kind of anti-buckling steel plate shear force wall of assembled for taking into account load and power consumption |
CN106968365B (en) * | 2017-05-12 | 2019-06-21 | 哈尔滨工业大学深圳研究生院 | A prefabricated anti-buckling steel plate shear wall with both load bearing and energy consumption |
CN107989238A (en) * | 2017-12-13 | 2018-05-04 | 刘家宇 | A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method |
CN109610685A (en) * | 2018-12-07 | 2019-04-12 | 青岛理工大学 | Double-steel-plate combined shear wall with externally-wrapped pressure-bearing non-tensioned concrete and embedded damping interlayer |
CN109736588A (en) * | 2018-12-28 | 2019-05-10 | 上海二十冶建设有限公司 | Continuous casting host area double steel plate shear wall construction method under restricted clearance |
CN109944349A (en) * | 2019-04-04 | 2019-06-28 | 河南绿建建筑科技有限公司 | Sandwich heat preservation steel concrete compound tube structure and its processing method |
CN109944357A (en) * | 2019-04-04 | 2019-06-28 | 河南绿建建筑科技有限公司 | Sandwich heat preservation steel concrete compound shear wall fabricated construction system |
CN109944349B (en) * | 2019-04-04 | 2024-05-03 | 河南绿建建筑科技有限公司 | Sandwich heat-insulating steel concrete combined pipe structure and processing and manufacturing method thereof |
CN109944357B (en) * | 2019-04-04 | 2024-09-27 | 河南绿建建筑科技有限公司 | Assembled structural system of sandwich heat-insulating steel concrete combined shear wall |
CN110748042A (en) * | 2019-10-24 | 2020-02-04 | 中国十七冶集团有限公司 | Sound insulation type steel plate concrete shear wall for high-rise building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201459953U (en) | A double-layer steel plate thermal insulation combined shear wall | |
CN102168455B (en) | U-shaped closed tendon connection structure of horizontal joints in assembled shear wall structures | |
CN201459954U (en) | A double-layer steel plate thermal insulation shear wall | |
CN202012136U (en) | U-shaped closed rib connection structure for horizontal seam of assembling shear wall structure | |
CN102852244B (en) | Detachable self-resetting type energy-dissipation coupling beam | |
CN109252727B (en) | Shock insulation layer rubber support, column, beam and plate system integrated assembly node and method | |
CN105569224A (en) | Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof | |
CN205954921U (en) | Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area | |
CN206957041U (en) | Piecemeal assembling type outer wall plate and its connecting structure | |
CN205653923U (en) | Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom | |
CN202627254U (en) | Shear wall consisting of vertical mild steel energy consumption belts with horizontal seams arranged among concrete-filled steel tubes | |
CN105064529A (en) | Prefabricated and assembled large-board shear wall structure with concealed bracings | |
CN105089204A (en) | Cold-formed thin-walled ribbed U-shaped steel-encased concrete laminated slab composite beam | |
CN108643396B (en) | Assembled built-in heat insulation layer foamed concrete composite wall-light steel frame connecting node | |
CN201915534U (en) | Load-bearing composite slab for steel structural residence | |
CN105569222A (en) | Vertical connection technology for precast assembled large panel shear walls with concealed supports | |
CN208009751U (en) | Light-duty multilayer steel-concrete-steel clamp core combined shear wall column component | |
CN106639050A (en) | Connecting structure between reinforced concrete shear walls and steel coupling beam | |
CN102704596A (en) | Combined shear wall with concrete wrapped steel plate dense beam embedded between profile steel overlapped columns and externally wrapping concrete and manufacturing method | |
CN108589969A (en) | A kind of combination assembled shear wall and preparation method thereof of the vertical ECC energy consumptions band of band | |
CN102704597A (en) | Encased concrete composite shear wall embedded with dense steel plate beams between concrete-filled steel tube columns and construction method thereof | |
CN212670968U (en) | Composite floor and building | |
CN107795029A (en) | Honeycomb separate type anti-seismic heat-preservation wall | |
CN207582741U (en) | A kind of position limiting structure of improved precast concrete lining | |
CN105971176B (en) | Thin-wall steel tube rib hollow concrete superimposed sheet, floor, building and manufacture method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100512 Termination date: 20100605 |