[go: up one dir, main page]

CN201326219Y - Modular building structure - Google Patents

Modular building structure Download PDF

Info

Publication number
CN201326219Y
CN201326219Y CNU2008202018531U CN200820201853U CN201326219Y CN 201326219 Y CN201326219 Y CN 201326219Y CN U2008202018531 U CNU2008202018531 U CN U2008202018531U CN 200820201853 U CN200820201853 U CN 200820201853U CN 201326219 Y CN201326219 Y CN 201326219Y
Authority
CN
China
Prior art keywords
wall
building structure
column
floor
modular building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202018531U
Other languages
Chinese (zh)
Inventor
黄昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008202018531U priority Critical patent/CN201326219Y/en
Application granted granted Critical
Publication of CN201326219Y publication Critical patent/CN201326219Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a modular building structure, which comprises a plurality of reinforcing steel bar frames which are arranged at intervals and are respectively and fixedly connected with a foundation; and a plurality of modularly produced columns, a plurality of modularly produced walls and a modularly produced floor; the column body is provided with a vertical through hole capable of containing the steel bar frame, the column body is also provided with a connecting position, the column body is sleeved on the steel bar frame, and the column body, the wall body and the steel bar frame can be combined into a whole by pouring concrete into the vertical through hole; the utility model aims at overcoming the shortcomings in the prior art and providing a building structure with simple structure and convenient installation.

Description

A kind of modular house architectural structure
Technical field
The utility model relates to a kind of building structure of adopting modular structure, belongs to technical field of buildings.
Background technology
General building structure all is to build by the method for cast-in-place concrete, such construction method length consuming time, and can produce a large amount of building debriss, be unfavorable for environmental protection; At present, have the modular architectural of employing structure to build the house, still, a lot of such methods but exist various drawbacks.These drawbacks embody a concentrated expression of: the process that the elaborate frame system that is used for the installed module panelling is assembled is very complicated; The securing member number that the bar structure panelling is connected and fixed is various, and it is very inconvenient to use; And the certain module structure exists bad structural strength.A kind of modular construction method that in No. the 2389724th, the patent document of french application, proposes as applicant BatimPro SA, this patent document has proposed a kind of modular architectural structure, what it used is to have the panelling that adjoins vertical side mutually, and it is complementary that shape is.Panelling links together by screw, and reinforces with metal sheet at the tie point place.The lamination type plastic foamboard production technology that relevant modular architectural application is used.Such structure is relatively complicated, and generally also needs corresponding module is fitted up after the module assembling, and the time of building like this is corresponding also can extend, and can produce building debris, also can't just can move under situation about assembling.
The utility model content
The purpose of this utility model is in order to overcome weak point of the prior art, to provide a kind of simple in structure, installing building structure easily;
In order to achieve the above object, the utility model adopts following scheme:
A kind of modular house architectural structure, it comprises the reinforced frame that a plurality of intervals are provided with and are connected with basic fixed respectively; And a plurality of cylinders, a plurality of by the body of wall of modularization production and the floor of producing by modularization by modularization production;
Described cylinder be provided with can ccontaining reinforced frame vertical through holes, on cylinder, also be provided with and connect the position, described cylinder is sleeved on the reinforced frame and can makes cylinder, body of wall and reinforced frame be combined into integral body by fluid concrete in vertical through holes;
Described body of wall is fixedly connected between the adjacent cylinder, and the two ends of body of wall are provided with the reservation connecting reinforcement, and described reservation connecting reinforcement is fixedlyed connected with reinforced frame by the connection position on the cylinder;
Described floor is fixedly installed on the body of wall.
Aforesaid a kind of modular house architectural structure, wherein said cylinder are a hollow cylinder.
Aforesaid a kind of modular house architectural structure, wherein said cylinder can be made up of the multi-disc member, and can form described hollow cylinder behind the multi-disc unit construction.
Aforesaid a kind of modular house architectural structure, wherein on described floor, be provided with interface, in described interface, be provided with connecting reinforcement, described connecting reinforcement can be fixedlyed connected with the reservation connecting reinforcement that is arranged on the body of wall top, and makes floor and wall body structure for whole by fluid concrete in vertical interface.
Aforesaid a kind of modular house architectural structure wherein is provided with the stopper slot of locating when being used to assemble body of wall on described cylinder, be respectively equipped with locating hole on described cylinder and the corresponding position of body of wall, is provided with the sheet that is located by connecting on described locating hole.
Aforesaid a kind of modular house architectural structure wherein is provided with decorative layer on described body of wall.
Aforesaid a kind of modular house architectural structure wherein is provided with decorative layer on described floor.
Aforesaid a kind of modular house architectural structure wherein is provided with decorative layer on described cylinder.
Aforesaid a kind of modular house architectural structure wherein is provided with on described floor and is used for interconnective reserved steel bar between the floor.
In sum, the beneficial effects of the utility model:
1, the utility model building structure adopts modular assembly to build, all members of building structure (except that following basis at the bottom of the ground, house) all can be made by factory, and the cylinder that goes out by factory's die production, body of wall, floor plate etc., size is standard extremely, metope, floor are smooth smooth, post angle, linea angulata slyness are straight, good visual effect;
2, in the utility model because all bodies of wall, slab surfaces are smooth, need not the secondary arrangement of plastering and can directly paste ceramics or japanning, reduced operation, can not occur delamination yet, fall quality security problem such as ash;
3, all interior and exterior finishes of building structure all can be finished in factory, do not influence existing finishing in the installation process.Can move in after installing the house, also reduce the generation of building debris;
4, all hydroelectric line, line boxes are imbedded in the body of wall aborning in advance in the utility model building structure, and position, size are accurate, insert to get final product when assembly unit.Frame for door and window is also cast in the lump when producing body of wall and is finished, and the normal problem that occurs of conventional house such as can not seep water;
5, can adopt hollow or filled and process design in all bodies of wall, the non-main part of the force of floor in the utility model, can improve body of wall, floor heat-insulating sound-insulating effect like this and reduce weight;
6, the building structure of adopting the utility model method to build has agility: such as 180 square metres of 2 layers of villas, can build up in 2~3 days in this way, connect water power, then can move in 5 days.The building that Building 18 floor heights are 4000 square metres can build up in 15 days;
7, the utility model building structure has changeability: owing to module is made in factory, and plurality of specifications and structure are arranged.Meeting under the safe prerequisite, assembly unit arbitrarily, strengthen, add to, add layer, displacement etc.;
8, the utility model building structure has disassembled property: need only the link that destroys between body of wall, floor, the cylinder, just can dismantle and shift.
Description of drawings
Fig. 1 a is one of schematic diagram of cylinder in the utility model; Fig. 1 b be cylinder in the utility model schematic diagram two; Fig. 1 c be cylinder in the utility model schematic diagram three;
Fig. 2 is the schematic diagram of body of wall in the utility model; Fig. 3 is the schematic diagram of body of wall in the utility model; Fig. 4 is the schematic diagram of floor in the utility model;
Fig. 5 is the schematic diagram of reinforced frame on the basis in the utility model;
Fig. 6 is arranged on schematic diagram on the reinforced frame for cylinder in the utility model;
Fig. 7 is arranged on schematic diagram between the cylinder for body of wall in the utility model;
Fig. 8 is the enlarged drawing at A place among Fig. 7;
Fig. 9 is arranged on schematic diagram between the cylinder for body of wall in the utility model;
Figure 10 is the schematic diagram after body of wall is arranged between the cylinder in the utility model;
Figure 11 is the enlarged drawing at B place among Figure 10; Figure 12 is arranged on schematic diagram on the body of wall for floor in the utility model; Figure 13 is the schematic diagram of floor in the utility model after being arranged on the body of wall; Figure 14 is the enlarged drawing at C place among Figure 13; Figure 15 a is one of schematic diagram of the another kind of embodiment of cylinder in the utility model; Figure 15 b is one of schematic diagram of the another kind of embodiment of cylinder in the utility model.
The specific embodiment
Below in conjunction with the description of drawings and the specific embodiment the utility model is described further:
A kind of modular house architectural structure shown in Fig. 1 a to 14, it comprises the reinforced frame 1 that a plurality of intervals are provided with and are connected with basic fixed respectively; And a plurality of cylinders 4, a plurality of by the body of wall 2 of modularization production and the floor of producing by modularization 3 by modularization production;
Described cylinder 4 be provided with can ccontaining reinforced frame 1 vertical through holes 41, on cylinder 4, also be provided with and connect position 5, described cylinder 4 is sleeved on the reinforced frame 1 and can makes cylinder 4, body of wall 2 and reinforced frame 1 be combined into integral body by fluid concrete in vertical through holes 41;
Described body of wall 2 is fixedly connected between the adjacent cylinder 4, and the two ends of body of wall 2 are provided with reserves connecting reinforcement 6, and described reservation connecting reinforcement 6 is fixedlyed connected with reinforced frame 1 by the connection position 5 on the cylinder 4;
Described floor 3 is fixedly installed on the body of wall 2.
Cylinder 4 described in the utility model is a hollow cylinder, and it is produced by modularization.On described cylinder 4, be provided with the stopper slot 9 of location when being used to assemble body of wall 2, on described cylinder 4 and body of wall 2 corresponding positions, be respectively equipped with locating hole 10, on described locating hole 10, be provided with the sheet 11 that is located by connecting.
On described floor 3, be provided with interface 7 in the utility model, in described interface 7, be provided with connecting reinforcement 8, described connecting reinforcement 8 can be fixedlyed connected with the reservation connecting reinforcement 6 that is arranged on body of wall 2 tops, and makes floor 3 and body of wall 2 structures for whole by fluid concrete in vertical interface 7.If the space that modular house architectural structure occupies in the utility model is bigger, that must adopt polylith floor 3 to bind, and is provided with to be used for interconnective reserved steel bar 12 between the floor on described floor 3.Polylith floor 3 forms a long interface on the place that is provided with reserved steel bar 12 and body of wall 2 tops, fluid concrete can make between polylith floor 3 and the body of wall 2 mutually that structure is integral body in described long interface
The wherein body of wall 2 that adopts in the utility model modular house architectural structure, floor 3 and cylinder 4 its smooth surfaces, need not secondary plaster the arrangement can directly paste ceramics or japanning, on body of wall 2, floor 3 and cylinder 4 its external surfaces, form decorative layer like this, after assembling, need not to fit up once more, on body of wall 2, also offer corresponding door, window etc. among the present invention, saved manufacturing procedure and building time like this.
Figure 15 a and Figure 15 b are that another embodiment of cylinder 4 is that described cylinder 4 can be made up of the multi-disc member in the utility model, and can form described hollow cylinder behind the multi-disc unit construction.If when using this cylinder, can fix all bodies of wall 2 earlier, weld reserve connecting reinforcement 6 and reinforced frame 1 after, cylinder 4 again closes.
Build above-mentioned modular house architectural structure in the utility model and can adopt following method, may further comprise the steps:
A, reinforced frame is set
On the basis, a plurality of reinforced frames 1 are set according to the architectural design fixed interval;
B, location, installation cylinder
The described reinforced frame 1 of cylinder 4 suits that is provided with vertical through holes 41;
C, inlay body of wall
Smear sealant in the places of handing-over mutually at body of wall 2 and cylinder 4, be embedded in body of wall 2 between the cylinder 4 and adjust fixing; At this moment being arranged on reservation connecting reinforcement 6 on the body of wall 2 inserts in the connection position that is opened on the cylinder 4 and with the reinforced frame 1 in the cylinder 4 and fixedlys connected;
D, installation floor
Smear sealant in the place of handing-over mutually at floor 3 and body of wall 2, cylinder 4, floor 3 is installed on the body of wall 2, this moment, the reservation connecting reinforcement 6 on body of wall 2 tops was inserted in the interface 7 that is opened on the floor 3, and fixedlyed connected with the connecting reinforcement 8 during interface 7 is set;
E, fluid concrete
Fluid concrete respectively on the vertical through holes 41 of above-mentioned cylinder 4 and the interface 7 on the floor 3 makes between body of wall 2, floor 3, the cylinder 4 mutually structure for whole.
The utility model building structure adopts modular assembly to build, all members of building structure (except that following basis at the bottom of the ground, house) all can be made by factory, and the cylinder that goes out by factory's die production, body of wall, floor plate etc., size is standard extremely, metope, floor are smooth smooth, post angle, linea angulata slyness are straight, good visual effect; Because all bodies of wall, slab surfaces are smooth, need not the secondary arrangement of plastering and directly to paste ceramics or japanning in the utility model, reduced operation, delamination also can not occur, fall quality security problem such as ash; All interior and exterior finishes of building structure all can be finished in factory, do not influence existing finishing in the installation process.Can move in after installing the house, also reduce the generation of building debris; Hydroelectric line, line boxes all in the utility model building structure are imbedded in the body of wall aborning in advance, and position, size are accurate, insert to get final product when assembly unit.Frame for door and window is also cast in the lump when producing body of wall and is finished, and the normal problem that occurs of conventional house such as can not seep water; Can adopt hollow or filled and process design in all bodies of wall, the non-main part of the force of floor in the utility model, can improve body of wall, floor heat-insulating sound-insulating effect like this and reduce weight; The building structure of adopting the utility model method to build has agility: such as 180 square metres of 2 layers of villas, can build up in 2~3 days in this way, connect water power, then can move in 5 days.The building that Building 18 floor heights are 4000 square metres can build up in 15 days; The utility model building structure has changeability: owing to module is made in factory, and plurality of specifications and structure are arranged.Meeting under the safe prerequisite, assembly unit arbitrarily is between strengthening, adding, add layer, displacement etc.; The utility model building structure has disassembled property: need only the link that destroys between body of wall, floor, the cylinder, just can dismantle and shift.

Claims (9)

1、一种模块化房屋建筑结构,其特征在于:其包括多个间隔设置并分别与基础固定连接的钢筋架(1);及多个由模块化生产的柱体(4)、多个由模块化生产的墙体(2)和由模块化生产的楼板(3);1. A modular building structure, characterized in that: it includes a plurality of steel frames (1) that are arranged at intervals and are fixedly connected to the foundation respectively; and a plurality of columns (4) produced by modularization, and a plurality of Modularly produced walls (2) and modularly produced floors (3); 所述的柱体(4)设有可容置钢筋架(1)的竖向通孔(41),在柱体(4)上还设有连接位(5),所述的柱体(4)套装在钢筋架(1)上并能够通过向竖向通孔(41)内浇注混凝土使柱体(4)、墙体(2)及钢筋架(1)结合为整体;The column (4) is provided with a vertical through hole (41) capable of accommodating the reinforcement frame (1), and a connection position (5) is also provided on the column (4), and the column (4) ) is set on the reinforcement frame (1) and can combine the column (4), the wall (2) and the reinforcement frame (1) into a whole by pouring concrete into the vertical through hole (41); 所述的墙体(2)固定连接在相邻柱体(4)之间,墙体(2)的两端设有预留连接钢筋(6),所述的预留连接钢筋(6)通过柱体(4)上的连接位(5)与钢筋架(1)固定连接;The wall (2) is fixedly connected between adjacent columns (4), and the two ends of the wall (2) are provided with reserved connecting reinforcement bars (6), and the reserved connecting reinforcement bars (6) pass through The connection position (5) on the column (4) is fixedly connected with the reinforcement frame (1); 所述的楼板(3)固定设置在墙体(2)上。The floor (3) is fixedly arranged on the wall (2). 2、根据权利要求1所述的一种模块化房屋建筑结构,其特征是所述的柱体(4)为一中空柱体。2. A modular building structure according to claim 1, characterized in that the column (4) is a hollow column. 3、根据权利要求2所述的一种模块化房屋建筑结构,其特征是所述的柱体(4)可由多片构件组成,并在多片构件组合后能形成所述的中空柱体。3. A modular building structure according to claim 2, characterized in that the column (4) can be composed of multiple components, and the hollow column can be formed after the combination of multiple components. 4、根据权利要求1所述的一种模块化房屋建筑结构,其特征是在所述的楼板(3)上设有接口(7),在所述的接口(7)中设有连接钢筋(8),所述的连接钢筋(8)可与设置在墙体(2)顶端的预留连接钢筋(6)固定连接,并通过向竖向接口(7)内浇注混凝土使楼板(3)和墙体(2)结构为整体。4. A modular building structure according to claim 1, characterized in that an interface (7) is provided on the floor (3), and connecting steel bars ( 8), the connecting reinforcement (8) can be fixedly connected with the reserved connecting reinforcement (6) arranged on the top of the wall (2), and the floor (3) and The body of wall (2) is structured as a whole. 5、根据权利要求1所述的一种模块化房屋建筑结构,其特征是在所述的柱体(4)上设有用于装配墙体(2)时定位的限位槽(9),在所述的柱体(4)和墙体(2)相应的位置上分别设有定位孔(10),在所述的定位孔(10)上设有定位连接片(11)。5. A modular building structure according to claim 1, characterized in that the column (4) is provided with a limit groove (9) for positioning when assembling the wall (2), Positioning holes (10) are respectively provided at the corresponding positions of the column body (4) and the wall body (2), and positioning connecting pieces (11) are provided on the positioning holes (10). 6、根据权利要求1所述的一种模块化房屋建筑结构,其特征是在所述的墙体(2)上设有装饰层。6. A modular building structure according to claim 1, characterized in that a decorative layer is provided on the wall (2). 7、根据权利要求1所述的一种模块化房屋建筑结构,其特征是在所述的楼板(3)上设有装饰层。7. A modular building structure according to claim 1, characterized in that a decorative layer is provided on the floor (3). 8、根据权利要求1所述的一种模块化房屋建筑结构,其特征是在所述的柱体(4)上设有装饰层。8. A modular building structure according to claim 1, characterized in that a decorative layer is provided on the column (4). 9、根据权利要求2所述的一种模块化房屋建筑结构,其特征是在所述的楼板(3)上设有用于楼板之间相互连接的预留钢筋(12)。9. A modular building structure according to claim 2, characterized in that said floor slabs (3) are provided with reserved steel bars (12) for interconnection between the floor slabs.
CNU2008202018531U 2008-10-11 2008-10-11 Modular building structure Expired - Lifetime CN201326219Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202018531U CN201326219Y (en) 2008-10-11 2008-10-11 Modular building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202018531U CN201326219Y (en) 2008-10-11 2008-10-11 Modular building structure

Publications (1)

Publication Number Publication Date
CN201326219Y true CN201326219Y (en) 2009-10-14

Family

ID=41178193

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202018531U Expired - Lifetime CN201326219Y (en) 2008-10-11 2008-10-11 Modular building structure

Country Status (1)

Country Link
CN (1) CN201326219Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN103343573A (en) * 2013-07-09 2013-10-09 普帝龙绿色建筑研发(重庆)有限公司 Modular building with high bearing performance and capable of being produced in industrialized mode and being dismantled and installed rapidly
CN109214767A (en) * 2017-07-07 2019-01-15 中联天盛防水科技股份有限公司 A kind of roof waterproof renovation project Quality Process supervising platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN103343573A (en) * 2013-07-09 2013-10-09 普帝龙绿色建筑研发(重庆)有限公司 Modular building with high bearing performance and capable of being produced in industrialized mode and being dismantled and installed rapidly
CN103343573B (en) * 2013-07-09 2015-08-19 普帝龙绿色建筑研发(重庆)有限公司 Can factorial praluction the quick disassembled dress of high-bearing modular building
CN109214767A (en) * 2017-07-07 2019-01-15 中联天盛防水科技股份有限公司 A kind of roof waterproof renovation project Quality Process supervising platform
CN109214767B (en) * 2017-07-07 2021-07-06 中联天盛防水科技股份有限公司 Roofing waterproof repair engineering quality process supervision platform

Similar Documents

Publication Publication Date Title
CN101725259B (en) A modular building structure and its construction method
CN107299699B (en) Assembled cavity shear wall horizontal joint Alveolus type dry type connection structure
CN101845852B (en) Light steel and light concrete structural system and construction method thereof
CN206070835U (en) A kind of assembled architecture bottom composite floor
CN103993679B (en) Low layer assembling combined wall house bolt connection node structure
CN102561513A (en) Unit cabin type building system
EP3892786A1 (en) Linear module for buildings for the making of structural frames of prefabricated buildings with thermal insulation, kit for buildings and prefabricated building thereof
CN201695515U (en) Light-steel light-concrete structural system
CN101565968A (en) Direct assembly concrete-filled steel tube combined special-shaped column and production method thereof
CN105863155A (en) Heat insulation and energy storage type RPC prefabricated wall panel system
CN2918571Y (en) Enveloped cold-forming steel full-combined building
CN116241011B (en) A concrete frame wall panel based on polyurethane casting abdominal cavity and its manufacturing method
CN2921139Y (en) Combined fasting large slab floor
CN201326219Y (en) Modular building structure
CN201598728U (en) Wood-structured building component
CN203008410U (en) Modularized overall moving house
CN203213344U (en) Assembled integral type reinforced concrete shear wall structure with high industrialization rate
CN214531068U (en) Assembled steel structure house
CN203320695U (en) Integrated house
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN109296074A (en) A prefabricated concrete column-beam connection node
CN2370077Y (en) Pouring connection assembled house prefabricated plate
CN111851791A (en) Assembled steel frame-steel sheet shear force wall structure
CN101914949B (en) Assembled housing and manufacturing method thereof
CN205329970U (en) Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20091014

Effective date of abandoning: 20081011

AV01 Patent right actively abandoned

Granted publication date: 20091014

Effective date of abandoning: 20081011