[go: up one dir, main page]

CN201298734Y - Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency - Google Patents

Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency Download PDF

Info

Publication number
CN201298734Y
CN201298734Y CNU2008201676153U CN200820167615U CN201298734Y CN 201298734 Y CN201298734 Y CN 201298734Y CN U2008201676153 U CNU2008201676153 U CN U2008201676153U CN 200820167615 U CN200820167615 U CN 200820167615U CN 201298734 Y CN201298734 Y CN 201298734Y
Authority
CN
China
Prior art keywords
voltage
fuel gas
electrical wiring
transformers
variable frequency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201676153U
Other languages
Chinese (zh)
Inventor
张农
陈净
沈洪流
张乐群
徐为民
孙文波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Electric Power Design Institute
Original Assignee
Zhejiang Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Design Institute filed Critical Zhejiang Electric Power Design Institute
Priority to CNU2008201676153U priority Critical patent/CN201298734Y/en
Application granted granted Critical
Publication of CN201298734Y publication Critical patent/CN201298734Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency. The main electrical wiring comprises two fuel gas generators and a steam turbine generator, the fuel gas generators and the steam turbine generator in the main electrical wiring are connected into a high-voltage electrical distribution device through the main transformers respectively, low-voltage sides of the two transformers of the fuel gas generators are in branch connection with on load voltage adjusting high-voltage unit transformers respectively, the on load voltage adjusting high-voltage unit transformers are connected with two segments of medium-voltage bus bars through medium-voltage bus bar incoming circuit breakers respectively, and the two segments of medium-voltage bus bars are connected through a communication circuit breaker; generator outlet circuit breakers are arranged at the outlets of the two fuel gas generators; the main electrical wiring reduces the number of the high-voltage starting/standby transformers, the corresponding space of the high-voltage electrical distribution device is left out, the investment is reduced, the occupied land of the device is reduced, and the switching operation of auxiliary power of the operators to switch a starting/standby state to a normal operating state can be reduced.

Description

Variable frequency starting two drags the main electrical scheme of a gas-steam combined Cycle Unit
Technical field
The utility model relates to a kind of electrical main connecting wire of power plant combustion machine unit, in particular, relate to a kind of power plant variable frequency starting two and drag the electrical main connecting wire of a gas-steam combined Cycle Unit.
Background technology
The development of China's electric utility is at present advanced by leaps and bounds, " under the Strategic Context of West-east Gas; natural gas line has been built many fuel gas generation units along the line successively; drag a gas-steam combined Cycle Unit for interim variable frequency starting two, the problem of the electrical main connecting wire saving investment how to optimize just is placed in front of us in country.
What routine adopted is that the whole series two drag a gas-steam combined Cycle Unit that a high voltage startup/spare transformer is set, every combustion gas unit established a main transformer, the change of No-load changer high pressure factory is propped up by the main transformer low-pressure side and is connect, give one section station-service working bus bar power supply respectively, on-load voltage regulation high voltage startup spare transformer is connected to working bus bar for starting or standby when standby.Because variable frequency starting combustion machine unit has adopted the variable frequency starting mode, so be provided with generator outlet circuit breaker (being called for short GCB) at the generator outlet place, therefore according to routine special high-pressure startup/spare transformer being set will increase investment.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of above-mentioned existence, and provide a kind of making full use of to be installed in the generator outlet circuit breaker, special-purpose startup spare transformer is not set, thereby the variable frequency starting two that has reduced space hold and investment drags the electrical main connecting wire of a gas-steam combined Cycle Unit.
The utility model is achieved by the following technical solution: it comprises two gas electricity generators, a steam turbine generator, two gas electricity generators and steam turbine generator insert high voltage distribution installation by main transformer separately respectively in the described electrical main connecting wire, the low-pressure side of two main transformers of two gas electricity generators is all propped up and is connect an on-load voltage regulation high pressure factory change, this on-load voltage regulation high pressure factory is flexible to press the bus lead-in circuit breaker to be connected to respectively in two sections in crossing to press bus, presses bus to link to each other by network interconnecting circuit in two sections.
After the outlet of described two gas electricity generators is provided with the generator outlet circuit breaker, startup/spare transformer is not set, two high pressure factories become standby each other, and the steam turbine generator is not provided with high pressure factory separately and becomes.
The utility model adopts variable frequency starting two to drag a gas-steam combined Cycle Unit electrical main connecting wire, cancelled special high-pressure startup/spare transformer, two on-load voltage regulation high pressure factories are set to be become, suitably increase the capacity that high pressure factory becomes, make two high pressure factories become standby each other, thereby effectively compressed investment, dwindled the electric equipment floor space, also reduced station service handover operation of operations staff simultaneously.
Compared with prior art, the beneficial effects of the utility model are: at first, reduced high voltage startup/spare transformer, saved corresponding high voltage distribution installation at interval, thereby reduced investment, secondly reduced the equipment occupation of land, can reduce startup/stand-by state and switch to operations staff's station service handover operation under the normal operating conditions.
Description of drawings
Fig. 1 is the utility model structural representation.
Embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.
The utility model includes that two gas electricity generators 1 and steam turbine generator 2, three main transformers 3, two on-load voltage regulation high pressure factories become 4, middle pressure bus lead-in circuit breaker 5, middle pressure bus-tie circuit breaker 6, middle pressure auxiliary bus bar 7, generator outlet circuit breaker 8 etc.Two gas electricity generators 1 and steam turbine generator 2 insert high voltage distribution installations by main transformer 3 separately respectively in the described electrical main connecting wire, the low-pressure side of two main transformers 3 of two gas electricity generators 1 is all propped up and is connect an on-load voltage regulation high pressure factory change 4, this on-load voltage regulation high pressure factory becomes 4 and is connected to respectively to press in two sections in 7, two sections of the buses by middle pressure bus lead-in circuit breaker 5 and presses bus to link to each other by network interconnecting circuit 6.
As a kind of improvement, two combustion machine units are respectively established an on-load voltage regulation high-pressure work factory and are become 4, and as the working power of high pressure auxiliary bus bar, the steam turbine generator is not provided with high-pressure work factory separately and becomes, and load is installed in respectively in two sections gas electricity generators and presses under the active section.This electrical main connecting wire is when a high pressure factory change or main transformer fault or maintenance, the lead-in circuit breaker 5 of this section bus disconnects, press bus-tie circuit breaker 6 in closing, power supply switches to non-faulty section bus 7, and non-faulty section high pressure factory becomes 4 and presses bus 7 power supplies in giving two sections simultaneously; When the combustion machine started, generator outlet circuit breaker 8 was in off-state, and this moment, station service was pressed auxiliary bus bar by main transformer, the change of high pressure factory in delivering to.
Described variable frequency starting two drags the electrical main connecting wire of a gas-steam combined Cycle Unit, after the outlet that it is characterized in that described two gas electricity generators 1 is provided with generator outlet circuit breaker 8, startup/spare transformer is not set, two high pressure factory changes 4 are standby each other, and steam turbine generator 2 is not provided with high pressure factory separately and becomes.
At last, it should be noted that above what enumerate only is specific embodiment of the utility model.Obviously, the utility model is not limited to above embodiment, and a lot of distortion can also be arranged.All distortion that those of ordinary skill in the art can directly derive or associate from the disclosed content of the utility model all should be thought protection range of the present utility model.

Claims (2)

1, a kind of variable frequency starting two drags the electrical main connecting wire of a gas-steam combined Cycle Unit, it comprises two gas electricity generators (1), a steam turbine generator (2), it is characterized in that in the described electrical main connecting wire that two gas electricity generators (1) and a steam turbine generator (2) insert high voltage distribution installation by main transformer (3) separately respectively, the low-pressure side of two main transformers (3) of two gas electricity generators (1) is all propped up and is connect an on-load voltage regulation high pressure factory change (4), this on-load voltage regulation high pressure factory becomes (4) and is connected to respectively by middle pressure bus lead-in circuit breaker (5) and presses bus (7) in two sections, presses bus continuous by network interconnecting circuit (6) in two sections.
2, variable frequency starting two according to claim 1 drags the electrical main connecting wire of a gas-steam combined Cycle Unit, after the outlet that it is characterized in that described two gas electricity generators (1) is provided with generator outlet circuit breaker (8), startup/spare transformer is not set, two high pressure factory changes (4) are standby each other, and steam turbine generator (2) is not provided with high pressure factory separately and becomes.
CNU2008201676153U 2008-11-17 2008-11-17 Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency Expired - Fee Related CN201298734Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201676153U CN201298734Y (en) 2008-11-17 2008-11-17 Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201676153U CN201298734Y (en) 2008-11-17 2008-11-17 Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency

Publications (1)

Publication Number Publication Date
CN201298734Y true CN201298734Y (en) 2009-08-26

Family

ID=41044720

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201676153U Expired - Fee Related CN201298734Y (en) 2008-11-17 2008-11-17 Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency

Country Status (1)

Country Link
CN (1) CN201298734Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102611192A (en) * 2012-04-19 2012-07-25 中水北方勘测设计研究有限责任公司 Power supply guiding and connecting device for middle-sized peak shaving hydropower station
CN110401227A (en) * 2019-03-19 2019-11-01 中电投电力工程有限公司 Debugging method for simultaneous phasing test of gas-steam combined cycle unit
CN112311016A (en) * 2020-11-19 2021-02-02 西安热工研究院有限公司 Black start system and method for single-bus subsection gas turbine power station with bypass bus connection
CN112332225A (en) * 2020-11-12 2021-02-05 上海惠生海洋工程有限公司 230kV and 115kV double-voltage output system of mobile floating combined cycle power generation ship

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102611192A (en) * 2012-04-19 2012-07-25 中水北方勘测设计研究有限责任公司 Power supply guiding and connecting device for middle-sized peak shaving hydropower station
CN110401227A (en) * 2019-03-19 2019-11-01 中电投电力工程有限公司 Debugging method for simultaneous phasing test of gas-steam combined cycle unit
CN112332225A (en) * 2020-11-12 2021-02-05 上海惠生海洋工程有限公司 230kV and 115kV double-voltage output system of mobile floating combined cycle power generation ship
CN112311016A (en) * 2020-11-19 2021-02-02 西安热工研究院有限公司 Black start system and method for single-bus subsection gas turbine power station with bypass bus connection

Similar Documents

Publication Publication Date Title
CN210404841U (en) Novel power supply system for hydropower station in black start
CN205231835U (en) Structure for large -scale thermal power factory unit high pressure service power each other is being equipped with
CN203352172U (en) Auxiliary power wiring structure for large thermal power plant
CN201298734Y (en) Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency
CN201332275Y (en) Variable voltage reactor of 500kV and uhv transmission lines
CN204577857U (en) A kind of 110kV transformer station adopting novel wire connecting way
CN212486196U (en) Power supply system is synthesized to inside of large-scale coal-electricity integration power station
CN202940470U (en) Double-bus wiring system
CN210927126U (en) Little grid system of alternating current-direct current for wisdom energy station
CN111342549A (en) Power supply system is synthesized to inside of large-scale coal-electricity integration power station
CN101488667A (en) Power supply method for large sponge titanium smelting total transforming plant
CN207459723U (en) Spare phase transformer quickly puts into arrangement
CN203481822U (en) Closed loop power supply model of medium voltage 10 kilovolt power distribution network
CN201830134U (en) Frequency converter with bypass
CN210957911U (en) High-voltage station service system
CN210957782U (en) 35kV transformer substation sectional bus system based on mixed superconducting current limiter
CN211321019U (en) Service power interconnection system among multiple thermal power generating units
CN213959761U (en) Reactive power compensation device
CN111181171B (en) Reactive compensation device
CN210443803U (en) 220kV HGIS power distribution device applied to single bus sectional wiring of transformer substation
CN210123906U (en) Electric main wiring structure of distributed energy power station
CN201868854U (en) GIS (gas insulated switchgear) structure changing 500KV main power supply into 66KV side power supply
CN219145022U (en) Power system topology structure for enterprise plant
CN201682259U (en) Intelligent integrated circuit with leakage protection and reactive compensation
CN206727653U (en) A kind of large-sized unit electric main power connection in power plant circuit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090826

Termination date: 20161117

CF01 Termination of patent right due to non-payment of annual fee